This is a Price Bid Form Attachment A for Asbestos and Lead-Based Paint Abatement and Mold Remediation Services issued by the Atlanta Independent School System (Atlanta Public Schools) in Georgia. The form solicits pricing for three distinct service categories: asbestos abatement, lead-based paint remediation, and mold and water damage remediation. For asbestos abatement, bidders must provide unit pricing for 18 line items including removal of pipe insulation at various heights, thermal system insulation abatement, floor tile and mastic removal, disposal services, containment staging, and HEPA air scrubber equipment rental. Lead-based paint abatement pricing includes remediation from building surfaces, waste disposal, and paint encapsulation services across three primary line items. Mold and water abatement pricing encompasses 21 line items covering mold remediation from various surfaces, water extraction and disposal, HVAC system cleaning, demolition services, carpet and fabric treatment, air quality equipment rental, and waste disposal.
The form requires bidders to provide unit costs for each line item with pricing measured in linear feet, square feet, cubic yards, per-unit charges, per-hour rates, per-day rental rates, and cubic feet as applicable to each service. Bidders must identify their company name, representative name and signature, and provide a total cost calculation. The form designates certain line items as "not used for scoring," allowing bidders to submit optional pricing for additional or miscellaneous services without impact to the evaluation process. No specific contract term, renewal options, set-asides, or funding amounts are detailed in this pricing form document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos
| Attachment A -Price Qualification Asbestos Abatement - ASBESTOS | ||||
| Item | Description | Unit of Measure | Cost | |
| 1). | Abate asbestos pipe insulation 8' high and below. Include PPE & Haz. Mat. safety equipment, air monitoring, and supervision by qualified professionals. | LF | ||
| 2). | Abate asbestos pipe insulation above 8' high. Include PPE & Haz. Mat. safety equipment, air monitoring, and supervision by qualified professionals. | LF | ||
| 3). | Abate asbestos TSI insulation elbow piping. Include PPE & Haz. Mat. safety equipment, air monitoring, and supervision by qualified professionals. | EA | ||
| 4). | Abate 12 ft. of asbestos pipe insulation up to a 4" pipe. Include PPE & Haz. Mat. safety equipment, air monitoring, and supervision by qualified professionals. | LF | ||
| 5). | Minimum Charge to reinsulate HVAC piping LF | LF | ||
| 6). | Abate asbestos material 8' and below from walls and ceilings. Include PPE & Haz. Mat. safety equipment, air monitoring, and supervision by qualified professionals. | SF | ||
| 7). | Abate asbestos material 8' and below from plastered walls and ceilings. Include PPE & Haz. Mat. safety equipment, air monitoring, and supervision by qualified professionals. | SF | ||
| 8). | Abate asbestos material above 8' from plastered walls and ceilings. Include PPE & Haz. Mat. safety equipment, air monitoring, and supervision by qualified professionals. | SF | ||
| 9). | Abate asbestos caulking around window sealing. Include PPE & Haz. Mat. safety equipment, air monitoring, and supervision by qualified professionals. | LF | ||
| 10). | Removal of non-asbestos ceiling tiles 8' and above. Include supervision by qualified professionals. | SF | ||
| 11). | Abate asbestos floor tile & mastic. Include PPE & Haz. Mat. safety equipment, air monitoring, and supervision by qualified professionals. | SF | ||
| 12). | Abate asbestos double-layer floor tile & mastic. Include PPE, & Haz. Mat. safety equipment, air monitoring, and supervision by qualified professionals. | SF | ||
| 13). | Disposal of asbestos waste materials | CY | ||
| 14). | Hazardous building material abatement hourly labor rate (include laborer and supervisor) | Per Hr | ||
| 15). | After business hours hazardous building material abatement hourly labor rate (include laborer and supervisor) | Per Hr | ||
| 16). | Stage containment area. (The use of a frame and polyethylene sheeting for walls and ceiling, and access entry/exit zones). | SF | ||
| 17). | Commercial sized HEPA Air Scrubber unit. | Per day | ||
| 18). | Other/Additional Services not listed | NOT USED FOR SCORING | ||
| 19). | Other/Additional Services not listed | NOT USED FOR SCORING | ||
| 20). | Other/Additional Services not listed | NOT USED FOR SCORING | ||
| Company Name: | ||||
| Company Representative Name: | ||||
| Company Representative Signature: | ||||
| Date: |
Total $0.00
Lead Based Paint
| Attachment A -Price Qualification Lead-Based Paint Abatement - LEAD BASED PAINT | ||||
| Item | Description | Unit of Measure | Cost | |
| 1). | Remediate lead-based paint from building material surfaces. Include PPE & safety equipment, air monitoring, and supervision by qualified professionals. | SF | ||
| 2.) | Waste handling and disposal | CUYD | ||
| 3.) | Paint Encapsulation- include PPE, safety equipment, air monitoring supervison, prep work, and materials | SF | ||
| 4.) | Other/Additional Services not listed | NOT USED FOR SCORING | ||
| 5.) | Other/Additional Services not listed | NOT USED FOR SCORING | ||
| 6.) | Other/Additional Services not listed | NOT USED FOR SCORING |
| Company Name: |
| Company Representative Name: |
| Company Representative Signature: |
| Date: |
Total $0.00
Mold & Water
| Attachment A -Price Qualification Mold & Water Abatement - MOLD & WATER | ||||
| Item | Description | Unit of Measure | Cost | |
| 1). | Remediate mold from drywall and/or ceiling areas. | SF | ||
| 2). | Remediate mold from the desk/tables and chairs. | Per unit | ||
| 3). | Demolition of drywall surface walls and/or ceilings, include building material disposal from site | SF | ||
| 4). | Demolition of plastered walls and/or ceilings, include building material disposal from site | SF | ||
| 5). | Remediation of wall and/or ceiling insulation, include disposal of material from site | SF | ||
| 6). | Steam clean carpet | SF | ||
| 7). | Water extraction only from carpet | SF | ||
| 8). | Water extraction only from the floor tiles | SF | ||
| 9). | Disposal of molded and/or water-damaged carpet | SF | ||
| 10). | HEPA vacuum walls, ceiling, and floors. | SF | ||
| 11). | HEPA vacuum drapes and furniture. | Per Hr | ||
| 12). | Oxzine Fog (or other type of Oxidizer) treatment of space | Cubic Ft | ||
| 13). | Steam clean fabric furniture (auditorium seats and office chairs) | Per unit | ||
| 14). | Remediate mold from HVAC ducts | LF | ||
| 15). | Clean HVAC coils roof top unit | Per unit | ||
| 16). | Clean HVAC coils PTAC ceiling/wall unit | Per unit | ||
| 17). | Clean HVAC coils, water source heat pump unit (ceiling mounted) | Per unit | ||
| 18). | Commercial sized HEPA Air Scrubber. | Per day | ||
| 19 ). | Commercial sized blowers/fans | Per day | ||
| 20 ). | Commercial sized dehumidifiers | Per day | ||
| 21 ). | Disposal of Waste Materials | Cubic Yard | ||
| 22). | Other/Additional Services not listed | NOT USED FOR SCORING | ||
| 23). | Other/Additional Services not listed | NOT USED FOR SCORING | ||
| 24). | Other/Additional Services not listed | NOT USED FOR SCORING |
| Company Name: |
| Company Representative Name: |
| Company Representative Signature: |
| Date: |