5-Consent of Surety-Change Order.pdf.pdf

PDF 648 KB Posted

Attached to
Countywide Wastewater Manhole Rehabilitation (WORCS 8)
Solicitation number
IFB-26-00407
Issued by
Hillsborough County, Florida

About this file

This is a Consent of Surety to Change Order form issued by Hillsborough County, Florida, applicable to the Countywide Wastewater Manhole Rehabilitation (WORCS 8) contract. The form is designed to document a surety's acknowledgment and agreement to modifications of an existing contract with Hillsborough County Water Resources. The form requires the surety to consent to changes in the contract amount (whether increasing or decreasing by a specified dollar amount) and/or extensions to the completion date (measured in calendar days). The consent document confirms that the performance bond and payment bond originally furnished under the contract are adjusted accordingly to reflect the modifications outlined in the change order. The form must be completed with the specific change order number, contract amount adjustment, timeline extension, and authorized signatures with the surety's seal.

The document requires notarization before a notary public in the State of Florida, County of Hillsborough, with the notary certifying the date, identity of the signatory, and capacity in which the person is executing the document. The form provides options for execution by an authorized representative or an attorney in fact (with power of attorney attached). The form was last revised on March 9, 2020. No pricing information, set-asides, or incumbent status is specified within this form itself; it functions solely as a procedural document for formalizing surety consent to contract modifications.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSENT OF SURETY TO CHANGE ORDER

CONTRACT TITLE:

CONTRACTOR (PRINCIPAL):

SURETY:

AGENT:

The SURETY does hereby acknowledge and agree to Change Order No. to the above referenced contract with Hillsborough County, the contract amount

(increasing/decreasing) by $ , and/or extending the completion date by ( ) calendar days. The SURETY further acknowledges that the performance bond and/or payment bond furnished under the aforementioned contract is accordingly changed to reflect the change in contract amount, and/or time included in Change Order No. .

This Consent is dated this day of , 20 .

SURETY:

BY: (SEAL)

Authorized Signature

-OR-

BY: (SEAL)

As Attorney in Fact (Attach Power of Attorney)

Printed Name

STATE OF FLORIDA

COUNTY OF HILLSBOROUGH

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this ___ day of ____________, 20___, __________________________ by (Name of person)

________________________ for _________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Know OR Produced Identification

Type of Identification Produced __________________

Revised 03.09.2020

File details come from the government source that posted it. Updated .