19-Attachment A- Supplemental Specifications 2.pdf
PDF 7 MB Posted
- Solicitation number
- IFB-26-00407
- Issued by
- Hillsborough County, Florida
About this file
This document is a Supplemental Specifications for Manhole Rehabilitation issued by Hillsborough County, Florida Water Resources Department in connection with the Countywide Wastewater Manhole Rehabilitation (WORCS 8) contract opportunity. The project scope encompasses ongoing, as-needed rehabilitation of existing wastewater manholes throughout Hillsborough County, including manhole inspection, replacement of frames and covers, invert rebuilding, removal of existing liners and coatings, inflow and infiltration repair, grouting and coating of manhole interiors, and restoration of associated sidewalks, curbs, gutters, irrigation systems, and roadways. The contract is structured as a term contract with work authorization through individual Work Orders issued by the Water Resources Department Director; the County reserves the right to award to one or more contractors and guarantees a minimum of $10,000 usage on the contract. Standard work hours are 7:00 a.m. to 4:00 p.m., Monday through Friday, excluding County holidays and weekends, with emergency work requiring response within one hour and mobilization within four hours. All work must comply with Hillsborough County Standard Specifications, County Technical Specifications, ASTM standards, and NASSCO standards; contractors must obtain all required permits including Maintenance of Traffic, Temporary Traffic Control, and Right-of-Way permits at no charge from the County, though they must pay any required dewatering permit application fees.
The contract is a lump-sum award with an estimated total value of $5,753,604.00, with pricing based on actual field measurements and Work Order quantities rather than estimated bid quantities. Contractors must submit unit prices for specific line items including manhole frame and cover replacement, chemical grouting, bench and invert restoration, spray-applied structural coating, liner removal, traffic control devices, sodding, asphaltic concrete pavement, and concrete sidewalk repair. Payment for coatings is calculated per vertical foot from the bottom of the manhole frame to the top of the invert or bench, with separate payment for frame and cover replacement and exterior restoration work. All mobilization, demobilization, and closeout costs must be included in unit rates; miscellaneous incidental items are incorporated into associated bid items with no separate payment. Product acceptability requires coating and lining materials to have a 10-year manufacturer's warranty and be listed on the Hillsborough County Public Utilities Approved Product List, with a minimum of 100 successful manhole rehabilitations documented in Florida and at least five years of in-service performance; contractors must have a minimum of five years' active experience in manhole rehabilitation and have completed at least 100 manholes in Florida. No Small Business Enterprise (SBE) set-aside goal has been established for this contract.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Supplemental Specifications for Manhole Rehabilitation SS-1
SUPPLEMENTAL SPECIFICATIONS
SECTION 1 - GENERAL
1.01 Scope
These specifications modify or supplement the General Conditions and other provisions of the Contract Documents. To the extent such provisions are not modified or supplemented herein; all provisions remain in full force and effect.
1.02 Number of Contracts (s)
The County reserves the right to award this Contract to one (1) or more Contractor’s.
1.03 Public Awareness and Outreach
In the event any activity under this Contract is determined to affect residents, the Contractor will be required to notify the affected residents using door hangers, letters, or flyers. All residents shall be notified at least seventy-two (72) hours in advance of mobilization. The geographical area of notification shall be determined by the County.
The County will provide the Contractor with the door hangers, letters, or flyers. All costs associated with this item shall be included in the Contractor's overhead.
1.04 Testing / Laboratory Services
A. All materials used in the construction of the project shall be subject to adequate inspection and testing in accordance with accepted standards. The Contractor shall select an independent laboratory or inspection agency for making all tests required by the specifications, and shall pay for this laboratory service direct, as a requirement of this Contract. Density testing of trenches and structure backfill (generally of soils, sub-grade, fill, pavement base and sub-base materials), shall be taken at intervals as specified in the Contract Documents, or as directed by the Project Manager. The Contractor shall provide advance notice to the Project Manager of required density tests. Reports of these tests shall be submitted for review to the Project Manager within ninety-six hours. The Contractor shall bear the sole responsibility to confirm that all densities meet the County Standards.
The Contractor shall pay for any additional tests resulting from the Contractor's failure to provide work that passes the required tests initially.
B. Materials of construction, particularly those upon which the strength and durability of the structure may depend, shall be subject to inspection and testing to establish conformance with specifications and suitability for uses intended.
Supplemental Specifications for Manhole Rehabilitation SS-2
C. Where specific performance or quality is referenced, it is Contractor's responsibility to have the necessary tests performed by qualified persons to show that the contractual requirements are being met. Where no reference is made, tests shall be performed in accordance with the methods prescribed by the American Society for Testing and Materials (ASTM), or such other organizations as would be applicable.
D. If these Contract Documents, or laws, ordinances, rules, regulations or orders of any public authority having jurisdiction to the Work, require any work to specifically be inspected, tested, or approved by someone other than Contractor, the Contractor shall give the Project Manager timely notice of readiness thereof.
Contractor shall furnish the Project Manager the required certificates of inspection, testing results or approvals. All such tests shall be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or these Contract Documents.
E. Any Work that fails any required test, inspection or approval, or any work that passes any required tests initially but does not meet the requirements of the Contract Documents, shall be considered Defective Work. It is the Contractor's sole responsibility to correct the Defective Work at no additional cost to the County. The cost of additional inspections and testing due to the defective work shall be borne by the Contractor at no additional cost to the County.
F. An allowance of $400,000 has been included in the Bid Proposal section to reimburse the Contractor for non-priced items. Reimbursement to the Contractor for testing shall be based on the actual amount paid by the Contractor without any mark-up and shall be made upon presentation of an invoice evidencing the Contractor’s payment of the same.
1.05 Inspections
A. The Project Manager may appoint Inspectors to observe both materials and work.
Such observation may extend to any or all parts of the work and to the preparation and manufacture of the materials to be used. The Inspector shall not be authorized to alter, revoke, enlarge, or relax the provisions of the work, nor will they be authorized to approve or accept any portion of the completed work, nor to issue instructions contrary to the Contract. An Inspector is assigned to keep the Project Manager informed on the progress of the work and the way it is being done. He shall call to the attention of the Contractor any deviation from the Contract Documents. Without approval from the Project Manager, the Inspector will not have the authority to reject defective materials or to suspend any Work that is being improperly performed.
Supplemental Specifications for Manhole Rehabilitation SS-3
B. Neither observations by the Project Manager or Inspector, nor inspections, tests or approvals by persons other than the Contractor shall relieve Contractor from their obligations to perform the work in accordance with the requirements of the Contract Documents.
1.06 Project Signs
One (1) project identification sign shall be placed at each location where work is being performed for the duration of that work. Because there may be more than one site, the County shall provide four (4) mobile signs to the Contractor. The Contractor shall ensure that the sign(s) are displayed at a prominent location at each site before beginning the work. The Contractor shall move the sign(s) as necessary and dispose of the signs when directed by the Project Manager.
1.07 Emergency Work
In the event of emergency work, as identified by the Project Manager, the Contractor will be required to respond to the Project manager within one (1) hour, be onsite to view the emergency within two (2) hours after communication with project manager and mobilize with crews and necessary equipment and materials within four (4) hours of verbal notification, including weekends and holidays. The Contractor is responsible to submit Traffic Control Plans per agency requirements and maintain devices for the duration of the project.
SECTION 2 - SPECIFICATIONS FOR DIVISION 2 OF THE TECHNICAL
SPECIFICATIONS
2.01 Description of Work
A. The following is a brief description of the work items included in this contract. The rehabilitation work includes, but is not limited to, the following items:
a. Manhole initial inspection.
b. Replacement of manhole frame and cover (F&C).
c. Rebuild the manhole invert (flow channel).
d. Clean manhole in preparation for coating.
e. Remove existing liners and/or coatings.
f. Repair minor and severe inflow/infiltration.
g. Repair inside surface of the manhole to restore structural integrity of the manhole prior to coating.
h. Grouting and/or coating of manhole interior.
i. Repair sidewalks, curbs, gutters, irrigation systems and roadways as related to the manhole rehabilitation.
Supplemental Specifications for Manhole Rehabilitation SS-4
j. Dispose of all waste materials, construction rubble, manhole liners, and any other waste from the rehabilitation of the manholes in accordance with all applicable laws, rules and regulations.
k. Maintain traffic flow as required by Hillsborough County Public Works Department Right-of-Way Management Office during manhole rehabilitation.
l. Final inspection of manhole(s) prior to acceptance by the County.
B. The Contractor shall submit to the Project Manager a weekly progress report including digital photographs of the work.
C. The Contractor shall furnish all labor, materials, and equipment to complete the work as described in the Technical Specifications, as shown on the Plans, and as directed by the Project Manager in accordance with the expressed or obvious intent of this Contract.
2.02 Reference Standards
A. All work shall be performed in strict accordance with the Hillsborough County Standard Specifications For Construction (latest edition), the Hillsborough County Public Utilities, Water Resources Department Water, Wastewater, and Reclaimed Water Technical Specifications (latest edition including Appendix B, Approved Products), the Hillsborough County Public Utilities, Water Resources Department Water, Wastewater and Reclaimed Water Technical Manual (latest edition), and the Hillsborough County Public Works' Utility Accommodation Guide and Rights of Way Use Procedure Manual (latest edition). The documents may be found on Hillsborough County’s webpage at:
http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications.
In all circumstances, the most stringent requirement, as determined or modified by the Project Manager, shall apply to the work. It is the Contractor’s responsibility to obtain and maintain the specifications and technical material necessary to perform the work.
B. The American Society for Testing and Materials (ASTM) standard specifications and installation standard practices are made part hereof by reference and shall be the latest edition and revision thereof. All rehabilitation shall be in accordance to these standards:
a. C78, Standard Test Method for Flexural Strength of Concrete
b. C109, Standard Test Method for Compressive Strength of Hydraulic
Cement Mortars
c. C157, Standard Test Method for Length Change of Hardened Hydraulic-
Cement Mortar and Concrete
Supplemental Specifications for Manhole Rehabilitation SS-5
d. C307, Standard Test Method for Tensile Strength of Chemical-Resistant Mortar, Grouts, and Monolithic Surfacings
e. C580, Standard Test Method for Flexural Strength and Modulus of Elasticity of Chemical-Resistant Mortars, Grouts, Monolithic Surfacing, and Polymer Concretes
f. C596, Standard Test Method for Drying Shrinkage of Mortar Containing Hydraulic Cement
g. C882, Standard Test Method for Bond Strength of Epoxy-Resin Systems Used with Concrete by Slant Shear
h. D638, Standard Test Method for Tensile Properties of Plastics
i. D792, Standard Test Methods for Density and Specific Gravity (Relative
Density) of Plastics by Displacement
j. D4787, Standard Practice for Continuity Verification of Liquid or Sheet
Linings Applied to Concrete Substrates
k. D4833, Standard Test Method for Index Puncture Resistance of
Geomembranes and Related Products
C. Standard Practice for Sealing Sewer Manholes Using Chemical Grouting For Chemical Grouting the following Standards shall apply:
a. ASTM F-2304 Standard Practices for Rehabilitation of Sewers
Using Chemical Grouting
b. ASTM F-2414 Standard Practices for Rehabilitation of Sewers
Manholes Using Chemical Grouting
c. ASTM F-2454 Standard Practices for Sealing Lateral Connections and Lines from Mainline Sewer Systems by Lateral Packer Method, Using Chemical Grouting
d. ASTM C1244 Concrete Sewer Manholes by the Vacuum Test Method
e. NASSCO Suggested Standard Specification for manhole inspection and assessment
2.03 Permits
This work will be performed using the Water Resources Annual General Use permit which authorizes general utility maintenance work. It shall be the Contractor’s sole responsibility to obtain the Maintenance of Traffic Permit (MOT), Temporary Traffic Control (TTC), and Right-of-way (RoW) permit for each Work Order. There will be no charge from Hillsborough County for MOT, TTC, or RoW permits. It shall also be the Contractor’s responsibility to obtain a dewatering permit from Florida Department of Environmental Protection if one is required. A $100 application fee is required for the Industrial Wastewater General Permit for dewatering.
2.04 Contract Estimated Quantities
Supplemental Specifications for Manhole Rehabilitation SS-6
Unit quantities are provided as a means of comparing bid proposals and as a basis for award.
However, these quantities are estimated and actual unit quantities may vary greatly during the term of this contract. THE BIDDER IS ADVISED THAT THE TOTAL
QUANTITY OF WORK REQUESTED MAY BE LESS THAN THE QUANTITY
ESTIMATED, AND IN FACT THE COUNTY ONLY GUARANTEES A MINIMUM
OF $10,000 USAGE ON THIS CONTRACT.
Bidders are cautioned against predicating their bid prices on an assumed scope of work or estimated bid quantities. The amount of award represents only the upper dollar limit beyond which no further work shall be ordered, except as may be approved by the Board through a Change Order. It is not known how much or how little work will be ordered during the term of this contract.
Bidder acknowledges that actual quantities may be significantly less than those indicated in the bid, and agrees that, as the Contractor, they will not make any claim for damages or for loss of profits because of a difference between the quantities bid and the quantity of work actually ordered.
Work Order pricing shall be based on actual field measurement, not estimated bid or planned quantities.
2.05 Measurement and Payment Supplement
Replace Section 01312 of the Public Works Standard Specification for Construction with the attached Water Resources Section 01025 - Measurement and Payment which is included as an attachment.
2.06 Authorization of Work
No work may be performed under this term contract except as authorized by a Work Order issued by the Water Resources Department Director, or designee and a Purchase Order. The Work Order will establish the Notice to Proceed date. The Contractor shall not proceed with, and shall not be compensated for, any work that is not authorized by written Work Order. Verbal authorization may be given when immediate response conditions occur at night and/or on weekends and followed-up with a written authorization within 24 to 48 hours of the occurrence.
2.07 Work Order Assignment Procedure
In the event the County awards this contract to more than one Contractor, Work Orders will be issued on a determination of the best overall value for the County.
Value shall be determined by the PROJECT MANAGER based on the following factors;
Scope, Schedule, and Cost.
The Project Manager shall develop a preliminary scope, schedule, and cost estimate for each task order and determine the best value for the County. If it is determined to be in the best interest of the County, a Work Order may be awarded to the Contractor with the lowest time
Supplemental Specifications for Manhole Rehabilitation SS-7 estimate (schedule) for the completion of the work. The Project Manager shall continue the Work Order Assignment Procedure described herein for the duration of the Contract, including all subsequent renewal periods.
2.08 Incidental Items
Miscellaneous or incidental items such as dewatering, cutting, patching, saw-cutting, concrete, electrical hardware, bolts, nuts, fittings, etc., or other items may be required to complete the construction as indicated on the plans. If no specific bid item is shown, such miscellaneous or incidental items are to be included in the unit price for the item with which they are associated. SEPARATE PAYMENT FOR MISCELLANEOUS INCIDENTAL ITEMS SHALL NOT BE MADE BY THE COUNTY. All components shown and described on the bid documents are to be included in the bid items shown on the bid form.
2.09 Sewage Spills
All wastewater or other spills resulting from Contractor operations hereunder shall be contained, removed, and cleaned up immediately by the Contractor at no additional cost to the County. The Contractor shall disinfect spills using a disinfectant method approved by the Project Manager. The Contractor shall report all spills immediately to the Project Manager. All required regulatory agencies shall be notified as soon as possible, but in no case later than twenty-four hours from the time of the spill. The Contractor shall provide the regulatory agencies and the Project Manager a detailed written report of the spill, describing the occurrence and all actions taken.
Disposal of Washwater – The Contractor may be allowed to decant excess washwater from a Jet-VAC truck or other pumping truck by directing the flow of the washwater into a sanitary sewer manhole whose location is approved by the Project Manager. Solids shall not be dumped into a manhole but shall be disposed of in an appropriate and permitted location at the Contractor’s expense. The Contractor shall not dispose of discharge washwater containing waste and debris into any streets, ditches, canals, rivers, or lakes.
2.10 Site Safety and Clean-Up
A. The Contractor shall be responsible for site safety and clean-up. The Contractor will be responsible for keeping the site safe for pedestrians and traffic. The Contractor shall dispose of all debris on a daily basis and be responsible for hauling all debris to an appropriate and permitted disposal site. The Contractor will not be allowed to accumulate excess debris on the site, unless approved by the Project Manager.
B. All costs associated with the safety, clean-up, and disposal of debris shall be included in the Contractor's overhead.
Supplemental Specifications for Manhole Rehabilitation SS-8
2.11 Emergency Work
In the event of emergency manhole rehabilitation work, as identified by the Project Manager, the Contractor will be required to respond to the request of the Project Manager and mobilize within four (4) hours of verbal notification, including weekends and holidays.
Failure to meet this Contract requirement may result in termination of this Contract and/or the filing of a claim by the County against the Performance Bond.
2.12 Standard Work Hours
The standard work hours shall be 7:00 A.M. to 4:00 P.M., Monday through Friday, excluding County-observed holidays and weekends. Work outside these hours shall require twenty-four hours notice to and written approval from the Project Manager. Standard work hours may be impacted by the requirements of Right-of-Way or MOT permits.
2.13 Pricing of Work Orders
Pricing of Work Orders shall be accomplished by multiplying the appropriate unit prices times the quantities of each line item required for the work order, to arrive at a Pay Quantity for that line item, then adding all such line item Pay Quantities to arrive at the Work Order Cost. It shall be the Contractor's responsibility to advise the County and obtain prior approval for any additional quantities to be utilized beyond those specified in the Work Order. The Contractor will not be compensated for any materials or work without written authorization from the Project Manager. The Contractor will be compensated for authorized additional quantities on the Revised Work Order after Final Completion of the Work Order
2.14 Digital Photography
A. Contractor shall take pre-construction and post-construction photos and submit the photos to the Project Manager in an electronic format. The photos shall include all features in the vicinity of the work that might be impacted by the construction. The Project Manager reserves the right to select the views to be photographed. Photos shall be named and labeled with the date the photo was taken, work package number, location (street address), and a brief description of times and activity covered in the photo.
B. If Contractor fails to submit post-construction photos to the Project Manager within ten days of completion of the work, the County reserves the right to have the post-construction photos taken by an independent photographer. All costs incurred by the County associated with the production of the post-construction photos will be deducted from the pay application.
C. In areas near surface waters, the photos shall include an upstream and downstream
Supplemental Specifications for Manhole Rehabilitation SS-9 view of each bank at the nearest point to the work and, if applicable, point of crossing. Also, a view of the line route shall be taken from each bank of the crossing and elsewhere as the Project Manager may direct.
SECTION 3 – Product Acceptability
3.01 Product/Contractor Pre-Qualification
A. The County encourages competition on the manhole rehabilitation project.
However, the County must assure that all products installed in the County’s system are of good quality, the manufacturers of such products are reputable, their prices are fair and reasonable, and the installers of such products are competent and experienced.
B. The coating/lining materials (Products) must have a 10-year manufacturer’s warranty and be on the Hillsborough County Public Utilities Approved Product List (Appendix B), http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications. To be acceptable, a minimum of 100 successful manhole rehabilitations of the Products that meet all the referenced specifications in the State of Florida must be documented to assure commercial viability. In addition, the rehabbed manholes shall have been in service within the wastewater collection system in the State of Florida for a minimum of five (5) years. The Contractor must have had at least five (5) years of active experience in the manhole rehabilitation of the County’s approved products and must have rehabbed a minimum of 100 manholes in the State of Florida.
SECTION 4 – Work Sequencing and Notification of Work Location
4.01 Work Sequencing
Areas/locations of manholes to be rehabbed are anticipated to be split into work orders.
For each work order, budget, and schedule per list of manholes shall be prepared and submitted to the Project Manager for approval. All manholes designated on the work order shall be completely rehabilitated before moving onto the next work order unless otherwise directed by the Project Manager. After completion of the first or sequential work order(s) and acceptance of the work by the Project Manager, the Contractor may request authorization to mobilize crews to the next work order(s).
4.02 Structural Rehabilitations of Interior Wall of Manholes
A. Apply geopolymer coating system approved by the Hillsborough County to the barrel sections over any existing coating. Coating material may be manually sprayed, or hand troweled by the local certified installer. The minimum thickness of the geopolymer coat system must be one inch (1”) and must be finished such that when the liner sets, the total wall thickness is homogeneous and monolithic.
Supplemental Specifications for Manhole Rehabilitation SS-10
The minimum compressive strength of the coating system must be 8,000 psi at 28 days and it must exhibit sufficient chemical resistance to sulfuric acid at a pH of
1.0 such that material loss is a maximum of 2% at 8 weeks in accordance with ASTM C267. Substrate preparation and liner application must be in accordance with manufacturer’s instructions. Contractor shall obtain a 10- year warranties for the County both from the supplier for materials and the local certified installer for the installation.
B. The Contractor shall install the coating system in accordance with the manufacturers recommendations to insure compatibility between the structural repair mortar and coating system.
C. Concrete surfaces requiring repair with cementitious materials shall be compatible with the corrosion resistant coating system. Available in both horizontal and vertical grades, cementitious structural repair mortar with corrosion inhibitors shall be used to patch or overlay existing deteriorated concrete surfaces.
4.03 Composition
A. For areas in need of repair up to 1½ inches thick, repairs shall be accomplished using a cementitious structural repair mortar with an integral corrosion inhibitor which is capable of application thickness up to 1½ inches in a single application.
B. For areas in need of repair greater than 1½ inches, but less than 3 inches thick, repairs shall be accomplished using a cementitious structural repair mortar, with an integral corrosion inhibitor and capable of an application thickness up to 3 inches in a single application.
C. For areas in need of repair greater than 3 inches thick, repairs shall be accomplished using a non-sag, cementitious structural repair mortar with a corrosion inhibitor and capable of vertical surface application thickness greater than 3 inches in a single application.
D. For older manholes, constructed out of brick, cementitious structural repair mortar shall be replaced in joints where it is missing so as to restore the structural integrity of the brick manhole.
E. The Contractor shall follow the manufacturer’s recommendation for bonding agent and wire mesh reinforcing to be installed within the repair, if needed.
F. The Contractor shall consult the manufacturer for recommendations to insure compatibility between each structural repair mortar and the coating system.
G. The Contractor shall obtain coating system manufacturer’s approval for the structural repair mortar prior to its use.
Supplemental Specifications for Manhole Rehabilitation SS-11
H. One hundred percent epoxy grout may be used for minor repairs. Prior approval from the coating system manufacturer will be required to ensure product compatibility.
4.04 Bench / Invert Restoration
“Major” rehab is defined as restoration of the bench/invert area and/or rebuilding of the bench slope. Invert rehab shall be carried out on all inverts with visible damage or infiltration. After blocking flow through the manhole and thoroughly cleaning the invert, a quick setting patching material shall be applied to the invert in an expeditious manner.
The mix shall be troweled uniformly onto the invert at a minimum thickness of ½ inch, extending out onto the bench sufficiently to tie into the coating that will be spray applied.
The finished invert shall be smooth and free of ridges. The flow may be re-established in the manhole within 45 minutes to 1 hour after placement of the material only if performing bench work without manhole coating.
4.05 Inflow and Infiltration Prevention
A. Inflow and Infiltration (I&I) shall be classified as “Minor” or “Severe”. (1) “Minor” I&I consists of water penetration of the manhole structure at a single localized area, appearing as a wet stain less than one square foot of area or a minute flow (trickle) of water on the interior surface of the manhole. (2) “Severe” I&I consists of multiple leaks penetrating an area greater than one square foot of interior manhole surface or of single leaks that spray into the interior of the manhole.
B. If “Minor” I&I is observed within the structure after surface preparation is complete, the area shall be prepared and a rapid setting crystalline enhanced hydraulic cement product, specifically formulated for infiltration control, shall be used to stop the Minor infiltration flows in accordance with the manufacturer's recommendations. The material shall be ThoRocTM Plug, OctocreteTM, Burke Plug, or approved equal.
C. Where infiltration flows are “Severe”, surface preparation, manhole drilling and pressure grouting are required. The material for pressure grouting shall be Avanti grout, DeNeef grout, or approved equal, installed in accordance with the manufacturer's written instructions.
4.06 Schedule for Reinstatement of Manholes
A requirement of this Contract shall be that once a manhole has been coated/lined, each manhole shall be completely reinstated (i.e. returned to 100 percent flow) following the curing of the coating/liner within the manhole.
Supplemental Specifications for Manhole Rehabilitation SS-12
4.07 Manhole Final Inspection and Acceptancy
Following final inspection and acceptance of the rehab work by the County, all identified warranty work will be at no cost to the County.
4.08 Notification of Location of Work
It is critical that the County has access to the job site at any time during the rehabilitation process. Therefore, the Contractor shall be responsible for planning and communicating the precise location of work being accomplished on a daily basis. In order to accomplish this, the Contractor shall notify the Project Manager by email of the location(s) of work to be performed the following business day (Monday – Friday). Notification shall be accomplished by 12:30 PM the business day before the work is to be performed.
END OF SECTION
SECTION 5 – ATTACHMENTS
The following attachments are included as part of these supplemental specifications:
1) Section 01025 Measurement and Payment
2) Appendix B: Approved Products and Materials
- END OF SECTION –
SECTION 01025 – MEASUREMENT AND PAYMENT
01025-1
Measurement and Payment
GENERAL
Measurement and payment shall be based upon the accepted complete Work that is performed in strict accordance with the drawings, specifications, and the pay item schedule.
Each unit price stated shall constitute full compensation as herein specified for each item of work complete, in place, and ready for use and operation in accordance with the drawings and specifications.
The descriptions in the following sections generally define the work tasks, materials, and labor associated with each pay item. This information is provided to assist the Contractor in assigning and accounting for costs associated with each pay item. Notwithstanding this, it is the Contractor's sole responsibility to fully define and establish the cost for each item and the work in its entirety.
Materials utilized shall be selected from those listed in the latest version of the
Hillsborough County Water Resources Department (HCWRD) Technical Specifications
– Approved Products and Materials List (Appendix B). The Contractor shall be responsible for downloading the most recent Appendix B for this Project. The latest version is made available online at the HCWRD website at:
http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications.
0. MOBILIZATION
The Contractor is expected to spend a reasonable number of hours inspecting the proposed scope of work, acquiring parts materials and equipment, and preparing a detailed cost estimate utilizing the unit price items and/or sources mentioned in the
Supplemental Specification.
The contractor shall be responsible for obtaining all permits, insurance, and bonds;
delivery of all parts, materials, and equipment to the site: furnishing and erecting project identification sign, obtaining or taking digital photography (as described in the supplemental specification), and other items as noted in section 01020, "Mobilization";
and providing sanitary and potable water facilities as required for the proper performance and completion of the work.
No separate payment shall be made for mobilization, demobilization, and closeout. The
Contractor must include any costs associated with mobilization, demobilization, and closeout in the unit rates for bid items included in this Contract
1. MANHOLE FRAME AND COVER (F&C) REPLACEMENT
This bid item describes measurement and payment for Manhole Frames and Covers
(F&C) installed during the rehabilitation of manholes. The manhole frame shall include the cover (it’s a set). The quantity to be paid for under this item is the number of Manhole Frames with the Covers acceptably installed as shown on the drawings or
01025-2 where directed by the Project Representative. The unit bid price includes furnishing and installing the F&C and all materials, labor, adjustment material, excavation and backfill, resetting or replacing of manhole F&C and restoration.
2. CHEMICAL GROUT AND HYDRAULIC CEMENT FOR MANHOLES NOT TO BE
COATED OR LINED.
This bid item is to be used to grout and seal leaks in manholes which do not require a structural coating or a fiberglass liner.
This bid item describes measurement and payment for Manhole Repairs with chemical grout and/or hydraulic cement.
This unit price item shall include all equipment, materials, and labor for the application of chemical grout injection to the interior of the manhole and patching of existing concrete surfaces. The work comprises installing a grout, hydraulic cement and includes sewer flow bypass (flow thru plugs), surface preparation, cleaning (sand or water blasting), and the removal/disposal of solids. The patching shall be in strict accordance with the manufacturers written recommendations to eliminate manhole leaks.
If “Minor” I&I is observed, a rapid setting crystalline enhanced hydraulic cement product, specifically formulated for infiltration control, shall be used to stop the Minor infiltration flows in accordance with the manufacturer's recommendations. The material shall be ThoRocTM Plug, OctocreteTM, Burke Plug, or approved equal. Where infiltration flows are “Severe”, surface preparation, manhole drilling and pressure grouting are required. The material for pressure grouting shall be Avanti grout, DeNeef grout, or approved equal, installed in accordance with the manufacturer's written instructions.
The unit price shall be based on the actual in-place volume of material (without allowance for waste) and shall include all labor, material, equipment and consumable items to complete the work and shall be full compensation for the work described herein.
Completed work that does not meet the specified requirements shall be removed and replaced or repaired to the Project Manager’s satisfaction at no additional cost to the
County.
Payment shall be according to the unit price bid for sealing leaks in manholes which did not require a structural coating or a fiberglass liner.
3. BENCH AND INVERT RESTORATION
This item provides for the restoration of bench and invert. The quantity to be paid for under this item is the number of manhole benches acceptably rehabilitated as shown on the drawings or where directed by the Project Representative.
The work includes the removal of all deteriorated concrete and loose bricks from the existing bench, restoration bench with hydraulic cement, applying coating system to the restored bench surfaces, protection of adjacent facilities, restoring all disturbed areas to reconstruction condition or better, and appurtenant work.
01025-3
Payment will constitute full compensation for all costs for rebuilding the invert and bench including, but not limited to, bypass, labor, equipment, transportation, tools, and all other related procedures and materials.
4. SPRAY APPLIED STRUCTURAL COATING
This bid item describes measurement and payment for the installation of spray applied structural coatings in existing in-service manholes. This is an all-inclusive bid item which includes the structural coating and all interior work, cleaning, grouting, leak sealing and materials necessary to install a spray applied structural coatings.
The Contractor shall furnish all labor, materials and equipment to coat the existing manhole with an approved coating, according to manufacture recommendation and
Hillsborough County Public Utilities Technical Specification and the Supplemental
Specification.
The work comprises installing an approved coating system as specified including bypass (flow thru plugs), surface preparation, cleaning (sand or water blasting), application of hydraulic cement or other means to fill voids and stop infiltration, curing, visually inspecting finished coating; testing, removal/disposal of solids and all appurtenant work.
If “Minor” I&I is observed, a rapid setting crystalline enhanced hydraulic cement product, specifically formulated for infiltration control, shall be used to stop the Minor infiltration flows in accordance with the manufacturer's recommendations. The material shall be ThoRocTM Plug, OctocreteTM, Burke Plug, or approved equal. Where infiltration flows are “Severe”, surface preparation, manhole drilling and pressure grouting are required. The material for pressure grouting shall be Avanti grout, DeNeef grout, or approved equal, installed in accordance with the manufacturer's written instructions.
The Contractor shall furnish all labor, materials and equipment to transport all debris removed including but not limited to manhole frame and cover from the existing manholes to an approved disposal site.
STRUCTURAL SPRAY COATING: The minimum thickness of the geopolymer liner system must be one inch (1”) and must be finished such that when the liner sets, the total wall thickness is homogeneous and monolithic.
Payment for spray applied manhole coatings and associated work (cleaning, grouting, leak sealing) will be made using the “per vertical foot” unit price listed in the bid proposal. Measurement shall be per vertical foot of coating applied to the manhole measured from the bottom of the manhole frame to the top of the invert or bench.
Separate payment will be made for the manhole frame and cover (if replaced) and exterior restoration work such as asphalt, concrete sidewalk and sod.
5. REMOVAL EXISTING MANHOLE LINER
01025-4
This item provides for the removal of existing liners T-lock PVC, Agru HDPE, A-Lok Dura
Plate 100 PVC and similar PVC liners from the interior of existing concrete manhole and disposal of the resultant debris in preparation for manhole rehabilitation. Sand or water blasting, substrate resurfacing, and surface coating is included in the bid items for fiberglass and sprayed applied liners. The removal of existing liners from the manhole will be in strict accordance with the lining and coating manufacturer’s recommendations and/or as directed by the PROJECTMANAGER. The unit price shall be based on the actual surface area of the overall dimensions of the manhole where liner is removed and shall include all labor, material, mobilization, demobilization, equipment, consumable items, and all incidentals to complete the work describe herein. The Contractor is responsible for disposing of debris at a licensed approved location and all costs associated with disposal are included in this unit price item.
Completed manhole liner removal that does not meet the specified requirements for coating application shall be rehabbed to the PROJECT MANAGER’s satisfaction at no additional cost to the County
6. TRAFFIC CONTROL DEVICES
Traffic Control Devices include barricades, arrow boards, signs, temporary pavement markers, or equipment on the job site lights, temporary striping and flagmen.
For all devices the following applies:
PH = Per hour calculated to the closest 15 minutes.
ED = Each per day calculated by rounding up to the next full day.
LF - Actual Linear Footage Measurement.
All travel, overhead or any other associated expenses in transportation and setting out will be included in the price. Time is calculated by actual time of persons.
7. SODDING
This bid item describes measurement and payment for grassing of completed construction areas by planting sod.
Sodding: Measurement of sodding will be on a square yard basis for the area of sod installed where shown on the drawings, or where directed by the Project Representative.
Sod will be paid for on the basis of type, and area installed, as shown on the Proposal.
The unit bid price for sodding includes soil preparation, furnishing and installing sod, rolling, mowing, and any other measure necessary to establish and maintain a healthy stand of grass until the work is accepted by the Owner.
No payment will be made for the installation of sod where existing lawn areas are disturbed by the Contractor during the performance of the Work. New sod shall be installed where existing lawn areas are disturbed by the operations of the Contractor.
Installation of sod shall be considered a subsidiary obligation of the Contractor and all costs associated therewith shall be included in the unit and lump sum unit prices.
01025-5
8. ASPHALTIC CONCRETE PAVEMENT REPLACEMENT AND OVERLAY
Work included under the bid items for asphaltic concrete pavement surface (Type S-I or SP
12.5) and overlay (Type SP 9.5) is furnish all labor, equipment and materials to place and maintain all asphaltic concrete pavement surface and overlay, as shown, specified and as directed by the Project Representative. Conform asphaltic concrete pavement surface and overlay to the requirements of Hillsborough County Public Works Standard Specifications for Construction October 2021.
The quantity of asphaltic concrete to be paid for under this bid item shall be the square yards of material acceptably installed within the limits shown on the drawings or where directed by the Project Representative. The area to be paid for shall be based on the dimensions shown on the drawings or where directed by the Project Representative.
The Project Representative may specify a maximum thickness of 9 inches of full depth asphalt to be used in lieu of approved base material. A thickness of less than 9 inches may be directed by the Project Representative depending on the site conditions. The maximum thickness to be paid for under this bid item shall be 9 inches of material acceptably installed within the limits shown on the drawings or where directed by the
Project Representative. The weight conversion that will be used use is (110LBS per square yard @ 1 inch thick)/2000. The unit of measure for full depth asphalt shall be tons.
The unit bid price for asphaltic concrete surface and friction courses shall include the cost of furnishing, placing, and compacting material, rolling, and correcting deficient thickness or cross section of base, surface, and friction courses. In addition, the unit price includes the cost of removal and disposal of existing asphalt. If the County request milling of existing asphalt in conjunction with a pipeline point repair or manhole replacement, the Contractor shall adjust the depth of asphalt in this area 1” lower than the proposed finish grade so that milling will not be required in the area of the repair.
9. CONCRETE SIDEWALK OR DRIVEWAY, 4-INCHES THICK
This bid item includes construction of concrete sidewalk and /or driveways where shown on the drawings,4-inches thick. The quantity to be paid for under this item shall be the area, in square yards acceptably installed to the limits and dimension shown on the drawings, or where directed by the Project Representative.
Payment will be according to design thickness of the sidewalk, as designated on the Bid
Form. Payment for this bid item includes formwork, concrete, reinforcing and finishing.
END OF SECTION