This document contains the drawings and details for the FSR 6N06 Storm Damage Repair project on the Six Rivers National Forest, Lower Trinity District. The project involves repairing landslide damage at two sites along Road 6N06 through the installation of mechanically stabilized earth (MSE) retaining walls. Key details include:
The project requires the removal and replacement of existing culverts, asphalt repair, and construction of MSE walls up to 120 feet long. The road will need to be closed to public traffic during the wall excavation and reconstruction work. The contract specifications, including requirements for the MSE wall materials, drainage systems, and culvert installation, are provided across multiple detailed drawings. The estimated project cost is between $500,000 and $1,000,000 and is set aside for small businesses. A mandatory site visit is scheduled for August 27, 2024, and all requests for information must be submitted by September 3, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00001 - Schedule and RFIs Round 1.pdf | ||
| RFI Official Responses - 1.pdf | ||
| 2. Schedule of Items - REVISION 001.docx | DOCX document | |
| 6. Davis-Bacon Act WD # CA20240004.pdf | ||
| 7. RFI Form.docx | DOCX document | |
| 3. Supplemental Specifications.pdf | ||
| 4. Fire Plan.pdf | ||
| 1. Statement of Work.pdf | ||
| 2. Schedule.docx | DOCX document | |
| 127EAW24R0071 - Road 6N06 Slide Repair.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
O National Headquarters - Nalic:NIForetll
• Ruffrctl Sialion HoMIQulrtOfl
USDA
United States Department of Agriculture Forest Service
CALIFORNIA
HUMBOLDT COUNTY
R-5 PACIFIC SOUTHWEST REGION
SIX RIVERS NATIONAL FOREST
LOWER TRINITY DISTRICT
FSR 6N06 STORM DAMAGE REPAIR
"' F-ortst ~ Laboratory
■ 1n19fl'llllonlllnltrluteo1Tropc;a,IF01estly
D State and Priv.ie ForOlll'y NM He~ten (ln--~.,_ ........ .....,""'Rlg,o,9 eit ervlce
Will
Bush Mountain Lookout
SJ'~
• ~wCr ek,CA955,3 ~ lilll
PROJECT LOCATION MAP
TRAVEL DIRECTIONS:
FROM:LowerTrinity District Office 580 Highway 96, Willow Creek, CA 95573 TO: 6N06 site(!).
FROM WILLOW CREEK, TRAVEL EAST ON STATE HIGHWAY 299 E TOWARD ROUTE 6. FOR 4.7 MILES.
FOLLOW SIGNS FOR FRIDAY RIDGE ROAD AND TURN RIGHT ONTO ROUTE 6. LATITUDE AND
LONGITUDE: 40.886161, -123. 613453.
FOREST LOCATION MAP
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 TITLE
G-02 SITE LOCATIONS
D-01A SITE 1 SITE PLAN
D-01B SITE 2 SITE PLAN
D-02A SITE 1 WALL PLANS AND SECTION DETAILS
D-02B SITE 2 WALL PLANS AND SECTION DETAILS
D-03 MSE WALL DETAILS AND NOTES
D-04 WALL DRAIN DETAILS
D-05 CULVERT INSTALLATION DETAILS
RECOMMENDED BY:
FOREST ENGINEER DATE
DISTRICT RANGER DATE
FOREST SUPERVISOR DATE
RO FACILITIES PROGRAM MANAGER DATE
APPROVED:
DIRECTOR OF ENGINEERING DATE
SHEET 1 OF 9
SITE 1
SITE 2
PLACE ROAD
CLOSED SIGN
PLACE ROAD
CLOSED SIGN
AT NEXT sh Rivoro N•1ion-2l F"""
INTERSECTION
.5 l
Trinity RiVP.r
South rork Trinity River
$tat@ f-lig,~,v~y 2~9
S Fork Rd
South Fork
Trinity River
So<>ti Fo
PROJECT NOTES:
1. DURING CONSTRUCTION, FSR 6N06 SHALL BE
CLOSED TO ALL PUBLIC TRAFFIC WHILE THE WALL
EXCAVATION AND RECONSTRUCTION IS OCCURRING.
ACCOMMODATE THRU TRAFFIC AS SOON AS POSSIBLE.
2. TRAFFIC ADVISORY SIGNS SHALL BE PLACED AT
THE FOLLOWING LOCATIONS:
• ON 6N06 ROAD AT THE INTERSECTION WITH FRIDAY
RIDGE ROAD INDICATING ROAD CLOSED.
• ON 6N06 AT THE INTERSECTION WITH 5N33B
INDICATING THE ROAD IS CLOSED.
3. SPECIFIC DETAILS OF THE ROAD CLOSURES AND
SIGNING REQUIREMENTS ARE IN CONTRACT SECTION
H.
4. WHEN THE CONTRACTOR IS NOT WORKING ON SITE
AND THE EXCAVATION IS OPEN, THEY SHALL PARK
MACHINESNEHICLES OR STOCKPILE MATERIAL SO AS
TO PREVENT INADVERTENT VEHICLE ACCESS NEAR
THE EXCAVATION.
5. NON-POTABLE WATER FOR CONSTRUCTION MAY BE
OBTAINED AT SPECIFIED LOCATIONS.
6. IT IS PRESUMED THAT THE CONTRACTOR WILL
REMOVE ABOUT 250 LF OF EXISTING PAVEMENT TO
ACCOMPLISH THE WORK. ANY ADDITIONAL AC
REMOVAL SHALL BE APPROVED BY THE CONTRACTING
OFFICER.
7. CONTRACTOR SHALL MINIMIZE TRAVEL OF STEEL
TRACKED MACHINES ON THE EXISTING AC PAVEMENT.
ANY DAMAGE TO THE ROAD(S) AS A RESULT OF THEIR
ACTIVITIES SHALL BE REPAIRED BY THE CONTRACTOR
AT NO ADDITIONAL COST TO THE GOVERNMENT.
United States Department of Agriculture Forest Service
(ROS)
PACIFIC SOUTHWEST REGION
STAMPS, LOGOS, AND SEALS
NO. REVISION / ISSUE DATE
PROJECT NAME
FSR 6N06 STORM
DAMAGE REPAIR
SIX RIVERS NF
LOWER TRINITY DISTRICT
DRAWING TITLE
SITE LOCATIONS
DATE ARCHIVE NO.
07/23/24
DESIGNER DRAWING SHEET NO.
J. BERRY
DRAWN G-02 J. BERRY
CHECKED
V.DUMLAO
PROJECT NO. SHEET 2 OF 9
S!, D
SAW CUT ASLPHAL T
POINT#
L-WALL FACE
R-WALL FACE
NOTE: REMOVE AND
REPLACE EXISTING
CMP WITH 24"CMP
NORTHING EASTING
6505823 2176575
6505912 2176652
ELEV.
NAD83 California State Planes, Zone I, US Foot
FRONT OF RETAINING WALL
DISC.
WALL LOCATIONS ARE APPROXIMATE.
FIELD ADJUST TO SITE CONDITIONS.
FINAL WALL ELEVATIONS WILL BE
DETERMINED IN THE FIELD.
SAW CUT ASLPHAL T
PLAN VIEW
I· • 1· I
FIELD VERIFIED
SITE PLAN OF SITE 1 SLIDE REPAIR
NOTES: FOR CONSTRUCTION NOTES,
SEE SHEETS D-2 {A&b) & D-3.
PROPOSED WALL LENGTH IS 120'.
EXTEND APPROXIMATELY 15 FEET
PAST FAILURE AT LATERAL EXTENTS.
FIELD VERIFY DIMENSIONS PRIOR TO
ORDERING MATERIAL
REMOVE ASPHALT BETWEEN SAW
CUTS AND REPLACE.
Unl18d SlatH Department of AgrlcuHura Forul Service
(ROS)
PACIFIC SOUTHWEST REGION
STAMPS, LOGOS, ANO SEALS
NO. REVISION/ ISSUE DATE
PROJECT NAME
FSR 6N06 STORM
DAMAGE REPAIR
SIX RIVERS NF
LOWER TRINITY DISTRICT
DRAWING TlllE
SITE 1 SITE PLAN
DATE
ARCHIVE NO.
07/23124
DESIGNER DRAWING SHEET NO.
J. BERRY
DRAWN D-01 AJ. BERRY
CHECKED
PROJECT NO. SHEET 3 OF 9
SAW CUT ASPHALT
POINT#
L-WALL FACE
R-WALL FACE
NOTE: REMOVE AND
REPLACE EXISTING
CMP WI TH 24"CMP
NORTHING EASTING
6504876 2175518 6504899 2175550
FRONT OF RETAINI NG WALL
ELEV. DISC.
WALL LOCATIONS ARE APPROXIMATE.
FIELD ADJUST TO SITE CONDITIONS.
FINAL WALL ELEVATIONS WILL BE
DETERMINED IN THE FIELD.
REMOVE AN D REPLACE
EXISTI NG CULVERT
PLAN VIEW
SAW CU T ASPHALT
I·, I
FIELD VERIFIED
SITE PLAN OF SITE 2 SLIDE REPAIR
NOTES: FOR CONSTRUCTION NOTES,
SEE SHEETS D-2A, D2B & D-3.
ACTUAL WALL LENGTH IS 40'
REMOVE ASPHALT NEEDED TO
REPLACE CULVERT. IT IS ASSUMED
ACCESS TO CONSTRUCT THE
RETAILING WALL WILL REQUIRE
MINIMAL REMOVAL OF EXISTING
ASPHALT.
United States Department of Agriculture Forest Service
(R05) PACIFIC SOUTliWEST REGION
STAMPS, LOGOS, AND SEALS
& 10
NO. REVISION / ISSUE DATE
PROJECT NAME
FSR 6N06 STORM
DAMAGE REPAIR
SIX RIVERS NF
LOWER TRINITY DISTRICT
DRAWING TITLE
SITE 2 SITE PLAN
DATE !ARCHIVE NO,
07/23/2024
DESIGNER DRAWING SHEET NO,
J.BERRY
DRAWN D-01 B J,BERRY
CHECK.ED
PROJECT NO. 51£ET 4 OF 9
EXTEND GEO-TEX AND GEOMEMBRANE
OVER ROCK IN TOP LIFT
NON-WOVEN GEOTEX
NOTES:
1. MSE WALL SHALL BE CONSTRUCTED IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS
& DRAWINGS AND THE REINFORCEMENT SYSTEM
MANUFACTURER'S RECOMMENDATIONS.
2. THE VARIOUS FABRICS AND MEMBRANES SHALL
CONFORM TO THE SPECIFICATIONS AND AS
SHOWN ON SHEET D-3
3. BACKFILL MATERIALS AND COMPACTIONS IN THE
MSE SHALL CONFORM TO FP-14, SECTION 255
AND THE SPECIAL PROJECT SPECIFICATIONS.
4. SEE SHEET D-4 FOR DRAINAGE SYSTEM DETAILS.
5. SEE SHEET D-3 FOR MSE WALL DETAILS
NON-WOVEN GEOTEX
COMPACTED SUB-BASE
GABION ROCK FACING
12" THICK FROM FACE
OF WALL MINIMUM
3" HMA SURFACE
GEO-COMPOSITE
MSE STRUCTURE
MINIMUM REINFROCMENT EMBEDMENT LENGTHS
SHOWN BELOW.
IF UNRIPPABLE BEDROCK IS ENCOUNTERED,
OBTAIN APPROVAL FOR SHORTER EMBEDMENT
LENGTHS FROM C.O.
21 FEET
21 FEET
19 FEET
19 FEET
12FEET
12 FEET
12 FEET
12 FEET
United States Department of Agriculture Forest Service
(ROS)
PACIFIC SOUTHWEST REGION
STAMPS, LOGOS, AND SEALS
NO. REVISION / ISSUE DATE
PROJECT NAME
FSR 6N06 STORM
DAMAGE REPAIR
SIX RIVERS NF
LOWER TRINITY DISTRICT
DRAWING TITLE
SITE 1
WALL PLANS AND
SECTION DETAILS
DATE ARCHIVE NO.
07/23/2024
DESIGNER DRAWING SHEET NO.
J. BERRY
DRAWN D-02A J. BERRY
CHECKED
P.MEINGAST
PROJECT NO. SHEET 5 OF 9
EXTEND GEO-TEX AND GEOMEMBRANE
~OCK IN TOP LIFT
NON-WOVEN GEOTEX
NOTES:
1. MSE WALL SHALL BE CONSTRUCTED IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS
& DRAWINGS AND THE REINFORCEMENT SYSTEM
MANUFACTURER'S RECOMMENDATIONS.
2. THE VARIOUS FABRICS AND MEMBRANES SHALL
CONFORM TO THE SPECIFICATIONS AND AS
SHOWN ON SHEET D-3
3. BACKFILL MATERIALS AND COMPACTIONS IN THE
MSE SHALL CONFORM TO FP-14, SECTION 255
AND THE SPECIAL PROJECT SPECIFICATIONS.
4. SEE SHEET D-4 FOR DRAINAGE SYSTEM DETAILS.
5. SEE SHEET D-3 FOR MSE WALL DETAILS
6. FOLLOW MANUFACTURER'S RECOMMENDATIONS
TO INSTALL CULVERT THROUGH MSE WALL
NON-WOVEN GEOTEX
COMPACTED SUB-BASE
SLOPE MAXIMUM
1¾ :1
GEO-COMPOSITE
GABION ROCK FACING
12" THICK FROM FACE
F WALL MINIMUM
DRAIN ROCK NOT
SHOWN
WALL AND ROAD SECTION
SITE 2
MINIMUM REINFROCMENT EMBEDMENT LENGTHS
SHOWN BELOW.
IF UNRIPPABLE BEDROCK IS ENCOUNTERED,
OBTAIN APPROVAL FOR SHORTER EMBEDMENT
LENGTHS FROM C.O.
15 FEET
15 FEET
12 FEET
12 FEET
10 FEET
10 FEET
United States Department of Agriculture Forest Service
(ROS)
PACIFIC SOUTHWEST REGION
STAMPS, LOGOS, AND SEALS
NO. REVISION / ISSUE DATE
PROJECT NAME
FSR 6N06 STORM
DAMAGE REPAIR
SIX RIVERS NF
LOWER TRINITY DISTRICT
DRAWING TITLE
SITE2
WALL PLANS AND
SECTION DETAILS
DATE ARCHIVE NO.
07/23/2024
DESIGNER DRAWING SHEET NO.
J. BERRY
DRAWN D-02 B J. BERRY
CHECKED
PROJECT NO. SHEET 6 OF 9
WWM WALL CAP
EXTEND GEO-TEX TO
EDGE OF ROCK FILL
WWM
INNERFACE - ALL
LIFT FACES
WWM INNERFACE -ALL LIFT FACES
COMPACTED
BACKFILL
GEOMEMBRANE
EXTEND HALF-WAY ACROSS ROCK FILL
NON-WOVEN GEO-TEX
COMAPACTED STRUCTURAL FILL
TOP Tl ERS, TYPICAL
GEO-TEX EXTENDES BACK 28" MINIMUM
COMPACTED STRUCTURAL FILL
NON-WOVEN GEO-TEX
BASETIER, FULLY BURI~/
BOTTOM Tl ERS, TYPICAL
CONSTRUCTION NOTES:
1. SITE EXCAVATION: THE GOVERNMENT DOES NOT
CONSIDER ANY CULVERT MATERIALS IN OTHER SITE TO
BE SALVAGEABLE. ALL SUCH MATERIALS ARE TO BE
REMOVED FROM GOVERNMENT LAND AND DISPOSED OF
IN ACCORDANCE WITH STATE AND LOCAL REGULATIONS.
2. THE C.O. SHALL INSPECT AND APPROVE THE WALL
STRUCTURE BASE PRIOR TO PLACEMENT OF THE FIRST
TIER (TIER 1)
3. THE CONTRACTOR IS RESPONSIBLE FOR SUPPL YING ALL
MATERIALS REQUIRED FOR COMPLETION OF THE
PROJECT.
4. TIER 1 SHALL BE BURIED TO FULL DEPTH. EXCAVATION
OF THE BASE PLATFORM IS TO BE THE MINIMUM TO
ALLOW FOR EFFECTIVE PLACEMENT OF THE TIER 1 MAT.
BACKFILL OF THE BASE UNDER TIER 1 SHALL BE IN
ACCORDANCE WITH 204, METHOD 2.
5. GEO-TEX SHALL BE PLACED ACCROSS THE ENDS OF
EACH TIER TO REDUCE MIGRATION OF COMPACTED
STRUCTURAL FILL INTO NATIVE SOILS (UNDISTURBED OR
COMPACTED)
MATERIAL NOTES:
1. GEO-TEXTILES (OTHER THAN SUPPLIED AS PART OF THE
MSE WALL) SHALL CLASS 2, TYPE C.
2. GEOMENBRANE SHALL CONFORM WITH SECTION 714.05
3. GEOCOMPOSITE MATERIAL SHALL CONFORM WITH THE
REQUIREMENTS ON TABLE 714-3, TYPE 1 SHEET DRAIN.
4. REQUIREMENTS FOR COMPONENTS OF THE BACK DRAIN
PIPING SYSTEM ARE NOTED ON SHEET D-4
United States Department of Agriculture Forest Service
(ROS)
PACIFIC SOUTHWEST REGION
STAMPS, LOGOS, AND SEALS
NO. REVISION / ISSUE DATE
PROJECT NAME
FSR 6N06 STORM
DAMAGE REPAIR
SIX RIVERS NF
LOWER TRINITY DISTRICT
DRAWING TITLE
MSE WALL DETAILS AND
NOTES
DATE ARCHIVE NO.
07/23/2024
DESIGNER DRAWING SHEET NO.
J. BERRY
DRAWN D-03 J. BERRY
CHECKED
PROJECT NO. SHEET 7 OF 9
GEO-COMPOSITE
PERFERATED 611
HDPE DRAIN PIPE
LOWER DRAINAGE
UPPER DRAINAGE
DETAIL D4-D
LAYOUT OF DRAINAGE SYSTEM
6" HDPE PERFORATED DRAIN PIPE
BENTONITE SEAL. SEE NOTE 3
"'-... /Xf_//·
'{ff/fffj, GEOMEMBRANE
611 HDPE DOUBLE-WALL DRAIN PIPE
DETAIL D4-C
SCREENED END CAP 811
- 16GA GALV. CMP
PERFERATED 6"
HDPE DRAIN PIPE
GEO-MEMBRANE
DETAIL D4-C
NOTES:
GEO-MEMBRANE
TOPS ROCK F
1. HDPE DRAINAGE PIPE MAY BE CONNECTED BY, THERMOFUSE
WELDING OR WITH MECHANICAL (BELL & SPIGOT) FITTINGS.
PIPE AND FITTINGS SHALL CONFORM TO AASHTO M253 AND
ASTM F2648 & D3212. ANY METAL COMPONENTS SHALL BE
STAINLESS STEEL.
2. HORIZONTAL DRAIN PIPE SHALL BE PLACED AT 2 - 3% SLOPE.
3. THE BENTONITE SEALS SHALL BE PLACED AT THE TRANSITION
FROM PERFERATED TO SOLID PIPE AND BE NO MORE THAN 12"
INSIDE THE EDGE OF THE GEOMENBRANE OR GEO-TEX.
4. THE DRAIN ROCK IN THE DRAINAGE SYSTEM SHALL BE
COMPLETELY ENCASED IN NON-WOVEN GEO-TEX AS SHOWN IN
DETAIL D4-A & B. THE HORIZONTAL PERFORATED PIPE IN THE
UPPER DRAINAGE SYSTEM SHALL BE COVERED WITH
NON-WOVEN GEO-TEX PRIOR TO BACKFILL OF THE SUB-BASE.
5. THERE ARE SEVERAL METHODS TO AFFECT AN EFFECTIVE SEAL
BETWEEN THE HDPE PIPE AND THE CMP. THE CONTRACTOR
SHALL SUBMIT FOR GOVERNMENT APPROVAL A SEALING
SYSTEM DESIGNED TO CREATE A LASTING SEAL BETWEEN THE
TWO PIPES.
611 DOUBLE WALL HDPE DRAIN PIPE
SEAL. SEE NOTE 5
' /, /, ' /, //, //, //,»> 01/' / ~
12" MAX. 5' I\IIIN. 10" MIN.
DETAIL D4-D
UPPER DRAIN, MID-POINT
WASHED DRAIN ROCK
DETAIL D4-A
WASHED DRAIN ROCK
6" HDPE DOUBLE-WALL
DRAIN PIPE
DETAIL D4-B
GEO-MEMBRANE END
611 ABOVE TOP OF PIPE
NON-WOVEN GEO-TEX
GEO- POSITE
'"'0 DETAIL D4-B
United States Department of Agriculture Forest Service
(ROS)
PACIFIC SOUTHWEST REGION
STAMPS, LOGOS, AND SEALS
NO. REVISION / ISSUE DATE
PROJECT NAME
FSR 6N06 STORM
DAMAGE REPAIR
SIX RIVERS NF
LOWER TRINITY DISTRICT
DRAWING TITLE
WALL DRAIN DETAILS
DATE ARCHIVE NO.
07/23/2024
DESIGNER DRAWING SHEET NO.
J. BERRY
DRAWN D-04 J. BERRY
CHECKED
PROJECT NO. SHEET 8 OF 9
PER
TYPICAL CULVERT INSTALLATION DETAILS NOTES:
N.T.S. 1. RIPRAP CLASS 2, PLACEMENT METHOD A IS REQUIRED. GRADATION SHALL BE AS REQUIRED IN
STANDARD SPECIFICATION TABLE 705-1, WHICH IS AS FOLLOWS:
- "SUBGRADE"
12" MIN
COVER
VARIES ________ _,I
,,__ I~ ~\>-i-).......--.\-------------------!_,1~-, DIAMETER / -- ~I
PERCENT OF ROCK
EQUAL OR SMALLER
BY COUNT, Dx
WEIGHT
(POUNDS)
270-750 110-270 42-110 8-11 10-42
15-21 11-15
6-8
RANGE OF INTERMEDIATE
DIMENSIONS
(INCHES)
~ I- -2% MIN. :---
~ CAMBER SHALL BE A MINIMUM
OF ~ OF 1 % OF THE PIPE LENGTH
2. GEOTEXTILES SHALL BE PLACED UNDER RIPRAP IN ALL INSTALLATIONS AND SHALL MEET THE REQUIREMENTS FOR TYPE IV-D OF SECTION 714.01 OF THE SPECIFICATIONS OF FP-14. GEOTEXTILE
SHALL BE NONWOVEN. PAYMENT FOR GEOTEXTILES IS INCIDENTAL, INCLUDED IN PAY ITEM
PIPE INSTALLATION
NOTES - ALL ROADS:
TYPICAL CULVERT INSTALLATION
TYPICAL CULVERT INSTALLATION WITH INLET BASIN
25101-1.
IN NARROW CHANNELS, ADJUST ROCK TO FIT STREAMBANKS.
1. THE OUTLETS OF ALL PIPE TO BE INSTALLED AND ALL EXISTING PIPE TO REMAIN SHALL BE CONSTRUCTED OR RECONSTRUCTED TO PROVIDE FOR A MINIMUM OF A-1% DRAINAGE SLOPE AWAY FROM ALL CSP FORA MINIMUM OF 50'. WHERE NECESSARY, CULVERTS SHALL HAVE A LEAD OFF DITCH OF SUFFICIENT LENGTH TO ASSURE AN ADEQUATE DRAINAGE OUTLET. PAYMENT FOR THE CONSTRUCTION OF LEAD OFF DITCHES UP TO 50' HAS
BEEN INCLUDED IN CULVERT PAY ITEMS.
2. CULVERTS NOTED TO BE SKEWED ON THE PLANS SHALL BE SKEWED AS STAKED BY THE ENGINEER.
3. ALL EXISTING PIPE LISTED FOR REMOVAL SHALL BE DISPOSED OFF GOVERNMENT PROPERTY. IN MULTIPLE PIPE INSTALLATIONS, THE ADJACENT
SIDES OF PIPE SHALL BE AT LEAST ONE-HALF THE NOMINAL PIPE DIAMETER APART OR 3', WHICHEVER IS LESS.
4. BACKFILL AROUND CULVERTS IS COMPACTION METHOD B, OF SPECIAL PROJECT SPECIFICATIONS SUB PARAGRAPH 209.11 - "ADJUST THE MOISTURE
CONTENT OF THE BACKFILL MATERIAL TO A MOISTURE CONTENT SUITABLE FOR COMPACTION. COMPACT EACH LAYER USING APPROPRIATE
COMPACTION EQUIPMENT UNTIL VISUAL DISPLACEMENT CEASES."
5. ALL GROUND DISTURBED OUTSIDE OF THE ROADBED IS REQUIRED TO BE SEEDED AND MULCHED, UNLESS NOTED OTHERWISE.
6. PIPE INSTALLATIONS LISTED AS "DEEP FILL" HAVE 5' OR MORE OF COVER AND PAYMENT INCLUDES CONSIDERATION FOR ADDITIONAL EXCAVATION
WORK REQUIRED AT THESE LOCATIONS.
7. POLYMERIC COATED CORRUGATED STEEL PIPE MAY BE SUBSTITUTED FOR ALUMINUM COATED, TYPE 2 CORRUGATED STEEL PIPE AND WILL BE
CONSIDERED AS EQUAL FOR PAYMENT. WHERE POLYMERIC COATED PIPE IS USED, THICKNESS OF COATING SHALL BE 10 MILS INSIDE AND 10 MILS OUTSIDE. POLYMERIC COATED PIPE MAY NOT BE BANDED TO ALUMINUM COATED OR SOLID ALUMINUM PIPE. ALL EXPOSED METAL OR AREAS OF PIPE WHERE POLYMERIC OR ALUMINUM COATING IS DAMAGED SHALL BE PAINTED WITH A ZINC DUST-ZINC OXIDE POWDER CONFORMING TO FEDERAL SPECIFICATION TT-P-641 OR MIL-P-21085 AND A TWO COMPONENT EPOXY PAIN, "SCOTCH CLAD", 2M, PPG OR EQUAL. THIS WORK SHALL BE
CONSIDERED INCIDENTAL TO CULVERT PAY ITEMS.
8. 18" MINIMUM BANDING OR LARGER WILL BE REQUIRED TO ATTACH MULTIPLE SECTIONS OF PIPE 36-INCHES IN DIAMETER OR LARGER.
9. MASTIC SEALANT REQUIRED ON ALL PIPES LARGER THAN 48" REQUIRING BANDING. THE MASTIC SHALL CONFORM TO AASHTO M 243. PIPES
SMALLER THAN 48" SHALL BE SEALED WITH MASTIC IF ANY GAPS BETWEEN PIPES IS GREATER THAN 1.5"
USDA ◄ ~oRESiTSERv1c~• - - us ~i!a "'t
--~NTOFAGR~
United States Department of Agriculture
Forest Service
(ROS)
PACIFIC SOUTHWEST REGION
STAMPS, LOGOS, AND SEALS
NO. REVISION / ISSUE DATE
PROJECT NAME
FSR 6N06 STORM
DAMAGE REPAIR
SIX RIVERS NF
LOWER TRINITY DISTRICT
DRAWING TITLE
CULVERT INSTALLATION
DETAILS
DATE !ARCHIVE NO.
07/23/24
DESIGNER DRAWING SHEET NO.
J. BERRY
DRAWN D-05 J. BERRY
CHECKED
PROJECT NO. SHEET 9 OF 9
Blank Page
| DATETITLE: |
| DATESITE LOCATIONS: |
| DATESITE 1 SITE PLAN: |
| DATESITE 2 SITE PLAN: |
| DATESITE 1 WALL PLANS AND SECTION DETAILS: |
| DATESITE 2 WALL PLANS AND SECTION DETAILS: |
| DATEMSE WALL DETAILS AND NOTES: |
| DATEWALL DRAIN DETAILS: |
| DATECULVERT INSTALLATION DETAILS: |
| D05Row1: |
| CULVERT INSTALLATION DETAILSRow1: |
| DATERow10: |
| D05Row2: |
| CULVERT INSTALLATION DETAILSRow2: |
| DATERow11: |
| D05Row3: |
| CULVERT INSTALLATION DETAILSRow3: |
| DATERow12: |
| D05Row4: |
| CULVERT INSTALLATION DETAILSRow4: |
| DATERow13: |
| D05Row5: |
| CULVERT INSTALLATION DETAILSRow5: |
| DATERow14: |
| D05Row6: |
| CULVERT INSTALLATION DETAILSRow6: |
| DATERow15: |
| D05Row7: |
| CULVERT INSTALLATION DETAILSRow7: |
| DATERow16: |
| D05Row8: |
| CULVERT INSTALLATION DETAILSRow8: |
| DATERow17: |
| D05Row9: |
| CULVERT INSTALLATION DETAILSRow9: |
| DATERow18: |
| D05Row10: |
| CULVERT INSTALLATION DETAILSRow10: |
| DATERow19: |
| D05Row11: |
| CULVERT INSTALLATION DETAILSRow11: |
| DATERow20: |
| D05Row12: |
| CULVERT INSTALLATION DETAILSRow12: |
| DATERow21: |
| D05Row13: |
| CULVERT INSTALLATION DETAILSRow13: |
| DATERow22: |
| D05Row14: |
| CULVERT INSTALLATION DETAILSRow14: |
| DATERow23: |
| D05Row15: |
| CULVERT INSTALLATION DETAILSRow15: |
| DATERow24: |
| undefined: |
| undefined_2: |
| ci: |
| ocS: |
| D05Row16: |
| CULVERT INSTALLATION DETAILSRow16: |
| DATERow25: |
File details come from the government source that posted it. Updated .