5-26-121202-P-AR Pricing Sheet.pdf

PDF 87 KB Posted

Attached to
Energy Conservation Consultant
Solicitation number
26-121202-P-AR
Issued by
Fulton County, Georgia

About this file

This is a pricing sheet for RFP No. 26-121202-P-AR issued by Atlanta Public Schools (APS) in Georgia for Energy Conservation Consultant services. The proposal solicits qualified vendors to provide energy conservation consulting services, with a pre-proposal conference scheduled for Thursday, February 19, 2026, at 2:00 p.m. ET via Microsoft Teams. Vendors are required to submit proposals that comply with all RFP requirements, attachments, and exhibits. The scope of work encompasses three primary phases: IGA oversight, construction phase, and measurement and verification (M&V) post-installation activities across multiple buildings and energy conservation measures (ECMs).

Vendors must provide hourly rates for three primary labor categories: Project Manager, M&V Specialist, and Energy Engineer, along with any additional labor categories as needed. Proposals should include task descriptions and estimated hours for each project phase. Vendors are required to submit a sample "not-to-exceed" (NTE) figure based on an assumed scope, such as 20 buildings with $25 million in ECMs. The total proposed fees must be clearly stated, and APS will not reimburse any costs not specifically included in the proposal. This pricing structure allows APS to evaluate vendor capability and cost competitiveness for energy conservation consulting services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

26-121202-P-AR ENERGY CONSERVATION CONSULTANT

Pricing Sheet

I have read and understand the requirements of this Request for Proposal RFP NO. 26-121202-P- AR and agree to provide the required services in accordance with this proposal and all attachments, exhibits, etc. I understand that APS will not be responsible for reimbursing any costs not specifically set forth in this proposal.

Total Proposed Fees $_____________

Non-scored criteria – For informational purposes only

Vendor: ____________________________

Signature: _________________________ Date: ___________________

Provide hourly rates for labor categories:

Project Manager

M&V Specialist

Energy Engineer

Ensure the RFP requests task descriptions and estimated hours for each phase of the project (IGA oversight, construction phase, M&V post-installation).

Provide a sample "not-to-exceed" (NTE) figure based on an assumed scope (e.g., for 20 buildings, $25M in ECMs, etc.).

Additional labor categories:

File details come from the government source that posted it. Updated .