This document contains the drawings and details for the FSR 6N06 Storm Damage Repair project on the Six Rivers National Forest, Lower Trinity District. The project involves repairing landslide damage at two sites along Road 6N06 through the installation of mechanically stabilized earth (MSE) retaining walls. Key details include:

The project requires the removal and replacement of existing culverts, asphalt repair, and construction of MSE walls up to 120 feet long. The road will need to be closed to public traffic during the wall excavation and reconstruction work. The contract specifications, including requirements for the MSE wall materials, drainage systems, and culvert installation, are provided across multiple detailed drawings. The estimated project cost is between $500,000 and $1,000,000 and is set aside for small businesses. A mandatory site visit is scheduled for August 27, 2024, and all requests for information must be submitted by September 3, 2024.

View the file

Other files

File Type Posted
A00001 - Schedule and RFIs Round 1.pdf PDF
RFI Official Responses - 1.pdf PDF
2. Schedule of Items - REVISION 001.docx DOCX document
6. Davis-Bacon Act WD # CA20240004.pdf PDF
7. RFI Form.docx DOCX document
3. Supplemental Specifications.pdf PDF
4. Fire Plan.pdf PDF
1. Statement of Work.pdf PDF
2. Schedule.docx DOCX document
127EAW24R0071 - Road 6N06 Slide Repair.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

O National Headquarters - Nalic:NIForetll

• Ruffrctl Sialion HoMIQulrtOfl

USDA

United States Department of Agriculture Forest Service

CALIFORNIA

HUMBOLDT COUNTY

R-5 PACIFIC SOUTHWEST REGION

SIX RIVERS NATIONAL FOREST

LOWER TRINITY DISTRICT

FSR 6N06 STORM DAMAGE REPAIR

"' F-ortst ~ Laboratory

■ 1n19fl'llllonlllnltrluteo1Tropc;a,IF01estly

D State and Priv.ie ForOlll'y NM He~ten (ln--~.,_ ........ .....,""'Rlg,o,9 eit ervlce

Will

Bush Mountain Lookout

SJ'~

• ~wCr ek,CA955,3 ~ lilll

PROJECT LOCATION MAP

TRAVEL DIRECTIONS:

FROM:LowerTrinity District Office 580 Highway 96, Willow Creek, CA 95573 TO: 6N06 site(!).

FROM WILLOW CREEK, TRAVEL EAST ON STATE HIGHWAY 299 E TOWARD ROUTE 6. FOR 4.7 MILES.

FOLLOW SIGNS FOR FRIDAY RIDGE ROAD AND TURN RIGHT ONTO ROUTE 6. LATITUDE AND

LONGITUDE: 40.886161, -123. 613453.

FOREST LOCATION MAP

INDEX OF SHEETS

SHEET SHEET TITLE DATE

G-01 TITLE

G-02 SITE LOCATIONS

D-01A SITE 1 SITE PLAN

D-01B SITE 2 SITE PLAN

D-02A SITE 1 WALL PLANS AND SECTION DETAILS

D-02B SITE 2 WALL PLANS AND SECTION DETAILS

D-03 MSE WALL DETAILS AND NOTES

D-04 WALL DRAIN DETAILS

D-05 CULVERT INSTALLATION DETAILS

RECOMMENDED BY:

FOREST ENGINEER DATE

DISTRICT RANGER DATE

FOREST SUPERVISOR DATE

RO FACILITIES PROGRAM MANAGER DATE

APPROVED:

DIRECTOR OF ENGINEERING DATE

SHEET 1 OF 9

SITE 1

SITE 2

PLACE ROAD

CLOSED SIGN

PLACE ROAD

CLOSED SIGN

AT NEXT sh Rivoro N•1ion-2l F"""

INTERSECTION

.5 l

Trinity RiVP.r

South rork Trinity River

$tat@ f-lig,~,v~y 2~9

S Fork Rd

South Fork

Trinity River

So<>ti Fo

PROJECT NOTES:

1. DURING CONSTRUCTION, FSR 6N06 SHALL BE

CLOSED TO ALL PUBLIC TRAFFIC WHILE THE WALL

EXCAVATION AND RECONSTRUCTION IS OCCURRING.

ACCOMMODATE THRU TRAFFIC AS SOON AS POSSIBLE.

2. TRAFFIC ADVISORY SIGNS SHALL BE PLACED AT

THE FOLLOWING LOCATIONS:

• ON 6N06 ROAD AT THE INTERSECTION WITH FRIDAY

RIDGE ROAD INDICATING ROAD CLOSED.

• ON 6N06 AT THE INTERSECTION WITH 5N33B

INDICATING THE ROAD IS CLOSED.

3. SPECIFIC DETAILS OF THE ROAD CLOSURES AND

SIGNING REQUIREMENTS ARE IN CONTRACT SECTION

H.

4. WHEN THE CONTRACTOR IS NOT WORKING ON SITE

AND THE EXCAVATION IS OPEN, THEY SHALL PARK

MACHINESNEHICLES OR STOCKPILE MATERIAL SO AS

TO PREVENT INADVERTENT VEHICLE ACCESS NEAR

THE EXCAVATION.

5. NON-POTABLE WATER FOR CONSTRUCTION MAY BE

OBTAINED AT SPECIFIED LOCATIONS.

6. IT IS PRESUMED THAT THE CONTRACTOR WILL

REMOVE ABOUT 250 LF OF EXISTING PAVEMENT TO

ACCOMPLISH THE WORK. ANY ADDITIONAL AC

REMOVAL SHALL BE APPROVED BY THE CONTRACTING

OFFICER.

7. CONTRACTOR SHALL MINIMIZE TRAVEL OF STEEL

TRACKED MACHINES ON THE EXISTING AC PAVEMENT.

ANY DAMAGE TO THE ROAD(S) AS A RESULT OF THEIR

ACTIVITIES SHALL BE REPAIRED BY THE CONTRACTOR

AT NO ADDITIONAL COST TO THE GOVERNMENT.

United States Department of Agriculture Forest Service

(ROS)

PACIFIC SOUTHWEST REGION

STAMPS, LOGOS, AND SEALS

NO. REVISION / ISSUE DATE

PROJECT NAME

FSR 6N06 STORM

DAMAGE REPAIR

SIX RIVERS NF

LOWER TRINITY DISTRICT

DRAWING TITLE

SITE LOCATIONS

DATE ARCHIVE NO.

07/23/24

DESIGNER DRAWING SHEET NO.

J. BERRY

DRAWN G-02 J. BERRY

CHECKED

V.DUMLAO

PROJECT NO. SHEET 2 OF 9

S!, D

SAW CUT ASLPHAL T

POINT#

L-WALL FACE

R-WALL FACE

NOTE: REMOVE AND

REPLACE EXISTING

CMP WITH 24"CMP

NORTHING EASTING

6505823 2176575

6505912 2176652

ELEV.

NAD83 California State Planes, Zone I, US Foot

FRONT OF RETAINING WALL

DISC.

WALL LOCATIONS ARE APPROXIMATE.

FIELD ADJUST TO SITE CONDITIONS.

FINAL WALL ELEVATIONS WILL BE

DETERMINED IN THE FIELD.

SAW CUT ASLPHAL T

PLAN VIEW

I· • 1· I

FIELD VERIFIED

SITE PLAN OF SITE 1 SLIDE REPAIR

NOTES: FOR CONSTRUCTION NOTES,

SEE SHEETS D-2 {A&b) & D-3.

PROPOSED WALL LENGTH IS 120'.

EXTEND APPROXIMATELY 15 FEET

PAST FAILURE AT LATERAL EXTENTS.

FIELD VERIFY DIMENSIONS PRIOR TO

ORDERING MATERIAL

REMOVE ASPHALT BETWEEN SAW

CUTS AND REPLACE.

Unl18d SlatH Department of AgrlcuHura Forul Service

(ROS)

PACIFIC SOUTHWEST REGION

STAMPS, LOGOS, ANO SEALS

NO. REVISION/ ISSUE DATE

PROJECT NAME

FSR 6N06 STORM

DAMAGE REPAIR

SIX RIVERS NF

LOWER TRINITY DISTRICT

DRAWING TlllE

SITE 1 SITE PLAN

DATE

ARCHIVE NO.

07/23124

DESIGNER DRAWING SHEET NO.

J. BERRY

DRAWN D-01 AJ. BERRY

CHECKED

PROJECT NO. SHEET 3 OF 9

SAW CUT ASPHALT

POINT#

L-WALL FACE

R-WALL FACE

NOTE: REMOVE AND

REPLACE EXISTING

CMP WI TH 24"CMP

NORTHING EASTING

6504876 2175518 6504899 2175550

FRONT OF RETAINI NG WALL

ELEV. DISC.

WALL LOCATIONS ARE APPROXIMATE.

FIELD ADJUST TO SITE CONDITIONS.

FINAL WALL ELEVATIONS WILL BE

DETERMINED IN THE FIELD.

REMOVE AN D REPLACE

EXISTI NG CULVERT

PLAN VIEW

SAW CU T ASPHALT

I·, I

FIELD VERIFIED

SITE PLAN OF SITE 2 SLIDE REPAIR

NOTES: FOR CONSTRUCTION NOTES,

SEE SHEETS D-2A, D2B & D-3.

ACTUAL WALL LENGTH IS 40'

REMOVE ASPHALT NEEDED TO

REPLACE CULVERT. IT IS ASSUMED

ACCESS TO CONSTRUCT THE

RETAILING WALL WILL REQUIRE

MINIMAL REMOVAL OF EXISTING

ASPHALT.

United States Department of Agriculture Forest Service

(R05) PACIFIC SOUTliWEST REGION

STAMPS, LOGOS, AND SEALS

& 10

NO. REVISION / ISSUE DATE

PROJECT NAME

FSR 6N06 STORM

DAMAGE REPAIR

SIX RIVERS NF

LOWER TRINITY DISTRICT

DRAWING TITLE

SITE 2 SITE PLAN

DATE !ARCHIVE NO,

07/23/2024

DESIGNER DRAWING SHEET NO,

J.BERRY

DRAWN D-01 B J,BERRY

CHECK.ED

PROJECT NO. 51£ET 4 OF 9

EXTEND GEO-TEX AND GEOMEMBRANE

OVER ROCK IN TOP LIFT

NON-WOVEN GEOTEX

NOTES:

1. MSE WALL SHALL BE CONSTRUCTED IN

ACCORDANCE WITH THE PROJECT SPECIFICATIONS

& DRAWINGS AND THE REINFORCEMENT SYSTEM

MANUFACTURER'S RECOMMENDATIONS.

2. THE VARIOUS FABRICS AND MEMBRANES SHALL

CONFORM TO THE SPECIFICATIONS AND AS

SHOWN ON SHEET D-3

3. BACKFILL MATERIALS AND COMPACTIONS IN THE

MSE SHALL CONFORM TO FP-14, SECTION 255

AND THE SPECIAL PROJECT SPECIFICATIONS.

4. SEE SHEET D-4 FOR DRAINAGE SYSTEM DETAILS.

5. SEE SHEET D-3 FOR MSE WALL DETAILS

NON-WOVEN GEOTEX

COMPACTED SUB-BASE

GABION ROCK FACING

12" THICK FROM FACE

OF WALL MINIMUM

3" HMA SURFACE

GEO-COMPOSITE

MSE STRUCTURE

MINIMUM REINFROCMENT EMBEDMENT LENGTHS

SHOWN BELOW.

IF UNRIPPABLE BEDROCK IS ENCOUNTERED,

OBTAIN APPROVAL FOR SHORTER EMBEDMENT

LENGTHS FROM C.O.

21 FEET

21 FEET

19 FEET

19 FEET

12FEET

12 FEET

12 FEET

12 FEET

United States Department of Agriculture Forest Service

(ROS)

PACIFIC SOUTHWEST REGION

STAMPS, LOGOS, AND SEALS

NO. REVISION / ISSUE DATE

PROJECT NAME

FSR 6N06 STORM

DAMAGE REPAIR

SIX RIVERS NF

LOWER TRINITY DISTRICT

DRAWING TITLE

SITE 1

WALL PLANS AND

SECTION DETAILS

DATE ARCHIVE NO.

07/23/2024

DESIGNER DRAWING SHEET NO.

J. BERRY

DRAWN D-02A J. BERRY

CHECKED

P.MEINGAST

PROJECT NO. SHEET 5 OF 9

EXTEND GEO-TEX AND GEOMEMBRANE

~OCK IN TOP LIFT

NON-WOVEN GEOTEX

NOTES:

1. MSE WALL SHALL BE CONSTRUCTED IN

ACCORDANCE WITH THE PROJECT SPECIFICATIONS

& DRAWINGS AND THE REINFORCEMENT SYSTEM

MANUFACTURER'S RECOMMENDATIONS.

2. THE VARIOUS FABRICS AND MEMBRANES SHALL

CONFORM TO THE SPECIFICATIONS AND AS

SHOWN ON SHEET D-3

3. BACKFILL MATERIALS AND COMPACTIONS IN THE

MSE SHALL CONFORM TO FP-14, SECTION 255

AND THE SPECIAL PROJECT SPECIFICATIONS.

4. SEE SHEET D-4 FOR DRAINAGE SYSTEM DETAILS.

5. SEE SHEET D-3 FOR MSE WALL DETAILS

6. FOLLOW MANUFACTURER'S RECOMMENDATIONS

TO INSTALL CULVERT THROUGH MSE WALL

NON-WOVEN GEOTEX

COMPACTED SUB-BASE

SLOPE MAXIMUM

1¾ :1

GEO-COMPOSITE

GABION ROCK FACING

12" THICK FROM FACE

F WALL MINIMUM

DRAIN ROCK NOT

SHOWN

WALL AND ROAD SECTION

SITE 2

MINIMUM REINFROCMENT EMBEDMENT LENGTHS

SHOWN BELOW.

IF UNRIPPABLE BEDROCK IS ENCOUNTERED,

OBTAIN APPROVAL FOR SHORTER EMBEDMENT

LENGTHS FROM C.O.

15 FEET

15 FEET

12 FEET

12 FEET

10 FEET

10 FEET

United States Department of Agriculture Forest Service

(ROS)

PACIFIC SOUTHWEST REGION

STAMPS, LOGOS, AND SEALS

NO. REVISION / ISSUE DATE

PROJECT NAME

FSR 6N06 STORM

DAMAGE REPAIR

SIX RIVERS NF

LOWER TRINITY DISTRICT

DRAWING TITLE

SITE2

WALL PLANS AND

SECTION DETAILS

DATE ARCHIVE NO.

07/23/2024

DESIGNER DRAWING SHEET NO.

J. BERRY

DRAWN D-02 B J. BERRY

CHECKED

PROJECT NO. SHEET 6 OF 9

WWM WALL CAP

EXTEND GEO-TEX TO

EDGE OF ROCK FILL

WWM

INNERFACE - ALL

LIFT FACES

WWM INNERFACE -ALL LIFT FACES

COMPACTED

BACKFILL

GEOMEMBRANE

EXTEND HALF-WAY ACROSS ROCK FILL

NON-WOVEN GEO-TEX

COMAPACTED STRUCTURAL FILL

TOP Tl ERS, TYPICAL

GEO-TEX EXTENDES BACK 28" MINIMUM

COMPACTED STRUCTURAL FILL

NON-WOVEN GEO-TEX

BASETIER, FULLY BURI~/

BOTTOM Tl ERS, TYPICAL

CONSTRUCTION NOTES:

1. SITE EXCAVATION: THE GOVERNMENT DOES NOT

CONSIDER ANY CULVERT MATERIALS IN OTHER SITE TO

BE SALVAGEABLE. ALL SUCH MATERIALS ARE TO BE

REMOVED FROM GOVERNMENT LAND AND DISPOSED OF

IN ACCORDANCE WITH STATE AND LOCAL REGULATIONS.

2. THE C.O. SHALL INSPECT AND APPROVE THE WALL

STRUCTURE BASE PRIOR TO PLACEMENT OF THE FIRST

TIER (TIER 1)

3. THE CONTRACTOR IS RESPONSIBLE FOR SUPPL YING ALL

MATERIALS REQUIRED FOR COMPLETION OF THE

PROJECT.

4. TIER 1 SHALL BE BURIED TO FULL DEPTH. EXCAVATION

OF THE BASE PLATFORM IS TO BE THE MINIMUM TO

ALLOW FOR EFFECTIVE PLACEMENT OF THE TIER 1 MAT.

BACKFILL OF THE BASE UNDER TIER 1 SHALL BE IN

ACCORDANCE WITH 204, METHOD 2.

5. GEO-TEX SHALL BE PLACED ACCROSS THE ENDS OF

EACH TIER TO REDUCE MIGRATION OF COMPACTED

STRUCTURAL FILL INTO NATIVE SOILS (UNDISTURBED OR

COMPACTED)

MATERIAL NOTES:

1. GEO-TEXTILES (OTHER THAN SUPPLIED AS PART OF THE

MSE WALL) SHALL CLASS 2, TYPE C.

2. GEOMENBRANE SHALL CONFORM WITH SECTION 714.05

3. GEOCOMPOSITE MATERIAL SHALL CONFORM WITH THE

REQUIREMENTS ON TABLE 714-3, TYPE 1 SHEET DRAIN.

4. REQUIREMENTS FOR COMPONENTS OF THE BACK DRAIN

PIPING SYSTEM ARE NOTED ON SHEET D-4

United States Department of Agriculture Forest Service

(ROS)

PACIFIC SOUTHWEST REGION

STAMPS, LOGOS, AND SEALS

NO. REVISION / ISSUE DATE

PROJECT NAME

FSR 6N06 STORM

DAMAGE REPAIR

SIX RIVERS NF

LOWER TRINITY DISTRICT

DRAWING TITLE

MSE WALL DETAILS AND

NOTES

DATE ARCHIVE NO.

07/23/2024

DESIGNER DRAWING SHEET NO.

J. BERRY

DRAWN D-03 J. BERRY

CHECKED

PROJECT NO. SHEET 7 OF 9

GEO-COMPOSITE

PERFERATED 611

HDPE DRAIN PIPE

LOWER DRAINAGE

UPPER DRAINAGE

DETAIL D4-D

LAYOUT OF DRAINAGE SYSTEM

6" HDPE PERFORATED DRAIN PIPE

BENTONITE SEAL. SEE NOTE 3

"'-... /Xf_//·

'{ff/fffj, GEOMEMBRANE

611 HDPE DOUBLE-WALL DRAIN PIPE

DETAIL D4-C

SCREENED END CAP 811

- 16GA GALV. CMP

PERFERATED 6"

HDPE DRAIN PIPE

GEO-MEMBRANE

DETAIL D4-C

NOTES:

GEO-MEMBRANE

TOPS ROCK F

1. HDPE DRAINAGE PIPE MAY BE CONNECTED BY, THERMOFUSE

WELDING OR WITH MECHANICAL (BELL & SPIGOT) FITTINGS.

PIPE AND FITTINGS SHALL CONFORM TO AASHTO M253 AND

ASTM F2648 & D3212. ANY METAL COMPONENTS SHALL BE

STAINLESS STEEL.

2. HORIZONTAL DRAIN PIPE SHALL BE PLACED AT 2 - 3% SLOPE.

3. THE BENTONITE SEALS SHALL BE PLACED AT THE TRANSITION

FROM PERFERATED TO SOLID PIPE AND BE NO MORE THAN 12"

INSIDE THE EDGE OF THE GEOMENBRANE OR GEO-TEX.

4. THE DRAIN ROCK IN THE DRAINAGE SYSTEM SHALL BE

COMPLETELY ENCASED IN NON-WOVEN GEO-TEX AS SHOWN IN

DETAIL D4-A & B. THE HORIZONTAL PERFORATED PIPE IN THE

UPPER DRAINAGE SYSTEM SHALL BE COVERED WITH

NON-WOVEN GEO-TEX PRIOR TO BACKFILL OF THE SUB-BASE.

5. THERE ARE SEVERAL METHODS TO AFFECT AN EFFECTIVE SEAL

BETWEEN THE HDPE PIPE AND THE CMP. THE CONTRACTOR

SHALL SUBMIT FOR GOVERNMENT APPROVAL A SEALING

SYSTEM DESIGNED TO CREATE A LASTING SEAL BETWEEN THE

TWO PIPES.

611 DOUBLE WALL HDPE DRAIN PIPE

SEAL. SEE NOTE 5

' /, /, ' /, //, //, //,»> 01/' / ~

12" MAX. 5' I\IIIN. 10" MIN.

DETAIL D4-D

UPPER DRAIN, MID-POINT

WASHED DRAIN ROCK

DETAIL D4-A

WASHED DRAIN ROCK

6" HDPE DOUBLE-WALL

DRAIN PIPE

DETAIL D4-B

GEO-MEMBRANE END

611 ABOVE TOP OF PIPE

NON-WOVEN GEO-TEX

GEO- POSITE

'"'0 DETAIL D4-B

United States Department of Agriculture Forest Service

(ROS)

PACIFIC SOUTHWEST REGION

STAMPS, LOGOS, AND SEALS

NO. REVISION / ISSUE DATE

PROJECT NAME

FSR 6N06 STORM

DAMAGE REPAIR

SIX RIVERS NF

LOWER TRINITY DISTRICT

DRAWING TITLE

WALL DRAIN DETAILS

DATE ARCHIVE NO.

07/23/2024

DESIGNER DRAWING SHEET NO.

J. BERRY

DRAWN D-04 J. BERRY

CHECKED

PROJECT NO. SHEET 8 OF 9

PER

TYPICAL CULVERT INSTALLATION DETAILS NOTES:

N.T.S. 1. RIPRAP CLASS 2, PLACEMENT METHOD A IS REQUIRED. GRADATION SHALL BE AS REQUIRED IN

STANDARD SPECIFICATION TABLE 705-1, WHICH IS AS FOLLOWS:

- "SUBGRADE"

12" MIN

COVER

VARIES ________ _,I

,,__ I~ ~\>-i-).......--.\-------------------!_,1~-, DIAMETER / -- ~I

PERCENT OF ROCK

EQUAL OR SMALLER

BY COUNT, Dx

WEIGHT

(POUNDS)

270-750 110-270 42-110 8-11 10-42

15-21 11-15

6-8

RANGE OF INTERMEDIATE

DIMENSIONS

(INCHES)

~ I- -2% MIN. :---

~ CAMBER SHALL BE A MINIMUM

OF ~ OF 1 % OF THE PIPE LENGTH

2. GEOTEXTILES SHALL BE PLACED UNDER RIPRAP IN ALL INSTALLATIONS AND SHALL MEET THE REQUIREMENTS FOR TYPE IV-D OF SECTION 714.01 OF THE SPECIFICATIONS OF FP-14. GEOTEXTILE

SHALL BE NONWOVEN. PAYMENT FOR GEOTEXTILES IS INCIDENTAL, INCLUDED IN PAY ITEM

PIPE INSTALLATION

NOTES - ALL ROADS:

TYPICAL CULVERT INSTALLATION

TYPICAL CULVERT INSTALLATION WITH INLET BASIN

25101-1.

IN NARROW CHANNELS, ADJUST ROCK TO FIT STREAMBANKS.

1. THE OUTLETS OF ALL PIPE TO BE INSTALLED AND ALL EXISTING PIPE TO REMAIN SHALL BE CONSTRUCTED OR RECONSTRUCTED TO PROVIDE FOR A MINIMUM OF A-1% DRAINAGE SLOPE AWAY FROM ALL CSP FORA MINIMUM OF 50'. WHERE NECESSARY, CULVERTS SHALL HAVE A LEAD OFF DITCH OF SUFFICIENT LENGTH TO ASSURE AN ADEQUATE DRAINAGE OUTLET. PAYMENT FOR THE CONSTRUCTION OF LEAD OFF DITCHES UP TO 50' HAS

BEEN INCLUDED IN CULVERT PAY ITEMS.

2. CULVERTS NOTED TO BE SKEWED ON THE PLANS SHALL BE SKEWED AS STAKED BY THE ENGINEER.

3. ALL EXISTING PIPE LISTED FOR REMOVAL SHALL BE DISPOSED OFF GOVERNMENT PROPERTY. IN MULTIPLE PIPE INSTALLATIONS, THE ADJACENT

SIDES OF PIPE SHALL BE AT LEAST ONE-HALF THE NOMINAL PIPE DIAMETER APART OR 3', WHICHEVER IS LESS.

4. BACKFILL AROUND CULVERTS IS COMPACTION METHOD B, OF SPECIAL PROJECT SPECIFICATIONS SUB PARAGRAPH 209.11 - "ADJUST THE MOISTURE

CONTENT OF THE BACKFILL MATERIAL TO A MOISTURE CONTENT SUITABLE FOR COMPACTION. COMPACT EACH LAYER USING APPROPRIATE

COMPACTION EQUIPMENT UNTIL VISUAL DISPLACEMENT CEASES."

5. ALL GROUND DISTURBED OUTSIDE OF THE ROADBED IS REQUIRED TO BE SEEDED AND MULCHED, UNLESS NOTED OTHERWISE.

6. PIPE INSTALLATIONS LISTED AS "DEEP FILL" HAVE 5' OR MORE OF COVER AND PAYMENT INCLUDES CONSIDERATION FOR ADDITIONAL EXCAVATION

WORK REQUIRED AT THESE LOCATIONS.

7. POLYMERIC COATED CORRUGATED STEEL PIPE MAY BE SUBSTITUTED FOR ALUMINUM COATED, TYPE 2 CORRUGATED STEEL PIPE AND WILL BE

CONSIDERED AS EQUAL FOR PAYMENT. WHERE POLYMERIC COATED PIPE IS USED, THICKNESS OF COATING SHALL BE 10 MILS INSIDE AND 10 MILS OUTSIDE. POLYMERIC COATED PIPE MAY NOT BE BANDED TO ALUMINUM COATED OR SOLID ALUMINUM PIPE. ALL EXPOSED METAL OR AREAS OF PIPE WHERE POLYMERIC OR ALUMINUM COATING IS DAMAGED SHALL BE PAINTED WITH A ZINC DUST-ZINC OXIDE POWDER CONFORMING TO FEDERAL SPECIFICATION TT-P-641 OR MIL-P-21085 AND A TWO COMPONENT EPOXY PAIN, "SCOTCH CLAD", 2M, PPG OR EQUAL. THIS WORK SHALL BE

CONSIDERED INCIDENTAL TO CULVERT PAY ITEMS.

8. 18" MINIMUM BANDING OR LARGER WILL BE REQUIRED TO ATTACH MULTIPLE SECTIONS OF PIPE 36-INCHES IN DIAMETER OR LARGER.

9. MASTIC SEALANT REQUIRED ON ALL PIPES LARGER THAN 48" REQUIRING BANDING. THE MASTIC SHALL CONFORM TO AASHTO M 243. PIPES

SMALLER THAN 48" SHALL BE SEALED WITH MASTIC IF ANY GAPS BETWEEN PIPES IS GREATER THAN 1.5"

USDA ◄ ~oRESiTSERv1c~• - - us ~i!a "'t

--~NTOFAGR~

United States Department of Agriculture

Forest Service

(ROS)

PACIFIC SOUTHWEST REGION

STAMPS, LOGOS, AND SEALS

NO. REVISION / ISSUE DATE

PROJECT NAME

FSR 6N06 STORM

DAMAGE REPAIR

SIX RIVERS NF

LOWER TRINITY DISTRICT

DRAWING TITLE

CULVERT INSTALLATION

DETAILS

DATE !ARCHIVE NO.

07/23/24

DESIGNER DRAWING SHEET NO.

J. BERRY

DRAWN D-05 J. BERRY

CHECKED

PROJECT NO. SHEET 9 OF 9

Blank Page

DATETITLE:
DATESITE LOCATIONS:
DATESITE 1 SITE PLAN:
DATESITE 2 SITE PLAN:
DATESITE 1 WALL PLANS AND SECTION DETAILS:
DATESITE 2 WALL PLANS AND SECTION DETAILS:
DATEMSE WALL DETAILS AND NOTES:
DATEWALL DRAIN DETAILS:
DATECULVERT INSTALLATION DETAILS:
D05Row1:
CULVERT INSTALLATION DETAILSRow1:
DATERow10:
D05Row2:
CULVERT INSTALLATION DETAILSRow2:
DATERow11:
D05Row3:
CULVERT INSTALLATION DETAILSRow3:
DATERow12:
D05Row4:
CULVERT INSTALLATION DETAILSRow4:
DATERow13:
D05Row5:
CULVERT INSTALLATION DETAILSRow5:
DATERow14:
D05Row6:
CULVERT INSTALLATION DETAILSRow6:
DATERow15:
D05Row7:
CULVERT INSTALLATION DETAILSRow7:
DATERow16:
D05Row8:
CULVERT INSTALLATION DETAILSRow8:
DATERow17:
D05Row9:
CULVERT INSTALLATION DETAILSRow9:
DATERow18:
D05Row10:
CULVERT INSTALLATION DETAILSRow10:
DATERow19:
D05Row11:
CULVERT INSTALLATION DETAILSRow11:
DATERow20:
D05Row12:
CULVERT INSTALLATION DETAILSRow12:
DATERow21:
D05Row13:
CULVERT INSTALLATION DETAILSRow13:
DATERow22:
D05Row14:
CULVERT INSTALLATION DETAILSRow14:
DATERow23:
D05Row15:
CULVERT INSTALLATION DETAILSRow15:
DATERow24:
undefined:
undefined_2:
ci:
ocS:
D05Row16:
CULVERT INSTALLATION DETAILSRow16:
DATERow25:

File details come from the government source that posted it. Updated .