Revised Attachment B - Proposal Checklist.docx
DOCX document 25 KB Posted
- Attached to
- Main Bus Program 2020
- Solicitation number
- 47QMCA20R0002
- Issued by
-
GSA Federal Acquisition Service
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B – PROPOSAL CHECKLIST
This proposal checklist is to assist Offerors in ensuring that proposals are complete. An electronic copy of this completed checklist must be included with all offers submitted. Prior to preparation of your offer, be sure to read the entire solicitation. Offers shall be prepared and submitted in the format outlined below.
Proposal Checklist
Volume 1—Administrative Requirements (ELECTRONIC VERSION ONLY - .zip file)
Included/ Completed
GSA
Use
Tab A – Attachment A - SF1449 {complete blocks 17(a), 30(a), 30(b) and 30(c)}
Tab B – Attachment B – This Proposal Checklist
Tab C – Financial Data
Tab D – Attachment C - Offeror Response Form (DO NOT include entire solicitation document)
Tab E – Proof of completion of VETS-4212 reporting requirement
Tab F – Letter(s) of Supply (if non-OEM offeror)
Tab G – Attachment G – Small Business SubK Plan (if Large Business)
Tab H – Past Performance Information (5 Pages Maximum)
Tab I – SAM Information
Volume 2—Technical Proposal
Included/ Completed
GSA
Factor 1 – Technical Capability (25 Pages Maximum)
Tab A – Technical Approach
a. Process for ensuring compliance with specifications
b. Process for order receipt and processing
c. Process for order input into production cycle
d. Process for vehicle shipment
e. Ability to comply with standard delivery which conforms to solicitation requirements
f. Project Plan identifying the following:
1) Date of completion or proposed build order
2) Order placement with all significant subcontractors, if applicable (cab and chassis, body, etc.) For non-OEM offerors, identify order placement procedures with suppliers
3) Delivery date of subcontracted items
4) Planned completion timeline
5) Planned inspection and shipment timeline
g. The time of shipment specified for each representative line item is supported by the Project Plan
h. No unapproved exceptions taken to the Federal Standards
i. Does not exceed 25 pages, excluding technical exceptions to the Federal Standard 833P (Attachment D)
Tab B – Exceptions to Federal Vehicle Standard 833P (Attachment D)
Factor 2 – Management Capabilities (15 Pages Maximum)
Tab A – Management Approach
a. Timely order processing that conforms to solicitation requirements for the time of shipment specified for each representative line item
b. Oversight to ensure production, shipment and delivery of vehicles conform to solicitation requirements (includes methods and timetables for certificates of origin and other vehicle documentation)
c. Management of suppliers and dealers
d. Warranty administration
e. Does not exceed 15 pages.
Volume 3—Price Proposal
Included/ Completed
GSA
AutoBid Pricing completed by 12:00pm ET June 25, 2020
Tab A - ELECTRONIC copy of AutoBid printout
SOLICITATION 47QMCA20R0002
File details come from the government source that posted it. Updated .