5-FY27 MRRC - Attachment C - Field Procedures v5.pdf
PDF 159 KB Posted
- Solicitation number
- GC10032
- Issued by
- Grand County, Utah
About this file
Summary
This is a Field Procedures attachment document for the Monument Replacement and Restoration Committee (MRRC) grant program administered by the State of Utah. The document provides comprehensive guidance for professional land surveyors conducting field surveys necessary for the maintenance, restoration, and relocation of Public Land Survey System (PLSS) corners within Utah. The project involves Grand County's restoration and perpetuation of fifteen (15) PLSS section corners located within the Castle Valley area. The procedures establish mandatory requirements for surveyors to accomplish specific end results for each corner, including locating the corner, establishing or maintaining an acceptable monument, creating reference documentation, gathering Utah Grid and Geodetic coordinates, and obtaining photographic documentation and field notes.
The field procedures require surveyors to follow established protocols from the Manual of Surveying Instructions (2009 edition) and utilize acceptable data-gathering equipment such as survey-grade GPS systems or total stations. Monument specifications require a minimum 2-inch diameter durable metal disk on pipe or rebar with specific installation requirements depending on terrain conditions. Surveyors must obtain coordinates in Utah Coordinate System (NAD 83), NAD 83 Geographic Coordinates, and NAVD 88 Elevation, derived from acceptable sources including the Utah Reference Network Control System or Opus Solution Reports. All work must be documented with field notes, reference monuments in multiple quadrants where possible, and photographs showing both monument markings and general corner vicinity. The procedures emphasize exhaustive research and evidence gathering before declaring any corner lost and requiring restoration through proportionate measurement methodology.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"ATTACHMENT C"
FIELD PROCEDURES
PURPOSE:
The purpose of this document is to give direction, guidance and an understanding of what is expected in performing field surveys necessary for the maintenance, restoration and re-location of
Corners of Cadastral surveys of the Public Land Survey System (PLSS) within the State of Utah.
END RESULT OF THE FIELD SURVEY:
Once the field survey is complete, the surveyor will have gathered, constructed, staked or completed a minimum of the following for each corner:
1. The corner will have been located.
2. The corner will have an acceptable monument.
3. The corner will be referenced.
4. Utah Grid and Geodetic coordinates will have been gathered for the corner.
5. A photo will have been taken of the corner monument (showing markings). A second photo will have been taken of the general corner vicinity.
6. Field notes will have been kept.
Information gathered during the field survey will later be transferred onto the Corner Monument
Record (Corner File) and the Record of Survey (ROS) which become the official documents for locating and perpetuating the corner.
1.1The corner will have been located:
1.1.1G.L.O. survey plats and field notes are a unique resource of important information about original corner monuments and their accessories. They contain such information as:
• The type of monument set, its dimensions, and markings.
• The type of corner (standard, witness, closing, meander, etc.).
• What accessories were established - a mound of stones and its dimensions, blazed bearing trees with their size, species and their course and distance from the corner.
• Relationship with other corners.
• Topography of the area.
The surveyor shall have copies of the G.L.O. plats and field notes while engaged in his survey.
1.1.2Research:
In addition to G.L.O. plats and notes, the surveyor should perform appropriate research into the corner's history. This research could include but not necessarily be limited to:
a. Records of survey as filed with the County Surveyor's office.
b. Corner Monument Records (Corner Tie Sheets). These are usually found in the County
Surveyor's office but may also be located in the County Recorder's office or with UGRC.
c. Right-of-way maps for highways, canals, railroads, etc.
d. Documents filed for record with the County Recorder's office.
e. Aerial photos.
f. NGS Data Sheets.
g. Records and testimony of Professional Land Surveyors and their employees who are familiar with the area.
h. Testimony of land owners or long-time residents of the area.
1.2The corner will have an acceptable monument.
1.2.1Existent Monument, not required to be replaced:
a. Unless directed otherwise by the County surveyor or this Committee (if there is not a current county surveyor), an original stone monument in its originally set location does not need to be replaced if it is firmly set, readily identifiable and reasonably durable.
b. County Surveyor, Private Licensed Surveyor, G.L.O. or B.L.M. brass or aluminum cap monuments on a pipe or minimum 5/8" rebar do not need to be replaced if they are firmly set, readily identifiable and reasonably durable.
1.2.2Existent Monument, required to be replaced:
The surveyor will be required to replace any monument not meeting criteria set forth in 1.2.1 a.
orb.
1.2.3Identification of Existent and Obliterated Corners:
a. Existent Corners are defined in 6-11 of the Manual of Surveying Instructions, 2009 edition (hereinafter referred to as Manual).
b. Obliterated corners are defined in 6-17 of the Manual.
c. The surveyor shall follow the process for determining the position of an Existent or
Obliterated Corner as given in Chapter Six of the Manual.
1.2.4Lost Corners:
The decision that a corner is lost should not be made until every means has been exercised that might aid in identifying its original position. The courts have admonished surveyors for being too quick to turn to proportionate measurement. They tell us, to find all evidence, every shred of evidence, before we say that the corner point is lost. Determining a corner to be lost and then applying proportionate methods of restoring it is the surveyor's last resort.
U.S. v Doyle 468 F 2nd 633 (1972)
"For corners to be lost, they must be so completely lost that they cannot be replaced by reference to any existing data or other sources of information, and before courses and distances can determine boundary. ALL MEANS/or ascertaining location of the lost monuments must first be exhausted. "
If a corner is declared lost, its position shall be determined by proportionate measurement as outlined in chapter seven of the Manual.
1.2.5Corner Monuments:
a. If a Corner Monument is set, it shall be a minimum 2” diameter durable metal disk on a pipe or rebar having a minimum diameter of 5/8” and a length of 24”
b. If the corner falls in a rock out-cropping, concrete or concrete post, a durable metal disk not less than 2" diameter, on a metallic stem not less than three inches long
{drilled into the base) and fixed with epoxy cement, is acceptable as the monument.
c. If the corner falls in a dirt or gravel road, the monument cap shall be buried 6" below the road surface.
d. If the corner falls in a paved road, the monument shall be placed in a prefabricated monument well. Alternately, the monument may be driven or drilled into the road base with its disk recessed ¼" to ½" below the pavement surface and any cavities created during the process, filled with epoxy, quikcrete, rockite, cement all, or other similar product.
e. In the event a corner monument cannot practically be set because of steep terrain, water, marsh, existing structures, busy roads, etc. a minimum of two reference monuments shall be set. These monuments shall be placed as outlined in 4-17 of the Manual.
f. Corner Monuments shall be marked {stamped) as shown in chapter four of the
Manual and shall bear the license number of the surveyor in responsible charge.
Reference monuments shall have the distance to the corner point stamped thereon.
1.3The corner will be referenced: (See example sketch 1.6.5)
a. Whenever possible, section corners and quarter-section corners {including reference monuments to these corners) shall be witnessed by at least four references of durable quality. If possible these references should also be in different quadrants.
b.Sixteenth section corners, monumented during original or subsequent cadastral surveys shall also be witnessed, as cited in item a. above.
c. All references shall be carefully described, and their bearings and distances from the corner noted in the field notes.
d. Acceptable reference monuments could be a nail in a utility pole or fence post, a scribe in a concrete structure or rock outcropping or a rebar driven into the ground. With exception of items such as concrete or rock scribes, a tag, washer or cap bearing the license number of the surveyor shall be affixed to the reference monument.
1.4 Utah Grid and Geodetic coordinates will have been gathered for the corner:
1.4.IThe surveyor shall obtain the following coordinates of the corner.
a. Utah Coordinate System - Northing and Easting (appropriate zone) 1983.
b. NAO 83 Geographic Coordinates (North Latitude and West Longitude).
c. NAVD 88 Elevation.
d. Reporting Units are to be U.S. Survey Foot or Meter.
1.4.2The Surveyor shall state the Coordinate Source:
a. Acceptable sources are the Utah Reference Network Control System (VRS) and Opus
Solution Reports.
b. Sample Surveyor's Statement: ••coordinates are NAO 83 (2011) (EPOCH 2010) derived from the Utah Reference Network Control System.
GEOID 12a, NAVD 88 Elevation = #,###.#."
1.4.3Acceptable Data Gathering Equipment:
a. Survey Grade G.P.S. List make and model (such as Trimble R6, TSC3 data collector).
b. Total Station. List make and model. (A total station instrument may be used to traverse to a corner where a G.P.S. observation is not practicable, such as beneath a tree or structure).
1.4.4Measuring to the Corner:
a. G.P.S. receiver or mirrors shall be placed on a tripod or a rod with biped supports and plumbed above the corner.
b. Three minute observations shall be observed.
c. Maintain a POOP of 6 or less.
d. Minimum horizon angle of 15°.
e. Should be observed with low RMS values.
1.5 A photo will have been taken of the corner monument (showing markings). A second photo will have been taken of the general corner vicinity.
| FIELD PROCEDURES |
| PURPOSE: |
| END RESULT OF THE FIELD SURVEY: |
| 1.1The corner will have been located: |
| 1.1.2Research: |
| 1.2The corner will have an acceptable monument. |
| 1.2.1Existent Monument, not required to be replaced: |
| 1.2.2Existent Monument, required to be replaced: |
| 1.2.3Identification of Existent and Obliterated Corners: |
| 1.2.4Lost Corners: |
| 1.2.5Corner Monuments: |
| 1.3The corner will be referenced: (See example sketch 1.6.5) |
| 1.4.IThe surveyor shall obtain the following coordinates of the corner. |
| 1.4.2The Surveyor shall state the Coordinate Source: |
| 1.4.3Acceptable Data Gathering Equipment: |
| 1.4.4Measuring to the Corner: |