Solicitation Amendment FA301623R00160001 SF 30.pdf
PDF 657 KB Posted
- Solicitation number
- FA301623R0016
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date 13 Jun 2023 20 Jun 2023
Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
IN
F O R M A
TI
O N
FROM TO
D es cri pti on
TOP LOAD WASHING MACHINE (924 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
TOP LOAD WASHING MACHINE (934 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenance, 4.5 Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
D es cri pti on
FRONT LOAD WASHING MACHINE (91 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
FRONT LOAD WASHING MACHINE (91 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3.
Washer/Dryer Maintenance, 4.5. Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr
SINGLE ELECTRIC DRYER (96 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3
SINGLE ELECTRIC DRYER (77 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3 Washer/Dryer
FA301623R00160001
ipt io n
Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
Maintenance, 4.5 Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipti on
SINGLE GAS DRYER (113 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
SINGLE GAS DRYER (113 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
D es cri pti on
STACKABLE ELECTRIC DRYER (552 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE ELECTRIC DRYER (552 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3.
Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipt io n
STACKABLE GAS DRYER (86 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE GAS DRYER (104 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipt io n
STACKABLE GAS COMBO (18 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE GAS COMBO (18 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
I N F O R M A T I O N
FROM TO
D es cr ip ti o n
STACKABLE ELECTRIC WASHER/DRYER COMBO (150
per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE ELECTRIC WASHER/DRYER COMBO (150 per month) IAW Performance Work Statement Paragraph(s) 3.
Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1.
Washer/Dryer Maintenance Schedule
IN
FO
R M
AT
IO
N
FROM TO
De scri ptio n
LARGE CAPACITY WASHERS (3 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
REIMBURSEMENT FOR ABUSE/REPAIRS IAW
Performance Work Statement Paragraph(s) 6.5 Equipment Abuse. Not-to-Exceed (NTE) amount of $3,000.00.
INF
OR
MA
TIO
N
FROM TO
Desc riptio n
REIMBURSEMENT FOR ABUSE/REPAIRS IAW Performance Work Statement Paragraph(s) 6.5 Equipment Abuse. Not-to-Exceed (NTE) amount of $3,000.00.
MONTHLY DUCT CLEANINGS IAW Performance Work Statement Paragraph(s) 4.2 Duct Cleaning, 4.4 Dryer Filter Cleaning
INF
OR
MA
TIO
N
FROM TO
Desc ripti on
MONTHLY DUCT CLEANINGS IAW
Performance Work Statement Paragraph(s) 4.2 Duct Cleaning, 4.4 Dryer Filter Cleaning
REMOVE AND REINSTALL WASHERS AND SINGLE STACK
DRYERS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
IN
FO
R M
AT
IO
N
FROM TO
De scri pti on
REMOVE AND REINSTALL WASHERS AND SINGLE
STACK DRYERS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
REMOVE AND REINSTALL STACK WASHERS AND
DRYERS OR DRYER SETS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
INF
OR
MA
TI
ON
FROM TO
Des crip tion
REMOVE AND REINSTALL STACK WASHERS AND DRYERS
OR DRYER SETS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
PHASE IN, INCLUDES DELIVERY AND SET UP
FEE PER MACHINE IAW Performance Work Statement Paragraph(s) 6.1 Phase-Out and Phase-In
IN
F O R M A
TI
O N
FROM TO
D es cri pti on
TOP LOAD WASHING MACHINE (924 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
TOP LOAD WASHING MACHINE (934 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenance, 4.5 Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
D es cri pti on
FRONT LOAD WASHING MACHINE (91 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
FRONT LOAD WASHING MACHINE (91 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3.
Washer/Dryer Maintenance, 4.5. Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipt io n
SINGLE ELECTRIC DRYER (96 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
SINGLE ELECTRIC DRYER (77 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3 Washer/Dryer Maintenance, 4.5 Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
FROM TO
TI
O N De scr ipti on
SINGLE GAS DRYER (113 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
SINGLE GAS DRYER (113 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
D es cri pti on
STACKABLE ELECTRIC DRYER (552 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE ELECTRIC DRYER (552 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3.
Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipt io n
STACKABLE GAS DRYER (86 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE GAS DRYER (104 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipt io n
STACKABLE GAS COMBO (18 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE GAS COMBO (18 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
I N F O R M A T
FROM TO
I
N D es cr ip ti o n
STACKABLE ELECTRIC WASHER/DRYER COMBO (150
per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE ELECTRIC WASHER/DRYER COMBO (150 per month) IAW Performance Work Statement Paragraph(s) 3.
Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1.
Washer/Dryer Maintenance Schedule
IN
FO
R M
AT
IO
N
FROM TO
De scri ptio n
LARGE CAPACITY WASHERS (3 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
REIMBURSEMENT FOR ABUSE/REPAIRS IAW
Performance Work Statement Paragraph(s) 6.5 Equipment Abuse. Not-to-Exceed (NTE) amount of $3,000.00.
INF
OR
MA
TIO
N
FROM TO
Desc riptio n
REIMBURSEMENT FOR ABUSE/REPAIRS IAW Performance Work Statement Paragraph(s) 6.5 Equipment Abuse. Not-to-Exceed (NTE) amount of $3,000.00.
MONTHLY DUCT CLEANINGS IAW Performance Work Statement Paragraph(s) 4.2 Duct Cleaning, 4.4 Dryer Filter Cleaning
INF
OR
MA
TIO
N
FROM TO
Desc ripti on
MONTHLY DUCT CLEANINGS IAW
Performance Work Statement Paragraph(s) 4.2 Duct Cleaning, 4.4 Dryer Filter Cleaning
REMOVE AND REINSTALL WASHERS AND SINGLE STACK
DRYERS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
IN
FO
R M
AT
IO
N
FROM TO
De scri pti on
REMOVE AND REINSTALL WASHERS AND SINGLE
STACK DRYERS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
REMOVE AND REINSTALL STACK WASHERS AND
DRYERS OR DRYER SETS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
IN
F O R M
A FROM TO
TI
N D es cri pti on
TOP LOAD WASHING MACHINE (924 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
TOP LOAD WASHING MACHINE (934 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenance, 4.5 Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
D es cri pti on
FRONT LOAD WASHING MACHINE (91 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
FRONT LOAD WASHING MACHINE (91 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3.
Washer/Dryer Maintenance, 4.5. Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipt io n
SINGLE ELECTRIC DRYER (96 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
SINGLE ELECTRIC DRYER (77 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3 Washer/Dryer Maintenance, 4.5 Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipti on
SINGLE GAS DRYER (113 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
SINGLE GAS DRYER (113 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
D es cri pti on
STACKABLE ELECTRIC DRYER (552 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE ELECTRIC DRYER (552 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3.
Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipt io n
STACKABLE GAS DRYER (86 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE GAS DRYER (104 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipt io n
STACKABLE GAS COMBO (18 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE GAS COMBO (18 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
I N F O R M A T I O N
FROM TO
D es cr ip ti o n
STACKABLE ELECTRIC WASHER/DRYER COMBO (150
per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE ELECTRIC WASHER/DRYER COMBO (150 per month) IAW Performance Work Statement Paragraph(s) 3.
Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1.
Washer/Dryer Maintenance Schedule
IN
FO
R M
AT
IO
N
FROM TO
De scri
LARGE CAPACITY WASHERS (3 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer
REIMBURSEMENT FOR ABUSE/REPAIRS IAW
Performance Work Statement Paragraph(s) 6.5 Equipment ptio n
Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule Abuse. Not-to-Exceed (NTE) amount of $3,000.00.
INF
OR
MA
TIO
N
FROM TO
Desc riptio n
REIMBURSEMENT FOR ABUSE/REPAIRS IAW Performance Work Statement Paragraph(s) 6.5 Equipment Abuse. Not-to-Exceed (NTE) amount of $3,000.00.
MONTHLY DUCT CLEANINGS IAW Performance Work Statement Paragraph(s) 4.2 Duct Cleaning, 4.4 Dryer Filter Cleaning
INF
OR
MA
TIO
N
FROM TO
Desc ripti on
MONTHLY DUCT CLEANINGS IAW
Performance Work Statement Paragraph(s) 4.2 Duct Cleaning, 4.4 Dryer Filter Cleaning
REMOVE AND REINSTALL WASHERS AND SINGLE STACK
DRYERS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
IN
FO
R M
AT
IO
N
FROM TO
De scri pti on
REMOVE AND REINSTALL WASHERS AND SINGLE
STACK DRYERS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
REMOVE AND REINSTALL STACK WASHERS AND
DRYERS OR DRYER SETS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
IN
F O R M A
TI
O N
FROM TO
D es cri pti on
TOP LOAD WASHING MACHINE (924 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
TOP LOAD WASHING MACHINE (934 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenance, 4.5 Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
D es
FRONT LOAD WASHING MACHINE (91 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3
FRONT LOAD WASHING MACHINE (91 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3.
cri pti on
Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
Washer/Dryer Maintenance, 4.5. Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipt io n
SINGLE ELECTRIC DRYER (96 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
SINGLE ELECTRIC DRYER (77 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3 Washer/Dryer Maintenance, 4.5 Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipti on
SINGLE GAS DRYER (113 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
SINGLE GAS DRYER (113 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
D es cri pti on
STACKABLE ELECTRIC DRYER (552 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE ELECTRIC DRYER (552 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3.
Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipt io n
STACKABLE GAS DRYER (86 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE GAS DRYER (104 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipt io n
STACKABLE GAS COMBO (18 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE GAS COMBO (18 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
I N F O R M A T I O N
FROM TO
D es cr ip ti o n
STACKABLE ELECTRIC WASHER/DRYER COMBO (150
per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE ELECTRIC WASHER/DRYER COMBO (150 per month) IAW Performance Work Statement Paragraph(s) 3.
Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1.
Washer/Dryer Maintenance Schedule
IN
FO
R M
AT
IO
N
FROM TO
De scri ptio n
LARGE CAPACITY WASHERS (3 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
REIMBURSEMENT FOR ABUSE/REPAIRS IAW
Performance Work Statement Paragraph(s) 6.5 Equipment Abuse. Not-to-Exceed (NTE) amount of $3,000.00.
INF
OR
MA
TIO
N
FROM TO
Desc riptio n
REIMBURSEMENT FOR ABUSE/REPAIRS IAW Performance Work Statement Paragraph(s) 6.5 Equipment Abuse. Not-to-Exceed (NTE) amount of $3,000.00.
MONTHLY DUCT CLEANINGS IAW Performance Work Statement Paragraph(s) 4.2 Duct Cleaning, 4.4 Dryer Filter Cleaning
INF
OR
MA
TIO
N
FROM TO
Desc ripti on
MONTHLY DUCT CLEANINGS IAW
Performance Work Statement Paragraph(s) 4.2 Duct Cleaning, 4.4 Dryer Filter Cleaning
REMOVE AND REINSTALL WASHERS AND SINGLE STACK
DRYERS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
IN
FO
R M
AT
IO
N
FROM TO
De scri pti on
REMOVE AND REINSTALL WASHERS AND SINGLE
STACK DRYERS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
REMOVE AND REINSTALL STACK WASHERS AND
DRYERS OR DRYER SETS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
IN
F O R M A
TI
O N
FROM TO
D es cri pti on
TOP LOAD WASHING MACHINE (924 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
TOP LOAD WASHING MACHINE (934 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenance, 4.5 Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
D es cri pti on
FRONT LOAD WASHING MACHINE (91 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
FRONT LOAD WASHING MACHINE (91 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3.
Washer/Dryer Maintenance, 4.5. Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipt io n
SINGLE ELECTRIC DRYER (96 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
SINGLE ELECTRIC DRYER (77 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3 Washer/Dryer Maintenance, 4.5 Clean-up, 5.1 Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipti on
SINGLE GAS DRYER (113 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
SINGLE GAS DRYER (113 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
D es cri pti on
STACKABLE ELECTRIC DRYER (552 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE ELECTRIC DRYER (552 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3.
Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipt io n
STACKABLE GAS DRYER (86 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE GAS DRYER (104 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
IN
F O R M A
TI
O N
FROM TO
De scr ipt io n
STACKABLE GAS COMBO (18 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE GAS COMBO (18 per month) IAW Performance Work Statement Paragraph(s) 3. Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1. Washer/Dryer Maintenance Schedule
I N F O
R M A T I O N
FROM TO
D es cr ip ti o n
STACKABLE ELECTRIC WASHER/DRYER COMBO (150
per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
STACKABLE ELECTRIC WASHER/DRYER COMBO (150 per month) IAW Performance Work Statement Paragraph(s) 3.
Equipment, 4.3. Washer/Dryer Maintenance, 4.5. Clean-up, 5.1.
Washer/Dryer Maintenance Schedule
IN
FO
R M
AT
IO
N
FROM TO
De scri ptio n
LARGE CAPACITY WASHERS (3 per month) IAW Performance Work Statement Paragraph(s) 3 Equipment, 4.3 Washer/Dryer Maintenace, 4.5 Clean-up, 5.1 Washer/Dryer Maintenace Schedule
REIMBURSEMENT FOR ABUSE/REPAIRS IAW
Performance Work Statement Paragraph(s) 6.5 Equipment Abuse. Not-to-Exceed (NTE) amount of $3,000.00.
INF
OR
MA
TIO
N
FROM TO
Desc riptio n
REIMBURSEMENT FOR ABUSE/REPAIRS IAW Performance Work Statement Paragraph(s) 6.5 Equipment Abuse. Not-to-Exceed (NTE) amount of $3,000.00.
MONTHLY DUCT CLEANINGS IAW Performance Work Statement Paragraph(s) 4.2 Duct Cleaning, 4.4 Dryer Filter Cleaning
INF
OR
MA
TIO
N
FROM TO
Desc ripti on
MONTHLY DUCT CLEANINGS IAW
Performance Work Statement Paragraph(s) 4.2 Duct Cleaning, 4.4 Dryer Filter Cleaning
REMOVE AND REINSTALL WASHERS AND SINGLE STACK
DRYERS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
IN
FO
R M
AT
IO
N
FROM TO
De scri pti on
REMOVE AND REINSTALL WASHERS AND SINGLE
STACK DRYERS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
REMOVE AND REINSTALL STACK WASHERS AND
DRYERS OR DRYER SETS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation, 4.7 Machine Relocation
The following CLIN(s) / SLIN(s) / ELIN(s) were deleted:
Item Supplies / Services Estimate d Quantity
Unit Unit Price Amount
PHASE IN, INCLUDES DELIVERY AND
SET UP FEE PER MACHINE IAW
Performance Work Statement Paragraph(s)
6.1 Phase-Out and Phase-In
Product Service Code: W079 Firm Fixed Price
1 Months
Item Supplies / Services Estimate d Quantity
Unit Unit Price Amount
REMOVE AND REINSTALL STACK
WASHERS AND DRYERS OR DRYER
SETS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation,
4.7 Machine Relocation
Product Service Code: W079 Firm Fixed Price
60 Each
Item Supplies / Services Estimate d Quantity
Unit Unit Price Amount
REMOVE AND REINSTALL STACK
WASHERS AND DRYERS OR DRYER
SETS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation,
4.7 Machine Relocation
Product Service Code: W079 Firm Fixed Price
60 Each
Item Supplies / Services Estimate d Quantity
Unit Unit Price Amount
REMOVE AND REINSTALL STACK
WASHERS AND DRYERS OR DRYER
SETS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation,
4.7 Machine Relocation
Product Service Code: W079 Firm Fixed Price
60 Each
Item Supplies / Services Estimate d Quantity
Unit Unit Price Amount
REMOVE AND REINSTALL STACK
WASHERS AND DRYERS OR DRYER
SETS IAW Performance Work Statement Paragraph(s) 4.6 Machine Reinstallation,
4.7 Machine Relocation
Product Service Code: W079 Firm Fixed Price
60 Each
Inspection and Acceptance
The inspection and acceptance locations for the following CLIN(s) / SLIN(s) / ELIN(s) were deleted:
Inspection and Acceptance Location - F2MRAA - F2MRAA 502 CES CEG Inspection and Acceptance Location - F2MRAA - F2MRAA 502 CES CEG Inspection and Acceptance Location - F2MRAA - F2MRAA 502 CES CEG
Inspection and Acceptance Location - F2MRAA - F2MRAA 502 CES CEG Inspection and Acceptance Location - F2MRAA - F2MRAA 502 CES CEG
Deliveries or Performance
The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATION FROM TO
Period of Performance 17 Sep 2023 to 16 Aug 2024 17 Oct 2023 to 16 Sep 2024
INFORMATION FROM TO
Period of Performance 17 Sep 2023 to 16 Aug 2024 17 Oct 2023 to 16 Sep 2024
INFORMATION FROM TO
Period of Performance 17 Sep 2023 to 16 Aug 2024 17 Oct 2023 to 16 Sep 2024
INFORMATION FROM TO
Period of Performance 17 Sep 2023 to 16 Aug 2024 17 Oct 2023 to 16 Sep 2024
INFORMATION FROM TO
Period of Performance 17 Sep 2023 to 16 Aug 2024 17 Oct 2023 to 16 Sep 2024
INFORMATION FROM TO
Period of Performance 17 Sep 2023 to 16 Aug 2024 17 Oct 2023 to 16 Sep 2024
INFORMATION FROM TO
Period of Performance 17 Sep 2023 to 16 Aug 2024 17 Oct 2023 to 16 Sep 2024
INFORMATION FROM TO
Period of Performance 17 Sep 2023 to 16 Aug 2024 17 Oct 2023 to 16 Sep 2024
INFORMATION FROM TO
Period of Performance 17 Sep 2023 to 16 Aug 2024 17 Oct 2023 to 16 Sep 2024
INFORMATION FROM TO
Period of Performance 17 Sep 2023 to 16 Aug 2024 17 Oct 2023 to 16 Sep 2024
INFORMATION FROM TO
Period of Performance 17 Sep 2023 to 16 Aug 2024 17 Oct 2023 to 16 Sep 2024
INFORMATION FROM TO
Period of Performance 17 Sep 2023 to 16 Aug 2024 17 Oct 2023 to 16 Sep 2024
INFORMATION FROM TO
Period of Performance 17 Sep 2023 to 16 Aug 2024 17 Sep 2023 to 16 Oct 2023
INFORMATION FROM TO
Period of Performance 17 Aug 2024 to 16 Aug 2025 17 Sep 2024 to 16 Sep 2025
INFORMATION FROM TO
Period of Performance 17 Aug 2024 to 16 Aug 2025 17 Sep 2024 to 16 Sep 2025
INFORMATION FROM TO
Period of Performance 17 Aug 2024 to 16 Aug 2025 17 Sep 2024 to 16 Sep 2025
INFORMATION FROM TO
Period of Performance 17 Aug 2024 to 16 Aug 2025 17 Sep 2024 to 16 Sep 2025
INFORMATION FROM TO
Period of Performance 17 Aug 2024 to 16 Aug 2025 17 Sep 2024 to 16 Sep 2025
INFORMATION FROM TO
Period of Performance 17 Aug 2024 to 16 Aug 2025 17 Sep 2024 to 16 Sep 2025
INFORMATION FROM TO
Period of Performance 17 Aug 2024 to 16 Aug 2025 17 Sep 2024 to 16 Sep 2025
INFORMATION FROM TO
Period of Performance 17 Aug 2024 to 16 Aug 2025 17 Sep 2024 to 16 Sep 2025
INFORMATION FROM TO
Period of Performance 17 Aug 2024 to 16 Aug 2025 17 Sep 2024 to 16 Sep 2025
INFORMATION FROM TO
Period of Performance 17 Aug 2024 to 16 Aug 2025 17 Sep 2024 to 16 Sep 2025
INFORMATION FROM TO
Period of Performance 17 Aug 2024 to 16 Aug 2025 17 Sep 2024 to 16 Sep 2025
INFORMATION FROM TO
Period of Performance 17 Aug 2024 to 16 Aug 2025 17 Sep 2024 to 16 Sep 2025
INFORMATION FROM TO
Period of Performance 17 Aug 2025 to 16 Aug 2026 17 Sep 2025 to 16 Sep 2026
INFORMATION FROM TO
Period of Performance 17 Aug 2025 to 16 Aug 2026 17 Sep 2025 to 16 Sep 2026
Period of Performance 17 Aug 2025 to 16 Aug 2026 17 Sep 2025 to 16 Sep 2026
INFORMATION FROM TO
Period of Performance 17 Aug 2025 to 16 Aug 2026 17 Sep 2025 to 16 Sep 2026
INFORMATION FROM TO
Period of Performance 17 Aug 2025 to 16 Aug 2026 17 Sep 2025 to 16 Sep 2026
INFORMATION FROM TO
Period of Performance 17 Aug 2025 to 16 Aug 2026 17 Sep 2025 to 16 Sep 2026
INFORMATION FROM TO
Period of Performance 17 Aug 2025 to 16 Aug 2026 17 Sep 2025 to 16 Sep 2026
INFORMATION FROM TO
Period of Performance 17 Aug 2025 to 16 Aug 2026 17 Sep 2025 to 16 Sep 2026
INFORMATION FROM TO
Period of Performance 17 Aug 2025 to 16 Aug 2026 17 Sep 2025 to 16 Sep 2026
INFORMATION FROM TO
Period of Performance 17 Aug 2025 to 16 Aug 2026 17 Sep 2025 to 16 Sep 2026
INFORMATION FROM TO
Period of Performance 17 Aug 2025 to 16 Aug 2026 17 Sep 2025 to 16 Sep 2026
INFORMATION FROM TO
Period of Performance 17 Aug 2025 to 16 Aug 2026 17 Sep 2025 to 16 Sep 2026
INFORMATION FROM TO
Period of Performance 17 Aug 2026 to 16 Aug 2027 17 Sep 2026 to 16 Sep 2027
INFORMATION FROM TO
Period of Performance 17 Aug 2026 to 16 Aug 2027 17 Sep 2026 to 16 Sep 2027
INFORMATION FROM TO
Period of Performance 17 Aug 2026 to 16 Aug 2027 17 Sep 2026 to 16 Sep 2027
INFORMATION FROM TO
Period of Performance 17 Aug 2026 to 16 Aug 2027 17 Sep 2026 to 16 Sep 2027
INFORMATION FROM TO
Period of Performance 17 Aug 2026 to 16 Aug 2027 17 Sep 2026 to 16 Sep 2027
INFORMATION FROM TO
Period of Performance 17 Aug 2026 to 16 Aug 2027 17 Sep 2026 to 16 Sep 2027
INFORMATION FROM TO
Period of Performance 17 Aug 2026 to 16 Aug 2027 17 Sep 2026 to 16 Sep 2027
INFORMATION FROM TO
Period of Performance 17 Aug 2026 to 16 Aug 2027 17 Sep 2026 to 16 Sep 2027
INFORMATION FROM TO
Period of Performance 17 Aug 2026 to 16 Aug 2027 17 Sep 2026 to 16 Sep 2027
Period of Performance 17 Aug 2026 to 16 Aug 2027 17 Sep 2026 to 16 Sep 2027
INFORMATION FROM TO
Period of Performance 17 Aug 2026 to 16 Aug 2027 17 Sep 2026 to 16 Sep 2027
INFORMATION FROM TO
Period of Performance 17 Aug 2026 to 16 Aug 2027 17 Sep 2026 to 16 Sep 2027
INFORMATION FROM TO
Period of Performance 17 Aug 2027 to 16 Aug 2028 17 Sep 2027 to 16 Sep 2028
INFORMATION FROM TO
Period of Performance 17 Aug 2027 to 16 Aug 2028 17 Sep 2027 to 16 Sep 2028
INFORMATION FROM TO
Period of Performance 17 Aug 2027 to 16 Aug 2028 17 Sep 2027 to 16 Sep 2028
INFORMATION FROM TO
Period of Performance 17 Aug 2027 to 16 Aug 2028 17 Sep 2027 to 16 Sep 2028
INFORMATION FROM TO
Period of Performance 17 Aug 2027 to 16 Aug 2028 17 Sep 2027 to 16 Sep 2028
INFORMATION FROM TO
Period of Performance 17 Aug 2027 to 16 Aug 2028 17 Sep 2027 to 16 Sep 2028
INFORMATION FROM TO
Period of Performance 17 Aug 2027 to 16 Aug 2028 17 Sep 2027 to 16 Sep 2028
INFORMATION FROM TO
Period of Performance 17 Aug 2027 to 16 Aug 2028 17 Sep 2027 to 16 Sep 2028
INFORMATION FROM TO
Period of Performance 17 Aug 2027 to 16 Aug 2028 17 Sep 2027 to 16 Sep 2028
INFORMATION FROM TO
Period of Performance 17 Aug 2027 to 16 Aug 2028 17 Sep 2027 to 16 Sep 2028
INFORMATION FROM TO
Period of Performance 17 Aug 2027 to 16 Aug 2028 17 Sep 2027 to 16 Sep 2028
INFORMATION FROM TO
Period of Performance 17 Aug 2027 to 16 Aug 2028 17 Sep 2027 to 16 Sep 2028
The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were deleted:
Period of Performance 0213 Period of Performance 0313 Period of Performance 0413 Period of Performance 0513 Period of Performance
List of Attachments
The following attachments were added:
JBSA FSH PWS - FY23 Washer and Dryer - 9 Jun 2023_V2
| IDCode: |
| Page: 1 |
| Pages: 23 |
| AmendNo: 0001 |
| EffDate: 09 Jun 2023 |
| ReqNo: |
| ProjNo: |
| IssCode: FA3016 |
| AdmCode: |
| IssuedBy: FA3016 502 CONS CL |
1655 SELFRIDGE AVE BLDG 5450, CP 210-671-3617
JBSA LACKLAND, TX 78236-5286
UNITED STATES
Zachary Fordham, Email: zachary.fordham@us.af.mil Telephone: 671-5145
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA301623R0016 |
| SolDate: 18 May 2023 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of this amendment is to: |
1. Remove the large capacity washer CLIN from the base year and all out years;
2. Update machine quantities per CLIN 0X01, 0X03, and 0X06;
3. Incorporate Revised PWS dated 9 Jun 2023. This version supersedes any prior version;
4. Update Period of Performance for all CLINS;
5. Extend Offer Due date to 20 June 2023, 12:00 PM CDT.
| ContNameTitle: |
| CoNameTitle: Emily Rodriguez |
| ContDate: |
| CODate: 09 Jun 2023 |
File details come from the government source that posted it. Updated .