4948_AWRF_Canopy_Coating_Repair_RFP_FINAL.pdf
PDF 945 KB Posted
- Solicitation number
- BPM007094
- Issued by
- Maricopa County, Arizona
About this file
The document is a Request for Proposal (RFP) issued by the City of Chandler, Arizona for Airport Water Reclamation Facility Canopy Coating Repair (Solicitation No. PW5-910-4948). The City is seeking proposals from qualified contractors to provide canopy coating repairs for 12 large metal canopies at the Airport Water Reclamation Facility (AWRF), located at 905 E. Queen Creek Rd. The project involves repairing canopies that have experienced significant coating degradation over their approximately 25-year lifespan. A pre-proposal conference is scheduled for August 12, 2025, at 10:00 am, with both in-person and remote attendance options, and a tour of the canopies will be provided after the meeting. Proposals are due on August 26, 2025, at 4:00 pm local Arizona time, and must be submitted via email. The contract term is set for 365 calendar days from the date the contractor is notified to proceed.
The RFP includes a detailed pricing proposal page with line items for different facility areas, including Aeration Basins, Clarifiers (1-3, 4, 5-6, 7, and 8), and Filters and EQ Basin. Contractors are required to provide pricing for the top of canopies, underneath canopies, and canopy support structures for each area. The City reserves the right to award all or a portion of the canopies based on cost and available funds. The evaluation criteria will weigh qualifications and experience at 40%, method of approach at 35%, and price proposal at 25%. The coating work will involve surface preparation, epoxy and polyurethane coating applications, and must meet specific technical specifications, including using Tnemec or Sherwin Williams products. The contractor must provide a 5-year material warranty and a 5-year workmanship warranty.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4948__Addendum_One_FINAL.pdf | ||
| 4948_Addendum_Three_FINAL.pdf | ||
| 4948_Addendum_Two_FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CHANDLER
NOTICE OF REQUEST FOR PROPOSAL PW5-910-4948
SOLICITATION TITLE: AIRPORT WATER RECLAMATION FACILITY CANOPY
COATING REPAIR
SOLICITATION NO.: PW5-910-4948
PROPOSAL DUE DATE: August 26, 2025
PROPOSAL DUE TIME: 4:00 pm local Arizona time
SUBMIT TO: Via email to:
raquel.mcmahon@chandleraz.gov
Email and attachments may not exceed 50 MB
PRE-PROPOSAL CONFERENCE: August 12, 2025
10:00 am local Arizona time
IN PERSON CONFERENCE ATTTENDANCE: Airport Water Reclamation Facility
905 E. Queen Creek Rd., Chandler 85286
A tour of the canopies will be provided after the meeting. Interested contractors are encouraged to attend.
REMOTE CONFERENCE ATTENDANCE
(COPY AND PASTE TO BROWSER)
https://chandleraz.webex.com/chandleraz/j.php?
MTID=m02f6d742531fdc9e299d01b02ba3a4d5
Dial In Number: 415-655-0001
Meeting Number: 2662 979 5659
CONTACT: Raquel McMahon, CPPB
Procurement Officer
Phone: (480) 782-2407
Email: raquel.mcmahon@chandleraz.gov
ISSUE DATE: July 30, 2025
Proposals for the commodity or service specified will be received by the Purchasing Division, City of
Chandler, via email to raquel.mcmahon@chandleraz.gov, until the time and date cited above. The
City does not accept proposals submitted through the Arizona Procurement Portal. Proposals must be submitted via email to the Procurement Officer.
Proposals must be received in the email inbox of the responsible Procurement Officer on or prior to the exact time and date indicated above.
Instructions for preparing proposals are provided on the following pages.
RFP Summary: The City is requesting proposals from qualified offerors to provide the City with canopy coating repairs pursuant to the attached agreement.
INFORMATION AND INSTRUCTIONS TO PROPOSERS
1. Vendor Registration. Proposers must register via the on-line vendor registration system to automatically receive notification of addenda to this solicitation or notice of other solicitation opportunities. Visit https://www.chandleraz.gov/business/vendor-services/purchasing, select Vendor Registration and Management.
2. Addendum. This RFP may only be modified by a written addendum. Proposers are responsible for obtaining all addenda. A Proposer must not rely on verbal responses to inquiries. A verbal reply to an inquiry does not constitute a modification of the solicitation.
3. Late Proposals. Late proposals will not be accepted. It is the sole responsibility of the
Proposer to ensure that its proposal is received at or prior to the exact date and time indicated on the Notice Page. The time stamp of the City’s email system will govern timeliness of submission.
4. Cost of Proposal Preparation. The City will not reimburse any Proposer the cost of responding to a solicitation.
5. Duty to Examine. It is the responsibility of each Proposer to examine the entire solicitation, seek clarification and make inquiries, and examine its proposal for accuracy before submitting it. Lack of care in preparing a proposal will not be grounds for modifying or withdrawing the proposal after the due date and time, nor will it give rise to any claim.
6. Inquiries. Any inquiry related to this solicitation, including any requests for or inquiries regarding standards referenced in the solicitation must be directed solely to the
Procurement Officer listed on the cover page of the solicitation. Proposers will not contact or direct inquiries concerning this solicitation to any other City employee unless the solicitation specifically identifies a person other than the Procurement Officer as a contact.
All inquiries, except those at the Pre-Proposal Conference, should be submitted in writing and refer to the appropriate solicitation number, page and paragraph. The City will consider the relevancy of all inquiries but is not required to respond in writing.
Any inquiry must be submitted as soon as possible and should be submitted at least ten days before the proposal due date and time for review and determination by City. Failure to do so may result in the inquiry not being addressed in a solicitation addendum.
7. Remote Attendance at Pre-Proposal Conference. The City may offer remote attendance at the Pre-Proposal Conference via a City-hosted dial-in meeting. If remote attendance is offered, meeting details will be provided on the Notice Page. Interested Offerors attending remotely may be required to register and provide, at a minimum, attendee name and company name.
Remote attendance is provided as a courtesy. Attendees are responsible for all aspects of their attendance. The City will not provide technical support for remote attendance.
https://www.chandleraz.gov/business/vendor-services/purchasing https://www.chandleraz.gov/business/vendor-services/purchasing
8. Exceptions to the Solicitation. Any exception to the solicitation must be submitted as soon as possible and should be submitted at least ten days before the proposal due date and time for review and determination by City. Failure to do so may result in the exception not being addressed in a solicitation addendum.
9. Proposal Amendment or Withdrawal. A proposal may be withdrawn at any time before the due date and time. A proposal may not be amended or withdrawn after the due date and time except as otherwise provided by applicable law.
10. Unit Price Prevails. In the case of discrepancy between the unit price or rate and the extension of that unit price or rate, the unit price or rate will govern.
11. Non-Collusion and Non-Discrimination. By signing and submitting the proposal, the
Proposer certifies that the Proposer did not engage in collusion or other anti-competitive practices in connection with the preparation or submission of its proposal; and the
Proposer does not discriminate against any employee or applicant for employment or person to whom it provides services because of race, color, religion, age, sex, national origin, or disability, and that it complies with all applicable Federal, state and local laws and executive orders regarding employment.
12. Waiver and Rejection Rights. The City reserves the right to waive any immaterial defect or informality; or reject any or all proposals, or portions thereof; or reissue the Request for
Proposal; and will be the sole judge of the merits of the proposals received.
13. Proposal Opening. Proposals will be opened as indicated on the Notice Page, unless amended in writing by the Procurement Officer issuing the solicitation. The name of each
Proposer will be public information following the proposal opening. No other information will be publicly disclosed at that time.
14. Public Record. All proposals submitted in response to this solicitation and all evaluation related records will become property of City and will become a matter of public record for review, subsequent to publication by the City of the proposed award in the agenda for the
City Council Meeting, or upon award by the appropriate approving authority or as otherwise required by law.
15. Confidential Information. A request for nondisclosure of data such as trade secrets or other proprietary information must be submitted with the proposal and must contain the basis for the request. Any information included in the request must be submitted as a separate file. Price is not confidential and will not be withheld. A blanket statement of confidentiality will not be considered. It is the Proposer’s responsibility to identify and segregate the information in the proposal provided to the City.
The City will review all requests for confidentiality and may approve or deny all or portions of the request. Information denied confidentiality will be released as public information. In the event of a public records request for information granted confidentiality, the City will endeavor provide 48-hours’ notice before releasing materials in order for the Proposer to apply for a court order blocking the release of the information.
16. Proposal Acceptance Period. All proposals will remain valid for 120 days after the day of the opening of proposals. The City may, at its sole discretion, release any proposal and return any security (as applicable) prior to that date. No Proposer may withdraw a proposal during this period without written permission from the City. Should any Proposer refuse to enter into an agreement, under the terms and conditions of the procurement, the
City may retain any security (as applicable) as liquidated damages.
17. Discussions with Proposers and Revisions to Proposals. Discussions and additional investigations may be conducted with responsible Proposers who submit proposals determined to be reasonably susceptible of being selected for award for the purpose of clarification to assure full understanding of, and responsiveness to, the solicitation requirements. Proposers will be accorded fair and equal treatment with respect to any opportunity for discussion and revision of proposals, and such revisions may be permitted after submissions and prior to award for the purpose of obtaining best and final proposals.
In conducting discussions, there will be no disclosure of any information derived from proposals submitted by competing Proposers. The purposes of such discussions will be to:
determine in greater detail such Proposer’s qualifications; explore with the Proposer the scope and nature of the project, the Proposer’s proposed method of performance, and the relative utility of alternate methods of approach; determine that the Proposer will make available the necessary personnel and facilities to perform within the required time;
agreeing upon compensation, which is fair and reasonable, taking into account the estimated value of the required services, and the scope, complexity and nature of such services.
18. Clarifications. City reserves the right to obtain Proposer clarifications where necessary to arrive at full and complete understanding of Proposer’s product, service, and solicitation response. Clarification means a communication with a Proposer for the purpose of eliminating ambiguities in the proposal and does not give Proposer an opportunity to revise or modify its proposal.
19. Agreement Negotiations. City reserves the right to conduct exclusive or concurrent negotiations with responsible Proposer(s) for the purpose of agreeing to the conditions, terms and price of the proposed agreement unless prohibited. Proposers will be accorded fair and equal treatment in conducting negotiations and there will be no disclosure of any information derived from proposals submitted by competing Proposers. Exclusive or concurrent negotiations will not constitute an agreement award nor will it confer any property rights to the successful Proposer. In the event the City deems that negotiations are not progressing, the City may formally terminate these negotiations and may enter into subsequent concurrent or exclusive negotiations with the next most qualified Proposer(s).
20. Payment. Proposers may agree to accept the City Procurement Card (Mastercard) for payment. Proposers should indicate on the Proposer Information and Offer Section of this
RFP, their willingness to accept City Procurement Card payments. The inability to accept payment by City Procurement Card will not disqualify a Proposer’s response.
Proposers may also agree to accept other traditional payment methods, including automated clearinghouse (ACH). Payment terms for traditional payment methods are Net
30 upon receipt of an accurate invoice. Proposers may propose additional discounts for early payment within their proposal.
21. Local Business Consideration. Where the Chandler Administrative Regulation MS-16
Local Business Consideration is applicable, any applicable Chandler Transaction Privilege
Tax will be deducted from the net cost for the purpose of evaluation.
22. Protests. A protest must be in writing and be filed with the Purchasing Division. Filed means delivery to the Procurement Officer or Procurement and Supply Senior Manager, whichever is applicable. A time and date of receipt will be documented in a verifiable manner for purposes of filing.
A protest must include:
a. The name, address, telephone number and email address of the protester;
b. The signature of the protester or its representative;
c. Identification of the solicitation or contract number;
d. A detailed statement of the legal and factual grounds of the protest including copies of relevant documents; and
e. The form of relief requested.
A protest based upon alleged improprieties in a solicitation that are apparent before the solicitation due date must be filed not less than five calendar days before the solicitation due date.
A protest of a proposed award requiring City Council approval must be filed within five calendar days of the first posting of the award recommendation on the Purchasing Division website or the City Clerk’s website, whichever occurs first. If the deadline for filing a protest occurs on a weekend or holiday, the protest must be filed the next business day.
A protest of an award not requiring City Council approval must be filed within ten days after the protester knows or should have known the basis of the protest.
23. Award. Unless otherwise provided in this solicitation, the City reserves the right to make multiple awards, award by item, group or as a total, as is deemed most advantageous to the City.
24. Execution of Agreement. Within ten days of notice that Proposer is the recommended awardee, Proposer will execute and return the Agreement to Purchasing.
25. Persons with Disabilities. Persons with a disability may request a reasonable accommodation, such as a sign language interpreter, by contacting the Procurement
Officer. Requests must be made as early as possible to allow time to arrange the accommodation.
PROPOSAL CONTENT
Proposers must submit one copy of the proposal via email to the responsible Procurement
Officer. The REQUEST FOR PROPOSAL TITLE, NUMBER AND OFFEROR NAME should be in the subject line of the email. Emails and attachments may not exceed 50 MB in size. Attachments should be in .pdf format and named with the RFP number and Offeror name. A single email is preferred, however multiple emails are permissible provided that all are received prior to the due date and time.
Proposals should include the following information in the order listed:
1. Completed Proposer Information and Offer Section. Complete and submit the Proposer
Information and Offer Section in the format provided in this solicitation. Failure to do so may result in the proposal being rejected as non-responsive. The Proposer Information and
Offer Section within the solicitation must include a signature by a person authorized to sign the proposal. The signature must signify the Proposer’s intent to be bound by its Proposal and the terms of the solicitation and that the information provided is true, accurate and complete.
2. Responses to Proposal Evaluation Criteria. Submit information requested in the
Evaluation Criteria Section provided in this solicitation. Forms, such as pricing forms, must be completed in the format provided in the solicitation. Failure to do so may result in the proposal being rejected as non-responsive.
3. Exceptions to Agreement. The City’s standard Agreement is included as a part of this solicitation. By submitting a proposal, the Proposer acknowledges having reviewed the
Agreement. Any exceptions to the Scope of Work or Specifications or to Agreement terms and conditions must be included with the proposal and be clearly identified. Exceptions not included in the proposal may not be introduced in the future. Any exceptions to the
Scope of Work, Specifications or the Agreement language will be considered and included in City’s evaluation of the proposal. A proposal that takes exception to a material requirement of any part of the Scope of Work, Specifications or Agreement language may be rejected as non-responsive.
4. Disclosure. If the Proposer has been debarred, suspended or otherwise lawfully precluded from participating in any public procurement activity, including being disapproved as a subcontractor with any Federal, state or local government, or if any such preclusion is currently pending, the Proposer must make disclosure. In the proposal, the
Proposer must include information including the name and address of the governmental entity, the effective date and duration of this suspension or debarment, and the relevant circumstances. The City reserves the right to reject a proposal received from a Proposer, including each of its principals, who is currently debarred, suspended or otherwise lawfully prohibited from any public procurement activity.
PROPOSER INFORMATION AND OFFER SECTION
Company Name
Business Type (Corporation, Partnership, etc.)
State of Incorporation (if applicable)
Federal Tax I.D. No.
Address
City, State, Zip
Authorized Signature
Name and Title
Contact Name
Title
Telephone
Chandler Transaction Privilege Tax (TPT)
No. (if applicable) Date of issue:
Is proposed purchase subject to TPT? _______yes _______no
Will you accept a City Procurement Card
(MasterCard) for payment of invoices? _______yes _______no
If you accept a MasterCard for payment, do you charge a fee?
_______yes _______no If yes, what is the fee?______
Will you accept automated clearinghouse
(ACH) for payment of invoices? _______yes _______no
Prompt Payment Terms Offered _______% Net _________ days
Disclosure of Debarment or Suspension
_______yes _______no
(If yes, please attach description of the circumstances)
Exceptions Taken
_______yes _______no
(If yes, please attach a clearly identified section)
Date Addendum #1
Acknowledged/Received
Date Addendum #2
Acknowledged/Received
Date Addendum #3
Acknowledged/Received
SCOPE OF WORK
BACKGROUND
The City of Chandler is requesting proposals for a qualified contractor to provide all labor, materials and equipment necessary to repair canopy coating at its Airport Water Reclamation
Facility located at 905 E. Queen Creek Rd. Chandler, AZ, 85286. The existing coatings are approximately 25 years old.
A tour of the canopies will be provided after the pre-proposal meeting. It is highly recommended potential contractors attend in person to view the sites as this is likely the only opportunity to view them.
The Airport Water Reclamation Facility (AWRF) features 12 large metal canopies, some of which have been in service since 1998. These structures provide critical coverage for wastewater treatment infrastructure and help minimize glare that could affect aircraft pilots during takeoff and landing at the nearby Chandler Airport. Due to their proximity to wastewater processes and chemical storage areas, the canopies have experienced significant coating degradation over time.
This deterioration threatens both the structural integrity and aesthetic appearance of the canopies. To maintain their protective function and extend their service life, the City is seeking proposals from qualified contractors to perform coating restoration, including surface preparation, recoating, and spot repairs, in accordance with industry standards for corrosion protection and durability.
GENERAL
Contractor Identification: Contractor will have signs (magnetic is acceptable) on the doors of all vehicles with identifying company name. All employees working for the contractor in Chandler will have ID Badges and wear company uniforms on their person when on city property.
Work Area: Contractor shall keep the work area safe for all during performance of the work.
Contractor shall, upon completion of the work, leave the site in a neat and clean condition as determined by the City. Contractor shall be responsible for preventing overspray to any surface, vehicle, or property.
TECHNICAL SPECIFICATIONS
SECTION 09900
PAINTING
1. DESCRIPTION
A. Scope:
1. Coating rehabilitation of the top and bottom sides of the previously coated aluminum ceiling panels and all support structure of Aeration, Clarifier and Filter Basin & EQ Basin Canopies located at the Chandler AWRF Site, 905 Queen Creek Road Chandler, AZ 85286.
2. Existing coatings on the canopies are approximately 25 years old.
3. Timeline for completion approximately one (1) year after work has started.
4. Coating manufacturer shall provide a 5-year material warranty.
5. Painter shall provide a 5-year workmanship warranty.
B. Coordination:
1. Coordinate the painting of areas that could be inaccessible if repairs have been completed.
2. Coordinate primers with finish paint materials in order to provide primers that are compatible with finish paint materials used. Review other sections where primed surfaces are provided, to ensure compatibility of the total painting system for the various surfaces and environment service exposures.
2. REFERENCES STANDARDS
ASTM International (ASTM)
1. ASTM D 16, Standard Terminology Relating to Paint, Varnish, Lacquer and Related
Products
2. ASTM D 3960, Practice for Determining Volatile Organic Compound (VOC) Content of
Paints and Related Coating
3. ASTM D 4228 Standard Practice for Qualification of Coating Applicators for
Application of Coatings to Steel Surfaces
NACE International (NACE)
1. NACE Publication 6D-173 A Manual for Painter Safety
The Society for Protective Coatings (SSPC)
1. SSPC-SP WJ-4/NACE WJ-4 – Light Cleaning
2. SP 2 (Hand Tool Cleaning)
3. SP 3 Power Tool Cleaning)
4. SSPC Painting Manuel Volume 1-Good Painting Practice Structures
5. SSPC - Volume 2, Systems and Specifications
6. SSPC Guide 6 - Containing Debris Generated During Paint Removal Operation
7. SSPC PA Guide 11 Protecting Corners, Edges, Crevices, and Irregular Steel Geometries by
Stripe Coating
Ensure that all referenced standards and standards that may be added later are used according that standard’s most current format.
3. DEFINITIONS
C. Definitions: Specific coating terminology used in this Section shall be in accordance with the definitions in ASTM D 16, ASTM D 3960 and the following definitions:
1. The term "paint" includes pretreatment and all painting system materials, such as primer, emulsion, enamel, organic/inorganic polymer coating, stain sealer and filler, and other applied materials whether used as prime, filler, intermediate or finish coats.
2. Field Coat: The application or the completion of application of the coating system after installation of the surface at the site of the Work.
3. Stripe Coat A “stripe coat” is a layer of coating applied to specific areas such as edges, welds, outside corners, bolt heads and threads, nuts, and crevices, to provide additional barrier protection. The stripe coat may be applied either before or after a layer of coating (often called a “full coat”) is applied over the entire surface being coated.
4. Shop Coat: One or more coats applied in a shop or plant prior to shipment to the site of erection or fabrication, where the field or finishing coat is applied.
5. Barrier Coat: A physical barrier, i.e. coating, between the substrate and its environment by keeping oxygen, moisture and other chemicals away from the substrate
6. Volatile Organic Compound (VOC) Content: The portion of the coating that is a compound of carbon, is photochemically reactive, and evaporates during drying or curing, expressed in grams per liter or pounds per gallon.
7. Touch-Up Painting: The application of paint on areas of painted surfaces to repair marks, scratches, and areas where the coating has deteriorated to restore the coating film to an unbroken condition.
8. Painter: Installer or applicator is the person or persons actually installing or applying the coating and/or lining in the field at the Project site.
9. The term Independent AMPP CCI: The inspection body, and its staff shall not engage in any activities that may conflict with their independence of judgement and integrity in relation to their inspection activities. In particular, they shall not become directly involved in the design, manufacture, supply, installation, user or maintenance of the items inspected, or similar competitive items. They are also a person and/or persons
(AMPP Certified Coating Inspector) that has satisfactorily completed the AMPP CIP program and is still actively certified by AMPP.
10. NACE International and SSPC (Society of Protective Coatings) have merged and is now recognized as AMPP (Association for Materials Protection and Performance) All previous certifications individually obtained from either organization is now recognized under
AMPP.
11. Holiday: A void, crack, thin spot, foreign inclusion, or contamination in the coating film that significantly lowers the dielectric strength of the coating. May also be identified as a holiday, discontinuity or pinhole.
12. Submerged Metal: Steel or iron surfaces below tops of channel or structure walls which will contain water even when above expected water level.
13. Exposed Surface: Any metal or concrete surface, indoors or outdoors that is exposed to view.
14. Dry Film Thickness (DFT): Thickness of fully cured coating, measured in mils (1/1000 inch).
15. Ferrous: Cast iron, ductile iron, wrought iron, and all steel alloys except stainless steel.
4. QUALITY ASSURANCE
A. Applicator Requirements
1. If any requirements of this specification are in conflict with a referenced standard, the more stringent requirement shall apply.
2. Engage a single PAINTING company with a minimum of 10 years experience regularly performing the application of coating and/or lining materials, with documented skill and successful experience in the application of the types of materials.
3. PAINTERS whose submissions indicate that they have not had the experience required to perform the Work shall not be approved. Qualifying experience shall include at least three previous projects of similar magnitude and complexity to this project that have been completed not less than 18 months prior to submission of qualifications to OWNERS REPRESENTATIVE.
4. Submit name and qualifications to OWNERS REPRESENTATIVE along with the following information on a minimum of three successful projects:
a. Name of projects
b. Names and telephone numbers of owners, architects or engineers responsible for projects.
c. Approximate contract cost of the paint materials.
d. Amount of area installed.
5. Submit in writing to the OWNERS REPRESENTATIVE acceptability of the PAINTER by the coating manufacturer.
6. PAINTER must submit list of projects of similar size and complexity along with names of persons and their work experience employed by the PAINTER. This includes evidence of worker in house or outside training and qualification programs. Only those submitted and approved persons will be permitted to work on the project. PAINTER must provide any qualification or training certificates of individuals at anytime to verify compliance.
7. PAINTER is completely responsible to ensure that their company personnel is completely trained and experienced in the proper use of all specified/submitted coating and lining materials, surface preparation and application equipment being used for the project. No person shall work on this project unless they have been previously approved by the OWNERS REPRESENTATIVE.
B. Source Quality Control:
1. Do not submit products that do not meet or exceed the performance criteria. All submitted coating and/or lining system must be able to provide long-term protection and performance within its intended service environment. Products exceeding current VOC limits will not be approved.
2. OWNERS REPRESENTATIVE may review manufacturer’s recommendations concerning methods of installation and number of coats of paint for each painting system.
PAINTER must prepare cost estimates based on painting systems, number of coats, coverages and installation methods specified.
3. All proposed "or equal" products shall be submitted 20 working days prior to the beginning of work with direct comparison to products specified including information on performance criteria adhesion, color and gloss retention, percent solids, VOC's per gallon, application methods, case histories and re-coat ability after curing , etc.
4. "Equal or better" manufacturers shall furnish the same color selection as the manufacturers specified, including intense chroma and custom pigmented colors in all painting systems.
5. Obtain each product from only one manufacturer. Multiple manufacturing sources for the same system component will not be approved by OWNERS
REPRESENTATIVE.
6. Certify product shelf-life history for each product source for materials manufactured by the same manufacturer, but purchased and stored at different locations or obtained from different sources.
7. Following the corrective measures by the PAINTER, an INDEPENDENT AMPP CCI shall re-inspect the work, at PAINTER'S expense. Within seven days after re-inspection, the INDEPENDENT AMPP CCI will provide a written report that the coatings have been applied properly and in accordance with the manufacturer's written recommendations and requirements.
C. Requirements of Regulatory Agencies: Surface preparation and application of coatings shall be performed by PAINTER in compliance with all applicable federal, state and local OSHA regulations and Maricopa County Air Pollution Control Regulations. Ensure that all required certifications for all regulatory agencies current and readily available upon request.
1. Obtain and comply with all safety precautions recommended by the paint manufacturer in printed instructions or special bulletins and as required by applicable regulations.
Provide forced ventilation in all areas where inadequate ventilation exists.
2. Comply with the regulations of governing authorities having jurisdiction for air quality and material disposal regulations. Revise painting systems specified herein in order to provide manufacturer's regulatory agency approved painting systems, where required.
3. Comply with governing authorities having jurisdiction for blast cleaning operations, confined space entry and disposition of spent abrasive and debris.
D. Pre-Application Meeting:
1. A pre-application meeting MUST take place at the job-site or mutually agreed upon site a minimum 3 weeks before the application of any coating or lining work proceeding.
Attendance is required of all principal decision making parties directly affecting work of this section, including General Contractor, Structural Contractor or Trades Persons of other work in and around the coatings work, Painter, Coating Manufacturer’s Technical
Representative, Coating Inspector, Site Safety and Health Supervisor, etc. Record the discussions of the conference and the decisions and agreements (or disagreements) and furnish a copy of the record to each party attending. Review foreseeable methods and procedures relating to the painting Work, including but not necessarily limited to, the following.
a. Review Project Coating Specification, Project requirements, including Contract
Documents, Project Schedule, approved Shop Drawings, pending and approved
Change Orders and requests for information that may have been submitted by
PAINTER to OWNERS REPRESENTATIVE.
b. Field quality control: Contractors responsibilities, i.e. providing written daily reports and review required samples and submittals, both completed and yet to be completed.
c. Review status of surfaces including drying, surface preparations and similar considerations.
d. Review the availability of materials, tradesman, equipment and facilities needed to make progress, avoid delays and protect the Work from damaging conditions.
e. Coating Inspector’s Authority and Responsibilities, required inspection, testing, certifying and quality control procedures.
f. Review weather and forecasted weather conditions, and procedures for coping with unfavorable conditions. Supplemental heating sources, as may be required to continue the Work under low temperature conditions, shall be in operating order and acceptable to paint applicator.
g. Review methods for complying with regulations of governing authorities having jurisdiction, such as compliance with environmental protection, health, safety, fire and similar regulations.
h. Material storage requirements
i. Protection of surfaces not scheduled to be coated
j. Application requirements and procedures
k. Protection of coating systems
2. Provide meeting minutes to all parties for review and possible clarification. Should any correction to the meeting minutes be required, the minutes should be corrected and resubmitted to all parties.
3. Reconvene the meeting at the earliest opportunity if additional information must be developed in order to conclude the subjects under consideration.
4. Record any revisions or changes agreed upon, reasons therefore, and parties agreeing or disagreeing with them.
E. Maintain a paint application log containing the information as shown below. A painter’s
Paint Application Log shall be maintained on a daily basis for all areas where the Work is being performed. The Paint Application Log shall be turned over to the OWNERS
REPRESENTATIVE by 9:00 a.m. the following day that the work was performed.
The log shall include the following:
a. Date
b. Time
c. Weather condition (at work location)
d. Air temperature (at work location)
e. Surface temperature (at work location)
f. Dew point (at work location) g.Humidity (at work location)
h. Material temperature (Before (Separately) and Mixed (Combined)
i. Location/area square footage
j. Description of Work performed
k. Materials used, colors and batch numbers, quantity of materials used (not including waste)
l. Application/surface preparation equipment and personnel
m. WFT/surface profile measurements
n. Comments, quality control procedures
o. Signature/Title
5. SUBMITTALS
A. Comply with the City of Chandler Arizona - Submittal Procedures.
B. Samples: Submit for approval the following:
1. Copies of manufacturer's complete color charts for each coating system.
C. Submit for approval the following:
1. Copies of manufacturer's current technical information and VOC content in comparison to current legal maximum limits allowed and current application instructions for each material proposed for use.
2. Submit Applicator's Qualifications in accordance with 1.04 Quality
Assurance. No submittal information will be reviewed until OWNERS
REPRESENTATIVE has received and approved applicator qualifications.
3. Product technical data including:
a. Acknowledgement that products submitted meet requirements of standards referenced.
b. Manufacturer's current written application instructions for submitted coating or lining systems.
c. Manufacturer’s current written repair procedure for the submitted coating or lining system.
4. PAINTER shall provide all appropriate air quality permits for abrasive blast.
operation, if required by local, county, state or federal laws or ordinances.
6.
A. Delivery: Deliver materials to site in manufacturer's original, unopened containers and packaging, with labels clearly identifying.
1. Coating or material name
2. Manufacture
3. Color name and number
4. Batch or lot number
5. Date of manufacture.
6. Mixing and thinning instructions
7. Federal Specification Number if applicable
8. Application and mixing instructions
9. Hazardous material identification label
10. Shelf life
11. Storage requirements Submit storage and application temperature requirements for all coating system materials
B. Storage of Materials:
1. Store materials in a clean dry area and within temperature range in strict accordance with the coating manufacturer's current written instructions
2. Keep containers sealed until ready for use.
3. Do not use materials beyond manufacturer’s shelf life limits.
4. All coating shall be delivered to the shop or job site in original, unopened containers with labels intact. Minor damage to containers is acceptable provided the container has not been punctured or the lid seal broken.
5. Each container of coating shall be clearly marked or labeled to show coating.
identification, date of manufacture, batch number, and other information as needed to meet regulatory requirements. Each type of coating shall be accompanied by the manufacturer’s Safety Data Sheet (SDS) and product data sheet containing information such as basic chemical composition, acceptable weather conditions for application, and proper storing and mixing.
6. All containers of coating shall remain unopened until required for use. No containers of coating shall be opened unless those materials will be applied that day. The label information shall be legible and shall be checked at the time of use.
7. Coating which has livered, gelled, or otherwise deteriorated during storage shall not be used; however, thixotropic materials which can be stirred to attain normal consistency may be used.
8. The oldest coating of each kind that is in acceptable condition shall be used first. In every case, the coating is to be used before its shelf life has expired. Materials exceeding storage life recommended by the Manufacturer shall be removed from the site.
9. Flammable materials shall be stored according to state and local codes.
10. Store all materials only in area or areas designated by the OWNERS
REPRESENTATIVE. Confine mixing, thinning, clean up and associated operations, and storage of materials related debris before authorized disposal, to these areas. All materials are to be stored on pallets or similar storage handling skids off the ground.
11. Mix all materials in an enclosed mixing area designated by the OWNERS
REPRESENTATIVE. This enclosed area must protect the mixing operation and materials from direct sunlight, inclement weather, freezing, or other means of damage or contamination. Protect all other concrete and metallic surfaces and finishes from any spillage of material(s) within the mixing area. The material temperature should be between 70F and 90F before application, unless noted otherwise on the current product data sheet.
12. Do not use floor drains, dikes or storm drains for disposal of coating system materials. PAINTER shall be responsible for the safe removal and lawful disposal of all waste materials.
13. The PAINTER shall take all precautions and implement all measures necessary to avert potential hazards associated with the resurfacing system materials as described on the pertinent Safety Data Sheets or container labels.
14. PAINTER is responsible for maintaining the storage and the environmental climate of that area for all coating materials that they will be using unless otherwise agreed upon.
15. Handling: Protect materials during handling and application to prevent damage or contamination.
7. SAFETY.
1. The PAINTER’s workforces should comply all federal, state and local regulations as well as with the provisions outlined in the following documents:
NACE Pub. 6D-173 “A Manual for Painter Safety”
2. The PAINTER shall provide personnel with all safety equipment necessary to protect them during any phase of the work according to all current OSHA
Standards.
3. PAINTER shall be responsible for the permitted confined space and shall adhere to all
OSHA requirements with regard to CONFINED SPACE including providing all equipment and personnel necessary.
4. PAINTER shall be responsible to erect and maintain scaffolding according to OSHA standards.
5. No work shall be performed until the appropriate Work Requests and Lockouts are approved by the Owners Representative. The Work Request system provides a mechanism to advise plant staff of a contractor’s work activities. The Lock Out /Tag Out system is a safety procedure to prevent unintended equipment activation.
6. Keep any flammable materials such as cleaning solvents, thinners, or resurfacing materials away from open flames, or sparks. Drums containing flammable materials shall be grounded. Flammable materials not being utilized shall be maintained in their on-site storage area.
7. Power tools are to be in good working order to avoid open sparking. No spark producing tools shall be utilized in restricted areas as indicated herein.
8. The PAINTER shall maintain a clean work area and having Underwriter’s Laboratories approved fire extinguishers on-hand. The PAINTER shall furnish these fire extinguishers.
9. Workers performing coating operations shall wear the appropriate personal protective equipment, clothing, and NIOSH approved respirator acceptable to industry standards and all government regulations.
10. Dispose of rags used for wiping up resurfacing materials, solvents, and thinners by drenching them with water and placing in a metal container with a tight fitting metal cover. Complete this disposal process at the end of each day. Final disposal of these materials is the PAINTER’s responsibility.
11. Matches, flames, or sparks resulting from any source including welding, must be removed from the work area during coating work. Smoking is NOT permitted accept for designated areas.
A. Site Facilities:
1. The provision of all supplemental heat energy sources, power, equipment and operating, maintenance and temperature monitoring personnel is the responsibility of PAINTER.
B. Existing Conditions:
1. Provide lighting (If Required) for all work areas as prescribed in SSPC Guide 12
2. Existing materials specified to be painted as part of the Work shall have their surfaces prepared to meet the requirements of the painting systems specified.
C. Environmental Requirements
1. Enclosures for areas or items that may require protection from the inclement weather or other detrimental effects so the project can continue, is the responsibility of the PAINTER.
2. Surfaces to be painted shall dry to the touch and at least 5°F above the dew point temperature and rising. Apply paints only when the temperature of surfaces to be painted, paint material, and the surrounding air temperatures are between 50°F and
95°F, unless otherwise permitted by the paint manufacturer's current printed instructions.
3. Apply paint system within the shortest possible time consistent with manufacturer's approved recommended curing instructions for each coat.
4. Epoxy paints shall not be applied if ambient temperature is expected to go below 50°F within 12 hours of application. Where manufacturer's printed recommendations require a higher or permit a lower minimum ambient temperature, this can be followed with written authorization from the Owners Representative.
5. Do not apply paint in rain, fog or mist; or when the relative humidity exceeds 85 percent; to damp or wet surfaces or when surfaces will reach dew point due to falling or rising temperatures and humidity conditions during the course of the paint application, unless otherwise permitted in writing by the paint manufacturer's printed instructions.
6. Painting may continue during inclement weather only if the areas and surfaces to be painted are enclosed and ambient conditions can be maintained continuously as specified by the paint manufacturer during application and drying periods.
D. Protection:
1. Cover or otherwise protect finished Work of other trades and surfaces not being painted concurrently or not to be painted.
2. During surface preparation and painting, the facility shall remain in operation.
Employ procedures that prevent contamination of the process or cause facility shutdown.
3. Coordinate and schedule surface preparation and painting to avoid exposing employees of PAINTER, OWNER, OWNERS REPRESENTATIVE and others not involved with surface preparation and painting. Provide required personnel safety equipment in compliance with the requirements of governing authorities having jurisdiction.
4. Submit protection procedures to be employed by PAINTER to OWNER or OWNER’S
REPRESENTATIVE. Do not begin surface preparation and painting Work in any area until OWNER or OWNER’S REPRESENTATIVE approves protection techniques proposed by PAINTER
5. Provide fire extinguishers and post caution signs warning against smoking and open flame when working with flammable materials.
E. All reasonable care shall be taken to protect against paint splatter and overspray.
Responsibility for any damage incurred to surrounding property resulting from this work belongs to PAINTER.
F. Signs shall be posted, as required, to alert the public of any risks associated with painting overspray, etc. All efforts shall be made to prevent debris from becoming wind blown.
G. Responsibility for obtaining any and all permits required to perform the Work belongs to
PAINTER.
PART 2 PRODUCTS
1. MANUFACTURER
A. Specification basis of design is Tnemec and Sherwin Williams
2. PAINTING SYSTEMS
A. Previously Coated Canopies Underneath Side Existing Ferrous and Non-Ferrous
Metals, Interior Dry Surfaces,
1. Clarifier, Filter Basin and EQ Basin Canopies
2. System Type: Epoxy
3. Surface Preparation: SSPC-SP WJ-4/NACE WJ-4 – Thoroughly clean the surface to be coated using metered potable water mixed with Simple Green at approximately 10 parts clean potable water to 1 part Simple Green.
Afterwards, pressure wash rinse using clean potable water to thoroughly remove any remaining residue.
Should other cleaning procedures be utilized using different types of biodegradable, non-hazardous chemical etch solutions or cleaners, the directions must be followed as provided by the manufacture and approved by the coating manufacture if they are not the same.
4. Touchup existing coating which have damaged or have bare areas, according to SSPC-SP2 or SSPC-SP3 at the time of painting system application. Tightly adhering coating surrounding the bare metal shall be feather edged a minimum of 1 inch back to provide a clean, dry, sound and smooth transition from bare metal to remaining coating.
5. Spot Prime (If required): Tnemec Series 135 Chembuild or Sherwin Williams
646 Macropoxy; 1 coat; 3.0 to 5.0 mils DFT
6. Full Tie Coat: Tnemec Series 135 Chembuild or Sherwin Williams 646 Macropoxy;
1coat; 3.0 to 5.0 mils DFT
7. Stripe Coat: Tnemec Series 135 Chembuild or Sherwin Williams 646 Macropoxy; 1coat;
3.0 to 5.0 mils DFT
8. Finish Coat: Tnemec Series 135 Chembuild or Sherwin Williams 646 Macropoxy;
1coat; 3.0 to 5.0 mils DFT
9. Dry Film Thickness Total System: 6.0 to 10.0 mils (Excluding the spot prime and stripe coat)
Note: Must use contrasting colors to differentiate coats. Reference 4 - General
Application Requirements, A. General. 7 and 9
B. Previously Coated Canopies Underneath Side Existing Ferrous and Non-Ferrous Metals, Interior Surfaces, Intermittently Wet
1. Aeration Basin Canopies
2. System Type: Epoxy
3. Surface Preparation: SSPC-SP WJ-4/NACE WJ-4 – Thoroughly clean the surface to be coated using clean metered potable water mixed with mixed with 30% vinegar or equal non hazardous chemical etch solution. Afterwards, pressure wash rinse using clean potable water to thoroughly remove any remaining residue. Should other cleaning procedures be utilized using different types of biodegradable, non-hazardous chemical etch solutions or cleaners, the directions must be followed as provided by the manufacture and approved by the coating manufacture if they are not the same.
4. Touchup existing coating which have damaged or have bare areas, according to SSPC-SP2 or SSPC-SP3 at the time of painting system application. Tightly adhering coating surrounding the bare metal shall be feather edged a minimum of 1 inch back to provide a clean, dry, sound and smooth transition from bare metal to remaining coating.
5. Spot Prime (If required): Tnemec Series 135 Chembuild or Sherwin Williams 646 Macropoxy; 1 coat; 3.0 to 5.0 mils DFT
6. Full Tie Coat: Tnemec Series 135 Chembuild or Sherwin Williams 646 Macropoxy; 1 coat; 3.0 to 5.0 mils DFT
7. Stripe Coat: Tnemec Series 135 Chembuild or Sherwin Williams 646 Macropoxy; 1 coat; 3.0 to 5.0 mils DFT
8. Finish Coat: Tnemec Series 135 Chembuild or Sherwin Williams 646 Macropoxy; 1 coat; 3.0 to 5.0 mils DFT 9. Dry Film Thickness Total System: 6.0 to 10.0 mils (Excluding the spot prime and stripe coat) Note: Must use contrasting colors to differentiate coats. Reference 4 - General Application Requirements, A. General. 7 and 9
C. Previously Coated Canopies Underneath Side Existing Ferrous and Non-Ferrous Metals Support Structure, Exterior Surfaces UV Exposure
1. System Type: Epoxy/Polyurethane
2. Surface Preparation: Surface Preparation: SSPC-SP WJ-4/NACE WJ-4 – Thoroughly clean the surface to be coated using hot potable water mixed with Simple Green at approximately 10 parts clean hot metered potable water to 1part Simple Green.
Afterwards, pressure wash rinse using clean hot metered potable water to thoroughly remove any remaining residue. Should other cleaning procedures be utilized using different types of biodegradable, non-hazardous chemical etch solutions or cleaners, the directions must be followed as provided by the manufacture and approved by the coating manufacture if they are not the same.
3. Spot Prime (If required): Tnemec Series 135 Chembuild or Sherwin Williams 646 Macropoxy; 1 coat; 3.0 to 5.0 mils DFT
4. Full Tie Coat: Tnemec Series 135 Chembuild or Sherwin Williams 646 Macropoxy; 1 coat; 3.0 to 5.0 mils DFT
5. Finish Coat: Tnemec Series V701 Hydroflon; 1 coat; 2.0-3.0 mils DFT or Sherwin Williams Sher-Loxane 800; 1 coat; 4.0 to 6.0 mils DFT
6. Dry Film Thickness Total System: 5.0 to 11.0 mils (Excluding the spot prime & stripe coat)
Note: Must use contrasting colors to differentiate coats. Reference 4 - General Application Requirements, A. General. 7 and 9
D. Previously Coated Roof Canopies and Support Structure Existing Ferrous and Non- Ferrous Metals Exterior Surfaces UV Exposure
1. System Type: Epoxy/Polyurethane
2. Surface Preparation: Surface Preparation: SSPC-SP WJ-4/NACE WJ-4 – Thoroughly clean the surface to be coated using hot potable water mixed with Simple Green at approximately 10 parts clean hot metered potable water to 1 part Simple Green.
Afterwards, pressure wash rinse using clean hot metered potable water to thoroughly remove any remaining residue. Should other cleaning procedures be utilized using different types of biodegradable, non-hazardous chemical etch solutions or cleaners, the directions must be followed as provided by the manufacture and approved by the coating manufacture if they are not the same.
3. Spot Prime (If required): Tnemec Series 135 Chembuild or Sherwin Williams 646 Macropoxy; 1 coat; 3.0 to 5.0 mils DFT
4. Full Tie Coat: Tnemec Series 135 Chembuild or Sherwin…