47QSSC27Q0028 Vendor Questions.pdf
PDF 95 KB Posted
- Attached to
- Purchase Olsun Electrics 225 KVA Transformer
- Solicitation number
- 47QSSC27Q0028
- Issued by
-
GSA Federal Acquisition Service
About this file
This file is a Vendor Questions and Answers document for RFQ 47QSSC27Q0028 regarding an Olsun 225 kVA Pad Mount Transformer, posted on November 13, 2026. The document addresses six key vendor inquiries concerning delivery, approvals, specifications, and testing requirements for the transformer to be delivered to the East Miramar Marine Corps Base storage facility.
Regarding delivery and lead time, vendors must state their actual Days After Receipt of Order (DARO) with justification, as the standard 8-day office policy does not apply to all acquisitions; DARO should reflect delivery at destination after order placement. For Government approval, spec data sheets with drawings are acceptable, with a standard 14-day approval timeline, though faster turnaround is expected. The confirmed delivery destination is the East Miramar Marine Corps Base storage facility across from the East Miramar Fed Fire Building, with additional receiving details to be provided post-award. Testing requirements specify that IEEE/ANSI factory production test reports provided with the unit are required, with no witness testing, field testing, installation, or startup services needed, as post-installation testing will not be required due to uncertain installation timelines. The primary configuration requires a Radial Feed-through Design with 6 x 200A bushings—three incoming and three outgoing—with bushing well inserts to be included. For replacement unit specifications, vendors should contact the Contracting Officer at cara.fowler@gsa.gov to obtain existing unit nameplate data, serial numbers, photos, and footprint or conduit-location constraints for the existing pad at B4-PS4-T62.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Posted 11/13/2026 1
Vendor Questions
RFQ 47QSSC27Q0028 (Olsun 225 kVA Pad Mount Transformer)
1. The RFQ lists a requested DARO of 8 days and provides a field in Section 2 for an extended lead time and reason. Will a quote stating an extended lead time be evaluated on the same basis as quotes meeting 8 days, and is there a latest acceptable delivery date? Should the stated lead time reflect delivery at destination, including factory testing and transit?
The 8 Day DARO is an office policy that does not work for all acquisitions. Please state your actual DARO and the reason for the extended lead time. DARO should be the date of delivery at destination after the order is placed.
2. Will the Government require submittal or approval drawings before the unit is released for manufacturing? If so, what review time should vendors plan for?
Spec data sheets with drawings are acceptable. Standard approval for Government is 14 days, but we should be able to turn it around quickly.
3. Delivery location (pages 1 and 13): Page 1 lists shipment to Naval Base San Diego, CA 92136, while the amended requirements specify delivery to the East Miramar Marine Corps Base storage facility across from the East Miramar Fed Fire Building. Please confirm the delivery location, receiving hours, any base access requirements for the carrier, and that offloading equipment suitable for the unit's weight will be available on site.
The requirements information on the Amend RFQ "East Miramar Marine Corps Base storage facility across from the East Miramar Fed Fire Building" is the correct updated delivery destination. Additional details will not be available until after award.
4. Testing (page 13): The amended requirements state that factory test results will be required, while the original RFQ and the brand name justification referenced certified testing post shipping. Please confirm that standard IEEE/ANSI factory production test reports provided with the unit satisfy the requirement, and that no witness testing, field testing, installation, or startup services are required.
IEEE/ANSI factory production test reports is what will be required. The Customer is unsure of the timeline for installation so post-installation testing will not be required.
5. Primary configuration (page 13): The amended requirements describe a "Radial Feed-through Design with 3 x 200A Bushing Wells," while the companion RFQ 47QSSC27Q0027 uses the same design description with six 200A bushing wells.
Please confirm the required configuration and bushing well quantity for this unit, and whether bushing well inserts are to be included.
Posted 11/13/2026 2
6 x 200A bushings refer to the radial feed through. An incoming set of three and an outgoing set of three.
6. Please provide the existing unit's nameplate data (including serial number), a photo if available, and any footprint or conduit-location constraints at Pad B4- PS4-T62 so the replacement fits the existing pad.
Photos are available by emailing the Contracting Officer at cara.fowler@gsa.gov mailto:cara.fowler@gsa.gov