5-26-002 SOW .docx

DOCX document 53 KB Posted

Attached to
Union County - Duck Stamp - well pump
Solicitation number
26-422DNR-DIREC-B-51512
Issued by
Tazewell County, Illinois

About this file

This is a Scope of Work document issued by the Illinois Department of Natural Resources for a small purchase procurement project at Union County State Fish & Wildlife Area in Jonesboro, Illinois. The project involves installing an additional irrigation well and pump system to supplement the existing well that currently serves approximately 186 acres of controlled hunting area containing 35 blinds and one ADA-accessible blind. The scope of work requires the contractor to drill a 16-inch PVC well to 100 feet below ground surface, install a 10ZS two-stage pump with a 30 horsepower three-phase vertical hollow shaft motor, connect the pump to the existing underground water system via an existing riser pipe, install a 12-inch butterfly valve to prevent backflow, and install an electrical panel for well operation. The contractor must provide all labor, equipment, and materials necessary for project completion. All work must be completed by October 1, 2026. The document does not specify a formal bidders' conference; however, an optional project meeting may be held at the Union County SFWA site office. Bids are valid for 90 calendar days following submission. Award will be made to the lowest, responsible, responsive bidder based on lump sum amount.

The contract is designated as a public work subject to Illinois Prevailing Wage Act requirements, with contractors required to pay prevailing wage rates established by the Illinois Department of Labor. The project qualifies as a small business set-aside contract, requiring the awarded contractor to be registered as a small business with the State of Illinois. The contractor must maintain an Illinois office as the primary place of employment and must have a minimum of five years of experience in water well construction with documentation of completion of at least five similar projects. A performance bond and labor and material payment bond equal to the full contract amount are required if the project cost exceeds $50,000. The contractor must maintain general commercial liability insurance of $1,000,000 per occurrence and $2,000,000 annual aggregate, auto liability insurance of $1,000,000, and workers' compensation insurance as required by law. The contractor must also submit certified payroll records monthly and maintain records for five years. An administrative fee of $15 for the Minority Contractor Opportunity Initiative will be deducted from the first payment issued to the awarded vendor. All materials must be new and of suitable grade, with steel products manufactured or produced in the United States unless a waiver is granted.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ILLINOIS DEPARTMENT OF NATURAL RESOURCES

SMALL PURCHASE PROCUREMENT

SCOPE OF WORK & PROJECT REQUIREMENTS

Date: January 2026 File# 5-26-002

LOCATION:Union County State Fish & Wildlife Area (SFWA)
2755 Refuge Road
Jonesboro, IL 62952

PROJECT TITLE: Install Irrigation Well

PROJECT NARRATIVE:

Union County SFWA encompasses approximately 6,200 acres in the Lower Mississippi River bottomlands. Numerous shallow sloughs and other water areas totaling approximately 1,100 acres are scattered throughout the area. Given the geographical and topological setting, a large population of waterfowl migrate to this site during the winter months. As such, Union County SFWAs management plan is largely focused on waterfowl management. This management plan includes flooding certain areas via irrigation wells and piping systems that allow the site to offer public hunting opportunities by providing 35 blinds and one (1) ADA accessible blind.

Just northeast of the Hunter Check Station along Timber Road, the site manages approximately 186 acres of controlled hunting area. Currently, one irrigation well and associated pump is responsible for flooding this area that accounts for 80% of the total controlled hunting areas. This pump has to operate continuously for approximately 80 consecutive days in order to maintain required water levels. This inefficient operation puts a significant strain on the system and should it go down, approximately 60% of the hunting blinds would be unavailable. Therefore, the Illinois Department of Natural Resources, hereinafter referred to as IDNR, is seeking bids to install an additional well and pump to supplement the existing system to maintain the 186-acre controlled hunting area. This additional well and pump will significantly reduce the load required by the existing system and will also provide backup should the existing pump go down.

SCOPE OF WORK:

This project will include the Contractor providing all labor, equipment, and materials needed to drill a 16” PVC well down to 100’ below ground surface (bgs), install and set a 10ZS – 2 Stage Pump and 30 hp – 3 phase vertical hollow shaft motor. The work will include plumbing the pump to the existing underground water system via an existing riser pipe, installing a 12” butterfly valve to prevent backflow, and installing the electrical panel for the operation of the well. Electrical supply to the panel will be completed under a separate project. Refer to Attachment 1 for the Project Location, Proposed Construction, Well Detail, and Piping Detail. The exact location of the well will be marked by the Site Superintendent. Refer to the Project Specifications section for particular details associated with the well components.

ATTACHMENTS:

Attachment 1 Project Plans & Details

A-1Project Location
B-1Proposed Construction
D-1Well Detail
D-2Piping Detail

Attachment 2 Turbine Pump Curve

PROJECT SPECIFICATIONS & REQUIREMENTS:

A. Project Specifications:

1) General Conditions The awarded Contractor must have at minimum five (5) years of experience in water well construction/installation and be able to provide documentation of completion of at least 5 projects similar in size and scope as this one.

Unless otherwise stipulated, the Contractor shall provide and pay for all materials, labor, tools, and equipment necessary for the execution of the Work. It will be the responsibility of the Contractor to verify all materials and quantities associated with the Work prior to submitting a bid.

The Contractor shall obtain all permits and certifications required to drill and install the irrigation well in accordance with the applicable rules and regulations for the State of Illinois.

In addition, the Contractor will furnish his/her own trash dumpster for all garbage and debris associated with the Work. The Contractor shall, at all times, keep the premises free from accumulation of waste material or rubbish caused by his/her employees or Work and at the completion of Work, he/she shall remove all rubbish from and about the Work Area. The Contractor shall repair and otherwise make good on any damage caused by this Work and leave the premises in the equivalent of the original condition.

The Contractor shall be responsible for verifying the locations of all existing utilities. Where unmarked utility lines, underground obstructions or piping may be uncovered on the premises, the Contractor shall notify the Utility Company having jurisdiction thereof and take all necessary measures to prevent interruption of services that may be damaged or interrupted through Contractor’s own negligence and be responsible for immediate repair and/or restoration at his/her expense.

Prior to trenching or excavating, contact JULIE (Joint Utility Location Information for Excavation) and the site manager to aid in locating all existing utilities. The successful bidder shall sign a Contract which will in terms follow the provisions of these general conditions regarding payments, responsibility, liability, etc., and which will by reference include these provisions as contract documents. It shall be understood that this Contract will be based on the quoted lump sum proposal. Bids will be awarded based on Lump Sum Amount.

2) Well Materials Motor: Vertical Hollow Shaft (VHS), 286TPA Frame, TEFC, 30 HP, 230/460V – 3 Phase, 1760 RPM, 1.15SF, 38FLA @ 460V, 76FLA @230V, Continuous Duty.

Pump: 10ZSA – 2 Stage Pump set at 60’. Refer to Attachment B – Pump Curve for additional specifications.

Well: 16” PVC pipe down to 60’, stainless steel well screen (50 slot size) – 40’

Control Panel: Square D Well Guard – Size 3 with steel frame and 100/200 disconnect. All wire, fuses, conduit necessary to connect control panel to VHS motor.

Piping: 12” diameter steel piping, one – 10’ section, one 20’ section, 12” tee fitting, and one – 12” 45o fitting, and all necessary gaskets and hardware necessary for connections. The flange and bolt pattern shall be inspected on the existing riser pipe to size accordingly.

Butterfly Valves: (2) – 12” Concentric Butterfly Valve, Class 150, Lug, DI Body, SS316 Disc, EPDM seat, SS316 stem, Fusion bonded epoxy coated, Lever operated with 10 position locking handle, NSF 61.

Refer to Attachment A for well and piping details.

B. Project Instructions and Notes:

The Contractor will be required to abide to all site regulations and work with the Site Superintendent Joe Thurston and site staff regarding working hours, staging areas, and securing the work site.

It is the responsibility of the Contractor to measure and verify all dimensions and lengths of the material required prior to bidding and/or ordering any materials.

1) Work Completed by Prime Contractor:

A minimum of fifty-one percent (51%) of the work shall be completed by the Prime Contractor on this project. Pursuant to (30 ILCS 500/1-15.17) the Contractor is the person having a contract with the Illinois Department of Natural Resources.

2) Coordination of Work Activities:

All work activities and entry to the site must be coordinated with the site superintendent.

3) Deliverables and Staff Training:

Not applicable.

4) Independent Testing:

Not applicable.

5) Contractor’s Licensing and/or Certifications:

Contractor shall be responsible for compliance with all applicable contractor and trades person licensing with the appropriate State agency.

6) Shop Drawings:

Submit for the approval of the DNR Project Architect/Engineer, shop drawings and product data for the following items:

a. VHS Motor

b. 10 ZS Pump Set

c. Piping, gaskets, fittings

d. Electrical Components

7) As-Built Markups:

The Contractor shall hand mark one set of drawings with corrections, dimensions, and "As-Built" notes. These Drawings shall be delivered to the DNR Project Architect/Engineer upon construction completion and prior to final payment request.

8) Extended Warranty:

a) Workmanship, materials and equipment subject to seasonal loads will be in conformance with the contract and free from defects for a period of two years, commencing from the goods acceptance date.

9) Contractor’s Schedule of Values:

Not applicable.

C. Project Requirements:

1)Project Meeting
PROJECT MEETING TO BE HELD: YES |X| NO |_|
MANDATORY ATTENDANCE: YES |_| NO |X|
Refer to the BidBuy solicitation for meeting date and time. The meeting location will be held at
the Union County SFWA site office, 2755 Refuge Road, Jonesboro, IL, 62952, in Union County.

3) Duration

Bids shall be good for ninety (90) calendar days after the submittal date, or for an extended period, if agreed to in writing by the Bidder and DNR.

4) Prevailing Wage Rates

This contract [or agreement] calls for the construction of a “public work,” within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the current “prevailing rate of wages” (hourly cash wages plus, amount for fringe benefits) in the county where the work is performed. The Illinois Department of Labor (IDOL) publishes the prevailing wage rates on its website at http://labor.illinois.gov/. IDOL revises the prevailing wage rates, and the contractor/subcontractor has an obligation to check the IDOL’s web site for revisions to prevailing wage rates. For information regarding current prevailing wage rates, please refer to IDOL’s website. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage requirements and notice and record keeping duties.

5) Certified Payroll

State law 820 ILCS 130/5 requires all contractors and sub-contractors working on state construction projects to submit certified payroll records to the Department of Natural Resources. The payroll records must include all workers employed by contractors on the project.

In accordance with 820 ILCS 130/5, the contractor and sub-contractor(s) shall make and keep, for a period of 5 years from the date of the last payment made on or after January 1, 2014 (the effective date of Public Act 98-328) on a contract or subcontract for public works, records of all laborers, mechanics, and other workers employed by them on the project. No later than the 15th day of each calendar month, the contractor shall file a certified payroll for the immediately preceding month with the Department of Natural Resources.

6) Small Business Set-Aside

The contractor awarded the bid must be registered as a small business, as required by the Small Business Set-Aside program. (For complete requirements, to become registered, or certify your business in the Small Business Set-Aside Program, visit http://www.sell2.illinois.gov/sbsp/set_aside.htm. or contact the Department of Central Management Services’ small business coordinator at 1-866-455-2897.)

7) Apprenticeship-in-Training

When applicable, the contractor and all subcontractors must be participants in apprenticeship and training programs that are both approved by and registered with the U.S. Department of Labor’s Bureau of Apprenticeship and Training. The program(s) must be in the same trade(s) in which the contractor or subcontractor performs work. For information on how to participate in or set up a program, contractors may call the U.S. Department of Labor at 312/596-5508 or visit their website http://www.doleta.gov/oa/ .

8) Illinois Office

The bidder must certify that the bidder will maintain an Illinois office as the primary place of employment for persons employed in the construction authorized by the contract.

9) Subcontractors

The Contractor shall identify the names of all subcontractors to be utilized by them in the performance of this contract, together with the anticipated amount of money that each subcontractor is expected to receive pursuant to this contract. Pursuant to Illinois Procurement Code (30 ILCS 500/1-15-108), a person or entity is not a “subcontractor” if that person only Provides goods or supplies that are incidental to the performance of a contract by a person who has a contract subject to the Code.

10) Insurance

Contractor shall, at all times during the term of this contract and any renewals or extensions, maintain and provide a Certificate of Insurance naming the State as an additionally insured for all required bonds and insurance. Certificates may not be modified or canceled until at least thirty (30) days’ notice has been provided to the State. Contractor shall provide: (a) General Commercial Liability insurance in the amount of $1,000,000 per occurrence (Combined Single Limit Bodily Injury and Property Damage) and $2,000,000 Annual Aggregate; (b) Auto Liability, including Hired Auto and Non-owned Auto (Combined Single Limit Bodily Injury and Property Damage), in amount of $1,000,000 per occurrence; and (c) Worker’s Compensation Insurance in the amount required by law. Insurance shall not limit Contractor’s obligation to indemnify, defend, or settle any claims.

11) Performance Bond/Labor and Material Payment Bond

Pursuant to the Public Construction Bond Act (30 ILCS 550/), a performance bond and a labor and material payment bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, shall be required if the project cost exceeds $50,000. Each bond shall be in the full amount of the contract. The bond must be from a surety licensed to do business within the State of Illinois and acceptable to IDNR.

12) Minority Contractor Opportunity Initiative

The State requires a fee of $15 to cover Expenses related to the administration of the Minority Contractor Opportunity Initiative. Any Vendor awarded a contract under Section 20-10, 20-15, 20-25 or 20-30 of the Illinois Procurement Code (30 ILCS 500) of $1000 or more is required to pay a fee of $15. The Comptroller shall deduct the fee from the first check issued to the Vendor under the contract and deposit the fee in the Comptroller’s Administrative Fund.

13) Permits and Licenses

Permits and licenses necessary for the execution of the work shall be secured and paid for by the Contractor.

14) Utilities

Before starting excavation, establish location and extent of underground utilities occurring in the work area. Contractor shall contact Joint Utility Locating Information for Excavators (J.U.L.I.E.) 800-892-0123.

15) Highway Permits

The Contractor is responsible for contacting the appropriate County Superintendent(s) of Highways and/or other appropriate local officials concerning the proposed work activities on the project as they may relate to use of the County and local road system. Coordination of any activities of concern to the County or Township shall be the responsibility of the Contractor. Special attention shall be given to load limits and seasonal restrictions.

16) New Products

Unless otherwise specifically provided in the contract documents, all materials, equipment and products incorporated in the work under the contract shall be new and of a suitable grade for the purpose intended.

17) Steel Products

Any steel product(s) used or supplied in the performance of this contract shall be manufactured or produced in the United States, in accordance with the Steel Products Procurement Act, unless a waiver is granted by IDNR (30 ILCS 565/).

18) Specified Materials

Bids shall be based on providing all products/materials exactly as required by the project specifications. Contractor may select from the list of acceptable manufacturers, offer an “equal” product and provide proof of its capabilities to meet the project specifications or, for products specified only by reference or performance standards, select any product which meets or exceeds the specified standards, by any manufacturer, subject to the approval of DNR.

19) Final Cleaning

Contractor shall clean-up all work related debris and construction materials and properly dispose off-site. The Contractor shall repair and otherwise make good any damage caused by the work and leave the premises in the equivalent of the original condition.

20) Warranties

The Contractor warrants that all work provided under the contract will be in conformance with the contract and free from defects in workmanship, materials, and equipment for a period of one year from the goods acceptance date. See Section B. Project Instructions and Notes, for any extended warranties that may apply.

21) Change Orders

Change order shall be defined as a change in a contract term, other than as specifically provided for in the contract, which authorizes or necessitates any increase or decrease in the cost of the contract or the time for completion. A change order shall be executed by the State agency and vendor evidencing the change. All changes shall be approved by the CPO, or designee, and be accompanied by a written determination that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed and the change is germane to the original contract as signed.

A change order or series of change orders which authorize or necessitate an increase or decrease in either the cost of a public contract by a total of $25,000 or more or the time of completion by a total of 180 days or more. (720 ILCS 5/33E-9). Change orders to contracts over the Small Purchase Threshold of $100,000, shall be published to the Illinois Procurement Bulletin, pursuant to Section 15-25 of the Code and documented pursuant to Section 33E-9 of the Criminal Code of 2012, in advance of execution of the change order.

The DNR Architect/Engineer shall determine if the change was unforeseeable and/or germane to the original contract and that the price is fair and reasonable. When changes in or modifications to the work become necessary, the Contractor shall submit an itemized cost for the work and shall include appropriate documentation to support the cost for the labor, material, and equipment.

22) Inducement Resolution

All or a portion of this project may be paid or reimbursed from the proceeds of tax-exempt bonds subsequently issued by the State.

23) Payment

Payments, including late payment charges, will be paid in accord with the State Prompt Payment Act and rules when applicable, 30 ILCS 540/; 74 III. Adm. Code 900. This shall be the Contractor’s sole remedy for late payments by the State. Payment terms contained in Contractor’s invoice(s) shall have no force or effect.

24) Contract Award

Contract award will be made to the lowest, responsible, responsive bidder. The Department of Natural Resources reserves the right to reject any or all bids.

25) Term of Contract

All work shall be completed by October 1, 2026, unless agreed to by both the Contractor and DNR, that a time extension is warranted.

26) Bid Submittal

Bids may be submitted electronically on BidBuy or by submitting the attached Bid Form.

27) Bid Submittal Date and Time

Refer to the BIDBUY solicitation for the bid date and time.

28) Questions

ALL QUESTIONS PERTAINING TO THE SCOPE OF WORK OR THE BIDBUY PROCEDURES, MUST

BE DIRECTED TO nicholas.a.bearss@illinois.gov mail address QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN THREE (3) BUSINESS DAYS BEFORE THE BID DATE.

29) Project Contacts: The following individuals are listed as project contacts during the construction phase. The Bidder may not communicate directly with any of these individuals during the bidding process. All communication during the bidding phase must be directed to the nicholas.a.bearss@illinois.gov mail address.

Project Architect/Engineer:

Jim Bowling Illinois Department of Natural Resources 11731 State Highway 37 Benton, IL 62812

Phone:618-435-8130
E-mail:james.bowling@illinois.gov

Site Superintendent:

Joe Thurston
Illinois Department of Natural Resources
Union County SFWA
2755 Refuge Road
Jonesboro, IL 62952
Phone:(618) 833-5175
E-mail:joe.thurston@illinois.gov

Billing:

Lori Hubbard Illinois Department of Natural Resources 11731 State Highway 37 Benton, IL 62812