About this file

The document is a Bid Schedule for Jones Park Improvements in Temple, Texas, prepared by the local government. The comprehensive bid schedule details 91 line items for a park renovation project, including site preparation, infrastructure improvements, and installation of various park amenities such as a restroom building, splash pad, basketball court, shade structures, picnic areas, fencing, landscaping, irrigation, and site furnishings. The project involves removing existing facilities and constructing new features across approximately 57,212 square feet of space, with a completion timeline of 180 consecutive calendar days from the Notice to Proceed.

The engineer's estimated project cost is $2,400,000, with the bid schedule allowing contractors to provide unit pricing for each detailed line item. The project encompasses extensive civil works including waterline and wastewater line installations, drainage improvements, concrete work, landscaping, and the installation of park infrastructure and recreational elements. The bid schedule requires precise unit pricing for each specific task, from mobilization and site preparation to final landscaping and amenity installations, providing a detailed and comprehensive approach to project costing and implementation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A-Base Bid

BID SCHEDULE
FOR
Jones Park Improvements
Temple, Texas

BASE BID

Total
ItemFinalUnitAmount
No.QuantityUnitDescriptionPrice(in numerals)
A-1100%Lump SumMobilization, Bonds and Insurance, not-to-exceed 5% of the Base Bid Amount, Complete For$$

A-2 4 Acre Provide Labor, Equipment, Tools & Supervision to Complete Preparation of Site Preparation, Complete For $ $

A-3 100% Lump Sum Prepare and Implement Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality (TCEQ), Complete For $ $

A-4100%Lump SumAdminister and Implement Barricade, Signing and Traffic Safety Plan (Vehicular and Pedestrian), Complete For$$
.
A-5100%Lump SumProvide Video of Project Site Pre-Construction and Post-Construction, Complete For$$

A-6 100% Lump Sum Provide Project Record Drawings, Complete For $ $

A-7 1,622 Linear Foot Furnish, Install, Maintain and Remove Silt Fence as required in the Plans, Complete For $ $

A-8 17 Each Furnish, Install, Maintain and Remove Tree Protection Fencing as required in the Plans, Complete For $ $

A-9 30 Linear Foot Furnish, Install, Maintain and Remove Inlet Protection as required in the Plans, Complete For $ $

A-10 350 Linear Foot Furnish, Install, Maintain and Remove Temporary Construction Fencing as required in the Plans, Complete For $ $

A-11 550 Square Yards Remove and haul off Existing Concrete Including Sidewalk, Picnic Areas, and Basketball Court, Complete For $ $

A-12 830 Square Yards Remove and haul off Existing Decomposed Granite Trail, Complete For

A-13 100% Lump Sum Remove and haul off Structures Including Playground, Canopies, Picnic Tables, Bathroom, Water Fountain, and Trash Can Structures, Complete For $ $

A-14 265 Linear Foot Remove and haul off Existing Fence, Complete For $ $

A-15 2 Each Remove and haul off Drainage Structures, Complete For $ $

A-16 4 Each Remove and haul off Tree, Complete For $ $

A-17 1 Lump Sum Remove and replace Irrigation, Including Double Check Backflow Preventer and all Appurtenances, Complete For $ $

A-18 1,078 Cubic Yard Unclassified Excavation, Complete For $ $

A-19 1,038 Cubic Yard Unclassified Fill, Complete For $ $

A-20 3,500 Square Yards Furnish and Install Class "A" 3,000 psi Concrete Trail, 4" Depth, Complete For $ $

A-21 660 Linear Foot Furnish and Install Concrete Footing with the Typical Concrete Trail Section along Playground Perimeter per Detail on Sheet G-04, Complete For $ $

A-22 2 Each Furnish and Install Type 7 Pedestrian Ramp, Complete For $ $

A-23 138 Linear Foot Furnish and Install 4" Diameter PVC Waterline, Including Bends, Complete For $ $

A-24 162 Linear Foot Furnish and Install 2" Diameter PVC Waterline, Including Bends, Complete For $ $

A-25 1 Each Furnish and Install 4"x6" Tapping Sleeve & Valve, Complete For $ $

A-26 1 Each Connect Proposed 2-inch Water Service Line to Restroom Building, Complete For $ $

A-27 100% Lump Sum Disconnect Water Service Line at Existing Water Drinking Fountain and Reconnect to Proposed Water Drinking Fountain, Including 50 Linear Feet of Waterline, Complete For $ $

A-28 1 Each Furnish and Install RPZ Backflow Preventer on the Water Service Line for the Restroom Building, Including Aluminum Cover, Complete For $ $

A-29 1 Each Furnish and Install Double Check Backflow Preventer on the Water Service Line for the Pump House Building, Including Vault, Complete For $ $

A-30 466 Linear Foot Furnish and Install 8" Diameter PVC SDR-26 D3034 Wastewater Line by Pipe Burst, Complete For $ $

A-31 221 Linear Foot Furnish and Install 4" Diameter PVC SDR-26 D3034 Wastewater Line by Open Cut, Complete For $ $

A-32 1 Each Furnish and Install 4' Diameter Doghouse Manhole, Complete For $ $

A-33 2 Each Remove, Furnish and Install 4' Diameter Manhole, Complete For $ $

A-34 2 Each Furnish and Install 4" Diameter Wastewater Cleanout, Complete For $ $

A-35 2 Each Connect Proposed 4-inch Wastewater Service Line to 8-inch Wastewater Line, Complete For $ $

A-36 1 Each Connect Proposed 4-inch Wastewater Service Line to Restroom Building, Complete For $ $

A-37 52 Linear Foot Funish and Install 2-inch PVC Storm Drain Line, Including Connections to the Water Drinking Fountain and RCP Storm Drain, Complete For $ $

A-38 2 Each Furnish and Install Concrete Headwall and Wingwall Structures, Complete For $ $

A-39 70 Linear Foot Furnish and Install 3' x 1.5' Concrete Box Culvert, Complete For $ $

A-40 12 Linear Foot Furnish and Install 42-inch Reinforced Concrete Pipe, Complete For $ $

A-41 2 Each Furnish and Install 24" x 24" Junction Box, Complete For $ $

A-42 180 Linear Foot Furnish and Install 18-inch Reinforced Concrete Pipe, Complete For $ $

A-43 180 Linear Foot Furnish and Install Safety End Treatment for 18" RCP at Channel, Complete For $ $

A-44 50 Cubic Yard Furnish and Install Concrete Riprap, Complete For $ $

A-45 100 Cubic Yard Furnish and Install Miscellaneous Concrete, Complete For $ $

A-46 100% Lump Sum Furnish and Install Restroom Building, Shade Structure, Concrete Low Walls, and Concrete Slab, Including All Required Appertenances Complete For $ $

A-47 288 Linear Foot Furnish and Install Low Stone Wall, Complete For $ $

A-48 389 Linear Foot Furnish and Install Planter Wall, Complete For $ $

A-49 218 Linear Foot Furnish and Install Concrete Edging, Including all Appertenances and Items, Complete For $ $

A-50 1 Each Furnish & Install Monument Base, Complete For $ $

A-51 1 Each Remove, Clean, and Relocate Historic Monument Plaque to be installed on New Monument Base, Complete For $ $

A-52 1 Each Remove, Clean, and Relocate Jones Park Sign Including all Appertenances and Items, Complete For $ $

A-53 1 Each Remove, Store, and Relocate Existing Boulder Including all Appertenances and Items, Complete For $ $

A-54 7 Each Furnish & Install Accessible Picnic Table including all Appurtenances & Items, Complete For $ $

A-55 6 Each Furnish & Install Trash Receptacle including all Appurtenances & Items, Complete For $ $

A-56 3 Each Furnish & Install Pet Waste Station including all Appurtenances & Items, Complete For $ $

A-57 3 Each Furnish & Install Bike Rack including all Appurtenances & Items, Complete For $ $

A-58 1 Each Furnish & Install Front Approach Drinking Fountain including all Appurtenances & Items, Complete For $ $

A-59 7 Each Furnish & Install Benches including all Appurtenances & Items, Complete For $ $

A-60 265 Linear Foot Furnish & Install Masonry Screen Fence including all Appurtenances & Items, Complete For $ $

A-61 2 Each Remove, Store and Relocate Existing Shade Structure, including all Appurtenances & Items, Complete For $ $

A-62 1 Each Furnish & Install 20' x 25' Shade Structure, including all Appurtenances & Items, Complete For $ $

A-63 1 Each Furnish & Install Basketball Shade Structure, including all Appurtenances & Items, Complete For $ $

A-64 2 Each Furnish & Install Basketball Hoop, including all Appurtenances & Items, Complete For $ $

A-65 1 Lump Sum Furnish & Install Basketball Court Markings and Surfacing, including all Appurtenances & Items, Complete For $ $

A-66 1 Lump Sum Furnish & Install Basketball Court Post Tensioned Slab, including all Appurtenances & Items, Complete For $ $

A-67 2,026 Square Foot Furnish & Install Artificial Turf, including all Appurtenances & Items, Complete For $ $

A-68 296 Cubic Yard Excavate & Prepare Subgrade for Playground, Complete For $ $

A-69 500 Linear Foot Furnish and Install Drainage System for Playscape and Artificial Turf, Including all Appertenances and Items for a Fully Functioning System, Complete For $ $

A-70 4000 Square Foot Furnish & Install Splashpad Concrete, including all Appurtenances & Items, Complete For $ $

A-71 1 Cubic Yard Furnish & Install Washed Granite, Complete For $ $

A-72 1 Cubic Yard Furnish & Install River Rock, Complete For $ $

A-73 22 Cubic Yard Furnish & Install Shredded Hardwood Mulch, Complete For $ $

A-74 137 Square Foot Furnish & Install Filter Fabric, Complete For $ $

A-75 10 Linear Foot Furnish & Install Steel Edging, Complete For $ $

A-76 175 Cubic Yard Furnish & Install Planting Soil, Complete For $ $

A-77 57,212 Square Foot Furnish & Install Bermuda Sod, Complete For $ $

A-78 42,203 Square Foot Furnish & Install Revegetation Hydromulch, Complete For $ $

A-79 621 Cubic Yard Furnish & Install 2" Depth of Topsoil for Bermuda Sod & Revegetation Hydromulch, Complete For $ $

A-80 5 Each Furnish & Install 100 Gallon Bald Cypress, Complete For $ $

A-81 6 Each Furnish & Install 100 Gallon Cedar Elm, Complete For $ $

A-82 2 Each Furnish & Install 200 Gallon Chinkapin Oak, Complete For $ $

A-83 5 Each Furnish & Install 100 Gallon Mexican Sycamore, Complete For $ $

A-84 3 Each Furnish & Install 100 Gallon Monterey Oak, Complete For $ $

A-85 6 Each Furnish & Install 45 Gallon Arizona Cypress, Complete For $ $

A-86 299 Each Furnish & Install 1 Gallon Big Blue Liriope, Complete For $ $

A-87 17 Each Furnish & Install 3 Gallon Dwarf Palmetto, Complete For $ $

A-88 22 Each Furnish & Install 3 Gallon Giant Turk's Cap, Complete For $ $

A-89 100% Lump Sum For Designing, Providing & Installing an Irrigation Plan & System, Signed and Sealed by a Texas Licensed Irrigation Designer, Complete For $ $

A-90 100% Lump Sum For Furnishing and Installing Irrigation System, Per Approved Signed and Sealed Plan, Complete For $ $

A-91 100% Lump Sum For Furnishing and Installing Splashpad Pump Equipment House, Complete For $ $

TOTAL BASE BID AMOUNT (ITEMS 1 to 91)

BID AMOUNT:

Page &P 9/19/2025

Base Bid Act Quant

BID SCHEDULE
FOR
SH-95 ROADWAY FOR BLACKLAND ROAD EXTENSION

BASE BID

Total
ItemEstimatedUnitAmount
No.QuantityUnitDescriptionPrice(in numerals)
1100%Lump SumMobilization, Bonds and Insurance, not-to-exceed 5% of the Base Bid Amount, Complete For$$

2 13 Station Provide Labor, Equipment, Tools & Supervision to Complete Preparation of Right-of-Way, Complete For $ $

3 100% Lump Sum Submit Trench Safety Plan Prepared & Signed by P.E., in Conformance with State Law and OSHA, Complete For $ $

4 1,287 Linear Foot Implement & Follow Trench Safety Plan (Pipe), Complete For $ $

5 660 Square Foot Implement & Follow Trench Safety Plan (Structures), Complete For $ $

6 100% Lump Sum Prepare Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality (TCEQ), Complete For $ $

7 100% Lump Sum Implement and Administer Barricade, Signing and Traffic Safety Plan (Vehicular and Pedestrian), Complete For $ $

8 100% Lump Sum Provide Project Record Drawings, Complete For $ $

9 100% Lump Sum Provide DVD of right-of-way pre-construction and post construction site conditions for the total project, Complete For $ $

10 18 Linear Foot Furnish & Install 24" Steel Encasement Pipe by Open Cut, Complete For $ $

11 842 Linear Foot Furnish and Install 12-inch Diameter PVC Water Line, including Thrust Restraint, Complete For $ $

12 2 Each Connect 12" Waterline to Existing 12" Waterline, Complete For $ $

13 1 Each Cut and Cap Existing 12" Waterline, Complete For $ $

14 3 Each Furnish and Install Standard Fire Hydrant Assembly Including Tee per Detail, Complete For $ $

15 1 Each Furnish and Install Water Service/Meter Assembly Including Tee per Detail, Complete For $ $

16 3 Each Furnish & Install 12" Gate Valve, Complete For $ $

17 4 Each Furnish & Install 12" Plug, Complete For $ $

18 2 Each Furnish & Install 12"x12" Tee, Complete For $ $

19 5 Each Furnish & Install 12" 45° Bend, Complete For $ $

20 100% Lump Sum Furnish All Materials, Equipment, Tools and Labor Necessary for Testing Water Line, Including Any Necessary Repairs, Sampling Stations, Flush Assemblies, Etc., Complete For $ $

21 295 Linear Foot Furnish and Install 18" Class III RCP, Complete For $ $

22 150 Linear Foot Furnish, Install, Maintain, and Remove Temporary 18" Class III RCP, Complete For $ $

23 1 Each Furnish & Install 18" Plug for 18" RCP, Complete For $ $

24 2 Each Furnish & Install 10'x3' Curb Inlet With Backside Opening, Complete For $ $

25 826 Square Yard Furnish & Install Concrete Sidewalk, Complete For $ $

26 1,647 Linear Foot Furnish & Install Standard Concrete Curb and Gutter, Complete For $ $

27 153 Linear Foot Furnish & Install Type I, 2" Concrete Curb and Gutter, Complete For $ $

28 4 Each Furnish & Install TxDOT Type 7 Curb Ramp With Detectable Warnings, Complete For $ $

29 70 Linear Foot Sawcut Existing Driveway, Complete For $ $

30 164 Linear Foot Sawcut Existing Asphalt Roadway, Complete For $ $

31 1,627 Cubic Yard Unclassified Roadway Excavation, Complete For $ $

32 533 Cubic Yard Unclassified Roadway Fill, Complete For $ $

33 5,455 Square Yard Furnish & Install 6-inch Moisture Conditioned Subgrade, Complete For $ $

34 3,961 Square Yard Furnish & Install Type II Geogrid, Complete For $ $

35 3,961 Square Yard Furnish & Install 10" CLBM Type A Grade II, Complete For $ $

36 3,961 Square Yard Furnish & Install One Course Surface Treatment, Complete For $ $

37 1,494 Square Yard Furnish & Install 12" Type B HMAC, Complete For $ $

38 4,493 Square Yard Furnish & Install 4 5/8" Type B HMAC, Complete For $ $

39 4,493 Square Yard Furnish & Install 2" Type C HMAC, Complete For $ $

40 2,583 Square Yard Furnish, Install, Maintain, & Remove Temporary 6" CLBM Type A Grade II, Including Required Excavation & Fill, Complete For $ $

41 2,583 Square Yard Furnish, Install, Maintain, & Remove Temporary 1.5" Type C HMAC, Including Required Excavation & Fill, Complete For $ $

42 504 Square Yard Furnish & Install Concrete Driveway Section, Complete For $ $

43 2 Each Furnish & Install R3-8L Turn Direction Sign, Including Pole and Base, Complete For $ $

44 4 Each Furnish & Install Thermoplastic Turn Arrow, Complete For $ $

45 2 Each Furnish & Install Thermoplastic "ONLY", Complete For $ $

46 799 Linear Foot Furnish & Install Continuous White Thermoplastic Striping, Complete For $ $

47 842 Linear Foot Furnish & Install Continuous Double Yellow Thermoplastic Striping, Complete For $ $

48 386 Linear Foot Furnish & Install Yellow Gore Thermoplastic Striping, Complete For $ $

49 67 Linear Foot Furnish & Install 24" White Thermoplastic Stop Bar, Complete For $ $

50 136 Linear Foot Furnish & Install 24" White Crosswalk, Measured As Width of Roadway, Complete For $ $

51 500 Linear Foot Furnish & Install French Drain including Bedding Material per Detail, Complete For $ $

52 100 Cubic Yard Furnish & Install Class A Concrete, Complete For $ $

53 100 Square Yard Furnish & Install Concrete Riprap, Complete For $ $

54 690 Linear Foot Furnish, Install, Maintain and Remove Silt Fence as required in the Stormwater Pollution Prevention Plan, Complete For $ $

55 31 Each Furnish, Install, Maintain and Remove Rock Berm as required in the Stormwater Pollution Prevention Plan, Complete For $ $

56 8,078 Square Yard Furnish & Install Hydromulch, Including Fertilizing & Watering to Promote and Establish Growth, Complete For $ $

TOTAL BASE BID AMOUNT (ITEMS 1 - 56)

BID AMOUNT:

&"CG Times,Italic"2015-142-20 Page &P

Summary & Signature Sheet Jones Park Improvements, Temple Texas

TOTAL PART A: $

TOTAL: $

By submitting a bid for this project, the contractor is acknowledging the insurance requirements found herein, and the bidder is asserting that, if awarded the contract, he can comply with all insurance requirements as specified within 30 days of award of the contract.
Receipt is hereby acknowledged of the following addenda to the contract documents.
Addendum No. 1 datedReceived
Addendum No. 2 datedReceived
Addendum No. 3 datedReceived
Addendum No. 4 datedReceived
Addendum No. 5 datedReceived

CONTRACTOR

BY

TITLE
Seal and Authorization
(if a corporation)
ADDRESS
ATTEST:
TELEPHONE NUMBER

E-MAIL ADDRESS

SECRETARY

&"CG Times,Italic"2023-CLA162 Page 8 09/19/2025

For Template

BID SCHEDULE
FOR
SH-95 ROADWAY FOR BLACKLAND ROAD EXTENSION

BASE BID

Total
ItemEstimatedUnitAmount
No.QuantityUnitDescriptionPrice(in numerals)
1100%Lump SumMobilization, Bonds and Insurance, not-to-exceed 5% of the Base Bid Amount, Complete For$$

2 13 Station Provide Labor, Equipment, Tools & Supervision to Complete Preparation of Right-of-Way, Complete For $ $

3 100% Lump Sum Submit Trench Safety Plan Prepared & Signed by P.E., in Conformance with State Law and OSHA, Complete For $ $

4 1,287 Linear Foot Implement & Follow Trench Safety Plan (Pipe), Complete For $ $

5 660 Square Foot Implement & Follow Trench Safety Plan (Structures), Complete For $ $

6 100% Lump Sum Prepare Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality (TCEQ), Complete For $ $

7 100% Lump Sum Implement and Administer Barricade, Signing and Traffic Safety Plan (Vehicular and Pedestrian), Complete For $ $

8 100% Lump Sum Provide Project Record Drawings, Complete For $ $

9 100% Lump Sum Provide DVD of right-of-way pre-construction and post construction site conditions for the total project, Complete For $ $

10 18 Linear Foot Furnish & Install 24" Steel Encasement Pipe by Open Cut, Complete For $ $

11 842 Linear Foot Furnish and Install 12-inch Diameter PVC Water Line, including Thrust Restraint, Complete For $ $

12 2 Each Connect 12" Waterline to Existing 12" Waterline, Complete For $ $

13 1 Each Cut and Cap Existing 12" Waterline, Complete For $ $

14 3 Each Furnish and Install Standard Fire Hydrant Assembly Including Tee per Detail, Complete For $ $

15 1 Each Furnish and Install Water Service/Meter Assembly Including Tee per Detail, Complete For $ $

16 3 Each Furnish & Install 12" Gate Valve, Complete For $ $

17 4 Each Furnish & Install 12" Plug, Complete For $ $

18 2 Each Furnish & Install 12"x12" Tee, Complete For $ $

19 5 Each Furnish & Install 12" 45° Bend, Complete For $ $

20 100% Lump Sum Furnish All Materials, Equipment, Tools and Labor Necessary for Testing Water Line, Including Any Necessary Repairs, Sampling Stations, Flush Assemblies, Etc., Complete For $ $

21 295 Linear Foot Furnish and Install 18" Class III RCP, Complete For $ $

22 150 Linear Foot Furnish, Install, Maintain, and Remove Temporary 18" Class III RCP, Complete For $ $

23 1 Each Furnish & Install 18" Plug for 18" RCP, Complete For $ $

24 2 Each Furnish & Install 10'x3' Curb Inlet With Backside Opening, Complete For $ $

25 826 Square Yard Furnish & Install Concrete Sidewalk, Complete For $ $

26 1,647 Linear Foot Furnish & Install Standard Concrete Curb and Gutter, Complete For $ $

27 153 Linear Foot Furnish & Install Type I, 2" Concrete Curb and Gutter, Complete For $ $

28 4 Each Furnish & Install TxDOT Type 7 Curb Ramp With Detectable Warnings, Complete For $ $

29 70 Linear Foot Sawcut Existing Driveway, Complete For $ $

30 164 Linear Foot Sawcut Existing Asphalt Roadway, Complete For $ $

31 1,627 Cubic Yard Unclassified Roadway Excavation, Complete For $ $

32 533 Cubic Yard Unclassified Roadway Fill, Complete For $ $

33 5,455 Square Yard Furnish & Install 6-inch Moisture Conditioned Subgrade, Complete For $ $

34 3,961 Square Yard Furnish & Install Type II Geogrid, Complete For $ $

35 3,961 Square Yard Furnish & Install 10" CLBM Type A Grade II, Complete For $ $

36 3,961 Square Yard Furnish & Install One Course Surface Treatment, Complete For $ $

37 1,494 Square Yard Furnish & Install 12" Type B HMAC, Complete For $ $

38 4,493 Square Yard Furnish & Install 4 5/8" Type B HMAC, Complete For $ $

39 4,493 Square Yard Furnish & Install 2" Type C HMAC, Complete For $ $

40 2,583 Square Yard Furnish, Install, Maintain, & Remove Temporary 6" CLBM Type A Grade II, Including Required Excavation & Fill, Complete For $ $

41 2,583 Square Yard Furnish, Install, Maintain, & Remove Temporary 1.5" Type C HMAC, Including Required Excavation & Fill, Complete For $ $

42 504 Square Yard Furnish & Install Concrete Driveway Section, Complete For $ $

43 2 Each Furnish & Install R3-8L Turn Direction Sign, Including Pole and Base, Complete For $ $

44 4 Each Furnish & Install Thermoplastic Turn Arrow, Complete For $ $

45 2 Each Furnish & Install Thermoplastic "ONLY", Complete For $ $

46 799 Linear Foot Furnish & Install Continuous White Thermoplastic Striping, Complete For $ $

47 842 Linear Foot Furnish & Install Continuous Double Yellow Thermoplastic Striping, Complete For $ $

48 386 Linear Foot Furnish & Install Yellow Gore Thermoplastic Striping, Complete For $ $

49 67 Linear Foot Furnish & Install 24" White Thermoplastic Stop Bar, Complete For $ $

50 136 Linear Foot Furnish & Install 24" White Crosswalk, Measured As Width of Roadway, Complete For $ $

51 500 Linear Foot Furnish & Install French Drain including Bedding Material per Detail, Complete For $ $

52 100 Cubic Yard Furnish & Install Class A Concrete, Complete For $ $

53 100 Square Yard Furnish & Install Concrete Riprap, Complete For $ $

54 690 Linear Foot Furnish, Install, Maintain and Remove Silt Fence as required in the Stormwater Pollution Prevention Plan, Complete For $ $

55 31 Each Furnish, Install, Maintain and Remove Rock Berm as required in the Stormwater Pollution Prevention Plan, Complete For $ $

56 8,078 Square Yard Furnish & Install Hydromulch, Including Fertilizing & Watering to Promote and Establish Growth, Complete For $ $

TOTAL BASE BID AMOUNT (ITEMS 1 - 56)

BID AMOUNT: