Addendum and Acknowledgement Doc.doc
DOC document 2 MB Posted
- Attached to
- Static Uninterruptible Power Supply (UPS)
- Solicitation number
- 4-B176-Q-00408-00
- Issued by
-
Department of Energy Office of Science
About this file
This document is an Addendum issued by Argonne National Laboratory for the Request for Proposal (RFP) 4-B176-Q-00408-00 for a Static Uninterruptible Power Supply (UPS). The addendum responds to contractor questions, clarifying that the required input and output voltage is 480V, and that there is a loading dock available for delivery. It also specifies that this RFP is for the purchase of the UPS equipment only, as the installation will be done under a separate contract. The RFP is being evaluated based on the lowest price, technically acceptable methodology. Proposals are due by 12:00pm CST on April 30th, 2024, and must include a completed ANL-70 Request for Quotation and ANL-70B Pre-Award Information, Representations and Certifications forms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ANL-70 Request for Quotation.doc | DOC document | |
| Reps Certs ANL-70B (Long).doc | DOC document | |
| UPS Spec-80Kw-FY24-Final.pdf | ||
| Appendix A-71COM-13-FEB-2023.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOLLY MURTAUGH
Procurement Specialist 3 Office of the Chief Financial Officer
Procurement Department
Argonne National Laboratory
9700 South Cass Avenue, Bldg. 201
Lemont, IL 60439
(630)252-3094 mmurtaugh@anl.gov
04/24/2024
TO ALL OFFERORS:
Subject:
Request for FORMDROPDOWN No. 4-B176-Q-00408-00 Addendum No. 01 Attached herewith for your information and use in preparing your proposal for subject project is one (1) copy of Addendum No.01.
Kindly acknowledge receipt of this Addendum by signing and returning one (1) copy of this letter.
Please email receipt to Procurement at mmurtaugh@anl.gov .
Sincerely, MOLLY MURTAUGH
Procurement Specialist 3 Procurement Department
Receipt Acknowledged:
Company:
By:
cc:
File
CF
Addendum No.
TO
REQUEST FOR FORMDROPDOWN
4-B176-Q-00408-00
FOR
Argonne National Laboratory
BLDG. 201 OCF
9700 S. Cass Ave.
Lemont, IL 60439
04/24/2024 This addendum is being issued to modify the subject FORMDROPDOWN 4-B176-Q-00408-00 as follows:
Response to contractor questions:
· In the specs, it states the input and output voltage should 480v, but the diagram on page 19 shows the utility input and output voltage is 208v. Can you clarify the voltage needed?- 480V Input ( 480V Output
· Is there a loading dock for delivery? Yes.
· Is the contractor responsible for the installation or is this for purchase of the product only? – Equipment only. Installation will be done under a separate contract.
U. S. Department of Energy laboratory managed by UChicago Argonne, LLC
File details come from the government source that posted it. Updated .