This is a bidding documents package for the Camp Fretterd Water Main Replacement Project in Baltimore County, Maryland, issued by the Maryland Environmental Service (MES). The project involves the construction of a new replacement water distribution system located at Camp Fretterd Military Reservation at 5405 Rue Saint Lo Drive in Reisterstown, Maryland 21136. The work includes installation of approximately 2,394 linear feet of 8-inch PVC C900 water main pipe, 3,210 linear feet of 8-inch RJ PVC C900 water main pipe, 2,179 linear feet of 6-inch PVC C900 water main pipe, 741 linear feet of 6-inch RJ PVC C900 water main pipe, valve installations (8-inch, 6-inch, and 4-inch gate valves), fire hydrant removal and installation, water service piping, pavement and concrete work, and finish grading totaling 15,476 square yards. The contract includes contingent bid items for insertion valves, pipe bends, asbestos-cement pipe connections, concrete encasement, test pit excavation, and additional materials. The bid documents are dated October 2027 with Project ID No. 1-26-2-19-5. The base contract completion period is three hundred sixty-five (365) consecutive calendar days from the Notice to Proceed, including weekends and holidays.
The evaluation basis is the lowest responsive total bid price from a responsible bidder. A bid bond in the amount of five percent (5%) of the total base bid price is required with bid submission. Liquidated damages are assessed at $1,839.00 per calendar day for work not completed within the specified time period. A Minority Business Enterprise (MBE) participation goal of thirteen percent (13%) is established for this contract. Bidders must submit documentation including a Construction Bid Form with all line items priced, a Bid/Proposal Affidavit addressing nondiscrimination, debarment, collusion, tax payment compliance, and Iran investment certifications, a Contractor's Qualification Questionnaire, an Equipment List, a List of Subcontractors, and an MBE Utilization and Fair Solicitation Affidavit with MBE Participation Schedule or waiver request. All bids must be accompanied by bid security and appropriate certifications regarding discriminatory boycotts of Israel and conflicts of interest. The contract is subject to prevailing wage requirements and the General Conditions of MES.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAMP FRETTERD WATER MAIN REPLACEMENT PROJECT
BALTIMORE COUNTY, MD
Project ID No. 1-26-2-19-5
Rev 6/2015
BIDDING DOCUMENTS ONLY
SOLICITATION, SCOPE OF WORK,
PREVAILING WAGE, ATTACHMENTS, AND
DRAWINGS ARE NOT INCLUDED IN THIS
FILE.
MES Project ID No. 1-26-2-19-7
CONSTRUCTION BID FORM
Page 1 of 7 October 2027
CONSTRUCTION BID FORM
BID ID NO: 1-26-2-19-5
CAMP FRETTERD WATER MAIN REPLACEMENT PROJECT
BALTIMORE COUNTY, MD
Date:
Firm Name:
Having carefully examined the bid documents for the above referenced project, including, but not limited to, “Instructions to Bidders,” “Maryland Environmental Service General Conditions”, “Technical Specifications” and:
Drawings numbered
Addenda numbered and having received clarification on all items of conflict or upon which any doubt arose, the undersigned proposes to furnish all labor, materials and equipment required in accordance with these documents:
BASE BID ITEMS
ITEM DESCRIPTION QUANTITY
UNIT OF
MEASURE
UNIT COST ITEM TOTAL
A-1 Mobilization 1 LS $ $
A-2 Construction Stakeout 1 LS $ $
A-3 Field Office 1 LS $ $
A-4 Erosion and Sediment Control 1 LS $ $
A-5 Forestation 1 LS $ $
(Sign Each Page for Identification) (Name of Firm) MES Project ID No. 1-26-2-19-7
CONSTRUCTION BID FORM
Page 2 of 7 October 2027
B-1 8-Inch PVC C900 Water Main
Pipe and Appurtenances 2,394 LF $ $
B-2 8-Inch RJ PVC C900 Water Main
Pipe and Appurtenances 3,210 LF $ $
B-3 6-Inch PVC C900 Water Main
Pipe and Appurtenances 2,179 LF $ $
B-4 6-Inch RJ PVC C900 Water Main
Pipe and Appurtenances 741 LF $ $
B-5 8-Inch Gate Valve with Valve Box 15 Each $ $
B-6 6-Inch Gate Valve with Valve Box 19 Each $ $
B-7 4-Inch Gate Valve with Valve Box 17 Each $ $
B-8 Remove Existing Fire Hydrant 9 Each $ $
B-9 New Fire Hydrant 9 Each $ $
B-10 6-Inch Cap and Blowoff 7 Each $ $
B-11 4-Inch Water Service Piping 1,268 LF $ $
B-12 1.5-Inch Water Service Piping 309 LF $ $
B-13 Pavement Patch 380 SY $ $
(Sign Each Page for Identification) (Name of Firm) MES Project ID No. 1-26-2-19-7
CONSTRUCTION BID FORM
Page 3 of 7 October 2027
B-14 Access Road Replacement 1,410 SY $ $
B-15 Concrete Curb Repair 100 LF $ $
B-16 Concrete Sidewalk Repair 552 SF $ $
B-17 Finish Grading 15,476 SY $ $
CONTINGENT BID ITEMS:
ITEM DESCRIPTION QUANTITY UNIT OF
MEASURE UNIT COST ITEM TOTAL
C-1 Contingent 8-Inch Insertion Valve 2 Each $ $
C-2 Contingent 6-Inch Insertion Valve 2 Each $ $
C-3 Contingent 8-Inch Pipe Bend 4 Each $ $
C-4 Contingent 6-Inch Pipe Bend 4 Each $ $
C-5 Contingent Connection to Asbestos-Cement Pipe 3 Each $ $
C-6 Contingent Concrete Encasement 10 CY $ $
C-7 Contingent Test Pit Excavation 25 CY $ $
(Sign Each Page for Identification) (Name of Firm) MES Project ID No. 1-26-2-19-7
CONSTRUCTION BID FORM
Page 4 of 7 October 2027
C-8 Contingent Excavation 50 CY $ $
C-9 Contingent Borrow 100 CY $ $
C-10 Contingent Selected Backfill 100 CY $ $
C-11 Contingent Graded Aggregate Base (GAB) 200 CY $ $
C-12 Contingent Pavement Patch 190 SY $ $
C-13 Contingent Access Road Replacement 705 SY $ $
TOTAL BID PRICE (Base Bid Items A-1 through B-17 + Contingent Bid Items C-1 through C-13)
(In Figures)
TOTAL BID PRICE (In Words) Basis of Evaluation
(Sign Each Page for Identification) (Name of Firm) MES Project ID No. 1-26-2-19-7
CONSTRUCTION BID FORM
Page 5 of 7 October 2027
NOTES:
A. The basis of award for this bid is the lowest responsive Total Bid Price in Words from a responsible bidder. Please do not round up any pricing or totals. Please note that all bid items should be filled in correctly or your bid will be considered non-responsive.
B. If the undersigned is notified by the Maryland Environmental Service of the acceptance of this Bid within ninety (90) days of the date of bid opening, the undersigned agrees to execute a contract for the above sum and to guarantee the completion of work required under the Base Bid within Three Hundred Sixty Five (365) Consecutive Calendar Days from the Notice to Proceed (NTP) including weekends and holidays.
C. The undersigned further agrees that, if the work is not completed within the specified time period, the contractor will be liable for liquidated damages in the amount of $1,839.00 per calendar day for every calendar day beyond the time specified.
D. Accompanying this Bid is a fully executed Bid Bond or acceptable security, in the amount of five percent (5%) of the TOTAL BASE BID PRICE.
E. The undersigned understands that, by submitting a bid, it agrees to all of the terms and conditions of Bid ID # 1-26-2-19-5.
F. The undersigned has read the General Conditions and acknowledges understanding that the award of the contract is subject to submission of an Affirmative Action Plan by the undersigned contractor and all of its subcontractors and acceptance of all such plans by Maryland Environmental Service. Failure to properly and completely fill in all blanks may be cause for rejection of this bid.
H. The undersigned certifies that the Bidder is (____) is not (____) a certified MBE. If so, certified by:
Certification Council Certification Number
MD Department of Transportation Certification Number
Federal Employer Identification Number:
(or Social Security Number, if no F.E.I.N.)
Construction Firm License Number Date Issued Place of Issuance
(Sign Each Page for Identification) (Name of Firm) MES Project ID No. 1-26-2-19-7
CONSTRUCTION BID FORM
Page 6 of 7 October 2027
INDIVIDUAL BIDDER
FIRM NAME:
ADDRESS:
TELEPHONE NO.:
FAX NUMBER:
WITNESS:
SIGNED:
PRINTED NAME:
PARTNERSHIP BIDDER
PARTNERSHIP NAME:
TELEPHONE NUMBER:
WITNESS:
as to BY:
(Signature)
(Partner Printed Name)
(Signature)
(Partner Printed Name)
(Sign Each Page for Identification) (Name of Firm) MES Project ID No. 1-26-2-19-7
CONSTRUCTION BID FORM
Page 7 of 7 October 2027
CORPORATE BIDDER
CORPORATION NAME:
TELEPHONE NUMBER:
WITNESS:
*Signature of Officer/Authorized Representative
(Officer/Authorized Representative Printed Name)
Title
*If not an officer of the corporation, attach appropriate proof, dated as of the date of this Bid, evidencing authority to execute on behalf of the corporation.
6/2015
Submit with Bid/Proposal
BID/PROPOSAL AFFIDAVIT
A. AUTHORITY
I HEREBY AFFIRM THAT:
I, (print name), (title), of
(print firm name) possess the legal authority to make this Affidavit.
B. CERTIFICATION REGARDING COMMERCIAL NONDISCRIMINATION
The undersigned bidder hereby certifies and agrees that the following information is correct: In preparing its bid on this project, the bidder has considered all proposals submitted from qualified, potential subcontractors and suppliers, and has not engaged in "discrimination" as defined in §19-103 of the State Finance and Procurement Article of the Annotated Code of Maryland. "Discrimination" means any disadvantage, difference, distinction, or preference in the solicitation, selection, hiring, or commercial treatment of a vendor, subcontractor, or commercial customer on the basis of race, color, religion, ancestry, or national origin, sex, age, marital status, sexual orientation, or on the basis of disability or any otherwise unlawful use of characteristics regarding the vendor's, supplier's, or commercial customer's employees or owners. "Discrimination" also includes retaliating against any person or other entity for reporting any incident of "discrimination". Without limiting any other provision of the solicitation on this project, it is understood that, if the certification is false, such false certification constitutes grounds for the State to reject the bid submitted by the bidder on this project, and terminate any contract awarded based on the bid. As part of its bid or proposal, the bidder herewith submits a list of all instances within the past 4 years where there has been a final adjudicated determination in a legal or administrative proceeding in the State of Maryland that the bidder discriminated against subcontractors, vendors, suppliers, or commercial customers, and a description of the status or resolution of that determination, including any remedial action taken. Bidder agrees to comply in all respects with the State's Commercial Nondiscrimination Policy as described under Title 19 of the State Finance and Procurement Article of the Annotated Code of Maryland.
B-1. CERTIFICATION REGARDING MINORITY BUSINESS ENTERPRISES.
The undersigned bidder hereby certifies and agrees that it has fully complied with the State Minority Business Enterprise Law, State Finance and Procurement Article, §14-308(a)(2), Annotated Code of Maryland, which provides that, except as otherwise provided by law, a contractor may not identify a certified minority business enterprise in a bid or proposal and:
(1) Fail to request, receive, or otherwise obtain authorization from the certified minority business enterprise to identify the certified minority proposal;
(2) Fail to notify the certified minority business enterprise before execution of the contract of its inclusion in the bid or proposal;
Effective 7/20/2012
(3) Fail to use the certified minority business enterprise in the performance of the contract; or
(4) Pay the certified minority business enterprise solely for the use of its name in the bid or proposal.
Without limiting any other provision of the solicitation on this project, it is understood that if the certification is false, such false certification constitutes grounds for the State to reject the bid submitted by the bidder on this project, and terminate any contract awarded based on the bid.
C. AFFIRMATION REGARDING BRIBERY CONVICTIONS
I FURTHER AFFIRM THAT:
Neither I, nor to the best of my knowledge, information, and belief, the above business (as is defined in Section 16-101(b) of the State Finance and Procurement Article of the Annotated Code of Maryland), or any of its officers, directors, partners, controlling stockholders, or any of its employees directly involved in the business's contracting activities including obtaining or performing contracts with public bodies has been convicted of, or has had probation before judgment imposed pursuant to Criminal Procedure Article, §6-220, Annotated Code of Maryland, or has pleaded nolo contendere to a charge of, bribery, attempted bribery, or conspiracy to bribe in violation of Maryland law, or of the law of any other state or federal law, except as follows (indicate the reasons why the affirmation cannot be given and list any conviction, plea, or imposition of probation before judgment with the date, court, official or administrative body, the sentence or disposition, the name(s) of person(s) involved, and their current positions and responsibilities with the business):
D. AFFIRMATION REGARDING OTHER CONVICTIONS
I FURTHER AFFIRM THAT:
Neither I, nor to the best of my knowledge, information, and belief, the above business, or any of its officers, directors, partners, controlling stockholders, or any of its employees directly involved in the business's contracting activities including obtaining or performing contracts with public bodies, has:
(1) Been convicted under state or federal statute of:
(a) A criminal offense incident to obtaining, attempting to obtain, or performing a public or private contract; or
(b) Fraud, embezzlement, theft, forgery, falsification or destruction of records or receiving stolen property;
(2) Been convicted of any criminal violation of a state or federal antitrust statute;
(3) Been convicted under the provisions of Title 18 of the United States Code for violation of the Racketeer Influenced and Corrupt Organization Act, 18 U.S.C. §1961 et seq., or the Mail Fraud Act, 18
U.S.C. §1341 et seq., for acts in connection with the submission of bids or proposals for a public or private contract;
(4) Been convicted of a violation of the State Minority Business Enterprise Law, §14-308 of the State Finance and Procurement Article of the Annotated Code of Maryland;
(5) Been convicted of a violation of §11-205.1 of the State Finance and Procurement Article of the Annotated Code of Maryland;
(6) Been convicted of conspiracy to commit any act or omission that would constitute grounds for conviction or liability under any law or statute described in subsections (1)—(5) above;
(7) Been found civilly liable under a state or federal antitrust statute for acts or omissions in connection with the submission of bids or proposals for a public or private contract;
(8) Been found in a final adjudicated decision to have violated the Commercial Nondiscrimination Policy under Title 19 of the State Finance and Procurement Article of the Annotated Code of Maryland with regard to a public or private contract; or
(9) Admitted in writing or under oath, during the course of an official investigation or other proceedings, acts or omissions that would constitute grounds for conviction or liability under any law or statute described in §§B and C and subsections D(1)—(8) above, except as follows (indicate reasons why the affirmations cannot be given, and list any conviction, plea, or imposition of probation before judgment with the date, court, official or administrative body, the sentence or disposition, the name(s) of the person(s) involved and their current positions and responsibilities with the business, and the status of any debarment):
E. AFFIRMATION REGARDING DEBARMENT
I FURTHER AFFIRM THAT:
Neither I, nor to the best of my knowledge, information, and belief, the above business, or any of its officers, directors, partners, controlling stockholders, or any of its employees directly involved in the business's contracting activities, including obtaining or performing contracts with public bodies, has ever been suspended or debarred (including being issued a limited denial of participation) by any public entity, except as follows (list each debarment or suspension providing the dates of the suspension or debarment, the name of the public entity and the status of the proceedings, the name(s) of the person(s) involved and their current positions and responsibilities with the business, the grounds of the debarment or suspension, and the details of each person's involvement in any activity that formed the grounds of the debarment or suspension).
F. AFFIRMATION REGARDING DEBARMENT OF RELATED ENTITIES
I FURTHER AFFIRM THAT:
(1) The business was not established and it does not operate in a manner designed to evade the application of or defeat the purpose of debarment pursuant to Sections 16-101, et seq., of the State Finance and Procurement Article of the Annotated Code of Maryland; and
(2) The business is not a successor, assignee, subsidiary, or affiliate of a suspended or debarred business, except as follows (you must indicate the reasons why the affirmations cannot be given without qualification):
G. SUB-CONTRACT AFFIRMATION
I FURTHER AFFIRM THAT:
Neither I, nor to the best of my knowledge, information, and belief, the above business, has knowingly entered into a contract with a public body under which a person debarred or suspended under Title 16 of the State Finance and Procurement Article of the Annotated Code of Maryland will provide, directly or indirectly, supplies, services, architectural services, construction related services, leases of real property, or construction.
H. AFFIRMATION REGARDING COLLUSION
I FURTHER AFFIRM THAT:
Neither I, nor to the best of my knowledge, information, and belief, the above business has:
(1) Agreed, conspired, connived, or colluded to produce a deceptive show of competition in the compilation of the accompanying bid or offer that is being submitted;
(2) In any manner, directly or indirectly, entered into any agreement of any kind to fix the bid price or price proposal of the bidder or offeror or of any competitor, or otherwise taken any action in restraint of free competitive bidding in connection with the contract for which the accompanying bid or offer is submitted.
I. CERTIFICATION OF TAX PAYMENT
I FURTHER AFFIRM THAT:
Except as validly contested, the business has paid, or has arranged for payment of, all taxes due the State of Maryland and has filed all required returns and reports with the Comptroller of the Treasury, the State Department of Assessments and Taxation, and the Department of Labor, Licensing, and Regulation, as applicable, and will have paid all withholding taxes due the State of Maryland prior to final settlement.
J. CONTINGENT FEES
I FURTHER AFFIRM THAT:
The business has not employed or retained any person, partnership, corporation, or other entity, other than a bona fide employee, bona fide agent, bona fide salesperson, or commercial selling agency working for the business, to solicit or secure the Contract, and that the business has not paid or agreed to pay any person, partnership, corporation, or other entity, other than a bona fide employee, bona fide agent, bona fide salesperson, or commercial selling agency, any fee or any other consideration contingent on the making of the Contract.
K. ACKNOWLEDGEMENT
I ACKNOWLEDGE THAT this Affidavit is to be furnished to the Procurement Officer and may be distributed to units of: (1) the State of Maryland; (2) counties or other subdivisions of the State of Maryland; (3) other states; and (4) the federal government. I further acknowledge that this Affidavit is subject to applicable laws of the United States and the State of Maryland, both criminal and civil, and that nothing in this Affidavit or any contract resulting from the submission of this bid or proposal shall be construed to supersede, amend, modify or waive, on behalf of the State of Maryland, or any unit of the State of Maryland having jurisdiction, the exercise of any statutory right or remedy conferred by the Constitution and the laws of Maryland with respect to any misrepresentation made or any violation of the obligations, terms and covenants undertaken by the above business with respect to (1) this Affidavit, (2) the contract, and (3) other Affidavits comprising part of the contract.
I DO SOLEMNLY DECLARE AND AFFIRM UNDER THE PENALTIES OF PERJURY THAT THE
CONTENTS OF THIS AFFIDAVIT ARE TRUE AND CORRECT TO THE BEST OF MY
KNOWLEDGE, INFORMATION, AND BELIEF.
Date:
By: (print name of Authorized Representative and Affiant)
(signature of Authorized Representative and Affiant)
Effective 5/25/2017
CONFLICT OF INTEREST
Reference COMAR 21.05.08.08
A. "Conflict of interest" means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to MES, or the person’s objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage.
B. "Person" has the meaning stated in COMAR 21.01.02.01B(64) and includes a Bidder/Offeror, Contractor, consultant, or subcontractor or sub-consultant at any tier, and also includes an employee or agent of any of them if the employee or agent has or will have the authority to control or supervise all or a portion of the work for which a Bid/Proposal is made.
C. The Bidder/Offeror warrants that, except as disclosed in §D, below, there are no relevant facts or circumstances now giving rise or which could, in the future, give rise to a conflict of interest.
D. The following facts or circumstances give rise or could in the future give rise to a conflict of interest (explain in detail—attach additional sheets if necessary):
E. The Bidder/Offeror agrees that if an actual or potential conflict of interest arises after the date of this affidavit, the Bidder/Offeror shall immediately make a full disclosure in writing to the procurement officer of all relevant facts and circumstances. This disclosure shall include a description of actions which the Bidder/Offeror has taken and proposes to take to avoid, mitigate, or neutralize the actual or potential conflict of interest. If the contract has been awarded and performance of the contract has begun, the Contractor shall continue performance until notified by the procurement officer of any contrary action to be taken.
I DO SOLEMNLY DECLARE AND AFFIRM UNDER THE PENALTIES OF PERJURY THAT
THE CONTENTS OF THIS AFFIDAVIT ARE TRUE AND CORRECT TO THE BEST OF MY
KNOWLEDGE, INFORMATION, AND BELIEF.
Date: ___________________________
By: _______________________________________________ (Authorized Representative and Affiant) http://www.dsd.state.md.us/comar/getfile.aspx?file=21.05.08.08.htm
Attachment A – MBE Forms effective date: Novmeber 13, 2020
Attachment A. Minority Business Enterprise (MBE) Forms
MBE UTILIZATION AND FAIR SOLICITATION AFFIDAVIT
& MBE PARTICIPATION SCHEDULE
PART 1 - INSTRUCTIONS
PLEASE READ BEFORE COMPLETING THIS DOCUMENT
This form includes Instructions and the MBE Utilization and Fair Solicitation Affidavit & MBE Participation Schedule which must be submitted with the bid/proposal. If the bidder/offeror fails to accurately complete and submit this Affidavit and Schedule with the bid or proposal, the Procurement Officer shall deem the bid non-responsive or shall determine that the proposal is not reasonably susceptible of being selected for award.
1. Contractor shall structure its procedures for the performance of the work required in this Contract to attempt to achieve the minority business enterprise (MBE) subcontractor participation goal stated in the Invitation for Bids or Request for Proposals. Contractor agrees to exercise good faith efforts to carry out the requirements set forth in these Instructions, as authorized by the Code of Maryland Regulations (COMAR) 21.11.03.
2. MBE Goals and Subgoals: Please review the solicitation for information regarding the Contract’s MBE overall participation goals and subgoals. After satisfying the requirements for any established subgoals, the Contractor is encouraged to use a diverse group of subcontractors and suppliers from the various MBE classifications to meet the remainder of the overall MBE participation goal.
3. MBE means a minority business enterprise that is certified by the Maryland Department of Transportation (“MDOT”). Only MBEs certified by MDOT may be counted for purposes of achieving the MBE participation goals. In order to be counted for purposes of achieving the MBE participation goals, the MBE firm, including a MBE prime, must be MDOT-certified for the services, materials or supplies that it is committed to perform on the MBE Participation Schedule.
A firm whose MBE certification application is pending may not be counted.
4. Please refer to the MDOT MBE Directory at https://mbe.mdot.maryland.gov/directory/ to determine if a firm is certified with the appropriate North American Industry Classification System (“NAICS”) Code and the product/services description (specific product that a firm is certified to provide or specific areas of work that a firm is certified to perform). For more general information about NAICS codes, please visit https://www.census.gov/eos/www/naics/. Only those specific products and/or services for which a firm is certified in the MDOT Directory can be used for purposes of achieving the MBE participation goals. CAUTION: If the firm’s NAICS Code is in graduated status, such services/products may not be counted for purposes of achieving the MBE participation goals. A NAICS Code is in the graduated status if the term “Graduated” follows the Code in the MDOT MBE Directory.
5. Guidelines Regarding MBE Prime Self-Performance. Please note that when a certified MBE firm participates as a prime contractor on a Contract, a procurement agency may count the distinct, clearly defined portion of the work of the Contract that the certified MBE firm performs with its own workforce toward fulfilling up to, but no more than, fifty-percent (50%) of the overall MBE participation goal, including up to one hundred percent (100%) of not more than one of the MBE participation subgoals, if any, established for the Contract.
salsai Typewritten Text salsai Typewritten Text salsai Typewritten Text salsai Typewritten Text salsai Typewritten Text
✓ In order to receive credit for self-performance, an MBE prime must be certified in the appropriate NAICS code to do the work and must list its firm in the MBE Participation Schedule, including the certification category under which the MBE prime is self-performing and include information regarding the work it will self-perform.
✓ For the remaining portion of the overall goal and the remaining subgoals, the MBE prime must also identify on the MBE Participation Schedule the other certified MBE subcontractors used to meet those goals or request a waiver.
✓ These guidelines apply to the work performed by the MBE Prime that can be counted for purposes of meeting the MBE participation goals. These requirements do not affect the MBE Prime’s ability to self-perform a greater portion of the work in excess of what is counted for purposes of meeting the MBE participation goals.
✓ Please note that the requirements to meet the MBE participation overall goal and subgoals are distinct and separate. If the contract has subgoals, regardless of MBE Prime’s ability to self-perform up to 50% of the overall goal (including up to 100% of any subgoal), the MBE Prime must either commit to use other MBEs for each of any remaining subgoals or request a waiver. As set forth in Attachment E Waiver Guidance, the MBE Prime’s ability to self-perform certain portions of the work of the Contract will not be deemed a substitute for the good faith efforts to meet any remaining subgoal or the balance of the overall goal.
✓ In certain instances where the percentages allocated to MBE participation subgoals add up to more than 50% of the overall goal, the portion of self-performed work that an MBE Prime may count toward the overall goal may be limited to less than 50%. Please refer to the Governor‘s Office of Small Minority & Women Business Affairs’ website for the MBE Prime Regulations Q&A for illustrative examples.
http://www.goMDsmallbiz.maryland.gov/Documents/MBE_Toolkit/MBEPrimeRegulatio n_QA.pdf
6. Subject to items 1 through 5 above, when a certified MBE performs as a participant in a joint venture, a procurement agency may count a portion of the total dollar value of the Contract equal to the distinct, clearly-defined portion of the work of the Contract that the certified MBE performs with its own forces toward fulfilling the Contract goal, and not more than one of the Contract subgoals, if any.
7. The work performed by a certified MBE firm, including an MBE prime, can only be counted towards the MBE participation goal(s) if the MBE firm is performing a commercially useful function on the Contract. Please refer to COMAR 21.11.03.12-1 for more information regarding these requirements.
8. Materials and Supplies: New Guidelines Regarding MBE Participation.
Regular Dealer (generally identified as a wholesaler or supplier in the MDOT Directory):
Up to 60% of the costs of materials and supplies provided by a certified MBE may be counted towards the MBE participation goal(s) if such MBE is a Regular Dealer of such materials and supplies. Regular Dealer is defined as a firm that owns, operates, or maintains a store, a warehouse, or any other establishment in which the materials, supplies, articles, or equipment are of the general character described by the specifications required under the contract and are bought, kept in stock, or regularly sold or leased to the public in the usual course of business; and does not include a packager, a broker, a manufacturer’s representative, or any other person that arranges or expedites transactions.
http://www.gomdsmallbiz.maryland.gov/Documents/MBE_Toolkit/MBEPrimeRegulation_QA.pdf http://www.gomdsmallbiz.maryland.gov/Documents/MBE_Toolkit/MBEPrimeRegulation_QA.pdf
Example for illustrative purposes of applying the 60% rule:
Overall contract value: $2,000,000 Total value of supplies: $100,000
Calculate Percentage of Supplies to overall contract value: $100,000 divided by $2,000,000 = 5%
Apply 60% Rule - Total percentage of Supplies/Products 5% x 60% = 3%
3% would be counted towards achieving the MBE Participation Goal and Subgoal, if any, for the MBE supplier in this example.
Manufacturer: A certified MBE firm’s participation may be counted in full if the MBE is certified in the appropriate NAICS code(s) to provide products and services as a manufacturer.
Broker: With respect to materials or supplies purchased from a certified MBE that is neither a manufacturer nor a regular dealer, a unit may apply the entire amount of fees or commissions charged for assistance in the procurement of the materials and supplies, fees, or transportation charges for the delivery of materials and supplies required on a procurement toward the MBE contract goals, provided a unit determines the fees to be reasonable and not excessive as compared with fees customarily allowed for similar services. A unit may not apply any portion of the costs of the materials and supplies toward MBE goals.
Furnish and Install and other Services: The participation of a certified MBE supplier, wholesaler, and/or regular dealer certified in the proper NAICS code(s) to furnish and install materials necessary for successful contract completion may be counted in full.
Includes the participation of other MBE service providers in the proper NAICS code(s) may be counted in full.
9. Dually certified firms. An MBE that is certified in more than one subgroup category may only be counted toward goal fulfillment of ONE of those categories with regard to a particular contract.
Example: A woman-owned Hispanic American (dually certified) firm may be used to fulfill the women-owned OR Hispanic American subgoal, but not both on the same contract.
10. CAUTION: The percentage of MBE participation, computed using the percentage amounts determined for all of the MBE firms listed in PART 3, MUST meet or exceed the MBE participation goal and subgoals (if applicable) as set forth in PART 2- for this solicitation. If a bidder/offeror is unable to meet the MBE participation goal or any subgoals (if applicable), then the bidder/offeror must request a waiver in PART 2 or the bid will be deemed not responsive, or the proposal not reasonably susceptible of being selected for award. You may wish to use the attached Goal/Subgoal Worksheet to assist in calculating the percentages and confirming that your commitment meets or exceeds the applicable MBE participation goal and subgoals (if any).
11. If you have any questions as to whether a firm is certified to perform the specific services or provide specific products, please contact MDOT’s Office of Minority Business Enterprise at 1- 800-544-6056 or via email to mbe@mdot.state.md.us sufficiently prior to the submission due date.
mailto:mbe@mdot.state.md.us
Subgoals (if applicable)
Total African American MBE Participation: _____________% Total Asian American MBE Participation: _____________%
Total Hispanic American MBE Participation: _____________% Total Women-Owned MBE Participation: _____________%
Overall Goal
Total MBE Participation (include all categories): _____________%
PART 2 - MBE UTILIZATION AND FAIR SOLICITATION AFFIDAVIT &
MBE PARTICIPATION SCHEDULE
This MBE Utilization and Fair Solicitation Affidavit and MBE Participation Schedule must be completed in its entirety and included with the bid/proposal. If the bidder/offeror fails to accurately complete and submit this Affidavit and Schedule with the bid or proposal as required, the Procurement Officer shall deem the bid non-responsive or shall determine that the proposal is not reasonably susceptible of being selected for award.
In connection with the bid/proposal submitted in response to Solicitation No. 1-26-2-19-5, I affirm the following:
1. MBE Participation (PLEASE CHECK ONLY ONE)
☐ I acknowledge and intend to meet IN FULL both the overall certified Minority Business
Enterprise (MBE) participation goal of 13 % percent and all of the following subgoals:
percent for African American-owned MBE firms percent for Hispanic American-owned MBE firms percent for Asian American-owned MBE firms percent for Women-owned MBE firms
Therefore, I am not seeking a waiver pursuant to COMAR 21.11.03.11. I acknowledge that by checking the above box and agreeing to meet the stated goal and subgoal(s), if any, I must complete PART 3 - MBE Participation Schedule and Part 4 Signature Page in order to be considered for award.
OR
☐ After making good faith outreach efforts prior to making this submission, I conclude that I am unable to achieve the MBE participation goal and/or subgoals. I hereby request a waiver, in whole or in part, of the overall goal and/or subgoals I acknowledge that by checking this box and requesting a partial waiver of the stated goal and/or one or more of the stated subgoal(s) if any, I must complete Part 3, the MBE Participation Schedule and Part 4 Signature Page for the portion of the goal and/or subgoal(s) if any, for which I am not seeking a waiver, in order to be considered for award. I acknowledge that by checking this box and requesting a full waiver of the stated goal and the stated subgoal(s) if any, I must complete Part 4 Signature Page in order to be considered for award.
Additional MBE Documentation
I understand that if I am notified that I am the apparent awardee or as requested by the Procurement Officer, I must submit the following documentation within 10 working days of receiving notice of the potential award or from the date of conditional award (per COMAR 21.11.03.10), whichever is earlier:
(a) Good Faith Efforts Documentation to Support Waiver Request (Attachment F)
(b) Outreach Efforts Compliance Statement (Attachment B);
(c) MBE Subcontractor/MBE Prime Project Participation Statement (Attachments C and
C Page 2);
(d) Any other documentation, including additional waiver documentation if applicable, required by the Procurement Officer to ascertain bidder or offeror responsibility in connection with the certified MBE participation goal and subgoals, if any.
I understand that if I fail to return each completed document within the required time, the Procurement Officer may determine that I am not responsible and therefore not eligible for contract award. If the contract has already been awarded, the award is voidable.
Information Provided to MBE firms
In the solicitation of subcontract quotations or offers, MBE firms were provided not less than the same information and amount of time to respond as were non-MBE firms.
Attachment A – MBE Forms effective date: November 13, 2020
PART 3 - MBE PARTICIPATION SCHEDULE
SET FORTH BELOW ARE THE (I) CERTIFIED MBES I INTEND TO USE, (II) THE PERCENTAGE OF THE TOTAL CONTRACT VALUE ALLOCATED TO EACH MBE FOR THIS PROJECT AND, (III) THE ITEMS OF WORK EACH MBE WILL PROVIDE UNDER THE CONTRACT. I HAVE CONFIRMED WITH THE MDOT DATABASE THAT THE MBE FIRMS IDENTIFIED BELOW (INCLUDING ANY SELF-PERFORMING MBE PRIME FIRMS) ARE PERFORMING WORK ACTIVITIES FOR WHICH
THEY ARE MDOT-CERTIFIED.
Prime Contractor Project Description Project/Contract Number
LIST INFORMATION FOR EACH CERTIFIED MBE FIRM YOU AGREE TO USE TO ACHIEVE THE MBE PARTICIPATION GOAL AND
SUBGOALS, IF ANY. MBE PRIMES: PLEASE COMPLETE BOTH SECTIONS A AND B BELOW.
SECTION A: For MBE Prime Contractors ONLY (including MBE Primes in a Joint Venture)
MBE Prime Firm Name:________________________________
MBE Certification Number: ___________
(If dually certified, check only one box.)
African American-Owned Hispanic American- Owned Asian American-Owned Women-Owned Other MBE Classification
NAICS code: _______________________________
Percentage of total Contract Value to be performed with own forces and counted towards the MBE overall participation goal (up to 50% of the overall goal): _______% Please refer to Item #8 in Part 1- Instructions of this document for new MBE participation guidelines regarding materials and supplies.
Percentage of total Contract Value to be performed with own forces and counted towards the subgoal, if any, for my MBE classification (up to 100% of not more than one subgoal): _______%
Supplier, wholesaler and/or regular dealer (count 60%) Manufacturer (count 100%) Broker (count reasonable fee/commission only) Furnish and Install and other Services (count 100%)
Complete the applicable prompt (select only one) from prompts A-C below that applies to the type of work your firm is self-performing to calculate amount to be counted towards achieving the MBE Participation Goal and Subgoal, if any.
A. Percentage amount of subcontract where the MBE Prime firm is being used for manufacturer, furnish and install, and/or services (excluding products / services from suppliers, wholesalers, regular dealers and brokers) ___%
B. Percentage amount for items of work where the MBE Prime firm is being used as supplier, wholesaler, and/or regular dealer (60% Rule).
Total percentage of Supplies/Products ___% x 60% = ___%
C. Percentage amount of fee where the MBE Prime firm is being used as broker (count reasonable fee/commission only) ___ %
Description of the work to be performed with MBE prime’s own forces:
SECTION B: For all Contractors (including MBE Primes and MBE Primes in a Joint Venture)
MBE Firm Name:______________________________________
MBE Certification Number: ______________________
(If dually certified, check only one box.)
African American-Owned Hispanic American- Owned Asian American-Owned Women-Owned Other MBE Classification
NAICS code: _______________________________
Please refer to Item #8 in Part 1- Instructions of this document for new MBE participation guidelines regarding materials and supplies.
Supplier, wholesaler and/or regular dealer (count 60%) Manufacturer (count 100%) Broker (count reasonable fee/commission only) Furnish and Install and other Services (count 100%)
Complete the applicable prompt (select only one) from prompts A-C below that applies to the type of work that the MBE firm named to the left will be performing to calculate the amount to be counted towards achieving the MBE Participation Goal and Subgoal, if any.
A. Percentage of total contract amount where the MBE firm is being used for manufacturer, furnish and install, and/or services (excluding products/services from suppliers, wholesalers, regular dealers and brokers) ___%
B. Percentage of total contract amount for items of work where the MBE firm is being used as supplier, wholesaler, and/or regular dealer (60% Rule)).
Total percentage of Supplies/Products ___% X 60% = ___%
C. Percentage amount of fee where the MBE firm is being used as broker (count reasonable fee/commission only) ___ %
Description of the work to be performed:
Name:______________________________________
MBE Certification Number: _____________________
(If dually certified, check only one box.)
African American-Owned Hispanic American- Owned Asian American-Owned Women-Owned Other MBE Classification
NAICS code: _______________________________
Please refer to Item #8 in Part 1- Instructions of this document for new MBE participation guidelines regarding materials and supplies.
Supplier, wholesaler and/or regular dealer (count 60%) Manufacturer (count 100%) Broker (count reasonable fee/commission only) Furnish and Install and other Services (count 100%)
Complete the applicable prompt (select only one) from prompts A-C below that applies to the type of work that the MBE Firm named to the left will be performing to calculate the amount to be counted towards achieving the MBE Participation Goal and Subgoal, if any.
A. Percentage of total contract amount where the MBE firm is being used for manufacturer, furnish and install, and/or services (excluding products/services from suppliers, wholesalers, regular dealers and brokers) ___%
B. Percentage of total contract amount for items of work where the MBE firm is being used as supplier, wholesaler, and/or regular dealer (60% Rule)).
Total percentage of Supplies/Products ___% X 60% = ___%
C. Percentage amount of fee where the MBE firm is being used as broker (count reasonable fee/commission only) ___ %
Description of the work to be performed:
Name:______________________________________
MBE Certification Number: ______________________
(If dually certified, check only one box.)
African American-Owned Hispanic American- Owned Asian American-Owned Women-Owned Other MBE Classification
NAICS code: _______________________________
Please refer to Item #8 in Part 1- Instructions of this document for new MBE participation guidelines regarding materials and supplies.
Supplier, wholesaler and/or regular dealer (count 60%) Manufacturer (count 100%) Broker (count reasonable fee/commission only) Furnish and Install and other Services (count 100%)
Complete the applicable prompt (select only one) from prompts A-C below that applies to the type of work that for the MBE firm named to the left will be performing to calculate the amount to be counted towards achieving the MBE Participation Goal and Subgoal, if any.
A. Percentage of total contract amount where the MBE firm is being used for manufacturer, furnish and install, and/or services (excluding products/services from suppliers, wholesalers, regular dealers and brokers) ___%
B. Percentage of the total contract amount for items of work where the MBE firm is being used as supplier, wholesaler, and/or regular dealer (60% Rule).
Total percentage of Supplies/Products ___% X 60% = ___%
C. Percentage amount of fee where the MBE firm is being used as broker (count reasonable fee/commission only) ___ %
Description of the work to be performed:
MBE Firm Name:______________________________________
MBE Certification Number: ______________________
(If dually certified, check only one box.)
African American-Owned Hispanic American- Owned Asian American-Owned Women-Owned Other MBE Classification
NAICS code: _______________________________
Please refer to Item #8 in Part 1- Instructions of this document for new MBE participation guidelines regarding materials and supplies.
Supplier, wholesaler and/or regular dealer (count 60%) Manufacturer (count 100%) Broker (count reasonable fee/commission only) Furnish and Install and other Services (count 100%)
Complete the applicable prompt (select only one) from prompts A-C below that applies to the type of work that the MBE firm named to the left will be performing to calculate the amount to be counted towards achieving the MBE Participation Goal and Subgoal, if any.
A. Percentage of total contract amount where the MBE firm is being used for manufacturer, furnish and install, and/or services (excluding products/services from suppliers, wholesalers, regular dealers and brokers) ___%
B. Percentage of total contract amount for items of work where the MBE firm is being used as supplier, wholesaler, and/or regular dealer (60% Rule)).
Total percentage of Supplies/Products ___% X 60% = ___%
C. Percentage amount of fee where the MBE firm is being used as broker___ %
Description of the work to be performed:
CONTINUE ON SEPARATE PAGE IF NEEDED
Attachment A – MBE Forms effective date: November 13, 2020
PART 4 – SIGNATURE PAGE
To complete Affidavit committing to MBE(s) or requesting waiver, Bidder/Offeror must sign below:
I solemnly affirm under the penalties of perjury that: (i) I have reviewed the instructions for the MBE Utilization & Fair Solicitation Affidavit and MBE Schedule, and (ii) the information contained in the MBE Utilization & Fair Solicitation Affidavit and MBE Schedule is true to the best of my knowledge, information and belief.
Bidder/Offeror Name Signature of Authorized Representative
(PLEASE PRINT OR TYPE)
Address Printed Name and Title
City, State and Zip Code Date
SUBMIT THIS AFFIDAVIT WITH BID/PROPOSAL
effective date: May 7, 2019
MBE ATTACHMENT E
WAIVER GUIDANCE
(for information only, no need to return with bids)
GUIDANCE FOR DOCUMENTING GOOD FAITH EFFORTS TO MEET MBE PARTICIPATION GOALS
In order to show that it has made good faith efforts to meet the Minority Business Enterprise (MBE) participation goal
(including any MBE subgoals) on a contract, the Bidder/offeror must either (1) meet the MBE Goal(s) and document its commitments for participation of MBE Firms, or (2) when it does not meet the MBE Goal(s), document its Good
Faith Efforts to meet the goal(s).
I. Definitions
MBE Goal(s) – “MBE Goal(s)” refers to the MBE participation goal and MBE participation subgoal(s).
Good Faith Efforts - The “Good Faith Efforts” requirement means that when requesting a waiver, the Bidder/offeror must demonstrate that it took all necessary and reasonable steps to achieve the MBE Goal(s), which, by their scope, intensity, and appropriateness to the objective, could reasonably be expected to obtain sufficient MBE participation, even if those steps were not fully successful. Whether the Bidder/offeror that requests a waiver made adequate good faith efforts will be determined by considering the quality, quantity, and intensity of the different kinds of efforts that the
Bidder/offeror has made. The efforts employed by the Bidder/offeror should be those that one could reasonably expect the
Bidder/offeror to take if the Bidder/offeror were actively and aggressively trying to obtain MBE participation sufficient to meet the MBE contract goal and subgoals. Mere pro forma efforts are not good faith efforts to meet the MBE contract requirements. The determination concerning the sufficiency of the Bidder/bidder’s/offeror’s good faith efforts is a judgment call; meeting quantitative formulas is not required.
Identified Firms – “Identified Firms” means a list of the MBEs identified by the procuring agency during the goal setting process and listed in the procurement as available to perform the Identified Items of Work. It also may include additional
MBEs identified by the Bidder/offeror as available to perform the Identified Items of Work, such as MBEs certified or granted an expansion of services after the procurement was issued. If the procurement does not include a list of Identified
Firms, this term refers to all of the MBE Firms (if State-funded) the Bidder/offeror identified as available to perform the
Identified Items of Work and should include all appropriately certified firms that are reasonably identifiable.
Identified Items of Work – “Identified Items of Work” means the Bid/Proposal items identified by the procuring agency during the goal setting process and listed in the procurement as possible items of work for performance by MBE Firms. It also may include additional portions of items of work the Bidder/offeror identified for performance by MBE Firms to increase the likelihood that the MBE Goal(s) will be achieved. If the procurement does not include a list of Identified
Items of Work, this term refers to all of the items of work the Bidder/offeror identified as possible items of work for performance by MBE Firms and should include all reasonably identifiable work opportunities.
MBE Firms – “MBE Firms” refers to firms certified by the Maryland Department of Transportation (“MDOT”) under COMAR 21.11.03. Only MDOT-certified MBE Firms can participate in the State's MBE Program.
II. Types of Actions Agency will Consider
The Bidder/offeror is responsible for making relevant portions of the work available to MBE subcontractors and suppliers and select those portions of the work or material needs consistent with the available MBE subcontractors and suppliers, so as to facilitate MBE participation. The following is a list of types of actions the procuring agency will consider as part of the Bidder/bidder’s/offeror’s Good Faith Efforts when the Bidder/offeror fails to meet the MBE Goal(s). This list is not intended to be a mandatory checklist, nor is it intended to be exclusive or exhaustive. Other factors or types of efforts may be relevant in appropriate cases.
A. Identify Bid/Proposal Items as Work for MBE Firms
1. Identified Items of Work in Procurements
(a) Certain procurements will include a list of Bid/Proposal items identified during the goal setting process as possible work for performance by MBE Firms. If the procurement provides a list of Identified Items of Work, the
Bidder/offeror shall make all reasonable efforts to solicit quotes from MBE Firms to perform that work.
(b) Bidder/offerors may, and are encouraged to, select additional items of work to be performed by MBE Firms to increase the likelihood that the MBE Goal(s) will be achieved.
2. Identified Items of Work by Bidder/offerors
(a) When the procurement does not include a list of Identified Items of Work or for additional Identified Items of Work, Bidder/offerors should reasonably identify sufficient items of work to be performed by MBE
Firms.
(b) Where appropriate, Bidder/offerors should break out contract work items into economically feasible units to facilitate MBE participation, rather than perform these work items with their own forces. The ability or desire of a prime contractor to perform the work of a contract with its own organization does not relieve the Bidder/offeror of the responsibility to make Good Faith Efforts.
B. Identify MBE Firms to Solicit
1. MBE Firms Identified in Procurements
(a) Certain procurements will include a list of the MBE Firms identified during the goal setting process as available to perform the items of work. If the procurement provides a list of Identified MBE Firms, the Bidder/offeror shall make all reasonable efforts to solicit those MBE firms.
(b) Bidder/offerors may, and are encouraged to, search the MBE Directory to identify additional MBEs who may be available to perform the items of work, such as MBEs certified or granted an expansion of services after the solicitation was issued.
2. MBE Firms Identified by Bidder/offerors
(a) When the procurement does not include a list of Identified MBE Firms, Bidder/offerors should reasonably identify the MBE Firms that are available to perform the Identified Items of Work.
(b) Any MBE Firms identified as available by the Bidder/offeror should be certified to perform the Identified Items of Work.
C. Solicit MBEs
1. Solicit all Identified Firms for all Identified Items of Work by providing written notice. The Bidder/offeror should:
(a) provide the written solicitation at least 10 days prior to Bid/Proposal opening to allow sufficient time for the
MBE Firms to respond;
(b) send the written solicitation by first-class mail, facsimile, or e-mail using contact information in the MBE