This is a Cooperative Agreement document from the U.S. Environmental Protection Agency (EPA) awarded to the City of New London, Connecticut, for the establishment and operation of a Brownfields Revolving Loan Fund (RLF) program. The City of New London will use the $1,000,000 award to capitalize a revolving loan fund to provide loans and subgrants for cleanup of brownfield sites within its geographic jurisdiction. The program includes issuing approximately 10 loans and 10 subgrants to remediate up to 20 brownfield sites, conducting up to 25 community meetings, finalizing up to 20 Analyses of Brownfield Cleanup Alternatives (ABCA), and submitting up to 25 quarterly reports. The cooperative agreement was awarded on August 14, 2023, with an award mailing date of August 17, 2023, and covers a project period from July 1, 2023, through September 30, 2028. The City will be required to competitively procure a Qualified Environmental Professional to oversee environmental site activities and will create community involvement plans and administrative records for each remediated site.

The agreement provides 100% federal cost-share with no local match required, as the funding is authorized under the Infrastructure Investment and Jobs Act (IIJA). Of the $1,000,000 total, the budget allocates $144,000 for personnel, $50,000 for fringe benefits, $3,000 for travel, $800,000 for contractual services, and $3,000 for other costs. The CAR must maintain a minimum 50/50 split between loan costs and non-loan programmatic costs by the end of the agreement period, with individual subgrants capped at $500,000. Up to 10% of funds may be used for administrative costs, with 5% specifically limited for direct administrative costs and indirect costs. The agreement is subject to Davis-Bacon prevailing wage requirements, Buy America sourcing provisions under IIJA, and federal cross-cutting requirements including DBE compliance, OSHA standards, and Section 504 of the Rehabilitation Act. Quarterly performance reports must be submitted to EPA using the Assessment, Cleanup and Redevelopment Exchange System (ACRES), with program income from loan repayments, interest, and fees retained and managed within the fund for continued lending activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4B - 00A01426 - 0 Page 1

RECIPIENT TYPE: Send Payment Request to:

Municipal Contact EPA RTPFC at: rtpfc-grants@epa.gov

RECIPIENT: PAYEE:

00A01426GRANT NUMBER (FAIN):

4B

PAYMENT METHOD:

ASAP

DATE OF AWARD

MAILING DATE

ACH#

08/17/2023

10482

U.S. ENVIRONMENTAL

PROTECTION AGENCY

Cooperative Agreement

MODIFICATION NUMBER:

PROGRAM CODE: 08/14/2023

TYPE OF ACTION

New

EIN:

City of New London 181 State Street New London, CT 06320-6302

06-6001880

181 State Street City of New London

New London, CT 06320-6302

PROJECT MANAGER EPA PROJECT OFFICER EPA GRANT SPECIALIST

Tom Bombria 181 State Street New London, CT 06320-6302 Email: TBombria@newlondonct.org Phone: 860-437-6346

Katy Deng 5 Post Office Sq, Suite 100 Boston, MA 02109-3912 Email: Deng.Katy@epa.gov Phone: 617-918-1286

Robert Smith Grant Management Branch 5 Post Office Sq, Suite 100 Boston, MA 02109-3912 Email: Smith.Robert.F@epa.gov Phone: 617-918-1960

See Attachment 1 for project description.

Revolving Loan Fund Cooperative Agreement for City of New London

PROJECT TITLE AND DESCRIPTION

$1,000,000.00

TOTAL PROJECT PERIOD COSTBUDGET PERIOD

07/01/2023 - 09/30/2028 $1,000,000.0007/01/2023 - 09/30/2028

TOTAL BUDGET PERIOD COSTPROJECT PERIOD

NOTICE OF AWARD

Based on your Application dated 06/01/2023 including all modifications and amendments, the United States acting by and through the US Environmental Protection Agency (EPA) hereby awards $1,000,000.00. EPA agrees to cost-share 100.00% of all approved budget period costs incurred, up to and not exceeding total federal funding of $1,000,000.00. Recipient's signature is not required on this agreement. The recipient demonstrates its commitment to carry out this award by either: 1) drawing down funds within 21 days after the EPA award or amendment mailing date; or 2) not filing a notice of disagreement with the award terms and conditions within 21 days after the EPA award or amendment mailing date. If the recipient disagrees with the terms and conditions specified in this award, the authorized representative of the recipient must furnish a notice of disagreement to the EPA Award Official within 21 days after the EPA award or amendment mailing date. In case of disagreement, and until the disagreement is resolved, the recipient should not draw down on the funds provided by this award/amendment, and any costs incurred by the recipient are at its own risk. This agreement is subject to applicable EPA regulatory and statutory provisions, all terms and conditions of this agreement and any attachments.

U.S. EPA, Region 1 , EPA New England

Boston, MA 02109-3912

5 Post Office Square, Suite 100 Boston, MA 02109-3912

THE UNITED STATES OF AMERICA BY THE U.S. ENVIRONMENTAL PROTECTION AGENCY

ISSUING OFFICE (GRANTS MANAGEMENT OFFICE)

ORGANIZATION / ADDRESS

5 Post Office Square, Suite 100

AWARD APPROVAL OFFICE

ORGANIZATION / ADDRESS

08/14/2023

DATE

U.S. EPA, Region 1, EPA New England R1 - Region 1

Digital signature applied by EPA Award Official Arthur Johnson - Director, Mission Support Division

4B - 00A01426 - 0 Page 2

EPA Funding Information

FUNDS FORMER AWARD THIS ACTION AMENDED TOTAL

$0 $1,000,000EPA Amount This Action $1,000,000

$0 $0EPA In-Kind Amount $0

$0 $0Unexpended Prior Year Balance $0

$0 $0Other Federal Funds $0

$0 $0Recipient Contribution $0

$0 $0State Contribution $0

$0 $0Local Contribution $0

$0 $0Other Contribution $0

$0 $1,000,000Allowable Project Cost $1,000,000

CERCLA: Secs. 104(k)(3) & 104(k)(5)(E) & 104(k) (10)(B)(iii) & Infrastructure Investment and Jobs Act (IIJA) (PL 117-58)

66.818 - Brownfields Multipurpose, Assessment, Revolving Loan Fund, and Cleanup Cooperative Agreements

Statutory Authority Regulatory AuthorityAssistance Program (CFDA) 2 CFR 200, 2 CFR 1500 and 40 CFR 33

Fiscal Site Name Req No FY Approp.

Code Budget

Oganization PRC Object

Class Site/Project Cost

Organization Obligation / Deobligation

- $1,000,000-4114000D79X890110AG7E4SD2323010CG048-

$1,000,000

4B - 00A01426 - 0 Page 3

Total Approved Allowable Budget Period Cost

Budget Summary Page

$144,000

$1,000,000

$1,000,000

$1,000,000

$0

$0

$0

$3,000

$800,000

Table A - Object Class Category (Non-Construction)

$500,000

$50,000

$3,000

$1,000,000

$1,000,000 $0

1. Personnel

2. Fringe Benefits

3. Travel

4. Equipment

5. Supplies

6. Contractual

7. Construction

11. Total (Share: Recipient ______ % Federal ______ %)

8. Other

9. Total Direct Charges

12. Total Approved Assistance Amount

13. Program Income

14. Total EPA Amount Awarded This Action

15. Total EPA Amount Awarded To Date

10. Indirect Costs: 0.00 % Base - 100.000.00

4B - 00A01426 - 0 Page 4

Attachment 1 - Project Description

Brownfields are real property, the expansion, development or reuse of which may be complicated by the presence or potential presence of a hazardous substance, pollutant, or contaminant. This agreement will provide funding under the Infrastructure Investment and Jobs Act (IIJA) for City of New London to capitalize a revolving loan fund as authorized by CERCLA 104(k)(3) in New London, Connecticut. Specifically, this agreement will provide funding for the recipient to capitalize a revolving loan fund from which to make loans and subgrants to clean up brownfield site(s) and conduct other necessary activities to prudently manage the RLF. Additionally, the recipient will competitively procure (as needed) and direct a Qualified Environmental Professional to oversee the environmental site activities, will create a community involvement plan and administrative record for each site that is remediated, and will report on program income, interim progress, and final accomplishments by completing and submitting relevant portions of the Property Profile Form and Brownfields RLF Form using EPA’s Assessment, Cleanup and Redevelopment Exchange System (ACRES). Further, the recipient will issue approximately 10 loans and 10 subgrants to remediate up to 20 brownfield site(s); anticipates holding up to 25 community meetings, finalizing up to 20 Analysis of Brownfield Cleanup Alternatives, and submitting up to 25 quarterly reports. Work conducted under this agreement will benefit the residents, business owners, and stakeholders in and near New London, Connecticut.

Site-specific and non-site-specific activities included: Non-site-specific tasks include, marketing the program to cities, towns, developers, and non-profits, conducting public outreach, and preparing outreach materials relevant to the City of New London's RLF Program. Site-specific tasks include verifying site and borrower/subgrant eligibility, sub-grant agreements, conducting site-specific public relations activities, and consulting with and enrolling sites in the Connecticut voluntary cleanup program. The City of New London will oversee completion of site remediation and preparation of cleanup completion documentation, including implementation of institutional controls.

4B - 00A01426 - 0 Page 5

Administrative Conditions

National Administrative Terms and Conditions

General Terms and Conditions

The recipient agrees to comply with the current EPA general terms and conditions available at:

https://www.epa.gov/grants/epa-general-terms-and-conditions-effective-october-1-2022-or-later.

These terms and conditions are in addition to the assurances and certifications made as a part of the award and the terms, conditions, or restrictions cited throughout the award.

The EPA repository for the general terms and conditions by year can be found at: https://www.epa.gov/grants/grant-terms-and-conditions#general.

A. Correspondence Condition

The terms and conditions of this agreement require the submittal of reports, specific requests for approval, or notifications to EPA. Unless otherwise noted, all such correspondence should be sent to the following email addresses

• Federal Financial Reports (SF-425): rtpfc-grants@epa.gov

• MBE/WBE reports (EPA Form 5700-52A): Grants Specialist on Page 1 of Award Document AND Larry Wells, Disadvantaged Business Utilization Program Manager: r1_mbewbereport@epa.gov

• All other forms/certifications/assurances, Indirect Cost Rate Agreements, Requests for Extensions of the Budget and Project Period, Amendment Requests, Requests for other Prior Approvals, updates to recipient information

(including email addresses, changes in contact information or changes in authorized representatives) and other notifications: Grants Specialist and Project Officer on Page 1 of Award Document

• Payment requests (if applicable): Project Officer on Page 1 of Award Document

• Quality Assurance documents, workplan revisions, equipment lists, programmatic reports and deliverables:

Project Officer on Page 1 of Award Document AND R1QAPPs@epa.gov

B. Pre-Award Costs

In accordance with 2 CFR 1500.9, the recipient may charge otherwise allowable pre-award costs (both Federal and non-

Federal matching shares) incurred from 07/01/2023 to the actual award date provided that such costs were contained in the approved application and all costs are incurred within the approved budget period.

Programmatic Conditions

FY23 Brownfields Revolving Loan Fund (RLF) Cooperative Agreement

Infrastructure Investment and Jobs Act Funds

Terms and Conditions

Please note that these Terms and Conditions (T&Cs) apply to Brownfields RLF capitalization cooperative agreements

4B - 00A01426 - 0 Page 6 awarded under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) § 104(k) and the

Infrastructure Investment and Jobs Act (IIJA), as well as agreements that transitioned to § 104(k), or agreements which have been amended after 12/24/14.

I. GENERAL FEDERAL REQUIREMENTS

Note: For the purposes of complying with certain provisions of the Uniform Grant Guidance (UGG), 2 CFR Part 200, loans made by RLF recipients are Subawards as that term is defined at 2 CFR § 200.1. The term subaward also encompasses

“grants” made by the RLF recipient under CERCLA § 104(k)(3)(B)(ii). The UGG requirements for subawards in the form of loans and subawards in the form of grants are different. For clarity, these T&Cs refer to “loans” to describe subawards that generate program income from repayments of principal, interest charges and loan processing fees paid by “borrowers.” The

T&Cs refer to “subgrants” to describe subawards the RLF recipient provides to an eligible entity or nonprofit organization

(“subgrantees”) under terms that do not require repayment.

A. Federal Policy and Guidance

1. Cooperative Agreement Recipients: By awarding this cooperative agreement, the Environmental Protection Agency

(EPA) has approved the application for the Cooperative Agreement Recipient (CAR). These T&Cs are effective for activities occurring after the date of July 1, 2023 of this cooperative agreement.

2. In implementing this agreement, the CAR shall comply with and require that work done by borrowers and subgrantees with cooperative agreement funds comply with the requirements of CERCLA § 104(k). The CAR shall also ensure that cleanup activities supported with cooperative agreement funding comply with all applicable federal and state laws and regulations. The CAR must ensure cleanups are protective of human health and the environment.

3. The CAR must consider whether it is required to have borrowers or subgrantees conduct cleanups through a State or Tribal response program. If the CAR chooses not to require borrowers and subgrantees to participate in a State or

Tribal response program, then the CAR is required to consult with the EPA Project Officer on each loan or subgrant to ensure the proposed cleanup is protective of human health and the environment.

If the State or Tribe does not have a promulgated response program that is applicable to the planned brownfield activity, then the CAR is required to consult with the EPA Project Officer to ensure the protectiveness of human health and the environment.

4. A term and condition or other legally binding provision shall be included in all loan and subgrant agreements entered into with the funds awarded under this agreement, or when funds awarded under this agreement are used in combination with non-federal sources of funds, to ensure that the CAR complies with all applicable federal and state laws and requirements. In addition to CERCLA § 104(k), applicable federal laws and requirements include 2 CFR Part 200.

5. The CAR must comply with federal cross-cutting requirements. These requirements include, but are not limited to, DBE requirements found at 40 CFR Part 33; OSHA Worker Health & Safety Standard 29 CFR § 1910.120; Uniform

Relocation Act (40 USC § 61); National Historic Preservation Act (16 USC § 470); Endangered Species Act (P.L. 93-

205); Permits required by Section 404 of the Clean Water Act; Executive Order 11246, Equal Employment Opportunity, and implementing regulations at 41 CFR § 60-4; Contract Work Hours and Safety Standards Act, as amended (40

USC §§ 327-333); the Anti-Kickback Act (40 USC § 276c); and Section 504 of the Rehabilitation Act of 1973 as

4B - 00A01426 - 0 Page 7 a.

b.

a.

implemented by Executive Orders 11914 and 11250. For additional information on cross-cutting requirements visit https://www.epa.gov/grants/epa-subaward-cross-cutter-requirements.

6. The CAR must comply with Davis-Bacon Act prevailing wage requirements and associated U.S. Department of

Labor (DOL) regulations for all construction, alteration, and repair contracts and subcontracts awarded with funds provided under this agreement by operation of CERCLA § 104(g). For more detailed information on complying with

Davis-Bacon please see the Davis-Bacon Addendum to these terms and conditions.

7. For funding added after May 14, 2022, refer to the General Term & Conditions for Buy America Sourcing requirements under the Build America, Buy America (BABA) provisions of the Infrastructure Investment and Jobs Act

(IIJA; also known as Bipartisan Infrastructure Law or BIL) (P.L. 117-58, §§70911-70917). An adjustment period waiver may apply to funding awarded between May 14, 2022 and February 28, 2023. The CAR can also refer to EPA’s

Frequently Asked Questions for BABA for more information.

8. The recipient agrees to have financial management and programmatic management systems in place to:

Track and report on expenditures of IIJA funds.

Track and report outputs and outcomes achieved with IIJA funds.

9. RLF supplemental funding is generally awarded on an annual basis to high-performing CARs who meet specific criteria. The CAR can find additional information on the timing and procedures for supplemental funding requests on the EPA Brownfields Program website (https://www.epa.gov/brownfields/brownfields-revolving-loan-fund-rlf-grants).

II. SITE/BORROWER/SUBGRANTEE ELIGIBILITY REQUIREMENTS

All brownfield sites that will be addressed using RLF funds must be located within the geographic boundary described in the scope of work for this cooperative agreement (i.e., the EPA-approved workplan).

A. Brownfield Site Eligibility

1. Prior to performing site work, the CAR must provide information to the EPA Project Officer about each site that will be addressed under this cooperative agreement. The CAR may use cooperative agreement funds to prepare information that is provided to the EPA Project Officer. The information that must be provided includes whether the site meets the definition of a brownfield site as defined in § 101(39) of CERCLA and whether the CAR is the potentially responsible party under CERCLA § 107, is exempt from CERCLA liability, or has defenses to CERCLA liability.

2. If the site is excluded from the general definition of a brownfield site but is eligible for a property-specific funding determination, then the CAR may request a property-specific funding determination from the EPA Project Officer. In its request, the CAR must provide information sufficient for EPA to make a property-specific funding determination on how financial assistance will protect human health and the environment, and either promote economic development or enable the creation of, preservation of, or addition to parks, greenways, undeveloped property, other recreational property, or other property used for nonprofit purposes. The CAR must not incur costs for cleaning up sites requiring a property-specific funding determination by EPA until the EPA Project Officer has advised the CAR that EPA has determined that the property is eligible.

3. Brownfield Sites Contaminated with Petroleum

For any petroleum-contaminated brownfield site that is not included in the CAR’s EPA-approved workplan, the CAR

4B - 00A01426 - 0 Page 8 b.

shall provide sufficient documentation to EPA prior to incurring costs under this cooperative agreement which documents that:

i. the State determines there is “no viable responsible party” for the site;

ii. the State determines that the person assessing, investigating, or cleaning up the site is a person who is not potentially liable for cleaning up the site; and

iii. the site is not subject to any order issued under Section 9003(h) of the Solid Waste Disposal Act.

This documentation must be prepared by the CAR or the State, following contact and discussion with the appropriate state petroleum program official. Please contact the EPA Project Officer for additional information.

Documentation must include:

i. the identity of the State program official contacted;

ii. the State official’s telephone number;

iii. the date of the contact; and

iv. a summary of the discussion relating to the State’s determination that there is no viable responsible party and that the person assessing, investigating, or cleaning up the site is not potentially liable for cleaning up the site.

Other documentation provided by a State to the recipient relevant to any of the determinations by the State must also be provided to the EPA Project Officer.

c. If the State chooses not to make the determinations described in Section II.A.3. above, the CAR must contact the EPA Project Officer and provide the information necessary for EPA to make the requisite determinations.

d. EPA will make all determinations on the eligibility of petroleum-contaminated brownfield sites located on tribal lands (i.e., reservation lands or lands otherwise in Indian country, as defined at 18 U.S.C. § 1151).

Before incurring costs for these sites, the CAR must contact the EPA Project Officer and provide the information necessary for EPA to make the determinations.

B. Borrower and Subgrantee Eligibility

1. The CAR may provide loans to an eligible entity, a site owner, a site developer, or another person without regard to whether the borrower is a for-profit organization. Borrowers do not have to own the property throughout the term of the loan unless ownership is required for the purpose of securing collateral or the CAR otherwise determines that borrower site ownership is necessary.

2. The CAR may only provide cleanup subgrants to an eligible entity or nonprofit organization to clean up sites owned by the eligible entity or nonprofit organization at the time of the award of the subgrant. Eligible subgrantees include eligible entities as defined under CERCLA § 104(k)(1), which includes nonprofit organizations exempt from taxation under Section 501(c)(3) of the Internal Revenue Code, and other nonprofit organizations as defined at 2 CFR § 200.70.

Nonprofit institutions of higher education as defined at 2 CFR § 200.55 are also eligible for cleanup subgrants.

Nonprofit organizations described in Section 501(c)(4) of the Internal Revenue Code that engage in lobbying activities

4B - 00A01426 - 0 Page 9 as defined in Section 3 of the Lobbying Disclosure Act of 1995 are not eligible for subgrants.

3. The subgrantee must retain ownership of the site throughout the period of performance of the subgrant. The subgrantee must consult with the CAR, who in turn must consult with the EPA Project Officer prior to transferring title or otherwise conveying the real property comprising the site during the period of performance of the subgrant. Once the subgrant ends, the statutory ownership requirement is extinguished. For the purposes of this agreement, the term

“owns” means fee simple title unless EPA Project Officer approves a different ownership arrangement.

4. The CAR shall not provide a subgrant to itself or another component of its own unit of government or organization.

5. The CAR may discount loans, also referred to as the practice of forgiving a portion of loan principal. For an individual loan, the amount of principal discounted may be any percentage of the total loan amount up to 50%, provided that the total amount of the principal forgiven for that loan shall not exceed $500,000 of the CAR’s total award amount (EPA funds + cost share, if applicable – see Section IV.A.1. and IV.B.3.). Eligible entities and nonprofit organizations described in Section II.B.1. are eligible for discounted loans. Private, for-profit entities are not eligible for discounted loans. In addition to these terms, a discounted loan shall not be used in combination with a subgrant at the same site. The discounted amount in a discounted loan shall apply towards non-loan costs in the 50/50 split rule described in Section IV.B.4. (i.e., the discounted amount cannot apply towards the 50% of EPA funds + cost share, if applicable – see Section IV.A.1., that must be spent on loans and associated eligible programmatic expenses). The

CAR may request a waiver of the discounted amount, discounted percentage, or the minimum 50/50 split by consulting with the EPA Project Officer for information about the waiver process. In general, a loan may not be discounted after it has already been executed. Any post-execution discounting has to be approved by the EPA Project Officer.

6. The CAR shall not loan or subgrant funds that will be used to pay for cleanup activities at a site for which a borrower or subgrantee is potentially liable under CERCLA § 107. In addition, the borrower or subgrantee may not be affiliated with a potentially liable person as described in CERCLA §§ 101(40)(H) and 107(q)(1)(A)(ii). The CAR may rely on its own investigation which can include an opinion from the borrower’s or subgrantee’s counsel. However, the

CAR must advise the borrower or subgrantee that the investigation and/or opinion of its subgrantee counsel is not binding on the Federal Government.

7. For approved eligible petroleum-contaminated brownfield sites, the borrower or subgrantee cleaning up the site must not be potentially liable for cleaning up the site. For brownfield grant purposes, an entity generally will not be considered potentially liable for petroleum contamination if it has not dispensed or disposed of petroleum or petroleumproduct at the site, has not exacerbated the contamination at the site, and taken reasonable steps with regard to the contamination at the site.

8. The CAR shall maintain sufficient documentation supporting and demonstrating the eligibility of the sites, borrowers, and subgrantees.

9. A borrower or subgrantee must submit information regarding its overall environmental compliance history including any penalties resulting from environmental non-compliance at the site subject to the loan or subgrant. The CAR, in consultation with EPA, must consider this history in its analysis of the borrower or subgrantee as a cleanup and business risk.

10. An entity that is currently suspended, debarred, or otherwise declared ineligible cannot be a borrower or subgrantee.

C. Obligations for CARs, Borrowers, or Subgrantees

4B - 00A01426 - 0 Page 10

1. CARs, borrowers, or subgrantees who are eligible, or seek to become eligible, to receive a loan or subgrant must provide information indicating that cooperative agreement funds will not be used to pay for a response cost at a site for which the CAR, borrower, or subgrantee is potentially liable under CERCLA § 107. The CAR, borrower, or subgrantee must demonstrate that it meets the requirements for one of the Landowner Liability Protections as either a Bona Fide

Prospective Purchaser (BFPP), Contiguous Property Owner (CPO), or Innocent Landowner (ILO). These requirements include certain threshold criteria and continuing obligations that must be met in order for the CAR, borrower, or subgrantee to maintain its eligible status. If the CAR, borrower, or subgrantee fails to meet these obligations, EPA may disallow the costs incurred under this cooperative agreement for cleaning up the site under CERCLA § 104(k)(8)(C).

The Landowner Liability Protection requirements include:

a. Performing “all appropriate inquiries” into the previous ownership and uses of the property before acquiring the property.

b. Not being potentially liable or affiliated with any other person who is potentially liable for response costs at the site through: any direct or indirect familial relationship, any contractual, corporate, or financial relationship, or through the result of a reorganized business entity that was potentially liable.

While not necessary to obtain ILO protection, the CAR, borrower, or subgrantee must still establish by a preponderance of the evidence that the act or omission that caused the release or threat of release of hazardous substances and any resulting damages were caused by a third party with whom the person does not have an employment, agency, or contractual relationship.

c. Demonstrating that no disposal of hazardous substances occurred at the facility after acquisition by the landowner (does not specifically apply for the CPO protection).

d. Taking “reasonable steps” with respect to hazardous substance releases by stopping any continuing releases, preventing any threatened future releases, and preventing or limiting human, environmental, or natural resource exposure to any previously released hazardous substance.

e. Complying with any land use restrictions established or relied on in connection with the response action at the site and not impeding the effectiveness or integrity of institutional controls employed in connection with the response action.

f. Providing full cooperation, assistance, and access to persons that are authorized to conduct response actions or natural resource restoration at the site from which there has been a release or threatened release.

g. Complying with information requests and administrative subpoenas (does not specifically apply for the ILO protection).

h. Providing all legally required notices with respect to the discovery or release of any hazardous substances at the site (does not specifically apply for the ILO protection).

Notwithstanding the CAR’s, borrower’s, and subgrantee’s continuing obligations under this agreement, the CAR, borrower, and subgrantee are subject to the applicable liability provisions of CERCLA governing its status as a BFPP, CPO, or ILO. CERCLA requires additional obligations to maintain the liability limitations for BFPP, CPO, and ILO; the relevant provisions for these obligations include §§ 101(35), 101(40), 107(b), 107(q) and 107(r).

CARs, borrowers, and subgrantees that are exempt from CERCLA liability or do not have to meet the requirements for asserting an affirmative defense to CERCLA liability must also comply with continuing obligation items c.-h.

4B - 00A01426 - 0 Page 11

III. GENERAL COOPERATIVE AGREEMENT ADMINISTRATIVE REQUIREMENTS

A. Sufficient Progress

1. This condition supplements the requirements of the Termination and Sufficient Progress Conditions in the General

Terms and Conditions.

The EPA Project Officer will assess whether the recipient is making sufficient progress in implementing its cooperative agreement 2 years from the date of award and on an annual basis thereafter. If EPA determines that the CAR has not made sufficient progress in implementing its cooperative agreement, the CAR, if directed to do so, must implement a corrective action plan concurred on by the EPA Project Officer and approved by the Grants Management Officer or

Award Official. Alternatively, EPA may terminate this agreement under 2 CFR § 200.340. for material non-compliance with its terms, or with the consent of the CAR as provided at 2 CFR § 200.340, depending on the circumstances.

Sufficient progress at 2 years and annually thereafter is indicated by the CAR having made a loan(s) and/or grant(s), but may also be demonstrated by a combination of all the following: hiring of all key personnel, the establishment and advertisement of the RLF, the development of one or more potential loans/subgrants, or other documented activities that demonstrate to EPA’s satisfaction that the CAR will successfully perform the cooperative agreement.

2. Partial termination can occur if a CAR fails to complete the initial round of lending in the time schedule provided in the cooperative agreement. In this situation, as provided at 2 CFR §§ 200.340(a)(1) and (5) or 2 CFR § 200.340(a)(3), as appropriate, the agreement may be partially terminated and the following actions may occur:

a. Unused cooperative agreement funds will be deobligated by EPA;

b. The cooperative agreement award may be amended to reflect the reduced amount of the cooperative agreement;

c. EPA may determine whether sufficient funds remain to permit effective RLF operation; or

d. EPA may terminate the agreement and recover the federal share of its assets if it determines that the purpose of the cooperative agreement cannot be met.

B. Substantial Involvement

1. The EPA Project Officer will be substantially involved in overseeing and monitoring this cooperative agreement.

Substantial involvement, includes, but is not limited to:

a. Close monitoring of the CAR’s performance to verify compliance with the EPA-approved workplan and achievement of environmental results.

b. Participation in periodic telephone conference calls to share ideas, project successes and challenges, etc., with EPA.

c. Reviewing and commenting on quarterly and annual reports prepared under the cooperative agreement

(the final decision on the content of reports rests with the recipient or subrecipients receiving pass-through awards).

d. Verifying sites meet applicable site eligibility criteria (including property-specific funding determinations described in Section II.A.2.) and when the CAR awards a subaward. The CAR must obtain technical assistance from the EPA Project Officer, or his/her designee, on which sites qualify as a brownfield site and

4B - 00A01426 - 0 Page 12 determine whether the statutory prohibitions found in CERCLA § 104(k)(5)(B)(i)-(iv) apply. (Note, the prohibition does not allow a subrecipient to use EPA cooperative agreement funds to clean up a site for which the subrecipient is potentially liable under CERCLA § 107.)

e. Reviewing and approving Quality Assurance Project Plans and related documents or verifying that appropriate Quality Assurance requirements have been met where quality assurance activities are being conducted pursuant to an EPA-approved Quality Assurance Management Plan.

f. Monitoring the use of program income after the cooperative agreement project period ends.

Substantial involvement may also include, depending on the direction of the EPA Project Officer:

g. Collaboration during the performance of the scope of work including participation in project activities, to the extent permissible under EPA policies. Examples of collaboration include:

i. Consultation between EPA staff and the CAR on effective methods of carrying out the scope of work provided the CAR makes the final decision on how to perform authorized activities.

ii. Advice from EPA staff on how to access publicly available information on EPA or other federal agency websites.

iii. With the consent of the CAR, EPA staff may provide technical advice to the CAR’s contractors or subrecipients provided the CAR approves any expenditures of funds necessary to follow advice from

EPA staff. (The CAR remains accountable for performing contract and subaward management as specified in 2 CFR § 200.318 and 2 CFR § 200.332 as well as the terms of the EPA cooperative agreement.)

iv. EPA staff participation in meetings, webinars, and similar events upon the request of the CAR or in connection with a co-sponsorship agreement.

h. Reviewing and approving that the Analysis of Brownfield Cleanup Alternatives (ABCA), or equivalent state

Brownfields program document, meets the Brownfields Program’s requirements for an ABCA.

i. Reviewing proposed procurements in accordance with 2 CFR § 200.325, as well as the substantive terms of proposed contracts or subawards (i.e., both subgrants and loans) as appropriate and discussing compliance with 50/50 split rule. If applicable, the EPA Project Officer may review the substantive terms of intra-governmental loans. The EPA Project Officer may review requests for proposals, invitations for bid, scopes of work and/or plans and specifications for contracts over $250,000 prior to advertising for bids.

j. Reviewing the qualifications of key personnel. (EPA does not have the authority to select employees or contractors, including consultants, employed by the CAR or subrecipients receiving pass-through awards.)

k. Reviewing information in performance reports to ensure all costs incurred by the CAR, borrower, subgrantee, and/or its contractor(s) if needed to ensure appropriate expenditure of grant funds.

EPA may waive any of the provisions in Section III.B.1., except for property-specific funding determinations. The EPA

Project Officer will provide waivers to provisions a. – f. in Section III.B.1. in writing.

2. Effects of EPA’s substantial involvement include:

4B - 00A01426 - 0 Page 13

a. EPA’s review of any project phase, document, or cost incurred under this cooperative agreement will not have any effect upon CERCLA § 128 Eligible Response Site determinations or rights, authorities, and actions under CERCLA or any federal statute.

b. The CAR remains responsible for ensuring that all cleanups are protective of human health and the environment and comply with all applicable federal and state laws. If changes to the expected cleanup become necessary based on public comment or other reasons, the CAR must consult with the EPA Project Officer and the State.

c. The CAR and its subrecipients remain responsible for ensuring costs are allowable under 2 CFR

Part 200, Subpart E.

C. Cooperative Agreement Recipient Roles and Responsibilities

1. All additional sites selected for eligible activities throughout the period of performance (i.e., sites that were not identified in the workplan) must be located within the geographic boundary(ies) identified by the CAR in the workplan. Consistent with the FY23 RLF Grant Guidelines and FY23 RLF Supplemental Funding Instructions, criteria for selecting additional sites must at least consider whether the site is located within an underserved community[1] in addition to considering the prioritization criteria identified in the FY23 application, FY23 RLF Supplemental Funding request, the workplan, or developed during implementation of the workplan. Note, subgrant criteria developed during the implementation of the workplan must lead to the CAR addressing sites in areas with similar characteristics as the areas discussed in the FY23 application or supplemental funding request.

2. CARs, other than state entities, that procure a contractor(s) (including consultants) where the contract will be more than the micro-purchase threshold in 2 CFR § 200.320(a)(1) ($10,000 for most CARs) must select the contractor(s) in compliance with the fair and open competition requirements in 2 CFR Part 200 and 2 CFR Part 1500. This requirement also applies to procurement processes that were completed before the award of this cooperative agreement. See the

Brownfields Grants: Guidance on Competitively Procuring a Contractor for additional information.

CARs may procure multiple contractors to ensure the appropriate expertise is in place to perform work under the agreement (e.g., expertise to provide oversight on site cleanup activities vs. community engagement) and to allow the ability for work be performed concurrently at multiple sites within the defined and approved geographic boundary.

3. The CAR is responsible for establishing an RLF team that will implement the program and assign a Program

Manager for coordinating the team’s activities as outlined below.

4. The CAR must acquire the services of a Qualified Environmental Professional(s) as defined in 40 CFR § 312.10, if it does not have such a professional on staff, to provide technical assistance, advice, and expertise to the CAR while the borrower or subgrantee and their cleanup contractor direct the cleanup at a given site.

5. The CAR shall act as or appoint a qualified “fund manager” to carry out responsibilities that relate to financial management of the loan and/or subgrant program. However, the CAR remains accountable to EPA for the proper expenditure of cooperative agreement funds. Any funding arrangements between the CAR and the fund manager must be consistent with 2 CFR Parts 200 and 1500 and EPA’s Subaward Policy. Additional information is available in EPA’s

Best Practice Guide for Procuring Services, Supplies, and Equipment Under EPA Assistance Agreements.

6. The CAR shall appoint appropriate legal counsel if counsel is not already available. Counsel must review all loan/subgrant agreements prior to execution unless the EPA Project Officer waives this requirement.

4B - 00A01426 - 0 Page 14

7. The CAR is responsible for ensuring that borrowers and subgrantees comply with the terms of their agreements with the CAR, and that agreements between the CAR and borrowers and subgrantees are consistent with the terms and conditions of this agreement.

8. When the CAR makes loans and subgrants under this agreement, they become a pass-through entity for the purposes of the subrecipient oversight and management requirements of 2 CFR §§ 200.331 through 200.332.

Requirements for oversight and management of subgrantees are supplemented in EPA’s National Term and Condition for Subawards which is included in the General Terms and Conditions of this Cooperative Agreement.

9. The following requirements apply when a pass-through entity (CAR) makes loans. These requirements apply to loans and borrowers in lieu of those specified in EPA’s National Term and Condition for Subawards.

a. Pass-through entities must establish and follow a system that ensures all loan agreements are in writing and contain all of the elements required by 2 CFR § 200.332(a) with the exception of the indirect cost provision of 2 CFR § 200.332(a)(4). EPA has developed an optional template for subaward agreements that is available in Appendix D of EPA’s Subaward Policy which may also be used for loan agreements.

b. Borrowers must comply with the internal control requirements specified at 2 CFR § 200.303 and are subject to the 2 CFR Part 200, Subpart F, Audit Requirements. The pass-through entity (CAR) must include a condition in all loans that requires borrowers to comply with this requirement. No other provisions of the

Uniform Grant Guidance, including the Procurement Standards, apply directly to borrowers.

c. Prior to making loans or subgrants, the pass-through entity (CAR) must ensure that each borrower or subgrantee has a “unique entity identifier.” This identifier is required for registering in the System for Award

Management (SAM) and by 2 CFR Part 25 and 2 CFR § 200.332(a)(1), but based on 2 CFR § 25.300, borrowers and subgrantees do not have to register in SAM. The unique entity identifier (UEI) is generated when an entity registers in SAM. Information on registering in SAM and obtaining a UEI is available in the

General Condition of the pass-through entity’s (CAR’s) agreement with EPA entitled “System for Award

Management and Universal Identifier Requirements.”

d. The pass-through entity (CAR) must ensure that the terms of all loan agreements and subgrants require that borrowers and subgrantees comply with 2 CFR Part 170, Reporting Subaward and Executive

Compensation under Federal Funding Accountability and Transparency Act (FFATA) set forth in the General

Condition of the pass-through entity’s (CAR’s) agreement with EPA entitled “Reporting Subawards and

Executive Compensation.”

e. In addition to other prudent lending practices described, in Section VI. below, pass-through entities

(CARs) must comply with EPA’s General T&Cs (Establishing and Managing Subawards).

10. As the pass-through entity, the CAR must report to EPA on its borrower and subgrantee monitoring activities under

2 CFR § 200.332(d), including the following information as part of the CAR’s quarterly performance reporting:

a. Summaries of results of reviews of financial and programmatic reports;

b. Summaries of findings from site visits and/or desk reviews to ensure effective borrower or subgrantee performance;

c. Environmental results the borrower or subgrantee achieved;

4B - 00A01426 - 0 Page 15

d. Summaries of audit findings and related pass-through entity management decisions, if any; and

e. Actions the pass-through entity has taken to correct any deficiencies such as those specified at 2 CFR §

200.332(e), 2 CFR § 200.208, Specific conditions, and the 2 CFR § 200.339, Remedies for Noncompliance.

12. Cybersecurity – The recipient agrees that when collecting and managing environmental data under this cooperative agreement, it will protect the data by following all applicable State or Tribal law cybersecurity requirements.

a. EPA must ensure that any connections between the recipient’s network or information system and EPA networks used by the recipient to transfer data under this agreement are secure. For purposes of this section, a connection is defined as a dedicated persistent interface between an Agency IT system and an external IT system for the purpose of transferring information. Transitory, user-controlled connections such as website browsing are excluded from this definition.

If the recipient’s connections as defined above do not go through the Environmental Information Exchange

Network or EPA’s Central Data Exchange, the recipient agrees to contact the EPA Project Officer no later than 90 days after the date of this award and work with the designated Regional/ Headquarters Information

Security Officer to ensure that the connections meet EPA security requirements, including entering into

Interconnection Service Agreements as appropriate. This condition does not apply to manual entry of data by the recipient into systems operated and used by EPA’s regulatory programs for the submission of reporting and/or compliance data.

b. The recipient agrees that any subawards it makes under this agreement will require the subrecipient to comply with the requirements in Cybersecurity Section a. above if the subrecipient’s network or information system is connected to EPA networks to transfer data to the Agency using systems other than the

Environmental Information Exchange Network or EPA’s Central Data Exchange. The recipient will be in compliance with this condition: by including this requirement in subaward agreements; and during subrecipient monitoring deemed necessary by the recipient under 2 CFR § 200.332(d), by inquiring whether the subrecipient has contacted the EPA Project Officer. Nothing in this condition requires the recipient to contact the EPA Project Officer on behalf of a subrecipient or to be involved in the negotiation of an

Interconnection Service Agreement between the subrecipient and EPA.

13. All geospatial data created must be consistent with Federal Geographic Data Committee (FGDC) endorsed standards. Information on these standards may be found at www.fgdc.gov.

D. Quarterly Performance Reports

1. In accordance with EPA regulations 2 CFR Parts 200 and 1500 (specifically, § 200.329, Monitoring and Reporting

Program Performance), the CAR agrees to submit quarterly performance reports to the EPA Project Officer within 30 days after each reporting period. The reporting periods are October 1 – December 31 (1st quarter); January 1 – March

31 (2nd quarter); April 1 – June 30 (3rd quarter); and July 1 – September 30 (4th quarter).

These reports shall cover work status, work progress, difficulties encountered, preliminary data results and a statement of activity anticipated during the subsequent reporting period, including a description of equipment, techniques, and materials to be used or evaluated. A discussion of expenditures and financial status for each workplan task, along with a comparison of the percentage of the project completed to the project schedule and an explanation of significant discrepancies from the EPA-approved workplan and budget shall be included in the report. The report shall also include any changes of key personnel concerned with the project that were approved by the EPA Grants Management

4B - 00A01426 - 0 Page 16

Officer or Award Official. (Note, as provided at 2 CFR § 200.308, Revision of budget and program, the CAR must seek prior approval from the EPA Grants Management Officer or Award Official for a change in a key person.)

The CAR shall refer to and utilize the Quarterly Reporting function within the Assessment, Cleanup and

Redevelopment Exchange System (ACRES) to submit quarterly reports.

2. The CAR must submit performance reports on a quarterly basis in ACRES using the Revolving Loan Fund

Quarterly Report function. Quarterly performance reports must include:

a. A summary that clearly differentiates between activities completed with EPA funds provided under the

Brownfield RLF cooperative agreement, and related activities completed with other sources of leveraged funding.

b. A summary and status of approved activities performed during the reporting quarter; a summary of the performance outputs/outcomes achieved during the reporting quarter; and a description of problems encountered during the reporting quarter that may affect the project schedule.

c. A comparison of actual accomplishments to the anticipated outputs/outcomes specified in the EPA-approved workplan and reasons why anticipated outputs/outcomes were not met.

d. An update on the project schedule and milestones, including an explanation of any discrepancies from the

EPA-approved workplan.

e. A list of the loans and/or subgrants during the reporting quarter.

f. The amount of the cooperative agreement’s total award amount (EPA funds + cost share, if applicable – see Section IV.A.1.) that has been committed thus far on loan costs and non-loan costs, respectively, and whether the cooperative agreement is expected to meet the 50/50 split by the end of the cooperative agreement project period for the cooperative agreement’s current total award amount.

g. A budget summary table with the following information: current approved project budget; EPA funds drawn down during the reporting quarter; costs drawn down to date (cumulative expenditures); program income generated and used (e.g., program income received and disbursed during the reporting quarter and during the entire cooperative agreement, and the amount of program income remaining); and total remaining funds. The budget summary table must include costs that are charged to the “other” budget object class category (e.g., subawards, etc.).

The CAR shall include an explanation of any discrepancies in the budget from the EPA-approved workplan, cost overruns or high unit costs, and other pertinent information. Program income accounting records must differentiate program income generated from interest and fees, versus program income generated from principal repayments. The CAR shall include a statement on funding transfers[2] among direct budget categories or programs, functions and activities that occurred during the quarter and cumulatively during the period of performance.

h. For local governments that are using RLF funding for health monitoring, the quarterly report must also include the specific budget, the quarterly expenditure, and cumulative expenditures to demonstrate that 10% of federal funding is not exceeded.

Note: Each property where cleanup activities were performed and/or completed must have its corresponding

4B - 00A01426 - 0 Page 17 information updated in ACRES (or via the Property Profile Form with prior approval from the EPA Project Officer) prior to submitting the quarterly performance report (see Section III.E. below).

3. For the loans executed by the CAR under this agreement, the CAR must also report on the following items as part of the CAR’s quarterly performance reporting:

a. Summaries of results of reviews of borrower financial and programmatic reports.

b. Environmental results achieved by the borrower.

4. The CAR must maintain records that will enable it to report to EPA on the amount of funds (direct EPA funding and program income) disbursed by the CAR to clean up specific properties under this cooperative agreement.

5. In accordance with 2 CFR § 200.329(e)(1), the CAR agrees to inform EPA as soon as problems, delays, or adverse conditions become known which will materially impair the ability to meet the outputs/outcomes specified in the EPA-approved workplan.

E. ACRES Data Submission

1. Property Profile Form: The CAR must report on interim progress (e.g., loan signed, clean up started) and any final accomplishments (e.g., clean up completed, contaminants removed, institutional controls required, engineering controls required) by completing and submitting relevant portions of the electronic Property Profile Form using the

Assessment, Cleanup and Redevelopment Exchange System (ACRES). The CAR must enter the data in ACRES as soon as the interim action or final accomplishment has occurred, or within 30 days after the end of each reporting quarter. The CAR must enter any new data into ACRES prior to submitting the quarterly performance report to the

EPA Project Officer. The CAR must utilize the electronic version of the Property Profile Form in ACRES.

2. Brownfields RLF Form: Additionally, the CAR must also report program income details on the Brownfields RLF

Form, which is located on the CAR’s RLF cooperative agreement homepage in ACRES.

F. Final Cooperative Agreement Performance Report with Environmental Results

1. In accordance with EPA regulations 2 CFR Parts 200 and 1500 (specifically, § 200.329 Monitoring and Reporting

Program Performance and 2 CFR § 200.344(a), Closeout), the CAR agrees to…