This document is installation instructions provided by Crafco, Inc. for hot-applied asphalt pavement crack sealing and joint sealing products, applicable to the City of Wichita's 2026 Outsourced Pavement Preservation Program in Kansas. The instructions detail the application procedures for Crafco's RoadSaver, PolyFlex, Parking Lot, and Asphalt Rubber products used to seal or fill working cracks and joints in asphalt concrete and Portland cement concrete pavements. The document specifies that these single-component, polymer-rubber modified asphalts are supplied in solid form and require heating in jacketed double boiler melters meeting ASTM D6690 specifications before application. Key technical parameters include application temperature ranges (80°C to 98°C or greater depending on climate grade), reservoir dimensions (width and depth specifications based on temperature grade), and application life of approximately 12 to 15 hours when heated to proper temperature. The instructions cover both routed and unrouted crack sealing methods, surface overbands, and joint sealing procedures for concrete pavements, with detailed guidance on reservoir preparation, cleaning requirements using minimum 90 psi compressed air, and finishing configurations.
The products are not fuel or oil resistant and should not be used in fuel or oil spill-prone areas or on pavements with surface treatments without proper routing depth to anchor into solid pavement. Installation requires pavement temperatures exceeding 40°F (4°C) for optimal adhesion, with provisions for heat lancing at lower temperatures if necessary. Critical safety precautions are emphasized due to the elevated temperatures at which products are applied, including requirements for protective clothing, traffic and pedestrian controls meeting MUTCD standards, proper melter operation, and careful material handling to prevent burns and respiratory irritation from fumes. The document advises against application in high-severity cracked areas without subsequent surface treatment or overlay, and provides guidance on avoiding product softening when surface treatments or seal coats are subsequently applied. Additional resources including product data sheets, material safety data sheets, and sealing guides are available through Crafco, Inc. and authorized distributors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTALLATION INSTRUCTIONS
INC HOT-APPLIED ROADSAVER, POLYFLEX, PARKINGimmo.CAN ERGON G COMPANY LOT AND ASPHALT RUBBER PRODUCTS
420 N. Roosevelt Ave.• Chandler AZ 85226
1- 800- 528- 8242•( 602) 276- 0406• FAX( 480) 961- 0513
JANUARY 2008
www. crafco. com
READ BEFORE USING THIS PRODUCT
GENERAL: These products are hot-applied, single component ASPHALT PAVEMENT CRACK SEALING: Crack sealing polymerhubber modified asphalts supplied in solid foul, used to seal or fill consists of installing extensible sealants into routed reservoirs in cracks or joints in asphalt concrete or Portland cement concrete pavements. working cracks in pavements in good condition.
These products are not fuel resistant, and should not be used in fuel or oil spill prone areas. To use, product is removed from the package, heated in a metier Reservoir Claing_ Based on the 98% LTPPBIND temperature range and applied to the pavement Details on pndrrct specifications, climate and ( difference fiorn high to low), as ks are to be toured as follows owe suitability, and product selection are contained in Product Data Sheets Temperature
Grade Range Reservoir Width Reservoir Depth
MELTING AND APPLICATION: These products must be 80° C or less A"( 12 mm) 19 min) melted in jacketed double boiler melters with effective agitation that 86° C 19 mm) 3"( 19 min) meet requirements of Appendix X1. 1 of ASTM D6690. Crafco 92° C 1 1/ 8"( 28 mm) '/ A"( 12 mm)
Supershot, EZ Series 2, and EZ Pour melters are recommended. Do 98° or greater 1 ' A"( 38 mm) A"( 12 min) not use direct fired or air heated machines. Heat transfer oil should not exceed 525° F( 274° C). The melter must be capable of safely heating Reservoir width should not exceed 1'' A"( 38 mm). Cutting should remove product to 400° F( 204° C). CAUTION: Stop agitation when adding at least 1/ 8"( 3 min) from each side and produce vertical, intact surfaces product to prevent splashing. Product is heated to between the with no loosely bonded aggregate. The pavement should be sound minimum application temperature and the maximum heating enough to resist significant spelling during cutting. Final reservoir width temperature which are shown on product containers and Product Data should not exceed twice the cutter width or 1' A"( 38 min) maximum.
Sheets. These products are most effectively applied with pressure feed Installation and Finishing. After cleaning, sealant at the requited wand systems. RoadSaver, PolyFlex and Parking Lot products can also temperature is installed in the reservoir. Sealant can be installed with up to be applied using gravity feed pour pots( Part No.40200 and 40201). a 3/ 8"( 10 min) underfill, flush fill, or with an overhand cap that does not exceed 1/ 16"( 1. 5mm) above the pavement surface, and not greater than a APPLICATION LIFE: Application life when heated to application 2" ( 50 mm) width beyond crack edges, depending on project temperature is approximately 12 to 15 hours and may be extended by specifications. These configurations are achieved using appropriate wand adding fresh product as quantity in the melter decreases. Product shall tips, shoes or squeegees. To reduce surface tack, Crafco DeTack or other be agitated during installation. Product may be reheated once to approved material may be applied.
application temperature, after initial heat up. When application life has been exceeded, RoadSaver and Parking Lot products will thicken, ASPHALT PAVEMENT CRACK FILLING: Crack filling consists become " stringy" and may then gel. If this occurs, product should of installing flexible, traffic resistant product into prepared, cleaned, non-immediately be removed from the melter and discarded. Asphalt working pavement cracks. Filler can be installed in routed or unrouted Rubber and PolyFlex products will soften when overheated or heated cracks or in surface overbands.
for too long. Routed Reservoir— Routed reservoirs are recommended for longest life. Guidelines for determining reservoir use are:
PAVEMENT TEMPERATURES: Apply product when pavement 1. Crack density should not exceed approximately 20%( linear feet temperature exceeds 40°F( 4°C). Lower temperatures may result in reduced ofcracks per square feet ofpavement area).
adhesion due to presence of moisture or ice. If pavement temperature is 2. Pavement should be sound enough to resist significant spelling lower than 40°F( 4°C), it may be warmed using a heat lance( Part No. during cutting,( Final reservoir width should not exceed double the 45650) that puts no direct flame on the pavement If installing at lower cutter width, or 1 ' A"( 38 mm) maximum pavement temperature than 40°F( 4°C), extreme care should be used to Reservoir Dimensions— Determined as follows:
insure that cracks or joints are dry and free from ice and other contaminants. 1. The cut should remove at least 1/ 8"( 3mm) from each side of the
Product temperature should be maintained at the maximum heating crack and cut back to sound pavement temperature. If installing product at night, assure that dew is not forming on 2. Minimum width is%"( 12 mm), maximum is 1'/"( 38 min).
the pavement surface. Applied product should be checked by qualified 3. Recommended cut depth is'/."( 19 mm).
personnel to assure that adhesion is adequate. 4. Reservoirs are then cleaned with compressed air.
Cleaned Unrouted Cracks— Cracks may be cleaned and filled without TRAFFIC CONTROLS: Place traffic controls in accordance with Part 6, reservoirs, but longer life is achieved with reservoirs. Cleaning consists of Temporary Controls, of the FHWA Manual on Uniform Traffic Control using high- pressure dry, clean compressed air, brushing, or vacuum devices( MUTCD) to protect the work site for the duration ofthe repairs. techniques to remove debris.
Surface Overbands— Product can be applied in overbands after crack
CRACK/ JOINT CLEANING: For appropriate adhesion, cracks cleaning with compressed air. Overbands should not exceed 1/ 16"( 1. 5 or joints must be thoroughly clean and dry immediately prior to product min) high above the pavement surface and not extend greater than 2"( 50 installation. After widening or debris removal, and just prior to product mm) beyond each crack edge.
installation, final cleaning shall use high pressure 90 psi ( 620kpa) Fidler Installation and Finishing— Same as sealant installation and minimum, dry, oil flee compressed air to remove any remaining dust finishing.
Both sides of the crack or joint shall be cleaned. Surfaces should be PORTLAND CEMENT CONCRETE PAVEMENT JOINT inspected to assure adequate cleanliness and dryness. SEALING AND RESEALING: Joint sealing and resealing consist of C2008, Crafco, Inc., All Rights Reserved installing extensible sealants into sawn and cleaned joint reservoirs in not adhere to asphalt or concrete pavements surfaces that are PCC pavements. contaminated with oil spills.
Reservoir Sawing— New concrete should be cured for at least 7 days Crack Sealing or Filling in Pavements with Surface Treatments:
prior to sawing the joint reservoir. Joint spacing should be at the design When crack sealing or filling pavements with chip cmis slurry seals, dimension, generally from approximately 12 to 20 ft. ( 3. 7 to 6.2m). and open graded friction courses, routing should be deep enough to Joints shall be at least ' W'( 6mm) wide, and should not exceed 1' Yr" extend through the surface treatment layer into the underlying asphalt 38mm). For new pavements designed with narrow joints using the concrete. This anchors product into solid pavement for better bonding.
initial narrow saw cut as the reservoir, spaced at 15 ft( 5m) maximum, and when using low modulus type sealants, joint width may be as CLEAN OUT: If melters used requite clean out, follow manufacturer' s narrow as 1/ 8 inch( 3mm). Contact Crafco for more details. Reservoir instructions. If solvent is used, insure it does not contaminate p,ndu t becalm depth should allow a sealant depth to width ratio of 1: 1 to 2: 1, sufficient dilution and flash problems may ocau.
depth for backer rod, and the specified surface recess. Reservoirs shall be cut no deeper than required When resealing, old sealant can be STORAGE: Pallets of product are protected with a weather resistant removed by knives, plows or sawing. Sawing shall slightly widen the covering. During storage, this covering must be intact to prevent boxes joint by 1/ 8 to V. inch( 3- 6mm) to remove all traces of old sealant and from getting wet If wet, boxes may lose strength and crush. Rips in the produce clean, intact vertical surfaces. Maximum joint width is 1 V2 pallet covering should be repaired to maintain packaging integrity.
inch( 38mm). Pallets should be stored on a dry, level surface with good drainage.
Reservoir Cleaning— After sawing, joints shall be flushed with water to Pallets should not be stacked because crushing of bottom boxes may remove sawing slurry and allowed to dry. Just prior to installing sealant, occur. Product properties are not affected by packaging deterioration both joint surfaces shall be cleaned using sandblasting, brushing or other means to remove any remaining of sawing residue. Final cleaning SAFETY PRECAUTIONS: Since these products are heated to is then done with high-pressure( minimum 90 psi, 62N/cm2) clean, elevated temperatures, it is essential that operations be conducted dry , oil free compressed air the same day that sealant is installed. safely. All personnel need to be aware of hazards of using hot applied Moisture and oil traps are required on the compressor. Joints must be materials and safety precautions. Before use, the crew should read and inspected to assure cleanliness by rubbing a finger along each face to understand product use and safety information on the box and the spot dust or other contaminants. If found, recleaning should occur until product MSDS. User should check D. O.T. requirements for joints are completely clean and dry. The objective of sawing and transportation of product at elevated temperatures above 212° F cleaning is to provide vertical, intact, clean concrete bonding surfaces ( 100° C).
free from all contaminants and are dry. HAZARDS ASSOCIATED WITH HOT-APPLIED
Backer Rod—After cleaning, heat resistant backer rod( ASTM D5249, MATERIALS: Skin contact with hot materials causes burns. Over
Type I) approx.' 25% larger than the joint width shall be installed to the exposure to fumes may cause respiratory tract irritation, nausea, or required depth without damage or punctures. Punctures or damage to headaches. Precautions are to be taken to prevent contact with hot backer rod may cause sealant bubbling. material and to avoid inhalation of fines for everyone in the vicinity.
Sealant Installation— Concrete should be cured at least 7 days prior to Safety precautions should include:
installing sealant Sealant heated to required temperature is installed per 1. Protective clothing to prevent skin contact with hot material.
project specifications. Typical installations include a recess up to V. inch 1. Care when adding product to melters to reduce splashing.
6mm), flush, or with a surface overhand ( maximum 1/ 16" ( 1. 5mm) 3. Careful operation of wands or pour pots that apply product above the surface, and 2"( 50 mm) maximum beyond each joint edge). 4. Traffic and pedestrian control measures which meet or exceed MUTCD requirements to prevent access to work areas while
INSTALLATION PRECAUTIONS: In certain situations, product is in a molten state.
additional consideration needs to be given to product selection and 5. Avoidance of material fumes.
application geometries. 6. Proper application configurations with a minimum amount of
Parking lots and other areas subjected to slow moving traffic and material excess.
pedestrians: Product used must be stiff enough at hot summer 7. Appropriate clean up ofexcessive applications or product spills.
temperatures to resist pick up and should not be applied on top of the pavement surface. Product should have a high temperature grade at least ADDITIONAL INFORMATION: Additional information one step above the LTPPBIND grade for the climate. For even better pick- regarding these products is available by contacting your distributor or up resistance, increase by two grades. Crafco, Inc. This information includes:
Pavement to receive an Overlay, Surface Treatment, or Seal Coat•. 1. Product Data Sheets
Product will be subjected to overlay heat effects and carriers for surface 2. Material Safety Data Sheet, treatments and seal coats. If product is applied on top of the pavement, 3. Safety Manual and an overlay is then placed, bumps may occur during compaction. 4. Sealing Cracks and Joints in Parking and Pedestrian Areas Refer to` Bump Formation& Prevention in Asphalt Concrete Overlays 5. " Bump Formation& Prevention In Asphalt Concrete Overlays
Which Have Been Crack Sealed" ( www.crafco. com) for more Which Have Been Crack Sealed" information. Solvents or other carriers in surface treatments may soften 6. Sealant Selection Guide product Prior to placing a surface treatment or seal enat a test strip should be placed to verify compatibility of the product and treatment
High Severity Cracked Areas: Highly cracked areas( fatigue cracks in wheel paths) should not be treated by coveting cracks becalm- pavement friction may be affected. These cracks can be filled if followed by a surface treatment or overlay to restore friction.
Fuel or Oil Spill Areas: These products should not be used in fuel or oil spill areas due to softening of the sealant that may occur. Sealant will
02008, Crafco, Inc., All Rights Reserved