5.04 - Attachment 04 - Price Matrix [1 page].xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Z2DA--Replace Windows and Weather Protection Federal contract opportunity
- Solicitation number
- 36C24824R0135
About this file
The provided document is a Price Matrix template for a federal contract opportunity to Replace Windows and Weather Protection at the Lake City VA Medical Center. The template includes line items for various construction divisions with fields to enter labor costs, material costs, and total costs. Additional fields are provided to enter overhead percentage, profit percentage, bond percentage, and the total base offer cost.
The related federal contract opportunity has a Solicitation Number of 36C24824R0135 and is issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 8. The contract is for the replacement of windows and weather protection at the Lake City VAMC facility located in Lake City, Florida.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 5.08 - Attachment 08 - Experience Modification Rate EMR [1 page].docx | DOCX document | |
| 5.07 - Attachment 07 - Subcontractor Past Performance Consent Form [1 page].docx | DOCX document | |
| 5.02 - Attachment 02 - Specifications [464 Pages].pdf | ||
| 5.01 - Attachment 01 - Drawing [55 Pages].pdf | ||
| 5.06 - Attachment 06 - Past Performance Survey [3 pages].docx | DOCX document | |
| 5.05 - Attachment 05 - Past Performance Questionnaire [3 pages].docx | DOCX document | |
| 36C24824R0135.docx | DOCX document | |
| 5.03 - Attachment 03 - Wage Determination [5 Pages].pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer
Base Offer Cost Breakdown
Project Number:
Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
Edward L Roy: VA assigned Project Title
| Project Location | ||
| Offeror Name | ||
| Offeror Street | ||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
File details come from the government source that posted it. Updated .