4827-0009-R Madison County Attachment A supplement Acquisition Bid Worksheet.xlsx

XLSX spreadsheet 624 KB Posted

Attached to
Non-IT IFB or RFQ Agency Services Sourcing Event Template
Solicitation number
Doc2170300387
Issued by
Avery County, North Carolina

About this file

This is a Bid Worksheet document issued by the North Carolina Department of Public Safety Emergency Management for an Acquisition Request for Bid (RFB) related to Storm 4827 in Madison County. The worksheet is designed for vendors to submit bids for property acquisition and site demolition services across multiple properties. The RFB encompasses four properties: 315 S Main Street in Marshall (mandatory), 3544 Gabriel's Creek Road in Mars Hill (mandatory), 17 Silvermine Road in Hot Springs (optional), and 2718 NC Highway 251 in Marshall (optional). Each property requires completion of individual Property Worksheets that detail acquisition activities (intake/DOB calculation, appraisal, title research, document preparation, and closing attorney fees) and site demolition activities (asbestos/lead inspection and remediation, structure demolition, UST/other clearance, and grade/seed work). Vendors must provide unit prices and quantities for all line items, specify units of measure, and include construction management costs and profit & overhead allocations for each property. The worksheet automatically calculates phase totals and grand totals, and vendors must provide an overall project timeframe in days from Notice to Proceed through closeout for all contracted work, which will be used in bid evaluation to meet HMGP goals and deadlines.

Vendors are strictly prohibited from modifying the bid worksheet structure, including adding or removing line items or changing formulas, with noncompliance resulting in proposal rejection. All pricing information must be entered in the designated light blue cells, and any calculation errors or concerns must be immediately reported to the State using the contact method specified in the RFB. The worksheet provides three additional miscellaneous cost rows per work phase for vendors to include other eligible costs with detailed descriptions, units of measure, unit prices, and quantities. Vendors are responsible for verifying the accuracy of all auto-calculated amounts for each work phase and the grand total. Currently, all line items display $0.00 values, indicating this is a blank template awaiting vendor completion.

View the file

Other files

File Type Posted
19-IFB-21703003717-RMT Madison Co Acq-Dem DRAFT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SUMMARY SHEET

North Carolina Department of Public Safety
Emergency Management
ACQUISITION REQUEST FOR BID WORKSHEET
RFB NUMBER:
VENDOR:
BID DATE:
BID SUMMARY
WORK PHASETOTAL
ACQUISITION$0.00
SITE DEMOLITION$0.00
PROFIT & OVERHEAD$0.00
CONSTRUCTION MANAGEMENT COSTS$0.00
GRAND TOTAL:$0.00

TOTAL PROJECT TIME (DAYS):

NOTES:**Please read the following information carefully**
1) The Vendor shall fill out this Bid Worksheet in its entirety.
2) Modifications to this worksheet (i.e., adding/removing line items, modifying formulas, etc.) are not permitted. Noncompliance shall constitute grounds to reject Vendor's proposal.
3) Vendor is responsible for providing information in light blue cells.
4) This Bid Summary Sheet auto-calculates the Work Phase Totals (Acquisition, Site Demolition, Profit & Overhead, and Management Costs) from subsequent Property Worksheets. Vendor shall verify that all amounts for each individual phase and the Grand Total have been calculated correctly. Any errors or concerns with this worksheet shall be brought to the immediate attention of the State; Vendor shall follow the contact method as specified in the RFB.
5) Vendor must provide Construction Management Costs and Profit & Overhead Costs for each property, as applicable.
6) An individual Property Worksheet must be filled out in its entirety for EACH property. Property Worksheets are included within this Bid Worksheet.
7) Vendor shall note the unit of measure for each line item listed on the Property Worksheet (i.e., linear feet, square feet, hour, flat rate, or any reasonable unit of measure). Vendor shall input a Unit Price and Quantity for every line item (a '1' must be entered in the Quantity column for flat or individual costs).
8) Additional rows for miscellaneous costs have been provided for each property. Three additional rows per work phase have been provided if the Vendor determines other eligible costs should be provided in their bid. If Vendor elects to use this category, a description of the cost must be provided along with the unit of measure, unit price, and quantity.
9) Vendor shall provide the anticipated overall project timeframe (i.e., total time to complete work for all properties listed). This estimate, in days, shall begin with the Notice to Proceed and end at closeout for all contracted work. Vendor shall strive to meet this timeframe, as well as any timeframes put forth by NCEM, barring any unexpected acts of nature requiring a change in the Scope of Work and/or Change Order(s). It is the responsibility of the Vendor to create a time schedule, including any phasing or work overlap, in order to complete all projects in the specified timeframe. The timeframe submitted by each Vendor shall be used by the State when evaluating bids as to meet HMGP goals and deadlines.

REF-SHEET2-DONOTMOVE

*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.

PROPERTY (1)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:315 S Main Street
PROJECT #:9CITY:Marshall
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead Remediation$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (2)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:3544 Gabriel’s Creek Road
PROJECT #:9CITY:Mars Hill
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead Remediation$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Concrete Slab adjacent to structure$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (3) Opt.

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:17 Silvermine Rd
PROJECT #:9CITY:Hot Springs
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead Remediation$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Shed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (4) Opt.

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:2718 NC Highway 251
PROJECT #:9CITY:Marshall
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead Remediation$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

REF-LASTSHEET-DONOTMOVE

*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.

image1.wmf

File details come from the government source that posted it. Updated .