Summary
This Scope of Work and Specifications document outlines Marion County Community Services Department's pre-qualified contractor program for residential rehabilitation projects under the SHIP & HOMES Rehab Program in Florida. The initiative seeks to establish an exclusive panel of general contractors to perform six standardized repair services: Roof Replacement, HVAC System Replacement, Domestic Well Replacement, Septic System Replacement, Handicapped Accessibility improvements (Doorways), and Electrical Panel Upgrades. All work must comply with state and federal guidelines, local building codes, and industry standards. Projects are capped at $75,000 per assignment, with contractors required to complete all work within timeframes specified in individual task orders and complete punch list items within seven days of issuance. Pre-quote meetings will be conducted one to two weeks after a quote is advertised, allowing contractors to assess projects on-site and propose necessary modifications. The general contractor serves as the prime contractor for all six commodities and manages all subcontractor coordination and pricing. Liquidated damages are assessed at $250 per day for delays, and retainage will be withheld per Florida Statutes until final project completion, including all punch list corrections and final inspections.
Qualified contractors must hold a current Florida General Contractor or Residential Builder license, possess current business licenses, maintain workers compensation and general liability insurance, demonstrate financial stability to self-finance projects for 30 days during reimbursement processing, and provide evidence of experience in residential construction and rehabilitation. Required submittals include a statement of interest, proof of qualifications and licenses, detailed descriptions of experience with three construction and three business references, proof of business location and ability to operate in Florida, W-9 forms, conflict of interest disclosures, and any additional supporting documentation. Marion County Community Services staff will evaluate all responses for inclusion in the pre-qualified contractor pool, with the county reserving the right to reject any or all responses due to acknowledged subjectivity in the evaluation process despite efforts to ensure impartial and fair assessment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PURPOSE: This contract is intended to standardize and streamline the quoting and repair execution process for the Community Services Department for their Rehab projects. The intention is to establish a select group of pre-qualified contractors to perform SHIP & HOMES Rehab work for Marion County Community Services. By establishing this Pre- Qualified Contractor contract the Community Services Department hopes to solicit several GENERAL CONTRACTOR’S to agree to the general specifications detailed in this document and be part of an exclusive group of pre-qualified contractors being requested to quote and perform the Rehab repair projects that Community Services has available on a continuous basis. This is intended to shorten quoting and awarding process to provide service to citizens in a more expedited and less arduous manner.
SCOPE: The proposed contract specifications are comprised of the 6 major services the Community Services Department most frequently provides to its Rehab clients. These are also the six most time sensitive repairs where the ability to shorten the time from client request to repair would be most beneficial. The six repair services are as follows:
• Roof Replacement
• HVAC Replacement
• Domestic Well Replacement
• Septic System Replacement
• Handicapped Accessibility (Doorways)
• Electrical Panel Upgrade
The specifications to follow are still consistent with the current Rehab standards that have been used for quoting purposes over the last several years. The intention was to not modify the current standards, but to standardize them for the purposes of a pre-qualification process. Every project will have its own specific specifications that may vary slightly for these specifications due to specific requirements for each specific project. It is intended to hold a pre-quote meeting shortly after (1 to 2 weeks) the quote is advertised to the pre-qualified contractors. At that onsite meeting contractors can fully discuss and assess the project and reference the project specific specifications and quote form. All pre-qualified GENERAL CONTRACTOR’S can provide their input which will be assessed and needed modifications can be made to increase the clarity of the project. We urge all pre-qualified GENERAL CONTRACTOR’S to actively participate in the pre-quote review, evaluation, and suggestion process with Procurement & Community Services.
It is intended that the pre-qualified GENERAL CONTRACTOR/GENERAL CONTRACTOR’S will be the GENERAL CONTRACTOR for all of the 6 commodities included below. As such, all SUB- CONTRACTOR coordination and pricing would be handled solely by the awarded GENERAL CONTRACTOR. The CONTRACTOR must comply with all State & Federal Guidelines and Regulations.
DISCLAIMER: All work specified below is not all-inclusive. They are general specifications so contractors can have a preview of the typical specifications utilized on Community Services rehab projects. Prior to an awarded GENERAL CONTRACTOR starting a specifically assigned project, the GENERAL CONTRACTOR is required to verify exact measurements, sizes and quantities; and to know job conditions, and to
REHAB PRE-QUALIFED CONTRACTORS
GENERAL SCOPE, SPECIFICATIONS, AND REQUIREMENTS
Immediately notify the Community Services Department of any other necessary work to achieve quality finished products that meet or exceed applicable specs and codes prior to work commencing. The specified items in this standard quote package or specific task orders assigned to the awarded GENERAL CONTRACTOR’S do not preempt any current applicable codes enforced by the permitting agency having jurisdiction. GENERAL CONTRACTOR agrees to complete project within time frame detailed on the specific task orders when issued and all punch list items completed within 7 days of punch list issuance.
WORKMANSHIP: All work to be performed in a workmanlike manner, in accordance with the Community Services Housing SHIP & HOMES Rehab Program specifications, local codes, industry standards and manufacturer specifications. Landscaping or sod replacement will not be allowed in this scope of work.
SUBSTITUTIONS: All substitutions and change orders must be approved, in writing, by Marion County Community Services prior to installation, or GENERAL CONTRACTOR risks replacing such materials at their own expense. Contact the Construction Coordinator immediately for change orders requiring immediate attention. GENERAL CONTRACTOR to photograph all work for client file.
LIQUIDATED DAMAGES: Liquidated Damages shall be assessed at a rate of $250 per day.
PROJECT MANAGEMENT: The GENERAL CONTRACTOR shall appoint one individual to act as the GENERAL CONTRACTOR'S representative in regard to the contract.
Contact numbers for this individual and for a secondary or back-up person shall be provided to the COUNTY.
PROJECT CORRESPONDENCE: All project correspondence and communications written or verbal shall be conducted between the GENERAL CONTRACTOR and owner thru the Community Services Project Coordinator. Written correspondence shall be in email form and shall be addressed to the Community Services Project Coordinator. If the GENERAL CONTRACTOR has a design/contract questions or clarifications that need to be made then the GENERAL CONTRACTOR shall contact the Community Services Project Coordinator to discuss the issues that need clarification. Whenever practical, the use of email is preferred form of communication for the project correspondence and it is recommended that all verbal communications regarding design or contract related issues be followed up with a confirmatory email to the parties involved. The GENERAL CONTRACTOR will be required to respond to any phone, verbal, or electronic communication from the Department Director, the Project Coordinator, or any higher authority such as an Assistant County Administrator, by the close of business the next day.
QUALITY ASSURANCE: Any defects or deficiencies in materials or workmanship that are deemed by the COUNTY as needing immediate correction shall be addressed within
10 days of written notification. Failure to correct the deficiencies within 10 days will result in the deduction of time against the overall contract term of completion.
METHOD OF MEASUREMENT and BASIS OF PAYMENT: Except for items noted in the Bid Form to be paid in Lump Sum, the Method of Measurement and the Basis of Payment shall be per unit price for each item identified in the Quote Form for each item completed, inspected and accepted by the COUNTY.
FINAL PAYMENT, RETAINAGE, and FINAL RETAINAGE RELEASE PAYMENT AND FINAL WAIVER OF BOND: For projects involving more than 1 invoicing cycle, retainage will be withheld in accordance with Florida Statutes until the project has reached final completion and an acceptance by the COUNTY. Final completion is defined as having all work complete, all punch list items corrected, Final Inspection complete and accepted.
Upon final completion the GENERAL CONTRACTOR shall submit the final invoice requesting release of retainage (if applicable) along with final waivers of bond from all SUB-CONTRACTOR’S and suppliers who performed work on the project. Any withheld retainage or final invoice shall not be partially or fully released or paid until all waivers of bond have been submitted to the COUNTY and verified.
SITE RESTORATION: Any damage to the existing facilities or surrounding grounds will be restored by the GENERAL CONTRACTOR to an acceptable condition as directed by the Community Services Department. All sodding shall be pallet sod and is to match existing sod type. No additional compensation shall be made for site restoration.
GENERAL CONTRACTOR: is responsible for coordinating all work activities to ensure project runs smoothly and in a professional manner. The GENERAL CONTRACTOR is also responsible for the conduct and dress of his staff and SUB-CONTRACTOR’S staff.
GENERAL CONTRACTOR to notify home owner each work day and provide a schedule and time when SUB- CONTRACTOR’S will be arriving to perform work. All SUB- CONTRACTOR’S must adhere to the schedule provided by the GENERAL CONTRACTOR. All roofing related repairs will require photographs of damaged areas that require replacement and to include additional photographs of same area once repaired. These areas include: fascia, sub-fascia, rafter tails, truss tails and plywood decking. Photos must be submitted to Project Coordinator at completion of this project.
STANDARD SPECIFICATIONS
SECTION 1: MISCELLANEOUS REQUIREMENTS
PERMITS & LICENCES: The GENERAL CONTRACTOR shall provide all required sketches and drawings, as required by the AHJ, if applicable. This cost shall be included with this work item. The GENERAL CONTRACTOR shall pay for and post on site all permits and licenses necessary to complete the project. GENERAL CONTRACTOR and SUB- CONTRACTOR’S must have current licenses required by the state, COUNTY and city. GENERAL CONTRACTOR to also provide current copies of company insurance and vehicle insurance. Upon completion of project, GENERAL CONTRACTOR must submit the following documents prior to receiving full payment;
signed lien release from all SUB- CONTRACTOR’S and Suppliers, COUNTY approved COC, if applicable and all approved final inspections from the permitting agency. A punch list inspection will be conducted by the Construction Coordinator, and any noted items must be completed by the GENERAL CONTRACTOR in a timely manner.
CONSTRUCTION DEBRIS REMOVAL & DISPOSAL: GENERAL CONTRACTOR shall provide onsite construction container for debris removal. GENERAL CONTRACTOR shall provide onsite portable toilet facilities for all GENERAL CONTRACTOR and SUB- CONTRACTOR staff use. GENERAL CONTRACTOR to provide plastic dust barrier to renovated areas to minimize dust, and use drop cloths to protect flooring and furniture.
GENERAL CONTRACTOR to vacuum and clean all areas outlined in the specific scopes of work for each project.
SECTION 2: SITE BUILT ROOF REMOVAL AND
REPLACEMENT
(Permit Required)
GENERAL REQUIREMENTS
• GENERAL CONTRACTOR is responsible for all final measurements, roof square footage and quantities for all roofing materials required to complete roof replacement.
• Shingle color to be selected by Owner.
• GENERAL CONTRACTOR is required to notify Project Coordinator two working days in advance of roof tear off date.
• Prior to dry-in decking, truss repair and wood fascia must be inspected by
Construction Coordinator.
• Roofing GENERAL CONTRACTOR and employees must use extreme caution while working around electrically charged wires to existing weather-head. GENERAL
CONTRACTOR and SUB-CONTRACTOR’S are responsible for providing safety training for all employees and trades while conducting work activities related to this project.
• Remove all existing shingles and underlayment down to roof decking.
• GENERAL CONTRACTOR to remove Gutters carefully and reinstall existing gutters when roof is complete. Note: This only applies to existing gutters.
• Re-nail existing sheathing per code specifications.
• Furnish and install sheets of plywood decking for repairs.
• Furnish and install Felt Buster® high traction synthetic roofing underlayment properly nailed per code.
• Furnish and install new code compliant roof plumbing vent stacks. Apply roofing tar and fasteners, per manufacturer instructions.
• Furnish and install new like-for-like kitchen and bathroom universal roof cap vents. Apply roofing tar and fasteners, per manufacturer instructions.
• Furnish and install new retrofit adjustable EPDM pipe flashing boot around existing weather-head, mounted through roof. Apply roofing tar and fasteners, per manufacturer instructions.
• Remove all water damaged wood fascia around home as needed. Note: Project Coordinator must inspect repair before covering.
• Furnish and install pressure treated lumber to replace rotten framing, behind finished fascia. Note: Project Coordinator must inspect repair before covering.
• Furnish and install pressure treated lumber to replace rotten finished fascia. Note:
Project Coordinator must inspect repair before covering.
• Furnish and install same species of lumber to replace rotten trusses, rafters, or truss tails.
Note: Project Coordinator must inspect repair before covering.
• Furnish and install new GAF® plastic cobra ridge vent with matching shingles install on top surface, per Building Code and Manufacturer specifications.
• Furnish and install new drip edge to covering entire roof perimeter. Drip edge to match color of shingles, per Building Code and Manufacturer specifications.
• Furnish and install new aluminum fascia to covering entire roof perimeter fascia.
Aluminum fascia to match color of shingles, per Building Code and Manufacturer specifications.
• Furnish and install 30-year architectural/dimensional shingles for entire roof area. Provide warranty information.
• During roof rafter and fascia repairs, soffits and j-channels may become loose and come apart. GENERAL CONTRACTOR to reinstall all loose j-channel and soffit sections around entire home, as needed. All damaged soffits during construction is the GENERAL CONTRACTORs responsibility to furnish and install to original condition.
• Furnish and install 30-year architectural/dimensional shingles for entire roof area. Provide warranty information.
• Construct/Reconstruct and re-roof any crickets that may be needed for the upslope side of any/all fireplace penetrations.
• GENERAL CONTRACTOR to spread tarps along the base of home to protect shrubs and catch roofing debris during demo. GENERAL CONTRACTOR thoroughly clean-up roof debris to exterior of home and use rolling magnet device to pick-up nails, when roof replacement is completed.
SECTION 3: HVAC SYSTEM REMOVAL AND
REPLACEMENT
(Permit Required)
GENERAL REQUIREMENTS
• GENERAL CONTRACTOR will remove existing air handler unit, including condenser unit and refrigerant lines to a legal disposal facility.
• Furnish and install new HVAC system to be UL listed, electric split system having a minimum efficiency rating of 15 seer that is properly sized to heat and cool the house.
Unit shall have minimum of 10 KW heat strips.
• Complete HVAC systems manufacturer to be Rheem®, Carrier®, RUDD® or Trane®, or COUNTY pre-approved equivalent. Complete system must be installed to manufacturer recommendations and current building code.
• Installation to include all materials, properly sized electrical wiring from air handler to condenser unit, electrical panel and disconnect boxes, fuses, disconnect box replacement if required and mechanical connections for system to operate properly and safely.
• Furnish and install refrigerant cap locks.
• Ductwork shall be properly sized to manufacturer design and tie into existing main duct work.
• Furnish and install approximately six (6ft.) of new supply run R6 duct board, up to horizontal turn in attic. Seal all edges with white mesh and mastic, to prevent air gaps.
• GENERAL CONTRACTOR to furnish and install new duct board insulation in the return air plenum chamber.
• Furnish and install new copper refrigerant lines and insulate with black foam to manufacturer recommendations and per COUNTY building code.
• Furnish and install new Honeywell® 6000 thermostat or Honeywell®, Home T6-Pro thermostat, or COUNTY approved equal. Replace thermostat wiring as needed.
• Furnish and install new ¾” plywood cap cover over return air plenum box.
• Furnish and install new one (1in.) external filter base rack to fit air handler unit.
• Furnish and install condensate line with removable cap and float switch in accessible area, within the air handler closet.
• Furnish and install new concrete condenser pad with tie-downs.
• Furnish and install one (1) eight (8Ln. ft.) galvanized metal chase to be surface mounted on back side of home if old refrigerant lines cannot be removed and must be rerouted into the attic. New metal chase to cover refrigerant lines and thermostat wires. Spray foam in the bottom opening of the chase, to fill all gaps.
• GENERAL CONTRACTOR will provide equipment manufacturer warranty and maintenance instructions.
• Provide one (1) additional replacement pleated fabric filter. Must have easy access and clear from obstructions for filter replacements.
• Remove all existing window A/C units on existing home and leave on property.
• GENERAL CONTRACTOR responsible to clean-up and remove all related construction debris to a legal disposal facility. Dump fees and construction dumpster costs are GENERAL CONTRACTOR’s responsibility.
SECTION 4: WELL & WATER TREATMENT SYSTEMS
(Permit Required)
GENERAL REQUIREMENTS
• GENERAL CONTRACTOR to obtain necessary permits to abandon current well and drill new well on client property.
• GENERAL CONTRACTOR to ensure new well location is a minimum distance of 75ft.
from septic field.
• Abandoned existing well per Florida building code and per Marion COUNTY Health Department. Plug by filling well from bottom to top with neat cement grout or bentonite and capped with a minimum of one foot of neat cement grout.
• Furnish and install new pressure switch and pressure gauge.
• Furnish and install approximately one hundred to one hundred fifty foot (100 to 150 Ln.
ft.) of new riser pipe.
• Furnish and install new bladder tank properly sized for well.
• Provide costs for drilling well from 100 to 150 foot deep.
• Furnish and install new properly sized pump.
• Furnish and install new control box.
• Furnish and install screen.
• Follow Building code P2904.5.1 Water Supply from individual source.
• Follow P2904.6.2 (1) Method of sizing pipe.
• Trench must be twenty four (24in. deep), per NEC.
• Furnish and install Electrical PVC conduit, per NEC.
• Use # 10 wire with ground from well to breaker panel, per NEC.
• PVC for plumbing can lay in same trench at six (6in.) above electrical conduit.
WATER TREATMENT SYSTEM
• GENERAL CONTRACTOR to obtain water analysis from water Treatment Company prior to installation of equipment. Water testing will determine the type of water treatment system required. Submit test results to Community Services.
• Marion COUNTY approved water treatment vendors are Jason’s Water Treatment, LLC and Culligan Water Systems.
• GENERAL CONTRACTOR to furnish and install new water treatment automatic pump and timer unit, salt tablet supply tank, all related PVC pipe, fittings and components to make system function properly. Bid to include a concrete pad at back side of home.
• GENERAL CONTRACTOR to furnish and install salt tablets to fill holding tank.
• GENERAL CONTRACTOR to clean all plumbing faucet screens in both bathrooms and kitchen.
• GENERAL CONTRACTOR to give instructions to maintain and operate equipment for homeowner.
SECTION 5: SEPTIC SYSTEM
(Permit Required)
GENERAL REQUIREMENTS
• Community Services wants contractors to be aware that the new regulations regarding septic systems being implemented by the State of Florida will most likely be in affect at the time of future septic system projects. To avoid any quote development confusion for future projects, all septic system/drain field replacement quotes are to be formulated and calculated based on the new state septic system requirements and shall be constructed to these new standards. If this work includes replacing the distribution box, then include it in your quote for the septic field replacement. Since there is the possibility a new septic tank will be required to meet the new state standards a pay item for it will be added as an alternate quote item on future projects. Contractors are instructed to provide the cost of a new septic tank (complete) to meet the new nitrogen reducing standards as directed by the state and county. If it is determined at the time of permitting that it is not needed, then it will not be required or paid for, however if it is required then the price submitted on the alternate quote item will be the price compensated. It is strongly recommended that all quoting contractors fully research all state and local requirements on septic systems specifically installed in the project area. Contractors are advised to contact FDOH as well as performing a full review of Florida Statute 381.0065 before submitting their quote.
• GENERAL CONTRACTOR to pump out the existing tank and install new drain fields that are properly sized and constructed for home, as per COUNTY and Department of Health guidelines.
• Removal of all failed soil and all existing nonfunctioning drain field materials shall be transferred to a legal disposal site.
• Use only approved materials, as per COUNTY and State Codes.
• All work is to be inspected by the State of Florida Health department as required by code.
• GENERAL CONTRACTOR to take before and after photographs of new drain field and related components.
• Furnish and install new drain field components, per State of Florida Health department.
• Prior to work commencement, GENERAL CONTRACTOR to locate electrical, coaxial cables and lawn sprinkler system runs to prevent damage.
• GENERAL CONTRACTOR to evaluate collection/distribution box. Task order to include repairs to collection/distribution box.
• Quotes are to include soil replacement, grade work area, remove rocks and root debris and reseed yard in work area when completed.
• GENERAL CONTRACTOR to provide final approved inspection from the State of Florida
Health department to Community Services.
SECTION 6: HANDICAPPED ACCESSABLITY –
DOORWAYS
(Permit Required)
GENERAL REQUIREMENTS
EXTERIOR DOOR REPLACEMENT
• GENERAL CONTRACTOR to provide product approval number of exterior doors.
• Furnish and install new pre-hung, insulated metal door or Composite with three (3) hinges.
• Exterior door will include, adjustable threshold, weather strip, striker plates, peep site, door knob to be lever style, including dead bolt and bottom door sweep.
• Door Manufactured by MMI® doors, Reliabuilt®, ThermaStar by Pella®, Atrium®, or
COUNTY approved equivalent.
• Optional Composite Fiberglass exterior doors, manufactured by PLASTPRO®, Inc. is preferred. Product approval #FL.15213 Fiberglass door. This installation will not require painting. Caulking holes, seams, miter joints, threshold, jamb and trim will be required.
• During installation GENERAL CONTRACTOR to provide and install shims necessary to plumb both sides of door and jamb. Include door expandable foam around jamb sides and header for insulation.
• Lever action type handle and dead bolt to be Schlage®, manufacturer.
• Furnish and install exterior trim to be brick molding or match existing trim for all door openings.
• Furnish and install matching interior trim for all door openings.
• Furnish and apply white GE®, silicone, mold resistant caulk on exterior door and trim to prevent water intrusion, or COUNTY approved equal.
• GENERAL CONTRACTOR to furnish and apply one (1) coat primer and two (2) coats of finish paint on door jamb and trim only.
INTERIOR DOOR REPLACEMENT
• GENERAL CONTRACTOR to provide product approval number of interior doors.
• Furnish and install new pre-hung, hollow core door with three (3) hinges.
• Interior door will include door knob to be lever style and all applicable hardware.
• Proposed door manufacturer must be submitted at time of quote for approval.
• During installation GENERAL CONTRACTOR to provide and install shims necessary to plumb both sides of door and jamb.
• Lever action type handle to be Schlage®, manufacturer.
• Furnish and install matching interior trim for all door openings.
• GENERAL CONTRACTOR to furnish and apply one (1) coat primer and two (2) coats of finish paint on door jamb and trim only.
SECTION 7: ELECTRICAL PANEL & SERVICE
UPGRADE
(Permit Required)
GENERAL REQUIREMENTS
ELECTRICAL PANEL, ELECTRICAL SERVICE AND/OR ELECTRIC SERVICE POLE
• CONTRACTOR to perform all electrical upgrades to meet or exceed all applicable codes, standards, and requirements.
• Quote to include all work necessary to upgrade the electrical panel, electrical service, or electrical pole as a complete and functioning installation.
• GENERAL CONTRACTOR to furnish & install new exterior service pole, meter can and main breaker panel. Install new schedule 80 PVC conduit from home to main breaker panel with proper size wires, per NEC. Rated 3R electrical, single phase, as per NEC.
• Furnish and install new exterior wood service pole, weather head, galvanized piping, and service box, per local building code.
• Furnish and install new exterior Main Square D 150-200amp main panel at service pole, or COUNTY approved equal. Include all associated breakers, per NEC.
• Furnish and install schedule 80 PVC pipe from bottom of service panel to proper code depth to home main electrical panel, per NEC.
• Furnish and install new properly sized stranded copper wire from interior home panel to exterior panel at service pole.
• Furnish and install new properly sized stranded copper wires from exterior panel up to weather head with approximately three (3ft.) of extra wire length for utility company hook up.
Furnish new meter can base. Contact utility company for meter, installation & power.
END OF GENERAL SCOPE AND SPECIFICATIONS
QUALIFICATIONS OF CONTRACTOR
1. Hold a current license as a General Contractor or Residential Builder in
Florida.
2. Not be debarred from conducting business with the state of Florida.
3. Contractor must not be on the SAM.Gov debarment or suspended list.
4. Possess a current business license where required by local law.
5. Have sufficient workers compensation, general liability and builders risk insurance policies in force.
6. Possess sufficient financial stability to enable the contractor to finance the rehabilitation for 30 days while reimbursement from MCBCC is processed.
7. Demonstrate experience in each of the areas listed under ROLE of
CONTRACTOR.
8. Expected and committed compliance with 2 CRF 200 Federal guidelines on
HOMES funded projects.
ROLE OF CONTRACTOR
The contractor should have considerable experience in construction and/or repair of residential property. Responsibilities are as follows. The following list should not be considered as all inclusive.
1. Perform or subcontract for specified repairs which could include but not be limited to roofing, HVAC systems, well installation, water treatment systems, septic systems, electrical, handicapped ramps and handicapped doorways.
2. Work with state and local building inspectors to ensure that the contracted work meets all local, state and national building codes.
3. Ensure compliance with applicable Federal and State of Florida labor laws.
4. Ensure compliance with applicable Federal, State of Florida and local environmental laws including laws relating to erosion control and waste disposal.
ADMINISTRATIVE GUIDANCE
This RFP is designed to provide interested respondents with basic information to submit a proposal that will meet the minimum requirements. It is not intended to limit a proposal’s content or exclude any relevant or essential data. Respondents are encouraged to expand upon the minimum requirements of the RFP.
REQUIRED SUBMITTALS
A complete response shall be submitted containing the following items:
1. Statement of Interest – A letter summarizing the background and experience representative of the work specified and being proposed by Marion County Community Services Department, including the contractor’s commitment to the current rehab programs and providing contracting services for those programs.
2. Name and contact information (including contact person and email address) of the organization submitting the response.
3. Specific Details of Proposed Services
a. Evidence of the qualifications listed under Qualifications of Contractor including but not limited to copies of all licenses and certificates of insurance for workers compensation, general liability and builders risk insurance.
b. A detailed description of experience in residential property construction and/or rehabilitation.
c. Proof of firm entity location (tangible tax listing, firm license or registration on www.sunbiz.org, or other type of location documentation)
d. Proof of firm's ability to do business in the State of Florida
e. W-9
f. Conflict of Interest Statement
g. Firm Certification Page/Addenda Acknowledgement/Cover Page
h. A description of your firm including numbers of professional and support staff, respectively.
i. Three construction references with contact information related to similar construction projects performed for public or private entities.
j. Three business references with contact information related to business relationships. At least one of the references should be a banking reference (to substantiate financial ability).
4. Disclosure of any business or familial relationship with members of the MCBCC staff or Board of Commissioners members.
5. Any additional information the respondent feels will strengthen their application qualifications.
EVALUATION CRITERIA
Each respondent should follow the above required format. All submittals will be carefully considered by Marion County Community Services staff for inclusion in the approved pre-qualified contractor’s pool.
HOWEVER, MCBCC ACKNOWLEDGES THAT THERE MAY BE SOME
SUBJECTIVITY IN EVALUATION OF THE LISTED CRITERIA. EVERY EFFORT
WILL BE MADE BY MCBCC OR ANY PANEL OF JUDGES TO BE IMPARTIAL
AND FAIR IN THE EVALUATION PROCESS. NOTWITHSTANDING THE ABOVE,
MCBCC RESERVES THE RIGHT TO REJECT ANY OR ALL RESPONSES.
| GENERAL CONTRACTOR to furnish and apply one (1) coat primer and two (2) coats of finish paint on door jamb and trim only. |
| GENERAL CONTRACTOR to furnish and apply one (1) coat primer and two (2) coats of finish paint on door jamb and trim only. |
| QUALIFICATIONS OF CONTRACTOR |
| ROLE OF CONTRACTOR |
| ADMINISTRATIVE GUIDANCE |
| REQUIRED SUBMITTALS |
| EVALUATION CRITERIA |
| HOWEVER, MCBCC ACKNOWLEDGES THAT THERE MAY BE SOME SUBJECTIVITY IN EVALUATION OF THE LISTED CRITERIA. EVERY EFFORT WILL BE MADE BY MCBCC OR ANY PANEL OF JUDGES TO BE IMPARTIAL AND FAIR IN THE EVALUATION PROCESS. NOTWITHSTANDING THE ABOVE, MCBCC RESERV... |