5_-_IFB_Exhibit_A-1.docx
DOCX document 20 KB Posted
- Attached to
- Annual ACM-Mold-Lead Paint Abatements
- Solicitation number
- PR269201A
- Issued by
- Tulare County, California
About this file
This is an Invitation for Bid (IFB) Exhibit A-1 pricing schedule for asbestos-containing material (ACM), mold, and lead paint removal and disposal services. The exhibit outlines unit pricing for multiple categories of hazardous material abatement work, including ceiling and wall material removal (200 square feet estimated), pipe and fitting insulation removal (150 linear feet estimated), floor material and mastic removal (100 square feet estimated), equipment insulation removal (750 square feet estimated), lead-based paint removal from metal surfaces (50 square feet estimated), lead-based paint removal from wood surfaces (50 square feet estimated), and mold-contaminated material removal (100 square feet estimated). The contractor must provide pricing for labor charges related to emergency calls on a per-man-hour basis and for general labor on non-miscellaneous abatement items. Additionally, emergency abatement calls with mobilization charges require pricing with a commitment to respond within 24 hours per call, and trip charges must be established for each removal call.
Bidders are required to submit unit pricing for each line item in the format of cost per unit of measure (square foot, linear foot, man hour, or per call), with extensions calculated by multiplying the estimated quantities by the submitted unit price. The document specifies that all estimated quantities represent prior year service levels and are provided solely to identify the lowest responsible bidder for contract award purposes. All line items must be completed with pricing; no exceptions are permitted. The contractor must provide the company or business name and calculate a total bid amount to be reflected on the primary Exhibit A document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4_-_IFB_Exhibit_A_-_Bid_Proposal_(Reg).docx | DOCX document | |
| 1_-_IFB_Invitation_For_Bid.doc | DOC document | |
| 2_-_IFB_Notice_To_Contractors.doc | DOC document | |
| 9_-_PDC_Map_with_Directions.docx | DOCX document | |
| 7_-_IFB_Exhibit_C_-_Special_Cond_(rev_2-21-25).doc | DOC document | |
| 8_-_IFB_Exhibit_D_-_Specifications.doc | DOC document | |
| 6_-_IFB_Exhibit_B_-_GTC_(2-2025).pdf | ||
| 3_-_IFB_Instructions_To_Bidders_(new_-_nb).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACM/Mold/Lead Paint Removal & Disposal Costs
EXHIBIT A1
Description
| Unit Price |
| Unit Measure |
Extension
Sq. Ft.
| Removal & Disposal of all ceiling/ wall materials (including the installation of pony walls &/or containment), etc. |
| X |
| $ |
| Per sq. ft. |
| = |
| $ |
Lin. Ft.
| Removal & Disposal of any sizes of pipe and fittings insulation (including the installation of pony walls &/or glove bag containment) &/or designated confined spaces, etc. |
| X |
| $ |
| Per Linear Ft. |
| = |
| $ |
Sq. Ft.
| Removal & disposal of any/or all floor materials, mastic, or non-mastic (including but not limited to, tile, sheet goods, carpet, etc. and the installation of pony walls, &/or containment), etc. |
| X |
| $ |
| Per sq. ft. |
| = |
| $ |
Sq. Ft.
| Removal & disposal of all thicknesses and sizes of insulation on equipment i.e., heat exchangers, vessels, tanks, etc. (including containment), etc. |
| X |
| $ |
| Per sq. ft. |
| = |
| $ |
| 50 Sq. Ft. |
| Removal of lead-based paint from metal surfaces |
| X |
| $ |
| Per sq. ft. |
| = |
| $ |
| 50 Sq. Ft. |
| Removal of lead-based paint from flat and/ or trim wood surfaces |
| X |
| $ |
| Per sq. ft. |
| = |
| $ |
| 100 Sq. Ft. |
| Removal of mold contaminated containing materials (sheetrock, plaster walls, ceiling tiles, etc.) |
| X |
| $ |
| Per sq. ft. |
| = |
| $ |
Hours
| Labor charges per man for emergency call. Per man hour (including the installation of pony walls, &/or glove bag, containment), etc. |
| X |
| $ |
| Per hour |
| = |
| $ |
Emergency Calls
| Emergency Abatement calls, including mobilization charges. (Contractor to respond within 24 hours per call) |
| X |
| $ |
| Per call |
| = |
| $ |
Hours
| Labor Charges per man to remove items other than miscellaneous items & material related to ACM abatement (Per Man Hour) |
| X |
| $ |
| Per hour |
| = |
| $ |
Trip Charge Trip Charge (minimum charge for each removal call)
| $ |
| Per trip |
| = |
| $ |
Quantities indicated represent an estimate only of services performed during prior years. This estimate is provided to identify the lowest responsible bidder for the purpose of awarding this contract.
NOTE: Emergency Calls – Labor charges per man for emergency call includes removal and disposal of any materials, example: ceiling tile, floor tile, tank, TSI, pipes, etc.
Total Bid: $_________________ This total bid amount must be reflected on Exhibit A.
All Above items must be completed, no exception.
Contractor’s Company/Business Name __________________________
File details come from the government source that posted it. Updated .