Summary

This is a Project Manual and bid package for the Lee County General Services Building Expansion, a design-bid-build construction project in Sanford, North Carolina. The project involves construction of an addition connecting to an existing building with a prefabricated canopy, including electrical, plumbing, mechanical, interior and exterior building construction, and site work with a new paved parking area. The sealed bid submission deadline is June 16, 2026, at 10:00 A.M. Eastern Standard Time, with bids received at the Lee County Finance office, 115 Chatham Street, Suite 301, Sanford, North Carolina 27330. A non-mandatory pre-bid conference will be held on May 14, 2026, at 10:00 A.M. at the project site (805 S. 5th Street, Sanford, NC 27330). Bidders may obtain electronic PDF copies of the Project Manual and Contract Drawings at no charge beginning May 6, 2026, from www.moseleydesigns.com/bidding/. Two copies of the complete bid package must be submitted, and all questions regarding the bid documents must be submitted in writing by 5:00 P.M. Eastern Standard Time on June 2, 2026. The project architect is Moseley Inc. of Raleigh, North Carolina. Based on a Notice to Proceed within 45 calendar days from bid opening, work shall be substantially complete no later than July 2027, with final completion within 60 calendar days thereafter. Liquidated damages are assessed at $1,000 per calendar day for failure to achieve substantial completion and $500 per day for failure to achieve final completion.

Bidders must submit a bid bond equal to five percent of the bid amount, made payable to Lee County, NC. The bid form requests both a base bid price and quantity allowances for additional undercut excavation. The contractor must comply with North Carolina's minority business enterprise requirements, including identification of HUB-certified subcontractors for plumbing, mechanical, and electrical work, with a 10 percent participation goal. The contractor must also comply with E-Verify employment verification requirements and certifications regarding Iran divestment and non-discrimination. Upon contract award, the successful bidder shall furnish a Performance Bond and Payment Bond, each covering 100 percent of the contract sum. The project documents specify extensive requirements for quality assurance, testing and inspection, submittal procedures, construction schedules, and closeout documentation. The specification sections address concrete work, masonry, structural steel, cold-formed metal framing, site work, and various mechanical and electrical systems, with requirements for compliance with ASTM standards, ACI standards, and applicable North Carolina building codes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

LEE COUNTY GENERAL SERVICES

BUILDING EXPANSION

SANFORD, NORTH CAROLINA

ARCHITECT’S PROJECT NO.: 651939

LEE COUNTY BID NO.: 4851-01-26

ARCHITECT/ENGINEER RALEIGH, NORTH CAROLINA

WITHERSRAVENEL, INC.

CIVIL CONSULTANT RALEIGH, NORTH CAROLINA

VOLUME 1 OF 1

APRIL 8, 2026

LEE COUNTY GENERAL SERVICES BUILDING EXPANSION

Lee County Bid No.: 4851-01-26 / Architect’s Project No.: 651939

PROFESSIONAL SEALS

ARCHITECT MOSELEY INC.

911 N. West Street, Suite 205 Raleigh, NC 27603 Phone: (919) 840-0091

ENGINEERING MOSELEY INC.

911 N. West Street, Suite 205

ARCHITECT NAME

License #

MOSELEY INC.

911 N. West Street, Suite 205

CIVIL

Jaclyn Adraitico License # 056077

WITHERSRAVENEL, INC.

137 South Wilmington St Suite 200 Raleigh, NC 27601 Phone: (919) 469-3340

STRUCTURAL Steven M. Cooke License # 035434

MOSELEY INC.

6210 Ardrey Kell Rd Suite 425 Charlotte, NC 28277 Phone: (704) 540-3755

Lee County Bid No.: 4851-01-26 / Architect’s Project No.: 651939

PROFESSIONAL SEALS

END OF SECTION 000107

PLUMBING NAME

License #

MOSELEY INC.

911 N. West Street, Suite 205

MECHANICAL David T. Whately License # 043951

MOSELEY INC.

3200 Norfolk St Richmond, VA 23230 Phone: (804) 794-7555

ELECTRICAL NAME

License #

MOSELEY INC.

911 N. West Street, Suite 205

Lee County Bid No. 4851-01-26 / Architect’s Project No: 651939

TABLE OF CONTENTS TOC - 1

TABLE OF CONTENTS

DIVISION 0 - PROCUREMENT AND CONTRACTING REQUIREMENTS

001100 Invitation to Bid 002100 Instructions to Bidders (AIA Document A701) 004100 Bid Form 004313 Bid Bond (AIA Document A310) 004513 Contractor's Qualification Statement (AIA Document A305) 005213 Contract Agreement Between Owner and Contractor Example (Owner Provided)

005213.01 Standard Form of Agreement – Exhibit A – Owner’s Insurance Requirements 006113 Form of Performance Bond, Form of Payment Bond (Owner Provided) 007200 General Conditions of the Contract for Construction (Owner Provided) 007201 Exhibit A-County of Lee, Rules for Implementing Mediated Settlement

Conferences in North Carolina Public Building Contracts (Owner Provided) 007339 Minority Business/Historically Underutilized Business Participation Outreach Plan and Guidelines (Owner Provided) 007400 New Vendor Package (Owner Provided)

Prebid Question Form: (Use on-line process. To access, go to www.moseleydesigns.com/bidding/, find the appropriate project, and select the “Submit a Question” link).

TECHNICAL SPECIFICATIONS

DIVISION 1 – GENERAL REQUIREMENTS

011000 Summary

012000 Price and Payment Procedures

012100 Allowances

012200 Unit Prices

012500 Substitution Procedures

013000 Administrative Requirements

013216 Construction Progress Schedule

014000 Quality Requirements

014001 Statement of Special Inspections

014002 Statement of Contractor Responsibility

014200 Definitions and Reference Standards

014520 Testing, Adjusting, and Balancing for HVAC

015000 Temporary Facilities and Controls

016000 Product Requirements

017000 Execution and Closeout Requirements

017419 Construction Waste Management and Disposal

017800 Closeout Submittals

017900 Demonstration and Training

018119 Indoor Air Quality Requirements

018317 Exterior Building Enclosure Air Barrier Requirements

DIVISION 2 – EXISTING CONDITIONS

024100 Demolition

024101 Asphalt Milling http://www.moseleydesigns.com/bidding/

TABLE OF CONTENTS TOC - 2

024113 Site Demolition

DIVISION 3 – CONCRETE

031000 Concrete Forming and Accessories

032000 Concrete Reinforcing

033000 Cast-In-Place Concrete

033055 Site Cast-In-Place Concrete

035400 Cast Underlayment

DIVISION 4 – MASONRY

042000 Unit Masonry

DIVISION 5 – METALS

051200 Structural Steel Framing

053100 Steel Decking

054000 Cold Formed Steel Framing – Structural (CFSF-S)

054400 Cold-Formed Steel Trusses

055000 Metal Fabrications

DIVISION 6 – WOOD PLASTICS AND COMPOSITES

061000 Rough Carpentry

064100 Architectural Woodwork and Casework

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

072100 Thermal Insulation

072700 Air Barriers

072736 Sprayed Foam (SPF) Air Barriers

074113 Metal Roof Panels

074646 Fiber-Cement Siding

076200 Sheet Metal Flashing and Trim

077100 Roof Specialties

078400 Firestopping

079200 Joint Sealants

DIVISION 8 – OPENINGS

081113 Steel Doors and Frames

081116 Aluminum Doors and Frames

081416 Flush Wood Doors

083100 Access Doors and Panels

085113 Aluminum Windows

087100 Door Hardware

088000 Glazing

089100 Louvers

DIVISION 9 – FINISHES

092216 Cold Formed Steel Framing - Non-Structural (CFSF-NS)

092900 Gypsum Board

093000 Tiling

095100 Acoustical Ceilings

096513 Resilient Base and Accessories

TABLE OF CONTENTS TOC - 3

096519 Resilient Tile Flooring

096813 Tile Carpeting

099100 Painting

DIVISION 10 – SPECIALTIES

101100 Visual Display Units

102600 Wall and Door Protection

102800 Toilet and Bath Accessories

104400 Fire Protection Specialties

107300 Protective Covers

DIVISION 11 – EQUIPMENT – NOT USED

DIVISION 12 – FURNISHINGS

122113 Horizontal Louver Blinds

DIVISION 13 – SPECIAL CONSTRUCTION – NOT USED

DIVISION 14 – CONVEYING SYSTEMS - NOT USED

DIVISION 21 – FIRE SUPPRESSION – NOT USED

DIVISION 22 – PLUMBING

220500 Common Work Results for Plumbing

220519 Meters and Gages for Plumbing Piping

220523 General-Duty Valves for Plumbing Piping

220529 Hangers and Supports for Plumbing Piping and Equipment

220548 Vibration and Seismic Control for Plumbing

220553 Identification for Plumbing Piping and Equipment

220700 Plumbing Insulation

221113 Facility Natural Gas Piping

221116 Domestic Water Piping

221119 Domestic Water Piping Specialties

221125 Circulating Pumps

221316 Sanitary Waste and Vent Piping

221319 Sanitary Waste Piping Specialties

223300 Electric Water Heaters

224000 Plumbing Fixtures

DIVISION 23 – MECHANICAL

230500 Common Work Results for HVAC

230513 Motors for HVAC Equipment

230529 Hangers and Supports for HVAC Piping and Equipment

230548 Vibration and Seismic Control for HVAC

230553 Identification for HVAC Piping and Equipment

230700 HVAC Insulation

233113 Metal Ducts

233300 Air Duct Accessories

233423 HVAC Power Ventilators

233713 Diffusers, Registers, and Grilles

234100 Particulate Air Filtration

TABLE OF CONTENTS TOC - 4

237413 Packaged Outdoor Central Station Air Handling Units

DIVISION 25 – INTEGRATED AUTOMATION – NOT USED

DIVISION 26 – ELECTRICAL

260519 Low-Voltage Electrical Power Conductors

260526 Grounding and Bonding for Electrical Systems

260529 Hangers and Supports for Electrical Systems

260533 Raceway and Boxes for Electrical Systems

260543 Underground Ducts and Raceways for Electrical Systems

260544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling

260553 Identification for Electrical Systems

260572 Overcurrent Protective Device Short-Circuit Study

260573 Overcurrent Protective Device Coordination Study

260574 Overcurrent Protective Device Arc-Flash Study

260923 Lighting Control Devices

262200 Low-Voltage Transformers

262413 Switchboards

262416 Panelboards

262726 Wiring Devices

262813 Fuses

262816 Enclosed Switches and Circuit Breakers

262913 Enclosed Controllers

264313 Surge Protection for Low-Voltage Electrical Power Circuits

265119 LED Interior Lighting

265619 LED Exterior Lighting

DIVISION 27 – COMMUNICATIONS

270500 Common Work Results for Communications

270528 Pathways for Communications Systems

271100 Communications Equipment Room Fittings

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

280500 Common Work Results for Electronic Safety and Security

280528 Pathways for Electronic Security

283111 Digital, Addressable Fire-Alarm System

DIVISION 31 – EARTHWORK

311000 Site Clearing

311001 Site Grubbing

312213 Rough Grading

312316 Excavation

312316.13 Trenching

312323 Fill

312500 Erosion and Sedimentation Controls

313116 Termite Control

DIVISION 32 – EXTERIOR IMPROVEMENTS

321123 Aggregate Base Courses

TABLE OF CONTENTS TOC - 5

321216 Asphalt Paving

321313 Concrete Paving

321723 Pavement Markings

323113 Chain Link Fences and Gates

329219 Seeding

DIVISION 33 – UTILITIES

330110.58 Disinfection of Water Utility Piping Systems

330130.87 Utility Adjustments

330505.31 Hydrostatic Testing

331417 Site Water Service Utility Laterals 333111 Public Sanitary Sewerage Gravity Piping

DIVISION 34 – TRANSPORTATION – NOT USED

END OF TECHNICAL SPECIFICATIONS

END OF TABLE OF CONTENTS

APPENDICES

Appendix A Geotech Report by Froehling & Robertson, Inc.

Dated February 27, 2026

Architect’s Project No: 651939

INVITATION TO BID ITB – 1

INVITATION TO BID

Bid Request No: 4851-01-26

Lee County General Services Building Expansion bids will be received in person, via regular mail by U.S. Postal Service, or via special courier service to:

Procurement Agent Lee County Finance 115 Chatham St, Suite #301 (3rd floor) in Sanford, North Carolina 27330, until but no later than, June 16, 2026 at 10am Eastern Standard Time.

Sealed Bids, in accordance with the Bid Documents, will be received prior to

10:00 A.M. June 16, 2026 at 115 Chatham St, Suite #301 (3rd floor) in Sanford, North Carolina 27330 and then publicly opened and read aloud immediately thereafter. Please note that two copies of the complete bid package must be submitted. If only one bid package is submitted, the bid will be rejected. Both bid packages may be in one sealed envelope.

Please note that Digital submissions are not allowed. 10AM official bid time will be recorded by procurement agent from their cell phone. Any adjustments to the bid written on the outside of the bid envelope will not be considered. Bids received after the above time shall not be considered.

Bids received after the announced time and date for submittal, whether by mail or otherwise, will be rejected. Bidders are responsible for ensuring their Bid is received before the deadline indicated. Bids submitted by telephone, text message, email, or facsimile shall not be accepted.

The Work generally consists of: An addition that connects to existing building with a prefabricated canopy. Building project consists of: electrical, plumbing, mechanical, interior and exterior building construction as well as site work including the addition of a paved parking area.

A non-mandatory Pre-Bid Conference for this project will be held at the project site:

805 S. 5th St, Sanford, NC 27330 at 10:00 A.M. on May 14, 2026, in front of the Lee County General Services Department building. Inclement weather plan: meet inside of building’s garage.

Beginning May 6, 2026, Bidders may obtain electronic PDF copies of the Project Manual and

Contract Drawings at no charge by visiting www.moseleydesigns.com/bidding/

All questions about the meaning or intent of the Bid Documents or Contract Documents shall be submitted

1. In writing to: Jessica Hill jhill@moseleydesigns.com

2. Visit www.moseleydesigns.com/bidding/ then click “Submit a Question” under the project name Written requests for clarification shall be received by the close of business, 5 P.M.

Eastern Standard Time on June 2, 2026. Any changes made to the written requirements of the Bid Documents shall be made by written Addendum only.

Architect’s Project No: 651939

INVITATION TO BID ITB – 2

In order for Moseley to maintain an accurate list of planholders (General Contractor’s only), each GC shall forward and complete the following required steps:

1. Submit the following information to: Jessica Hill jhill@moseleydesigns.com

Company Name:

Address:

Phone:

Email Address:

Contact Person:

Lee County reserves the right to reject all bids, to waive informalities and technicalities, and to cancel the Bid Process at any time.

END OF INVITATION TO BID

Document A701

– 2018 Instructions to Bidders

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:35:57 ET on 02/25/2026 under Order No.4104248195 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (960777813)

This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.

FEDERAL, STATE, AND LOCAL

LAWS MAY IMPOSE

REQUIREMENTS ON PUBLIC

PROCUREMENT CONTRACTS.

CONSULT LOCAL

AUTHORITIES OR AN

ATTORNEY TO VERIFY

REQUIREMENTS APPLICABLE

TO THIS PROCUREMENT

BEFORE COMPLETING THIS

FORM.

It is intended that AIA Document G612™–2017, Owner’s Instructions to the Architect, Parts A and B will be completed prior to using this document.

for the following Project:

(Name, location, and detailed description)

Lee County General Services Building Expansion 805 S 5th Street Sanford, North Carolina 27330

THE OWNER:

(Name, legal status, address, and other information)

Lee County, NC 115 Chatham Street Suite 302 Sanford, North Carolina 27330 Telephone Number: 919-718-4605

THE ARCHITECT:

(Name, legal status, address, and other information)

Moseley Inc.

911 North West Street Suite 205 Raleigh, North Carolina 27603 Telephone Number: 919-840-0091

TABLE OF ARTICLES

1 DEFINITIONS

2 BIDDER’S REPRESENTATIONS

3 BIDDING DOCUMENTS

4 BIDDING PROCEDURES

5 CONSIDERATION OF BIDS

6 POST-BID INFORMATION

7 PERFORMANCE BOND AND PAYMENT BOND

8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:35:57 ET on 02/25/2026 under Order No.4104248195 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (960777813)

ARTICLE 1 DEFINITIONS

§ 1.1 Bidding Documents include the Bidding Requirements and the Proposed Contract Documents. The Bidding Requirements consist of the advertisement or invitation to bid, Instructions to Bidders, supplementary instructions to bidders, the bid form, and any other bidding forms. The Proposed Contract Documents consist of the unexecuted form of Agreement between the Owner and Contractor and that Agreement’s Exhibits, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, all Addenda, and all other documents enumerated in Article 8 of these Instructions.

§ 1.2 Definitions set forth in the General Conditions of the Contract for Construction, or in other Proposed Contract Documents apply to the Bidding Documents.Documents, but are subject to and governed by definitions under applicable laws and regulations.

§ 1.3 Addenda are written or graphic instruments issued by the Architect, which, by additions, deletions, clarifications, or corrections, modify or interpret the Bidding Documents.

§ 1.4 A Bid is a complete and properly executed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents.

§ 1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents, to which Work may be added or deleted by sums stated in Alternate Bids.

§ 1.6 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from, or that does not change, the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted.

§ 1.7 A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, as described in the Bidding Documents.

§ 1.8 A Bidder is a person or entity who submits a Bid and who meets the requirements set forth in the in conformance with Bidding Documents.

§ 1.9 A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion of the Work.

§ 1.10 A Responsible Bidder means a person or entity that has the capability, in all respects, to perform fully the Contract requirements and the moral and business integrity and reliability that will assure good faith performance.

§ 1.11 A Responsive Bidder means a person or entity that has submitted a Bid which conforms in all material respects to the Invitation to Bid and requirements of the Bidding Documents.

§ 1.12 An informality means a minor defect or variation of a Bid from the exact requirements of the Invitation to Bid and of the Bidding Documents which does not affect the price, quality, quantity or delivery schedule for the goods, services or construction being procured.

ARTICLE 2 BIDDER’S REPRESENTATIONS

§ 2.1 By submitting a Bid, the Bidder represents that:

.1 the Bidder has read and understands the Bidding Documents;

.2 the Bidder understands how the Bidding Documents relate to other portions of the Project, if any, being bid concurrently or presently under construction;

.3 the Bid complies with the Bidding Documents;

.4 the Bidder has visited the site, become familiar with local conditions under which the Work is to be performed, and has correlated the Bidder’s observations with the requirements of the Proposed Contract Documents;

.5 the Bid is based upon the materials, equipment, and systems required by the Bidding Documents without exception; and

.6 the Bidder has read and understands the provisions for liquidated damages, if any, set forth in the form of Agreement between the Owner and Contractor.

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:35:57 ET on 02/25/2026 under Order No.4104248195 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (960777813)

.7 The Bidder has carefully reviewed the Bidding Documents and has verified that all of the Bidding Documents received are complete. The Bidder shall notify the Architect immediately if received Bidding Documents are not complete.

.8 The Bidder has familiarized itself with all applicable federal, state and local laws, ordinances, rules and regulations that in any manner may affect cost, progress or performance of the Work; the Bidder has obtained the necessary licenses for bidding, if applicable, and is licensed or certified to perform the Work.

.9 The Bidder shall pay all county, city, state and federal taxes required by laws in effect at the time the Bids are received and resulting from the Work or traceable thereto. Said taxes shall not be in addition to the Contract price between the Owner and the Bidder, as the taxes shall be an obligation of the Bidder and not of the Owner, and the Owner shall be held harmless and indemnified for the same by the Bidder.

.10 The failure or omission of any Bidder to receive or examine any form, instrument, addendum or other documents, or to acquaint itself with conditions existing at the site(s), shall in no way relieve any Bidder from any obligations with respect to its Bid or to the Contract.

.11 The Bidder agrees that its Bid shall be based on products and work indicated in the Bidding Documents.

ARTICLE 3 BIDDING DOCUMENTS

§ 3.1 Distribution § 3.1.1 Bidders shall obtain complete Bidding Documents, as indicated below, from the issuing office designated in the advertisement or invitation to bid, for the deposit sum, if any, stated therein.

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall obtain Bidding Documents.)

§ 3.1.2 Any required deposit shall be refunded to Bidders who submit a bona fide Bid and return the paper Bidding Documents in good condition within ten days after receipt of Bids. The cost to replace missing or damaged paper documents will be deducted from the deposit. A Bidder receiving a Contract award may retain the paper Bidding Documents, and the Bidder’s deposit will be refunded.

§ 3.1.3 Bidding Documents will not be issued directly to Sub-bidders unless specifically offered in the advertisement or invitation to bid, or in supplementary instructions to bidders.

§ 3.1.2.1 When the Bidding Documents are returned by the Bidders to the Architect or Owner, the shipping or postage shall be prepaid by the Bidder. The Bidder’s deposit will not be refunded if the deposit sum is non-refundable as indicated in the Advertisement or Invitation to Bid.

§ 3.1.4 Bidders shall use complete Bidding Documents in preparing Bids. Neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete Bidding Documents.

§ 3.1.4.1 Every Bidder is responsible to review all Bidding Documents received to verify that each set contains a complete set of Contract Documents. Any incomplete Bidding Documents shall be immediately returned to the Architect.

§ 3.1.5 The Bidding Documents will be available for the sole purpose of obtaining Bids on the Work. No license or grant of use is conferred by distribution of the Bidding Documents.

§ 3.2 Modification or Interpretation of Bidding Documents § 3.2.1 The Bidder shall carefully study the Bidding Documents, shall examine the site and local conditions, and shall notify the Architect of errors, inconsistencies, or ambiguities discovered and request clarification or interpretation pursuant to Section 3.2.2.

§ 3.2.2 Requests for clarification or interpretation of the Bidding Documents shall be submitted by the Bidder in writing and shall be received by the Architect at least seven days prior to the date for receipt of Bids.

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall submit requests for clarification and interpretation.)

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:35:57 ET on 02/25/2026 under Order No.4104248195 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (960777813)

§ 3.2.3 Modifications and interpretations of the Bidding Documents shall be made by Addendum. Modifications and interpretations of the Bidding Documents made in any other manner shall not be binding, and Bidders shall not rely upon them.

§ 3.3 Substitutions § 3.3.1 The materials, products, and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance, and quality to be met by any proposed substitution.

§ 3.3.1.1 The Bidder assumes all risks using a price or bid proposal representing a product or Work that is not indicated in the Bidding Documents and, if the Bidder elects to use that product or Work he shall submit it in accordance with the Division 1 requirements, and as stated herein. If that product or Work is rejected, the Bidder shall provide a product or Work indicated in the Bidding Documents at its cost. The Architect and the Owner shall not consider any requests for additional payments to provide the Work as required by the Contract Documents.

§ 3.3.2 Substitution Process § 3.3.2.1 Written requests for substitutions shall be received by the Architect at least ten days prior to the date for receipt of Bids. Requests shall be submitted in the same manner as that established for submitting clarifications and interpretations in Section 3.2.2.

§ 3.3.2.2 Bidders shall submit substitution requests on a Substitution Request Form if one is provided in the Bidding Documents.

§ 3.3.2.3 If a Substitution Request Form is not provided, requests shall include (1) the name of the material or equipment specified in the Bidding Documents; (2) the reason for the requested substitution; (3) a complete description of the proposed substitution including the name of the material or equipment proposed as the substitute, performance and test data, and relevant drawings; and (4) any other information necessary for an evaluation. The request shall include a statement setting forth changes in other materials, equipment, or other portions of the Work, including changes in the work of other contracts or the impact on any Project Certifications (such as LEED), that will result from incorporation of the proposed substitution.

§ 3.3.3 The burden of proof of the merit of the proposed substitution is upon the proposer. The Architect’s decision of approval or disapproval of a proposed substitution shall be final.

§ 3.3.4 If the Architect approves a proposed substitution prior to receipt of Bids, such approval shall be set forth in an Addendum. Approvals made in any other manner shall not be binding, and Bidders shall not rely upon them.

§ 3.3.5 No substitutions will be considered after the Contract award unless specifically provided for in the Contract Documents.

§ 3.4 Addenda § 3.4.1 Addenda will be transmitted to Bidders known by the issuing office to have received complete Bidding Documents.

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Addenda will be transmitted.)

Copies of the Addendum will be posted electronically, and a notice of posting will be sent via facsimile/email to each plan holder of record.

§ 3.4.2 Addenda will be available where Bidding Documents are on file.

§ 3.4.3 Addenda will be issued no later than four days prior to the date for receipt of Bids, except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids.

§ 3.4.3.1 Depending on the nature of an Addendum (clarifications, limited scope of revisions, added manufacturers) issued less than four days prior to receipt date, the Architect, in its professional judgment, reserves the right to issue said Addendum without postponement of the bid date. However, if in the professional judgment of the Architect, the information contained in the Addendum would be such that it would be unfair or unreasonable to prepare a bid proposal

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:35:57 ET on 02/25/2026 under Order No.4104248195 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (960777813) based on the revisions in the Addendum, then the bid date will be postponed to allow distribution of the Addendum and time to prepare a bid proposal.

§ 3.4.4 Prior to submitting a Bid, each Bidder shall ascertain that the Bidder has received all Addenda issued, and the Bidder shall acknowledge their receipt in the Bid.

ARTICLE 4 BIDDING PROCEDURES

§ 4.1 Preparation of Bids § 4.1.1 Bids shall be submitted on the forms included with or identified in the Bidding Documents.

§ 4.1.2 All blanks on the bid form shall be legibly executed. Paper bid forms shall be executed in a non-erasable medium.

§ 4.1.3 Sums shall be expressed in both words and numbers, unless noted otherwise on the bid form. In case of discrepancy, the amount entered in words shall govern.Where so indicated by the bid form, all amounts shall be expressed in figures only.

§ 4.1.4 Edits to entries made on paper bid forms must be initialed by the signer of the Bid.All changes made by the Bidder to the bid form or outside of the envelope shall be signed or initialed by the Bidder. Bids containing any conditions, omissions, erasures, alterations, or items not called for in the Bid, may be rejected by the Owner as being incomplete or nonresponsive.

§ 4.1.5 All requested Alternates shall be bid. If no change in the Base Bid is required, enter "No Change" or as required by the bid form. If the Bidder does not desire to bid on an Alternate, enter the words "No Bid". If the Owner elects to accept an Alternate, all Bidders submitting a "No Bid" for the Alternate selected by the Owner will be ruled nonresponsive and their Bid will not be considered in the award of the Contract. If the Bidder does not enter an Alternate Bid amount, "No Change", or ’No Bid" for all requested Alternates, and leaves the Alternate information blank, their Bid will be considered nonresponsive and will not be considered in the award of the Contract.

§ 4.1.6 Where two or more Bids for designated portions of the Work have been requested, the Bidder may, without forfeiture of the bid security, state the Bidder’s refusal to accept award of less than the combination of Bids stipulated by the Bidder. The Bidder shall neither make additional stipulations on the bid form nor qualify the Bid in any other manner.

§ 4.1.7 Each copy of the Bid shall state the legal name and legal status of the Bidder. As part of the documentation submitted with the Bid, the Bidder shall provide evidence of its legal authority to perform the Work in the jurisdiction where the Project is located. Each copy of the Bid shall be signed by the person or persons legally authorized to bind the Bidder to a contract. A Bid by a corporation shall further name the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached, certifying the agent’s authority to bind the Bidder.

§ 4.1.8 A Bidder shall incur all costs associated with the preparation of its Bid.

§ 4.2 Bid Security § 4.2.1 Each Bid shall be accompanied by the following bid security:bid security in the form of either a cashier’s or certified check or an acceptable Bid Bond in the amount of five percent (5%) of the Bid amount, and made payable to Lee County, NC. The bid security is a guarantee that if the Contract is awarded by the Owner to the Bidder, the Bidder shall enter into the Contract with the Owner for the Work mentioned in this Bid or forfeit the bid security to the Owner, not as a penalty, but as liquidated damages. No forfeiture under a bid security shall exceed the lesser of (i) the difference between the Bid for which the bid security was written and the next low Bid of another Bidder, or (ii) the face amount of the bid security.

(Insert the form and amount of bid security.)

§ 4.2.2 All bonds shall be executed by a surety company selected by the Bidder which is legally authorized to do business in the State of North Carolina, and the bond shall be the same in both form as well as substance as AIA Document A310, Bid Bond. The Bidder shall require the attorney-in-fact, who executed the required bond on behalf of the surety company, to affix thereto a certified and current copy of the power of attorney. The bond premium shall be paid by the Bidder and the cost shall be included in the Bid.

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:35:57 ET on 02/25/2026 under Order No.4104248195 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (960777813)

§ 4.2.2 The Bidder pledges to enter into a Contract with the Owner on the terms stated in the Bid and shall, if required, furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder. Should the Bidder refuse to enter into such Contract or fail to furnish such bonds if required, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as a penalty. In the event the Owner fails to comply with Section 6.2, the amount of the bid security shall not be forfeited to the Owner.

§ 4.2.3 If a surety bond is required as bid security, it shall be written on AIA Document A310™, Bid Bond, unless otherwise provided in the Bidding Documents. The attorney-in-fact who executes the bond on behalf of the surety shall affix to the bond a certified and current copy of an acceptable power of attorney. The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.

§ 4.2.4 The Owner will have the right to retain the bid security of Bidders to whom an award is being considered until (a) the Contract has been executed and bonds, if required, have been furnished; (b) the specified time has elapsed so that Bids may be withdrawn; or (c) all Bids have been rejected. However, if no Contract has been awarded or a Bidder has not been notified of the acceptance of its Bid, a Bidder may, beginning 61 days after the opening of Bids, withdraw its Bid and request the return of its bid security.

§ 4.3 Submission of Bids § 4.3.1 A Bidder shall submit its Bid as indicated below:

(Indicate how, such as by website, host site/platform, paper copy, or other method Bidders shall submit their Bid.)

§ 4.3.2 Paper copies of the Bid, the bid security, and any other documents required to be submitted with the Bid shall be enclosed in a sealed opaque envelope. The envelope shall be addressed to the party receiving the Bids and shall be identified with the Project name, the Bidder’s name and address, and, if applicable, the designated portion of the Work for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation "SEALED BID ENCLOSED" on the face thereof.

§ 4.3.2.1 FOR NORTH CAROLINA In compliance with N.C.G.S. 143-128 (d) Bidders shall identify on their bid the subcontractors they have selected for the subdivisions or branches of work identified and defined in N.C.G.S, 143-128(a) but briefly referred to as (1) Plumbing, and (2) Mechanical, and (3) Electrical. A Bidder whose bid is accepted shall not substitute any person as subcontractor in the place of the subcontractor listed in the original bid, except (i) if the listed subcontractor’s bid is later determined by the Contractor to be nonresponsible or nonresponsive or the listed subcontractor refuses to enter into a contract for the complete performance of the bid work, or (ii) with the approval of the awarding authority for good cause shown by the Contractor. The terms, conditions, and requirements of each contract between the contractor and a subcontractor performing the work under a subdivision or branch of work listed above shall incorporate by reference the terms, conditions, and requirements of the Contract between the Contractor and the Owner.

§ 4.3.2.2 Submit a single copy of the bid form and bid bond.

§ 4.3.3 Bids shall be submitted by the date and time and at the place indicated in the invitation to bid. Bids submitted after the date and time for receipt of Bids, or at an incorrect place, will not be accepted.

§ 4.3.4 The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.

§ 4.3.5 A Bid submitted by any method other than as provided in this Section 4.3 will not be accepted.

§ 4.3.6 In the solicitation or awarding of Contracts, the Owner shall not discriminate because of the race, religion, color, sex, age, disability or national origin of the Bidder. The Owner welcomes and encourages the participation of small businesses and businesses owned by women and minorities in procurement transactions made by the Owner.

§ 4.3.7 Trade secrets or proprietary information submitted by a Bidder in connection with a procurement transaction, shall not be subject to public disclosure under the Freedom of Information Act; however, the Bidder must invoke the applicable protection, prior to or upon submission of the data or other materials, and must identify the data or other materials to be protected and state the reasons why protection is necessary. The Owner will not accept responses to the Invitation to Bid

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:35:57 ET on 02/25/2026 under Order No.4104248195 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (960777813) in cases where the Bidder declares the entire response to the Invitation to Bid to be proprietary information. The Bidder must designate, in the smallest increments possible, that part of the Bid which is deemed to be proprietary.

§ 4.4 Modification or Withdrawal of Bid § 4.4.1 Prior to the date and time designated for receipt of Bids, a Bidder may submit a new Bid to replace a Bid previously submitted, or withdraw its Bid entirely, by notice to the party designated to receive the Bids. Such notice shall be received and duly recorded by the receiving party on or before the date and time set for receipt of Bids. The receiving party shall verify that replaced or withdrawn Bids are removed from the other submitted Bids and not considered. Notice of submission of a replacement Bid or withdrawal of a Bid shall be worded so as not to reveal the amount of the original Bid.A Bid may not be modified, withdrawn or canceled by the Bidder after the time and date designated for the receipt of Bids and for sixty-one (61) calendar days thereafter except as provided in subparagraph 4.4.3 of these Instructions to Bidders and each Bidder so agrees in submitting a Bid.

§ 4.4.1.1 A Bid may be modified or withdrawn by the Bidder any time prior to the time and date set for the receipt of Bids.

The Bidder shall notify the Owner in writing of its intentions. Such notice shall be in writing over the signature of the person who submitted the original Bid and the notice shall be received and date and time stamped by the Owner on or before the date and time set for the receipt of Bids.

§ 4.4.1.2 Bidders may indicate modifications to Bid amounts by writing the modification on the outside of the sealed envelope containing the Bid and initialing the modification. Only the Bid amount may be modified by this means; no other qualifications may be made.

§ 4.4.2 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids in the same format as that established in Section 4.3, provided they fully conform with these Instructions to Bidders. Bid security shall be in an amount sufficient for the Bid as resubmitted.

§ 4.4.3 After the date and time designated for receipt of Bids, a Bidder who discovers that it made a clerical error in its Bid shall notify the Architect of such error within two days, or pursuant to a timeframe specified by the law of the jurisdiction where the Project is located, requesting withdrawal of its Bid. Upon providing evidence of such error to the reasonable satisfaction of the Architect, the Bid shall be withdrawn and not resubmitted. If a Bid is withdrawn pursuant to this Section 4.4.3, the bid security will be attended to as follows:A Bidder may withdraw its Bid from consideration if the Bid price was substantially lower than other Bids due solely to a mistake therein, provided the Bid was submitted in good faith, and the mistake was a clerical mistake as opposed to a judgment mistake, and was actually due to an unintentional arithmetic error or an unintentional omission of a quantity of Work, labor made directly in the compilation of a Bid which unintentional arithmetic error or unintentional omission can be clearly shown by objective evidence drawn from inspection of original work papers, documents and materials used in the preparation of the Bid sought to be withdrawn. If a Bid contains both clerical and judgment mistakes, a Bidder may withdraw its Bid from consideration if the Bid would have been substantially lower than the other Bids due solely to the clerical mistake, that was an unintentional arithmetic error or an unintentional omission of a quantity of Work, labor or material made directly in the compilation of a Bid which shall be clearly shown by objective evidence drawn from inspection of original work papers, documents and materials used in the preparation of the Bid sought to be withdrawn.

§ 4.4.3.1 The Bidder shall submit to the Owner its original work papers, documents and materials used in the preparation of the Bid within one (1) day after the date fixed for submission of Bids. Such work papers shall be delivered to the Owner by the Bidder in person or by registered mail at or prior to the time fixed by the Owner for the opening of Bids. The Contract shall not be awarded by the Owner until such period has elapsed. Such mistake shall be proved only from the original work papers, documents, and materials delivered to the Owner as required herein.

§ 4.4.3.2 No Bidder who is permitted to withdraw a Bid shall for compensation, supply any material or labor to or perform any subcontract or other work agreement for the person or firm to whom the Contract is awarded or otherwise benefit directly or indirectly from the performance of the Work for which the withdrawn Bid was submitted.

§ 4.4.3.3 If a Bid is withdrawn under authority of this section, the next lowest responsive and responsible Bidder shall be deemed to be the low Bidder.

(State the terms and conditions, such as Bid rank, for returning or retaining the bid security.)

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:35:57 ET on 02/25/2026 under Order No.4104248195 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (960777813)

§ 4.4.3.4 When the procedure set forth in the paragraphs above is utilized, original work papers, documents, and materials used in the preparation of the Bid must be submitted in an envelope or package separate and apart from the envelope containing the Bid marked clearly as to the contents.

§ 4.4.3.5 If the Owner denies the withdrawal of a Bid under the provisions of this section, it shall notify the Bidder in writing stating the reasons for its decision and award the Contract to such Bidder at the Bid price, provided such Bidder is a responsible and responsive Bidder.

ARTICLE 5 CONSIDERATION OF BIDS

§ 5.1 Opening of Bids If stipulated in an advertisement or invitation to bid, or when otherwise required by law, Bids properly identified and received within the specified time limits will be publicly opened and read aloud. A summary of the Bids may be made available to Bidders.All Bids received on time in accordance with the Bidding Document requirements shall be opened and publicly read aloud. Any Bidder, upon request, shall be afforded the opportunity to inspect Bid records within a reasonable time after the opening of all Bids but prior to award, except in the event that the public body decides not to accept any of the Bids and to reopen the Contract. Otherwise, Bid records shall be open to public inspection only after award of the Contract. Any inspection of procurement transaction records shall be subject to reasonable restriction to ensure the security and integrity of the records.

§ 5.2 Rejection of Bids Unless otherwise prohibited by law, the Owner shall have the right to reject any or all Bids. A Bid not accompanied by a required bid security or by other data required by the Bidding Documents, or a Bid which is in any way incomplete or not in conformance with requirements of the Bidding Documents is subject to rejection.

§ 5.3 Acceptance of Bid (Award) § 5.3.1 It is the intent of the Owner to award a Contract to the lowest responsive and responsible Bidder, Bidder provided the Bid has been submitted in accordance with the requirements of the Bidding Documents. Unless otherwise prohibited by law, the Documents and does not exceed the funds available. The Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid which, in the Owner’s judgment, is in the Owner’s own best interests.

§ 5.3.1.1 In determining the lowest responsible Bidder, the Owner may consider, among other things, the Bidder’s past performance, conduct on other contracts, and other information provided by the Bidder, including in the Contractor’s Pre-Qualification Package, if requested.

§ 5.3.2 Unless otherwise prohibited by law, the Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the lowest responsive and responsible Bidder on the basis of the sum of the Base Bid and Alternates accepted.

§ 5.3.3 In case of a tie Bid, preference may be given to goods, services, and construction produced in Lee County or the State of North Carolina or provided by persons, firms or corporations having principal places of business in Lee County or the State of North Carolina, if such a choice is available; otherwise the tie shall be decided by lot. A Lee County business may be given preference over a State of North Carolina business, if such a choice is available.

§ 5.3.4 If a Contract is to be awarded, the Owner will give the Bidder a Notice of Award within sixty (60) calendar days after the day of the Bid opening.

§ 5.4 NEGOTIATION WITH LOWEST RESPONSIVE AND RESPONSIBLE BIDDER

§ 5.4.1 If award of a Contract to the lowest responsive and responsible Bidder is precluded because of limitations on available funds, the Owner reserves the right to negotiate the Bid amount with the lowest responsive, responsible Bidder to obtain a Contract amount within the available funds. The negotiations may involve changes in either the features or scope of the Work. Such negotiations may include reducing the quantity, quality, or other cost saving mechanisms involving items in the Bid amount, including unit prices (if any) and/or allowances (if any) that affect the Bid amount, and/or Alternates (if any).

§ 5.4.2 The Owner shall notify the lowest responsive and responsible Bidder that such a situation exists and the Owner and Bidder shall then conduct their negotiations in person, by mail, by telephone or by any means they find convenient.

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:35:57 ET on 02/25/2026 under Order No.4104248195 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (960777813)

§ 5.4.3 If an acceptable Contract can be negotiated, the changes to the Bid amount and Bidding Documents agreed upon in the negotiations shall be summarized in a "Post Bid Addendum," and included in the Contract.

§ 5.4.4 If the Owner and the lowest responsive and responsible Bidder cannot negotiate a Contract within available funds, the Owner shall terminate negotiations and reject all bids.

ARTICLE 6 POST-BID INFORMATION

§ 6.1 Contractor’s Qualification Statement Bidders to whom award of a Contract is under consideration shall submit to the Architect, upon request and within the timeframe specified by the Architect, a properly executed AIA Document A305™, Contractor’s Qualification Statement, unless such a Statement has been previously required and submitted for this Bid.

§ 6.2 Owner’s Financial Capability A Bidder to whom award of a Contract is under consideration may request in writing, fourteen days prior to the expiration of the time for withdrawal of Bids, that the Owner furnish to the Bidder reasonable evidence that financial arrangements have been made to fulfill the Owner’s obligations under the Contract. The Owner shall then furnish such reasonable evidence to the Bidder no later than seven days prior to the expiration of the time for withdrawal of Bids. Unless such reasonable evidence is furnished within the allotted time, the Bidder will not be required to execute the Agreement between the Owner and Contractor.

§ 6.3 Submittals § 6.3.1 After notification of selection for the award of the Contract, the Bidder shall, as soon as practicable or as stipulated in the Bidding Documents, submit in writing to the Owner through the Architect:

.1 a designation of the Work to be performed with the Bidder’s own forces;

.2 names of the principal products and systems proposed for the Work and the manufacturers and suppliers of each; and

.3 names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the Work.

§ 6.3.2 The…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .