5-19-097 Attachment 2 Precast Vault Toilet Specifications.pdf
PDF 267 KB Posted
- Solicitation number
- 27-422DNR-REALT-B-53610
- Issued by
- Illinois
About this file
This is a precast vault toilet specifications document prepared by the Illinois Department of Natural Resources (IDNR) for Pod 13 at Ramsey Lake State Recreation Area (SRA), associated with IDNR File #5-19-097. The project requires construction of three new vault toilets featuring precast concrete single or double restroom structures to be delivered and installed on crushed stone foundations. The specifications detail dimensional requirements for single restroom buildings (7'-0" x 11'-11" x 8'-7" exterior) and double restroom buildings (11'-11" x 13'-9" x 9'-5" exterior), with interior spaces accommodating a minimum 60-inch diameter unobstructed turning area. The structures must comply with design standards including Seismic Design Category C, 30 PSF roof live load for snow, 100 PSF floor live load, and 115 MPH wind loading. Acceptable precast manufacturers include Easi-Set Worldwide, CXT Precast Products, and Crest Precast, with the same manufacturer providing all structures. The specifications require monolithic panel construction for roof, floor, and walls with sealed interior joints featuring locked-in coving, post-tensioned reinforcement, and gabled roofs with 3/12 pitch and simulated cedar shake finishes.
The project specifications establish stringent material and quality assurance requirements, including 5,000 PSI minimum 28-day compressive strength steel-reinforced concrete, ASTM A615 Grade 60 reinforcing steel, and post-tensioning strand enclosed in greased plastic sheath creating a cable pattern with no less than 2.5 parallel cables in any direction. The precast concrete building producer must be certified by the National Precast Concrete Association (NPCA), the Precast/Prestressed Concrete Institute (PCI), or equivalent, with a minimum of five years' experience manufacturing and setting precast concrete. Fixtures and accessories include 3'-0" x 6'-8" insulated metal restroom entry doors with commercial-grade locks and stainless steel self-closing hinges, waterless ADA-compliant toilets with 304 stainless steel risers, stainless steel grab bars, aluminum wall vents with mesh screens, and aluminum vault cleanout covers rated for 300 PSF pedestrian loads. Site preparation requires a minimum 4-inch thick aggregate subbase compacted to 95 percent maximum dry density with vertical soil capacity of 1,500 pounds per square foot, positive drainage around the building, and contractor provision of adequate level workspace for crane and tractor-trailer placement with no overhead lines within 75 feet of the pad center.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDNR File # 5-19-097 Pod #13 – Ramsey Lake Vault Toilets Ramsey Lake SRA
ATTACHMENT 2
PRECAST VAULT TOILET SPECIFICATIONS
IDNR File # 5-19-097 13 34 00-1 July 2026
SECTION 13 34 00
FABRICATED ENGINEERED STRUCTURES
PRECAST CONCRETE VAULT TOILET (PRIVY) STRUCTURE
SECTION 1 – GENERAL
1.1 SUMMARY
Contractor shall furnish a precast concrete single or double restroom structure. Building to be delivered and placed on crushed stone foundation in accordance with manufacturer’s recommendations. Manufacturer to provide building with all necessary openings as specified by contractor in conformance with manufacturer’s structural requirements.
1.2 REFERENCES
A. ACI-318-11: Building Code Requirements for Structural Concrete and Commentary
B. ASCE/SEI 7-10: Minimum Design Loads for Buildings and Other Structures
C. IBC 2012: International Building Code
D. PCI Design Handbook, 7th Edition
E. Concrete Reinforcing Institute, Manual of Standard Practice
F. UL-752 (Test Method level 5) for bullet resistance certified by a military approved laboratory.
G. 2010 ADA Standards for Accessible Design
H. International Plumbing Code (IPC) and National Electrical Code (NEC)
I. USDA Forest Service Publication: In-depth Design and Maintenance Manual for Vault
Toilets (Incorporating FAN™ Natural Ventilation System)
1.3 SYSTEM DESCRIPTION
DESIGN REQUIREMENTS
A. System shall be from the approved manufacturers and standard models listed below and/or be in accordance with the requirements of this specification.
Acceptable Manufacturers and Models – Same manufacturer must provide all structures.
Manufacturer Single Restroom Model Double Restroom Model
1. Easi-Set Worldwide Logan Dry Carson Dry (no chase)
2. CXT Precast Products Gunnison Tioga Special (no chase)
3. Crest Precast RM 150 RM 250 (no chase)
B. Building Dimensions*:
1. Single Restroom Building:
Exterior: 7’-0” x 11’-11” x 8’-7 ½” (tallest point) Interior: 6’-6” x 6’-10” x height (varies)
IDNR File # 5-19-097 13 34 00-2 July 2026
2. Double Restroom Building:
Exterior: 11’-11” x 13’-9” x 9’-5 ½” (tallest point) Interior: 6’-10” x 13’-3” x height (varies)
*Measurements may vary slightly by manufacturer. Buildings shall be large enough to provide a minimum 60” diameter unobstructed turning area inside.
C. Design Loads:
1. Seismic Design Category ‘C’, Risk Design Category II
2. Roof Live Load (Snow) – 30 PSF
3. Floor Live Load – 100 PSF
4. Wind Loading* – 115 MPH
*Design loads relate to precast components only, not accessories (i.e. doors, windows, vents, etc.)
D. Roof: Gabled style roof. Roof panels shall overhang on all sides to prevent water intrusion. The pitch of the roof shall be 3/12. The roof standard finish is a simulated cedar shake. Other finishes are available.
E. Roof panels, floor, and wall panels must each be produced as single component monolithic panels. No floor or vertical wall joints will be allowed, except at perimeter interfaces, corners and partitions. Wall panels shall be set on top of floor panel.
F. Wall-to-Floor interior surface joints along the perimeter of each restroom and partitions
(if precast) must contain the locked-in, easy clean-out radius coving. The 3/8” (recessed) x 2” cove must be continuous around the interior of the restroom and along the sides of any precast partitions. Apply 5,000 PSI (minimum) non-shrink, non-metallic grout to the cove, finishing the grout to form a flush 1” minimum radius.
1.4 SUBMITTALS
A. Engineering calculations designed and sealed by a professional engineer, licensed to practice in the state where the project is located, shall be submitted for approval.
B. Manufacturers’ product literature shall be provided for all plumbing, electrical and miscellaneous installed fixtures demonstrating compliance with these specifications.
C. Contractor shall submit plans from selected manufacturer for IDNR review. Contractor to provide color options for both interior and exterior finishes.
1.5 QUALITY ASSURANCE
A. The precast concrete building producer shall be a plant-certified member of either the National Precast Concrete Association (NPCA), The Precast/Prestressed Concrete Institute (PCI), or equal.
B. The precast concrete building producer shall demonstrate product knowledge and must have a minimum of 5 years experience manufacturing and setting precast concrete.
IDNR File # 5-19-097 13 34 00-3 July 2026
SECTION 2 – PRODUCTS
2.1 MATERIALS
A. Concrete: Steel-reinforced, 5000 PSI minimum 28-day compressive strength, air-entrained (ASTM C260).
B. Reinforcing Steel: ASTM A615, grade 60 unless otherwise specified.
Welded wire fabric: ASTM 185, Grade 65
C. Post-tensioning Strand: 41K Polystrand CP50, ½” 270 KSI Seven-Wire strand, enclosed within a greased plastic sheath (ASTM A416). Each Roof and floor shall be post-tensioned using a single, continuous tendon. Said tendon is placed in the concrete slab to form a perimeter loop starting from one corner of the slab to a point where the cable entered the slab. The tendon then turns 90 degrees and follows the cable member(s) in the periphery to a point midway along the “X” axis of the concrete building panel and then turns 90 degrees along the “Y” axis of the concrete building panel. This bisects the concrete building panel and crosses the opposite parallel portion of the cable member and exits from an adjacent side of the concrete building panel. This creates a cable pattern with no less than 2.5 parallel cables in any direction. To ensure a watertight design, no alternate methods shall be substituted for the post-tensioning.
D. Sealant: All joints between panels shall be caulked along the exterior and interior surface of the joints. Exterior sealant shall be DOW CORNING 790 silicone sealant or equal.
Interior sealant shall be SIKAFLEX-1A elastic sealant (paintable) or equal. Exterior caulk reveals to be 3/8”x 3/4” deep so that sides of the joint are parallel for proper caulk adhesion. Back of the joint to be taped with bond breaking tape to ensure adhesion of caulk to parallel sides of joint and not the back.
E. Panel Connections: All panels shall be securely fastened together utilizing cast-in stainless steel embeds and welding. All welding shall be done in conformance with AWS, Structural Welding Code latest revision. Steel is to be of structural quality, hot-rolled carbon complying with ASTM A304. No floating-in of connection plates shall be allowed.
F. Stain and Paint:
a. Interior concrete surfaces (toilet rooms)
i. Interior floors will be a two component, water based polyamide epoxy floor coating (gray, unless otherwise specified).
ii. Interior walls and ceilings will be a pre-catalyzed water based epoxy.
b. Exterior concrete surfaces
i. Exterior walls and roof will be a water-based acrylic, water-repellent penetrating stain.
2.2 ACCESSORIES AND FIXTURES
A. Doors and Frames: Shall comply with Steel Door Institute “Recommended Specifications for Standard Steel Doors and Frames” (SDI-100) and as herein specified. All door and frame galvanizing shall be in accordance with ASTM A924 and A653, minimum coating thickness shall be A60.
1. The buildings shall be equipped with 3’-0” x 6’-8” x 1-3/4” (restroom entry doors) thick insulated, 18 gauge, metal doors with 16-gauge frames (to meet wall thickness). Doors shall have a flush top cap. Doors and frames shall be factory bonderized and painted with one coat of rust-inhibitive primer and one finish-coat of enamel paint; color to be BOLT BROWN unless otherwise specified.
2. Doors and frames shall meet SDI standard Level 2, 1¾” heavy duty.
IDNR File # 5-19-097 13 34 00-4 July 2026
B. Door Hardware:
1. Cylindrical Lock: Commercial grade, shall meet requirements of ANSI A156.2, series 4000, UL listed and ADA approved. Zinc dichromate chassis with cast solid zinc levers to resist corrosion. Furnish locks with 6-pin solid brass keyway. Exterior locks and unlocks by key, interior push button lock, released when lever is turned. Manufacturer shall provide a limited lifetime warranty on this product.
2. Hinges: Self-Closing (spring) Hinges. Shall comply with ANSI A156.17 Grade 1 self closing hinges (3 per door). Hinges shall be Stainless Steel Grade 304 (ANSI K81071F) US32D brushed satin finish. Manufacturer shall provide a lifetime limited warranty.
3. Door Sweep: Nylon brush door sweep, ANSI/BHMA certified. Sweeps shall have an integral drip edge to repel water from base of door. Sweeps shall be approved for UL 10C positive pressure and suitable for use with fire doors up to three hours.
4. Drip Cap: Aluminum drip cap with minimum projection of 2 ½” shall be furnished.
5. Door Stop: ANSI 156.16 approved wall mounted door stop with keeper constructed of a corrosion resistant cast brass material. Finish US26D (626) brushed chrome finish.
C. Wall Vent: Wall vents will be extruded aluminum, minimum thickness of .125”, 6063-T5 alloy. Vents to be supplied with aluminum mesh insect screen and 204-R1 clear anodized finish.
D. Signs: Signs to have braille, characters, and pictograms to meet ADA requirements.
E. Windows: Frames shall be constructed from stainless steel. Window glazing will be ¼” translucent Lexan.
F. Grab Bars: Stainless steel tubing, 18 gauge, type 304 stainless steel, mounted 1-1/2 inches from wall.
G. Toilet Paper Dispenser: Dispenser will be constructed of 3/16” to 1/4” thick 304 stainless steel. Dispenser will be capable of holding three (3) standard rolls of toilet paper.
H. Plumbing:
1. Waterless Toilet: ADA compliant, 18 gauge type 304 stainless steel riser with seat cover
I. Vault Cleanout Cover: Aluminum hatch, rated for a 300 psf pedestrian load. Cover to be hinged with a staple for padlock and a hold open arm to prevent closing. OR if required, cleanout cover frames will be constructed from steel. Plate for vault cleanout cover will be ¼” thick diamond plate steel. Lid will be hinged and configured so that it can be locked with a padlock. A gasket will be provided around the perimeter of the lid to provide an airtight seal.
J. Vent Stack: Vent stack(s) to be 12” (nominal) diameter High-Density Polyethylene Pipe.
K. Vault Liner: Inside of vault tank(s) to be lined with a water based acrylic coating (Conseal CS-55) or equal, applied per manufacturers specifications.
2.3 Finishes
A. Interior of Building: Smooth form finish on all interior panel surfaces unless exterior finish is produced using a form liner, then smooth hand-troweled finish.
IDNR File # 5-19-097 13 34 00-5 July 2026
B. Exterior of Building (standard): Barn board finish on all exterior wall surfaces with a simulated cedar shake roof finish.
SECTION 3 – EXECUTION
3.1 SITE PREPARATION
A. All material, methods of construction, and testing & inspection shall conform to the applicable requirements of the codes and standards listed in the project specifications.
B. Aggregate subbase shall be a minimum of 4” thick and down to firm subgrade. The vertical soil capacity under stone shall be compacted to have minimum bearing of 1,500 pounds per square foot. Stone shall be IDOT CA-6 gradation compacted to 95% maximum dry density. Elevations and levelness of the prepared stone base shall be within ¼” in all directions.
C. Provide positive drainage around the building.
D. Provide Butyl Sealant between the vault and building floor.
3.2 SITE ACCESS
Contractor must provide a level, unobstructed area large enough for a crane and a tractor-trailer to park adjacent to the pad. Crane mats or other temporary means shall be used as necessary to prevent damage to adjacent pavements and features. Any damage shall be repaired at the contractor’s expense. Crane must be able to place outriggers within 5’-0” of edge of pad; truck and crane must be able to get side-by-side under their own power. No overhead lines may be within 75’ radius of center of pad. Firm roadbed with turns that allow 65’ lowbed tractor-trailer must be provided directly to site. No building shall be placed closer than 2’-0” to an existing structure unless specifically permitted.
3.3 EXCAVATION AND ELEVATION
A. Comply with all applicable OSHA standards for excavation.
B. No excavation will be left open without proper shielding of fencing.
C. Excavate for the placement and installation of the toilet vault tank(s) to a depth that will allow the structure site to be free draining. After installation is complete, the depth of the tank excavation should allow for the stone base and leveling course beneath the toilet vault.
D. Finish floor elevation will be at least 4-6 inches above natural grade measured at the front (entrance) of the exterior slab unless otherwise specified or approved by IDNR to maintain site drainage and ADA compliance. The back of the building shall be raised slightly higher to allow water to freely drain out of toilet room(s).
3.4 BACKFILL AND COMPACTION
A. Compact natural subgrade at the bottom of the vault excavation to a minimum vertical soil capacity of 1,500 PSF.
B. Install and compact stone base and leveling course to specified elevation ensuring levelness of the stone.
C. Set the vault(s) in place and check for proper alignment and levelness. Backfill around the structure(s). Use excavated material suitable for backfilling or stone fill. Rocks or stone
IDNR File # 5-19-097 13 34 00-6 July 2026 larger than 6 inches in maximum dimension shall be discarded from excavated material if used for backfilling.
D. Lift thickness for backfill material – loose lifts of 8 inches and 6 inches for vibratory and static compaction respectively.
E. Use compaction equipment suited to achieve specified compaction for subgrade, stone base, and backfill (drum rollers – static and vibratory, rammer, plate tamper – static and vibratory, etc.). Vibrating equipment is used for compaction of course materials.
F. Intended final grade is flush with the top of the front floor slab. Allow for placement of topsoil to reach that grade. Grade backfill away from structure for positive drainage.
END 13 34 00.
| 5-19-097 SOW Attachments.pdf |
| 5-19-097 SOW Attachments.pdf |
| Attachment Title Sheets |
| RAMSEY LAKE VAULT TOILETS V5 JUNE 22 - 2026 FINAL PLANS 5-19-097.pdf |
| RAMSEY LAKE PROPZ RAMSEY LAKE PROPOSEDNE_DC108.pdf |
| RAMSEY LAKE VAULT TOILETS V4 JUNE 22 - 2026 FINAL PLANS 5-19-097.pdf |
| RAMSEY LAKE PROPZ RAMSEY LAKE PROPOSEDNE_DC-102.pdf |
| RAMSEY LAKE PROPZ RAMSEY LAKE PROPOSEDNE_DC104.pdf |
| RAMSEY LAKE VAULT TOILETS V3 JUNE 22 - 2026 FINAL PLANS 5-19-097.pdf |
| RAMSEY LAKE VAULT TOILETS V2 JUNE 22 - 2026 FINAL PLANS 5-19-097.pdf |
| RAMSEY LAKE VAULT TOILETS JUNE 22 - 2026 FINAL PLANS 5-19-097.pdf |
| Cover Sheet 2013 Layout1 (1).pdf |
| RAMSEY LAKE DEMOZZ RAMSEY LAKENE DEMO-Model C00.pdf |
| RAMSEY LAKE DEMOZZ RAMSEY LAKENE DEMO-Model C101.pdf |
| RAMSEY LAKE VAULT TOILETS JUNE 16 - 2026 FINAL PLANS 5-19-097 |
| binder 1 ramsey vt project.pdf |
| RAMSEY LAKE PROPZ RAMSEY LAKE PROPOSEDNE_D C106.pdf |
| RAMSEY LAKE PROPZ RAMSEY LAKE PROPOSEDNE_D C105.pdf |
| RAMSEY LAKE PROPZ RAMSEY LAKE PROPOSEDNE_D C107.pdf |
RAMSEY LAKE PROPZ RAMSEY LAKE PROPOSEDNE_DC103.pdf
| 5-19-097 SOW Attachments |
| 5-19-097 SOW Attachments.pdf |
| Attachment Title Sheets.pdf |
| 13 34 00 - Fabricated Engineered Structures.pdf |
| C. IBC 2012: International Building Code |
| D. PCI Design Handbook, 7th Edition |
| A. The precast concrete building producer shall be a plant-certified member of either the National Precast Concrete Association (NPCA), The Precast/Prestressed Concrete Institute (PCI), or equal. |