5-1-26-2-19-5 Forest Conservation Plan Drawings.pdf
PDF 14 MB Posted
- Solicitation number
- 1-26-2-19-5
- Issued by
- Baltimore County, Maryland
About this file
This is a Forest Conservation Plan drawing set prepared by Navarro & Wright Consulting Engineers for the Camp Fretterd Water Main Replacement Project located at 13700 Hanover Pike, Reisterstown, Maryland 21136, a 486.08-acre site owned by the State of Maryland, Military Department. The project involves the installation of new water mains and abandonment/removal of existing water mains across a Limit of Disturbance (LOD) of 155,640 square feet (3.57 acres). The plan includes comprehensive sediment and erosion control measures, tree protection protocols, and forest conservation requirements in compliance with the 2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control. No stormwater management is required as no new impervious area is proposed and all ground will be restored to original conditions. A field study conducted on May 14, 2022, confirmed no forested areas, wetlands, floodplain, steep slopes, or highly erodable soils within the LOD. The 17-sheet drawing set, prepared by licensed Professional Engineer Paul J. Navarro (License No. 21009), details site layouts, utility locations, temporary erosion and sediment control measures including silt fencing, stabilized construction entrances, soil stabilization matting, and same-day stabilization areas limiting trench openings to 100 linear feet per day.
The plan mandates tree protection through plastic mesh fencing installation around specimen trees and throughout the forest conservation areas, with 36 specimen trees identified for protection or removal. Off-site forest planting of 578 native trees is required across 71,875 square feet (1.65 acres) on Glen Falls Road, including species such as Kentucky Coffee Tree, Red Maple, Sugar Maple, River Birch, Pin Oak, Willow Oak, and Crabapple. Detailed specifications address invasive species suppression using mechanical removal and approved herbicide applications by licensed applicators, pre-construction and pre-planting inspections coordinated with Baltimore City, proper planting techniques with mycorrhizal fungi amendments, mulching requirements, two-year maintenance and warranty periods, and post-construction corrective measures. All work must comply with Baltimore City supplement requirements and Forest Conservation Manual standards. The project site is located entirely within the Liberty Reservoir Watershed, with a large onsite forested area designated as a DNR Focal Area. Historical buildings on-site will not be affected by proposed work activities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- LIMIT OF DISTURBANCE
- 18" SILT FENCE
TEMP
SOIL
STOCKPILE
SEDIMENT CONTROL / FOREST CONSERVATION LEGEND
MB
- STABILIZED CONSTRUCTION ENTRANCE
- TYPE ``A'' MOUNTABLE BERM
- TEMPORARY SOIL STOCKPILE
SF SF SF
MdB GdB
- SOIL BOUNDARY
- SOIL STABILIZATION MATTING
- SAME DAY STABILIZATIONSDS
- COMBINATION SILT FENCE / TREE
PROTECTION FENCE
SFTPF SFTPF
- TREE PROTECTION FENCETPF TPF
MASTER LEGEND
INDEX CONTOUR
CONTOUR
STORM PIPE
CONCRETE
E V-POWR
SURVEY TREE OR SPECIMEN TREE
WATER VALVE
BUILDING
EXISTING LEGEND
INDEX CONTOUR
CONTOUR
PROPOSED LEGEND
LIMIT OF DISTURBANCE
X FENCE
UE UE UNDERGROUND ELECTRIC
SOIL BOUNDARY
LIGHT POLE
EXISTING WATER
GAS GAS GAS ELECTRIC
FCE جل جلاله FOREST CONSERVATION EASEMENT,
FENCING AND SIGNAGE
CAMP FRETTERD
PROPOSED FOREST PLANTING AREA - FINAL
FOR
WATER MAIN REPLACEMENT
MES PROJECT ID 1-22-2-26-3
BALTIMORE COUNTY, MARYLAND
CAMP FRETTERD
LOCATION MAP
SCALE: 1" = 2000'
VICINITY MAP
SCALE: 1" = 1 MILE
SITE
SITE
GENERAL NOTES:
1. The purpose of this plan is to provide sediment and erosion control for the installation of new water mains and abandonment/removal of the existing water mains. SWM for this project is not required since no new impervious area is proposed and all ground will be restored to original conditions.
2. Property Information: Site Address: 13700 Hanover Pike, Reisterstown, MD 21136 Owner: State of Maryland, Military Department Tax Account No.: 0419071650 Tax Map: 0039 Tax Map Grid: 0015 Parcel No.: 68 Liber/Folio: L. 08312 / F. 00339 Total Site Area: 486.08 Acres (Per deed)
3. Total LOD for Water Main Replacement = 155,640 S.F. / 3.57 Ac.
4. The boundary shown hereon was taken from record plans provided by GMB.
5. Topography, utilities, and existing features shown hereon are taken from a field run survey by GMB dated June, 2022.
Contours are shown at a one-foot interval.
6. Refer to the Geotechnical report by Findling, Inc., dated August 4, 2022 for subsurface conditions.
7. In accordance with a field study conducted on May 14, 2022 by Steven Heiss, Q.P., Sr. Environmental Scientist, for
Navarro & Wright Consulting Engineers, Inc., there are no forested areas, tidal or non-tidal wetlands, floodplain, steep slopes, wetland buffers or highly erodable soils located within the LOD of the Water Main Replacement.
8. SWM for this project is not required since no new impervious area is proposed and all ground will be restored to original conditions.
9. This site is located entirely within the Liberty Reservoir Watershed. The large onsite forested area is a DNR Focal Area.
10. There are historical buildings located on this site. No work is proposed within the vicinity of any historical building.
11. All construction shall be in accordance with the latest MDE Standards. The Erosion and Sediment Control plans were prepared in accordance with the “2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control”, dated December, 2011, by MDE-WRA and NRCS.
DRAWING LIST
DWG. NO.
SHEET NO.
FCP-1
FCP-2
FCP-3
FCP-4
FCP-5
FCP-6
FCP-7
FCP-8
FCP-9
FCP-10
FCP-11
FCP-12
FCP-13
FCP-14
FCP-15
FCP-16
FCP-17
TITLE
FOREST CONSERVATION PLAN - TITLE SHEET
FOREST CONSERVATION PLAN - KEY SHEET
FOREST CONSERVATION PLAN
FOREST CONSERVATION PLAN
FOREST CONSERVATION PLAN
FOREST CONSERVATION PLAN
FOREST CONSERVATION PLAN
FOREST CONSERVATION PLAN
FOREST CONSERVATION PLAN
FOREST CONSERVATION PLAN
FOREST CONSERVATION PLAN
FOREST CONSERVATION PLAN
FOREST CONSERVATION PLAN
FOREST CONSERVATION PLAN
FOREST CONSERVATION PLAN - OFFSITE PLANTING PLAN
FOREST CONSERVATION AND PLANTING NOTES AND DETAILS
FOREST CONSERVATION AND PLANTING NOTES AND DETAILS
._____________ ________________________________PAUL J. NAVARRO21009
4/14/2023
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
C24-05
1-26-2-19-5
1 11/12/25 Revised MES Project Number
1-26-2-19-5
SD
GAS
GAS
GAS
GAS
GAS
GAS
GAS
G
AS
G
AS
GAS
GAS
G
AS
GAS GAS
GAS
G A
S
GAS
GAS
GAS
GAS
GAS
GAS
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
U E
U E
U E
U E
U E
U E
U E
UE
U E
U E
U E
U E
U E
U E
UE
UE
U E
UE
UE
UE
UE
UE
UE
UE
C
C
C C C
C
C
C
C
C
C C
C C
C
C
C
C
C
C
C
C
C
C
C
GAS
GAS
GAS
GAS
GAS
GAS
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
U E
UE
C
U E
U E
U E
U E
U E
U E
U E
UE
U E
U E
U E
U E
U E
U E
UE
U E
U E
GAS
GAS
GAS
GAS
GAS
UE
UE
UE
UE
UE
UE
UE
U E
U E
UE
UE
UE
UE
U E
UE
U E
U E
UE
UE
UE
UE
UE
UE
UE
UE
X
X X
X
X
X
X
X
X
X
UE
U E
C
C
C
C
C
C
C
C
C
C
UE
UE
U E
GAS
GAS
GAS
GAS
GAS
GAS GAS
GAS GAS
UE UEC
C C
UE UE UE U
E
U E
U E
U E
U E
U E
UE
UE
UE
UE
U E
U E
U E
U E
UE
U E
U E
UE
UE
UE
UE
U E
C U E
UEC
UE
UE
UE
UE
UE
C C
C
C
C
C
C
GAS
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C
C
C C
C C
C C
C C
C
C
C
C
C
C
C
C
UE
UE
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
GAS
GAS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G A
S G
A S
G A
S G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
GAS
GAS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
GAS
G
AS
G
AS
G
AS
G
AS
C
C
C
C
C
C
G
AS
GAS
GAS
GAS
GAS
UE
UE
UE
U E
U E
U E
GAS
G
AS
C U E
G
AS
UE
UE
UE
UE
UE
UE
UE
UE
GAS
GAS
GAS
GAS
GAS
UE
UE
C
U E
U E
C
C
UE
UE
UE
UE
UE
UE
G
AS
GAS
GAS
GAS
GAS G
AS
G
A S
G
AS
G
AS
G A
S G
A S
G
AS
G
AS
G
AS
GAS
UE
UE
GAS
GAS
U E
U E
U E
U E
U E
U E
UE
U E
U E
GASC
GAS
C
U E
U E
U E
X X
X
X X
X
X
U E
UE
UE
GASC
C
SHT 3
SHT 4
SHT 5
SHT 6 SHT 7
SHT 13
SHT 14
SHT 8
SHT 10
SHT 11
SHT 12
M bD
MaC
GdB
G dA
M bD
G dB
G aC
G dB
GdB
G aB
GaC
GfB
GdC
MaD GdC
G dC
G dC
M aD
G dB
M aD
G dB
G dB
GaB
MbD
GhB
GdC
W gB
W gB
W gB
W gB
WgB
MaC
GhC
MdE
MdE GhC GdBGdC
GdC
GdC
M aD
MaD
M dE
Cf A
MaD
M aD
M aD
GdC
GdC
MaD GdC
GdC
GfB
GdC
GaB
GfB
GfB
GdB
GaB
G dB
G aB
G aC
G dA
G dA
G dA
G dB
G dA
GdA
G dB
G dB
GdB
MbD
GdA
GdB
G dA
G dA
G dB
G dB
MaD
GdC
GdB
GdB
G dC
G dB
G dB
G dC
M aD
G dC
G dB
G dC
SHT 9
OMAHA BEACH CIR.
RUE SAINT LO DR.
PARK DR.
WATER VIEW DR.
MANSION DR.
RUE SAINT LO DR.
RUE SAINT LO DR.
SHT 15
X
X
XXX
X
GdB
MaC
GhB
GaC
GeC
BhB
GhB
MbD
GLEN FALLS ROAD
GLEN FALLS ROAD
FC
E
جل جلاله
FC
E
جل جلاله
FC
E
جل جلاله
FC
E
جل جلاله
FCE
جل جلاله
FCE
جل جلاله
FCE
جل جلاله
FC
E
جل جلاله
FC
E
جل جلاله
FC
E جل جلاله
FC
E
جل جلاله
FC
E
جل جلاله
FCE
جل جلاله
FCE
جل جلاله
FCE
جل جلاله
UE
C
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE
UE UE
UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE
UE UE
UE
UE UE
UE UE
UE UE
UE UE
UE UE UE
UE UE
UE UE
UE UE UE
UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE
UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE
UE
UE
UE
UE
UE
UE UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE
UE UE
UE UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE UE
UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE UE
UE UE UE
UE UE
UE UE
UE UE UE
UE UE
UE UE
UE UE
UE UE UE
UE
UE UE
UE UE
UE UE
UE
UE UE
UE UE UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE
UE UE UE
UE UE UE
UE UE UE
UE UE UE
UE
UE UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE
UE
UE
UE
UE
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS
GAS
GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS
GAS
GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS GAS
GAS
GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS GAS
GAS
GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS GAS
GAS
GAS
GAS
GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS
GAS GAS GAS
GAS
GAS
UE
UE
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UE
U E
U E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE UE UE UE UE UE UE UE UE UE UE UE
UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE
UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE
UE UE
UE
UE
U E
U E
UE
U E
U E
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
GAS
GAS
GAS
GA
S
GA
S
GA
S
GAS
GA
S
GAS
GA
S
GA
S
GAS
GA
S
GAS
GA
S
GAS
GA
S
GAS
GA
S
GA
S
GA
S
GA
S
GAS
GA
S
GAS
GA
S
GAS
GA
S
GAS
GA
S
GA
S
GAS
GAS
GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS GAS GAS
GAS GAS
GAS GAS
GAS GAS GAS GAS GAS
GAS GAS GAS
GAS GAS
GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
C C
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UEUE
UEUEUEUEUE
UEUEUEUEUE
UEUE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
G
AS
GAS
G A
S
UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE UE
UE UE
UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C C C C C
C C C C C C
C C C C C C
C C C C C C
C C C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
C C C
C C C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE UE UE UE
UE UE UE UE UE
UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
PROPOSED
OFF-SITE
FOREST
PLANTING AREA
BUILDING NO. 421
(DECISION CENTER)
BUILDING NO. 420
(WEINBERG CENTER)
BUILDING NO. 107
(ABE SHERMAN BARRACKS)
BUILDING NO. 106
(PATRICK REGAN BARRACKS)
BUILDING NO. 104
(WILLIAM CREIGLER BARRACKS)
BUILDING NO. 103
(FLEETWOOD HALL BARRACKS)
BUILDING NO. 108
(GREY HOUSE)
BUILDING NO. 102
(COSTIN DINING/MESS HALL)
BUILDING NO. 109
(STOREHOUSE)
BUILDING NO. 101
(SCHAEFER HALL/EDUCATION CENTER)
BUILDING NO. 100
(29TH DIVISION HALL)
BUILDING NO. 105
(SHERWOOD HALLMAN BARRACKS)
BUILDING NO. 110
(CHAPEL)
BUILDING NO. 111
(RESERVATION MANAGER)
BUILDING NO. 115
(WACHTER MAINTENANCE FACILITY)
BUILDING NO. 228
(PAVILION)
BUILDING NO. 206
(GIST BUILDING)
BUILDING NO. 207
(CORPORAL CHARLES VEAL)
BUILDING NO. 30
(PUMP HOUSE)
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
SAME DAY STABILIZATION:
USE SDS FOR THESE AREAS. NO MORE THAN 100 L.F. OF TRENCH, OR NO MORE
THAN CAN BE BACKFILLED AND FULLY STABILIZED IN A SINGLE DAY MAY BE OPENED
EACH DAY. NO OTHER EARTH DISTURBANCE OF ANY KIND SHALL BE UNDERTAKEN
THAT CANNOT BE FULLY STABILIZED AT THE END OF EACH WORK DAY.
1 11/12/25 Revised MES Project Number
SD
UE
UEUEUEUEUEUEUE
UE UE UE UE UE
UE U
E
UE
UE
U E
UE
C
C C C C C C C
C
C
UE
U E
UE
UE
GdC
MaD
MdE
CfA
MaD
MaD
GdC
MaD
MdE
CfA
MaD
MaD
LIMITS OF DISTURBANCE
155,640 S.F., 3.57 AC.
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
UE
U E
U E
UE
UE
UE UE
UE
UE UE
UE UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE
UE UE
UE
C
C
C
C
C
C
C
C
C C
C C
C
C C
C C
C
C
C
C
C
UE UE UE UE UE UE UE UE UE UE
UE
UE
UE
UE
UE
UE
U E
U E
U E
U E
U E
U E
U E
UE
U E
U E
UE
U E
U E
U E
U E
U E
U E
U E
U E
UE
UE
UE
UE
UE
UEUE
UE
UE
UE
WATER VIEW DR.
SP-029
SP-030
SP-031
SP-032
SP-033
SP-034
S F
SF
SF
SF SF SF SF SF SF SF
SF SF SF
SDS
SDS
TPF
TPF
TPF
TPF
- LIMIT OF DISTURBANCE
- 18" SILT FENCE
TEMP
SOIL
STOCKPILE
SEDIMENT CONTROL / FOREST CONSERVATION LEGEND
MB
- STABILIZED CONSTRUCTION ENTRANCE
- TYPE ``A'' MOUNTABLE BERM
- TEMPORARY SOIL STOCKPILE
SF SF SF
MdB GdB
- SOIL BOUNDARY
- SOIL STABILIZATION MATTING
- SAME DAY STABILIZATIONSDS
- COMBINATION SILT FENCE / TREE
PROTECTION FENCE
SFTPF SFTPF
- TREE PROTECTION FENCETPF TPF
MATCH LINE SEE SHEET 4
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
SAME DAY STABILIZATION:
USE SDS FOR THESE AREAS. NO MORE THAN 100 L.F. OF TRENCH, OR NO MORE
THAN CAN BE BACKFILLED AND FULLY STABILIZED IN A SINGLE DAY MAY BE OPENED
EACH DAY. NO OTHER EARTH DISTURBANCE OF ANY KIND SHALL BE UNDERTAKEN
THAT CANNOT BE FULLY STABILIZED AT THE END OF EACH WORK DAY.
SPECIMENS TO BE REMOVED
SP-029, SP-031, SP-033
1 11/12/25 Revised MES Project Number
U E
U E
UE
UE
GAS
C
C
GdC
GdC
MaD
GdC
GdC
MaD
GdCGdC
GdC
MaD
GdC
GdC
MaD
GdC
LIMITS OF DISTURBANCE
155,640 S.F., 3.57 AC.
W
AT
ER
V
IE
W
D R.
SP-027
SP-028
SP
-0
SF
SF
SF
SDS
SDS
SDS
SDS
SDS
TPF
TP
F
MATC
H LI
NE S
EE S
HEET
M A
TC
H
L
IN
E S
E E
S H
E E
T
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
SAME DAY STABILIZATION:
USE SDS FOR THESE AREAS. NO MORE THAN 100 L.F. OF TRENCH, OR NO MORE
THAN CAN BE BACKFILLED AND FULLY STABILIZED IN A SINGLE DAY MAY BE OPENED
EACH DAY. NO OTHER EARTH DISTURBANCE OF ANY KIND SHALL BE UNDERTAKEN
THAT CANNOT BE FULLY STABILIZED AT THE END OF EACH WORK DAY.
1 11/12/25 Revised MES Project Number
E
U E
UE
U E
U E
U E
U E
UE
UE
U E
UE
U E
U E
UE
U E
U E
UE
UE
UE
UE
UE
X
XX
X
X
X
X X
X
X
X
X
X
X
X
WgB
MdE
MdE
GhC
GdB
GdC
GdC
GdC
LIMITS OF DISTURBANCE
155,640 S.F., 3.57 AC.
SP-025
SP-026
SP-027
SF
SF SF SF
SF SF
SDS
SDS
SDS
SDS
SDS
M A
TC
H
L
IN
E S
E E
S H
E E
T
MATCH LINE SEE SHEET 6
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
SAME DAY STABILIZATION:
USE SDS FOR THESE AREAS. NO MORE THAN 100 L.F. OF TRENCH, OR NO MORE
THAN CAN BE BACKFILLED AND FULLY STABILIZED IN A SINGLE DAY MAY BE OPENED
EACH DAY. NO OTHER EARTH DISTURBANCE OF ANY KIND SHALL BE UNDERTAKEN
THAT CANNOT BE FULLY STABILIZED AT THE END OF EACH WORK DAY.
1 11/12/25 Revised MES Project Number
UE
UE UE UE UE UE UE UE UE UE
UE
UE
UE
UE
UE
X
X
X
X
GaC
GfB
GaBMbD
GhB
GdC
WgBWgB
WgB
WgB
MaC
GhC
MdE
LIMITS OF DISTURBANCE
155,640 S.F., 3.57 AC.
RUE SAINT LO DR.
R U
E
SA
IN
T
LO
D
R
SP-024
INSTALL NEW FIRE HYDRANT AND
ABANDON EXISTING FIRE HYDRANT.
SDS
SDS SDS
SDSM
AT
C H
L
IN
E
SE
E
SH
EE
T
M
AT
C H
L
IN
E
SE
E
SH
EE
T
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
SAME DAY STABILIZATION:
USE SDS FOR THESE AREAS. NO MORE THAN 100 L.F. OF TRENCH, OR NO MORE
THAN CAN BE BACKFILLED AND FULLY STABILIZED IN A SINGLE DAY MAY BE OPENED
EACH DAY. NO OTHER EARTH DISTURBANCE OF ANY KIND SHALL BE UNDERTAKEN
THAT CANNOT BE FULLY STABILIZED AT THE END OF EACH WORK DAY.
SPECIMEN TO BE REMOVED
SP-024
1 11/12/25 Revised MES Project Number
E
C
GAS
GAS GAS GAS GAS GAS
UE UE UE UE
UE
UE UE UE UE
UE
UE UE UE UE UE UE
UE
UE
UE UE
UE UE UE
UE
UE UE UE
UE
U E
UE
UE
UE
UE
UE
UE
UE
C UE
UE UE UE
UE UE
GAS GAS GAS GAS GAS GAS GAS GAS
GAS
UE
UE
UE
UE
UE
UE
UE
UE
GAS
GAS
GAS
GAS
GAS
UE
U E
C
U E
U E
C C
UE
UE
UE
UE
UE
U E
GfB GdC
GfB GdC
GaB
GfB
GfB
GdB
GaB
U E
C
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE
UE
UE UE
UE UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE UE
UE UE UE
UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE
UE UE UE UE UE UE UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE
UE
UE
UE
UE
UE
UE
UE
UE UE UE UE UE UE UE
UE UE UE UE UE UE UE UE UE
UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE
UE
UE
UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE
UE UE
UE UE UE
UE UE UE
UE UE
UE UE UE
UE UE
UE UE UE
UE UE
UE UE UE
UE UE
UE UE UE
UE UE
UE UE UE
UE UE
UE UE UE
UE UE
UE UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE UE
UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE
UE UE UE UE UE UE UE UE UE UE UE
UE
UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE UE
UE UE UE
UE UE
UE UE UE
UE UE
UE UE UE UE UE
UE UE UE UE UE UE
UE UE UE UE UE UE
UE UE UE UE UE UE
UE UE UE UE UE
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
LIMITS OF DISTURBANCE
155,640 S.F., 3.57 AC.
RUE SAINT LO DR.
SP-036
SP-035
INSTALL NEW FIRE HYDRANT AND
ABANDON EXISTING FIRE HYDRANT.
SDS
SDS
SDS
SDS
SDS
M
AT
CH
L
IN
E
SE
E
SH
EE
T 6 M A
TC
H
L
IN
E S
E E
S H
E E
T
MATCH LINE SEE SHEET 8
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
SAME DAY STABILIZATION:
USE SDS FOR THESE AREAS. NO MORE THAN 100 L.F. OF TRENCH, OR NO MORE
THAN CAN BE BACKFILLED AND FULLY STABILIZED IN A SINGLE DAY MAY BE OPENED
EACH DAY. NO OTHER EARTH DISTURBANCE OF ANY KIND SHALL BE UNDERTAKEN
THAT CANNOT BE FULLY STABILIZED AT THE END OF EACH WORK DAY.
SPECIMENS TO BE REMOVED
SP-035, SP-036
1 11/12/25 Revised MES Project Number
GAS
UE
U E
U E
U E
U E
UE
UE
UE
UE
U E
UE
UE
U E
U E
C
C
C
C
C
C
C
U E
U E
C
C
C
U E
U E
U E
UE
UE
UE
UE
UE
U E
U E
UE
GAS
GAS
G
AS
G
AS
G
AS
GASGAS
GdA
MbD
GdB
GaC
GdB
G dB
G aB
GdB
GaB
GaC
GdA
GdA
GdA
GdB
GdB
GdB
U E
U E
U E
UE
UE
C
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
UE
UE
U E
G
AS
G
AS
G
AS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
G A
S
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G A
S G
A S
G A
S G
A S
G A
S G
A S
G
AS
G
AS
G A
S G
A S
G A
S G
A S
G A
S G
A S
G A
S G
AS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GASGASGASGASGASGASGASGASGAS
GASGASGASGASGASGASGASGASGASGASGAS
GASGASGAS
U E
C
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
U E
U E
UE
UE
UE
U E
U E
U E
U E
U E
U E
U E
U E
U E
UE
U E
UE
U E
U E
UE
U E
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
UE
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
LIMITS OF DISTURBANCE
155,640 S.F., 3.57 AC.
LIMITS OF DISTURBANCE
155,640 S.F., 3.57 AC.
O M
A H
A B
E A
C H
C
IR
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SD
S
SDS
SDS
SDS
SDS
SDS
SDS
SDS
SDS
SDS
M
AT
C H
L
IN
E
SE
E
SH
EE
T
MATCH LINE SEE SHEET 11
MATCH LINE SEE SHEET 9
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
SAME DAY STABILIZATION:
USE SDS FOR THESE AREAS. NO MORE THAN 100 L.F. OF TRENCH, OR NO MORE
THAN CAN BE BACKFILLED AND FULLY STABILIZED IN A SINGLE DAY MAY BE OPENED
EACH DAY. NO OTHER EARTH DISTURBANCE OF ANY KIND SHALL BE UNDERTAKEN
THAT CANNOT BE FULLY STABILIZED AT THE END OF EACH WORK DAY.
NOTE:
THERE ARE NO FORESTED AREAS ON THIS SHEET.
1 11/12/25 Revised MES Project Number
G
AS
G
AS
U E
U E
U E
U E
U E
C
C
C C
C C
C
CC
UE
U E
U E
UE
UE
UE
UE
UE
UE
UEUE
UE
UE
UE
U E
U E
UE
C
UE
MbDGdB GdB
GdA
GdB
GdB
G dB
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G A
S G
A S
G
AS
G A
S G
A S
G A
S G
AS
G
A S
G A
S G
AS
G
AS
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
CC
U E
UEUE
UE
UE
UE
UE
UE
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
CC
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
UE
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
UE
U E
U E
U E
U E
U E
U E
U E
UE
UE
U E
UE
U E
UE
U E
UE
U E
UE
UE
UE
U E
U E
U E
U E
U E
UE
U E
U E
U E
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
U E
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
UE
UE
UE
U E
UE
UE
UE
U E
UE
U E
UE
U E
UE
U E
UE
U
EUE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
U E
UE
UE
UE
UE
UE
UE
UE
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
UE
U E
UE
U E
U E
UE
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
GAS
G
AS
U E
U E
U E
U E
U E
U E
LIMITS OF DISTURBANCE
155,640 S.F., 3.57 AC.
OMAHA BEACH CIR.
SF
SF
SF
SF
SF
SF
SF
SF
SF
S F
S F
SDS
SDS
SDS
SDS
SDS
SDS
MATCH LINE SEE SHEET 8
MATCH LINE SEE SHEET 10
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
SAME DAY STABILIZATION:
USE SDS FOR THESE AREAS. NO MORE THAN 100 L.F. OF TRENCH, OR NO MORE
THAN CAN BE BACKFILLED AND FULLY STABILIZED IN A SINGLE DAY MAY BE OPENED
EACH DAY. NO OTHER EARTH DISTURBANCE OF ANY KIND SHALL BE UNDERTAKEN
THAT CANNOT BE FULLY STABILIZED AT THE END OF EACH WORK DAY.
NOTE:
THERE ARE NO FORESTED AREAS ON THIS SHEET.
1 11/12/25 Revised MES Project Number
GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UE
UE
UE
UE
UE
UE
UE
C
C
C
C
C C
UE
C U E
UE
C
UE
UE UE
UE
UEC
C C
C C
C C
GAS
GAS
UE
UE
UE
UE
UE
UE
MaC
GdB GdA
GdB
MbD
GdAGdB
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS
G
AS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
G
AS
GAS
GAS
GAS
G
AS
GAS
GAS
G
AS
G
AS
GAS
GAS
G
AS
GAS
GAS
G
AS
G
AS
GAS
GAS
C C
C C
C C
C C
C C
C C
C C
C C
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
UEUEUEUEUEUEUEUEUEUEUEUEUEUE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C
GAS
GAS
GAS
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE
UE UE
UE
UE UE
UE UE
UE
UE UE
UE UE
UE UE
UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE UE
UE
UE
UE
UE UE
UE
UE
UE UE
UE
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C
C C
C
C C
C
C C
C
C C
C
C C
C
C C
C
C C
C
C C
C C
C C
C
C C
UE
LIMITS OF DISTURBANCE
155,640 S.F., 3.57 AC.
OMAHA BEACH CIR.
SF
SF
SF
SF
SD
S
SDS
SDS
SDS
SDS
SDS
MATC
H LI
NE S
EE S
HEET
9 M
AT
CH
L
IN
E
SE
E
SH
EE
T
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
SAME DAY STABILIZATION:
USE SDS FOR THESE AREAS. NO MORE THAN 100 L.F. OF TRENCH, OR NO MORE
THAN CAN BE BACKFILLED AND FULLY STABILIZED IN A SINGLE DAY MAY BE OPENED
EACH DAY. NO OTHER EARTH DISTURBANCE OF ANY KIND SHALL BE UNDERTAKEN
THAT CANNOT BE FULLY STABILIZED AT THE END OF EACH WORK DAY.
NOTE:
THERE ARE NO FORESTED AREAS ON THIS SHEET.
1 11/12/25 Revised MES Project Number
GAS
GAS
GAS
GAS
UE
U E
UE
UE
UE
UE
UE
C
C
C
G A
S
GAS
GAS
GAS GAS
GAS
GAS
GAS
G
AS
U E
U E
G
AS
G
AS
UE
UE
UE
UE
UE
UE
UE
GdA
Gd A
GdA
GdA
GdB
GdB
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
UE
U E
U E
UE
U E
U E
U E
U E
U E
U E
U E
U E
U E
UE
U E
U E
UE
U E
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
UE
U E
U E
U E
U E
UE
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
U E
LI
M
IT
S
OF
DI
ST
UR
BA
NC
E
5, S.
F.
, 3 .5
AC
LIMITS OF DISTURBANCE
155,640 S.F., 3.57 AC.
O M
A H
A B
E A
C H
C
IR
OMAHA BEACH CIR.
OMAHA BEACH CIR.
SF SF S
F
SD
S
SD
S
SDS
SDS
SDS
SDS
SDS
SDS
MATCH LINE SEE SHEET 8
M
AT
C H
L
IN
E
SE
E
SH
EE
T
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
SAME DAY STABILIZATION:
USE SDS FOR THESE AREAS. NO MORE THAN 100 L.F. OF TRENCH, OR NO MORE
THAN CAN BE BACKFILLED AND FULLY STABILIZED IN A SINGLE DAY MAY BE OPENED
EACH DAY. NO OTHER EARTH DISTURBANCE OF ANY KIND SHALL BE UNDERTAKEN
THAT CANNOT BE FULLY STABILIZED AT THE END OF EACH WORK DAY.
NOTE:
THERE ARE NO FORESTED AREAS ON THIS SHEET.
1 11/12/25 Revised MES Project Number
GAS GAS GAS
UE UE UE UE UE
C C C C C
U E
GAS
G
AS
G
AS
G
AS
G
AS
U E
U E
U E
U E
U E
G
AS
G
AS
G
AS
G
AS
C
C
C
C
C
C
C
C
C
C
CC
UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GdB
MaD
GdC
G dC
G dC
MaD
GdC
GdB
GdB
UE
U E
U E
U E
U E
U E
UE
U E
UE
U E
U E
U E
U E
U E
U E
UE
U E
U E
U E
UE
UE
U E
UE
U E
U E
U E
UE
U E
U E
U E
U E
U E
U E
U E
U E
U E
UE
UE
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
UE
U E
UE
U E
UE
U E
UE
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
G
AS
G
AS
G
AS
G
AS
GAS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
GAS
G
AS
G
AS
G
AS
G
AS
GAS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
LIMITS OF DISTURBANCE
155,640 S.F., 3.57 AC.
OMAHA BEACH CIR.
RU
E
SA
IN
T
LO
D R.
SP-036
SP
-0
36SD
S
SDS
SDS
SDS
SDS
SF SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
MATCH LINE SEE SHEET 7
MATC
H LI
NE S
EE S
HEET
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
SAME DAY STABILIZATION:
USE SDS FOR THESE AREAS. NO MORE THAN 100 L.F. OF TRENCH, OR NO MORE
THAN CAN BE BACKFILLED AND FULLY STABILIZED IN A SINGLE DAY MAY BE OPENED
EACH DAY. NO OTHER EARTH DISTURBANCE OF ANY KIND SHALL BE UNDERTAKEN
THAT CANNOT BE FULLY STABILIZED AT THE END OF EACH WORK DAY.
SPECIMEN TO BE REMOVED
SP-036
1 11/12/25 Revised MES Project Number
CCC
CC
C
CCCC
C C
C C
C
C
C
C
C
C
C
C
C
C UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE
UE
UE
UE UE UE UE
UE
UE
UE
UE UE UE
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GAS
GAS
GAS GAS GAS GAS
GAS
GAS GAS
GAS
GAS GAS GAS
G dC
GdC
MaD
GdB
MaD
GdCGdB
GdB
GdC
5, S.
F.
, 3 .5
AC
LIMITS OF DISTURBANCE
155,640 S.F., 3.57 AC.
SP-018
SP-022
SP-023SP-021
SP-010
SP-009
SP-020 SP-019
SP-008
SP-007
SP-006
SD
S
SDS
SDS SDS
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
TPF TPF TPF
TPF
TPF TPF
TPF
TPF
TPF
TPF TPF TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
EXISTING
FOREST
EXISTING
FOREST
EXISTING
FOREST
M A
TC
H
L
IN
E S
E E
S H
E E
T
M
AT
C H
L
IN
E
SE
E
SH
EE
T
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
SAME DAY STABILIZATION:
USE SDS FOR THESE AREAS. NO MORE THAN 100 L.F. OF TRENCH, OR NO MORE
THAN CAN BE BACKFILLED AND FULLY STABILIZED IN A SINGLE DAY MAY BE OPENED
EACH DAY. NO OTHER EARTH DISTURBANCE OF ANY KIND SHALL BE UNDERTAKEN
THAT CANNOT BE FULLY STABILIZED AT THE END OF EACH WORK DAY.
1 11/12/25 Revised MES Project Number
UE UE
UE UE
UE
UE
UE
UE UE UE
C C
CCC
CCCC
UE UE UE
UE
UE UE UE
UE
UEGAS GAS GAS GAS
GAS
GAS GAS GAS
GAS
GAS
CC
C
C
C
C
GAS
GAS
GAS
GAS
GAS
UE
UE
UE
UE
UE
UE
GASC
UE
UE
U E
GASC
G
AS
C
UE
U E
U E
GdC
GdB
GdB
MaD
GdC
GdB
GdC
LIMITS OF DISTURBANCE
155,640 S.F., 3.57 AC.
SP-001
SP-016
SP-002
SP-017
SP-005
SP-004SP-003
SP-011
SP-014
SP-015
SP-012
SP-013
SDS
SDS
SDS
TPF
TPF
TPF
TPF
TPF
TPF
TPF TPF TPF
TPF
TPF
TPF
TPF TPF TPF TPF TPF TPF
TPF
TPF TPF
TPF
TPF
TPF
TPF
TPF TPF TPF TPF
TPF
EXISTING
FOREST
EXISTING
FOREST
EXISTING
FOREST
EXISTING
FOREST
M A
TC
H
L
IN
E S
E E
S H
E E
T
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
SAME DAY STABILIZATION:
USE SDS FOR THESE AREAS. NO MORE THAN 100 L.F. OF TRENCH, OR NO MORE
THAN CAN BE BACKFILLED AND FULLY STABILIZED IN A SINGLE DAY MAY BE OPENED
EACH DAY. NO OTHER EARTH DISTURBANCE OF ANY KIND SHALL BE UNDERTAKEN
THAT CANNOT BE FULLY STABILIZED AT THE END OF EACH WORK DAY.
1 11/12/25 Revised MES Project Number
X
XXX
GdB
MaC
GhB
GaC
GeC
BhB
GhB
MbD
GLEN FALLS ROAD
FC
E
جل جلاله
FC
E
جل جلاله
FC
E
جل جلاله
FC
E
جل جلاله
FCE
جل جلاله
FCE
جل جلاله
FCE
جل جلاله
FC
E
جل جلاله
FC
E جل جلاله
FC
E
جل جلاله
FC
E جل جلاله
FC
E
جل جلاله
FCE
جل جلاله
FCE
جل جلاله
FCE
جل جلاله
SF
TP
F
SF
TP
F
SF
TP
F
SF
TP
F
SF
TP
F
SFTPF
SFTPF
SFTPF
SFTPF
SFTPF
SFTPF
SFTPF
SFTPF
SFTPF
SFTPF
SFTPF
SFTPF
SFTPF
SFTPF
SF SF
SF
SF
SF
SF
SF
SF SF SF
SF
SF
SF
STAGING AREA
(50'x220')
LIMITS OF OFFSITE PLANTING AREA
71,875 S.F., 1.65 AC.
FCE جل جلاله FOREST CONSERVATION EASEMENT,
FENCING AND SIGNAGE
GdB
- COMBINATION SILT FENCE / TREE
PROTECTION FENCE
SFTPF SFTPF
- TREE PROTECTION FENCETPF TPF
- LIMIT OF DISTURBANCE
- 18" SILT FENCESF SF SF
- LIMIT OF DISTURBANCE
- 18" SILT FENCE
SEDIMENT CONTROL / FOREST CONSERVATION LEGEND
- STABILIZED CONSTRUCTION ENTRANCE
MdB GdB
- SOIL BOUNDARY
- TREE PROTECTION FENCETPF TPF
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WHERE PREPARED OR
APPROVED BY ME, PAUL J. NAVARRO, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICESE NO. 21009, EXPIRATION DATE: 10-25-2025.
CORPORATE OFFICE
151 RENO AVENUE
NEW CUMBERLAND, PA 17070
PHONE: (717) 441-2216
FAX: (717) 441-2218
www.navarrowright.com
CONSULTING ENGINEERS, INC.W
N
TYPICAL PLANTING LAYOUT DETAIL
NOT TO SCALE
OFFSITE FOREST CONSERVATION TREES (578 TREES REQUIRED)
QTY BOTANICAL/COMMON NAME CALIPER HEIGHT NOTES
80 (14%) GYMNOCLADUS DIOICUS - KENTUCK
COFFEE TREE
2-1/2" - NATIVE
60 (10%) MALUS - CRABAPPLE 2-1/2" - NATIVE
32 (9%) QUERCUS PALUSTRIS - PIN OAK 2-1/2" - NATIVE
200 (30%) ACER RUBRUM - RED MAPLE 2-1/2" - NATIVE
80 (14%) BETULA NIGRA - RIVER BIRCH - 12' - 14' NATIVE
76 (13%) ACER SACCHARUM - SUGAR MAPLE 2-1/2" - NATIVE
50 (10%) QUERCUC PHELLOS - WILLOW OAK 2-1/2" - NATIVE
NOTE: TREES SHALL BE PLANTED IN A RANDOM FASHION.
1 11/12/25 Revised MES Project Number
Notes:
· All proposed planting areas within the limits of disturbance will be planted with trees per the Baltimore City Supplement to the State Forest Conservation Manual following construction completion.
· All temporary access locations will enter onto City property from City roads. The access paths throughout the limits of disturbance will consist of a mulched material.
Protection:
· Install plastic mesh tree protection fencing and construction signs as shown on the Forest Conservation Plan (FCP). Make sure all fencing and construction signs are visible, well-anchored, and placed in the correct location. Be prepared to make field adjustments of the plastic mesh tree protection fencing as determined by the City Environmental Planner.
· An inspection (pre-construction meeting) will occur before construction begins to ensure that the forest protection devices have been installed properly and retention areas are clearly marked. This inspection shall occur before any forest clearing, stress reduction measures, or grading is started. The developer will need to schedule the inspection with the Baltimore Office of Sustainability (410-396-1670) and the Baltimore City Department of Recreation & Parks (410-396-6109).
Attendees shall include the developer's representative, construction superintendent, Maryland Licensed Tree Expert (if required), the City Environmental Planner, and a representative from the Baltimore City Department of Recreation & Parks. It is the developer's responsibility to coordinate and schedule this inspection.
· Upon approval of placement of forest protection devices, no clearing or grading shall begin until stress reduction measures as indicated on the approved FCP has been implemented, unless otherwise permitted by the City Environmental Planner. Appropriate measures may include:
A: Root pruning.
B: Crown reduction or pruning.
C: Watering.
D: Fertilizing, only if soil test show that pH and nutrients are extremely low.
E: Vertical mulching.
An International Society of Arboriculture Certified Arborist must perform/supervise all stress-reduction measures. Documentation of stress reduction must be sent to the City Environmental Planner at 417 E. Fayette Street, 8th Floor, Baltimore, Maryland 21202.
· Temporary tree protection devices shall be maintained and installed by the contractor for the duration of the construction project and must not be altered without prior approval of the City Environmental Planner. No equipment, trucks, materials, or debris may be stored within the tree protection fence areas during the entire construction project. No access to the fenced area will be permitted. Tree protection fencing shall not be removed without approval of the City Environmental Planner.
· Remove any trees within the limits of disturbance that is scheduled to be removed prior to construction in a manner that will not damage the remaining trees.
Invasive species suppression:
· Refer to the FSD Report: Section 9.0 (Invasive Species
Control) for details of species removal/suppression.
· Submit State Herbicide Applicator License and
Certification for the Company, Supervisor/Superintendent working on the project. The Certification must state that the assigned Supervisor/Superintendent is certified in the category related to the project; Forest, Right of Way, or Aquatic Pest Control (for work directly adjacent to or over water).
· Contractor to remove all invasive species within the limits of disturbance and planting area prior to planting.
Control of invasive plants using approved mechanical removal (machetes, chainsaws, pruners, etc.) methods or approved herbicide applications. Spray as necessary, as according to the FSD report. The Contractor must be sensitive and selective to avoid harming native plant species during invasive plant removal. The Contractor is responsible for damages if mechanical removal is performed outside the removal area.
· Seed invasive species suppression areas with appropriate seed mix for the area.
Planting:
· Prior to installation of landscaping, afforestation or reforestation, the applicant must schedule an on-site pre-planting meeting with the City Environmental Planner (410-396-1670) and the City Arborist (410-396-6109). Attendees shall include the contractor, landscaper, City Environmental Planner, and City Arborist. The Contractor is required to stake out each individual planting pit for trees and request the City to inspect and approve plant spacing and planting techniques prior to proceeding. All details of the planting plans will be discussed including:
o Plant quality § Trees shall conform to the current version of the American Standard for Nursery Stock (ANSI Z60.1).
§ Proper form for species. No substitution of plant materials is permitted without prior written approval from the City.
§ Plant materials must be selected from certified nurseries that have been inspected by state and/or federal agencies. Nursery inspection certificates shall be furnished to the City upon request.
§ No co-dominant stems or multiple trunks (unless approved by City Environmental Planner and City Arborist).
§ Sound graft union.
§ Girdling roots removed.
§ Trees shall be healthy, vigorous, and insect/disease free.
o Proper Planting § No higher than 3”, § Exposed root flare, § Wire baskets/twine/burlap removed from top half of root ball, § All synthetic burlap or twine removed completely, § No hose and wire, § Hole twice the size of the root ball, § Mulched properly, § Wildlife protection installed (if required).
Trees not complying with the above guidelines may be rejected at the discretion of the City Environmental Planner and the City Arborist. To maximize the trees potential for survival, tree planting will not be permitted between the dates of June 1 and September 1, or when the ground is frozen, or as directed by the City. Live stakes should be installed during cold weather months.
Plantings will only occur when weather and soil conditions will permit the successful establishment of plants.
The Contractor shall refer to the Planting Schedules for specific spacing requirements. In the Planting Schedule, the Contractor shall use the overall spacing figure to determine the spacing between each species of vegetation.
All planting pits shall be dug by hand. Walls of planting pits shall be dug so that they are vertical or sloping outward in heavy soils. Scarify the walls of the pit after digging.
Excavate the planting pit to twice the width of the root mass. The planting pit shall be deep enough to allow the root flare to be flush with the existing grade or no more than 3” higher.
Remove all debris from the pit and tamp loose soil in the bottom of the pit by hand. Remove the plant either by cutting or inverting the container. There is no need to remove the peat pot or cut the root mass of herbaceous plugs. Do not handle the plant by the branches, leaves, or stem.
Place the plant straight in the center of the planting pit, carrying the plant by the root mass. Never lift or carry a plant by the trunk or branches.
No fertilizer shall be used for herbaceous planting.
Place four (4) ounces of fertilizer in each plant pit for up to 1-gallon size containers, six (6) ounces for up to 3-gallon container size, and place eight (8) ounces for up to a 5-gallon container size. Place the fertilizer in the planting pit completely surrounding the plant ball prior to backfilling.
Mix a minimum of 500 spores of endomycorrhizal fungi and 30 million spores of ectomycorrhizal fungi to each cubic foot of backfill for trees and shrub planting.
Backfill planting pit with existing soil and hand tamp as pit is being backfilled to completely fill all voids and air pockets. Do not over compact soil. Make sure plant remains straight during backfilling/tamping procedure. If staking is required, trees must be staked. All stakes must be removed after twelve (12) months.
DO NOT COVER THE TOP OF THE ROOT MASS
WITH SOIL.
Trees shall be mulched. A minimum diameter of 20-inches of mulch shall be placed around each plant.
Mulch shall be 2” to 3” thick. Mulch shall NOT be placed directly against the stem of the plant.
The Contractor shall leave no open planting pits at the close of each day.
Initial Watering: The Contractor must provide one (1) initial watering after planting or seeding. Watering beyond the initial watering will be considered additional watering and will be included within the maintenance agreement. All watering must be accomplished using a hose with nozzle and breaker or a sprinkler. Water must be applied in sufficient quantities to maintain moist soil to a depth of at least 4”. Water must be applied at low water pressure directly to each plant, allowing water to be absorbed into the planting pit soil until saturated, but without runoff. The Contractor must avoid application of too much water.
The following may be used as a guideline for water volume requirements for plants installed for stream work.
Caliper Gallons of Water Under 1 inch 5
1.5 inch 5 to 10 2 inch 10 to 15
2.5 inch 15 to 20 >2.5 inch 20 to 30
Use of Existing Soil: The backfill for existing soil shall consist of soil amended to the following composition:
approximately 45-77% silt, 0-25% clay, 25-33% sand, pH of 5.5-6.5, and organic content of 3-5% by weight.
Foreign material and stones over 2 inches in diameter are not permitted. Random soil sampling may be conducted to ensure this requirement is met.
Replacement Soil: Furnished topsoil shall come from approved sources and shall be good, friable, free-draining and uniform in texture/structure and natural loam soil. Topsoil shall contain no subsoil material and free of sticks, stones, rocks, weeds, debris or other extraneous matter.
(1) The Contractor shall use topsoil from an area that has never been stripped and shall have an acidity range of pH 5.5 to pH 6.5.
(2) The topsoil shall have an organic content minimum of 3% by weight. Clay loam is not acceptable.
(3) The topsoil shall be graded to the lines indicated and top soiling or other operations shall be corrected to prevent formation of depressions where water will stand.
(4) Provide topsoil as required to correct areas damaged during construction within and outside of the indicated limits of disturbance.
(5) The topsoil shall not be placed when the subgrade is frozen, excessively wet/dry or in a conditional otherwise detrimental to the proposed planting or the proper grading.
Post Planting:
· The City Environmental Planner and City Arborist must be notified IN WRITING when the planting is complete.
The maintenance and warranty period will not begin until the City Environmental Planner and City Arborist has accepted all plantings. Trees will be inspected for plant quality and proper planting in accordance with City specifications. Once the maintenance period has begun, the applicant is responsible to maintain plant health in accordance with the signed Maintenance Agreement.
Routine inspections will be conducted throughout the warranty period and the applicant will be notified in writing when corrective measures are required. Failure to compete the work by the given date may result in fines being issued, permits revoked, or other punitive measures. Such maintenance shall include when appropriate, but not necessarily be limited to:
o Watering, fertilizing, and control of competing vegetation during the initial planting and through the maintenance period as may be necessary.
o Pruning, mulching, tightening, and removal of guys and stakes within 6 months, resetting of plants to proper grades or upright position, and furnishing and applying such sprays or other items necessary to thwart damage from insects and disease.
o Providing protection measures such as fencing and interpretive signs as necessary, to prevent destruction or degradation of the planting site.
o Following those standards contained in the Forest Conservation Manual for the protection and satisfactory establishment of forest where applicable.
o Eradicate, suppress, and control invasive exotic plant species during the maintenance period to the satisfaction of the City Environmental Planner.
o Installing and maintaining devices to protect against wildlife damage.
Post-Construction:
· An inspection shall be requested IN WRITING after construction is completed. Corrective measures may be required for existing trees and/or forest areas, which may include, but are not limited to the following:
o Removal and replacement of dead or dying trees.
o Pruning of dead or declining limbs.
o Soil aeration.
o Fertilization.
o Watering.
o Wound repair.
o Cleanup of debris.
· After inspection and completion of corrective measures (if necessary) have been undertaken, all temporary protection devices shall be removed from the site. No additional grading, sodding, or burial of debris may take place.
Specification For Seeding (Post Site Preparation):
A. Mulch: Apply ½” to ¾” thick layer or 60 to 80 straw bales per acre.
B. Hydro mulch: Wood cellulose applied at a net dry weight of 750 pounds per acre.
C. Erosion Control Blankets (coir mat) acceptable as determined by the City.
D. Mulching straw and Stabilizing Materials:
All straw mulch shall be bound with a suitable binder or straw shall be rolled thoroughly with a crimping roller in several directions to prevent erosion of the soil and/or mulch.
E. Apply Water.
F. Fertilizer: The Contractor shall use organic fertilizers in lieu of petroleum-based fertilizers. Suitable products that are commercially available are marketed and certified as 'organic' or 'natural' fertilizers. Organic materials shall include such items as sea grasses/kelp, rock powder, bone meal, whey, bean meal, blood meal, composted manure, etc. Product nutrient content shall be identified in the standard form of Nitrogen (N), Phosphorous (P) and Potassium (K) ratios. Fertilizer nutrient content shall be 20-10-5. The application rate shall be equivalent to a 5-gram tablet per bare root plant. The City or City's agent must approve any proposed substitution to this nutrient content. Application rates of fertilizers shall be 800-1200 lb/acre of 10-10-10 (or the equivalent).
G. Limestone Application rates of limestone shall be 1-1½ tons/acre.
H. Construction: The Contractor shall furnish and install the permanent seed mix.
I. Installation: All areas disturbed by construction shall be seeded in accordance with the planting plans and schedules. Areas not disturbed, or areas where the City allows permanent retention of wood chip mulch protection, shall not be seeded. All areas to be seeded shall conform to the finished grades as specified on the plans and be free of all weeds, trash, debris, brush, clods, loose rocks, and other foreign materials larger than 3” in diameter or length that would interfere with seeding. All gullies, washes, or disturbed areas that develop subsequent to final dressing shall be repaired prior to seeding. No seeding shall be performed on frozen ground or when the temperature is 320F/00C or lower. Sow seed mixture between the dates of March 1 and May 31 or between the dates of August 15 and October 31. Apply ground agricultural limestone at a rate of 92 lbs. / 1000 sf. Apply 0-20-20 fertilizer with the limestone at a rate of 15 lbs. per 1000 sf. Immediately prior to seeding, supply 10 pounds of 38_0_0 ureaform and 12 pounds of 10_20_20 or equivalent per 1000 sf. If planting cannot be accomplished within the dates noted above, apply temporary seeding and mulch. Mulch as specified above. Lime and fertilizer requirements shall be as noted above.
J. Site Preparation: Areas that are to be seeded as directed by the planting plan AND have not been graded or otherwise had the soil exposed, will require some site preparation. A light disking or rototilling ONLY to 1” in depth is all that is needed. It is important to stay outside the Critical Root Zone of trees as indicated in the planting plans.
1. Broadcast Method:
Broadcast by hand or by backpack seeder using the proper proportion seeding rate and seed proportion for area. To help proportion the seed, filler can be used such as; sawdust, kitty litter, or sand.
Broadcast half the seed in direction (vertically) and the other half in the opposite direction (horizontally).
To achieve good seed to soil contact this procedure is to be followed by rolling or tracking seed into top ¼” of the soil.
2. Hydro-seeding Method:
In areas, too wet to work use the hydro-seed.
Apply seed with appropriate amounts of hydro-mulch for good seed placement. To follow up use straw mulch or hydro-mulch to seed cover.
K. Mulching: At the rate of two tons/acre apply non rotten small grain straw after seeding. Using a vegetable oil based tackifier (or an approved tackifier) at the rate of 100 pounds in 750 gallons of water per acre and anchor mulch immediately after application. During the period of October 31 through February 28, the site should be protected by applying and anchoring straw mulch at the rate of two tons per acre. Seeding should start as soon as possible in the spring.
L. Broadcasting: Seeding shall be accomplished by using a broadcast spreader. The City must approve any alternative seeding methods.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .