47QFPA23R0001 RFP QandA 2 Response 03282023.pdf
PDF 215 KB Posted
- Attached to
- Office of People Analytics (OPA) Analytical Support for Research, Surveys, and Statistics
- Solicitation number
- 47QFPA23R0001
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Analytical Support for Office People Analytics Centers for Health & Resilience (H&R) and Retention & Readiness (R&R)
(Solicitation # 47QFPA23R0001)
47QFPA23R0001 Q&A #2 28 March 2023
Question
Does the Questio n Pertain to the
TOR,
PWS, or an Attach ment?
Paragraph
Pag e #
Vendor Question Government Response
41 PWS 4.1.7 6 4.1.7. Prepare a Staffing Plan.
Noting that the Staffing plan is a main component in Element B, is it acceptable to include a cross-reference in 4.1.7 (Part of Element A) to the Staffing Plan portion of Element B or does the staffing plan information need to appear in both Elements A and B.
Correction to Q&A #1, Q6, which should read: There is only 1 Staffing Plan required, which is part of the Volume II, Factor II, Element B contents and evaluation criteria. It may be cross-referenced under Volume II, Factor II Element A. As a reminder, Volume II is subject to a total 75-page limit.
42 PWS 4.18 6 4.1.8. Quality Control Plan. Noting that Quality Control Plan has its own element (Element C), is it acceptable to include a cross-reference in 4.1.8 (Part of Element A) to Element C (The Quality Control Plan) or does the quality control plan information need to appear in both Elements A and C.
Correction to Q&A #1, Q7, which should read: There is only 1 Quality Control Plan, required which is part of Volume II, Factor II, Element C. It may be cross-referenced under Volume II, Factor II Element A. As a reminder, while Element C is not included in the page count, Volume II is still subject to a total 75-page limit.
43 Q&A #1 Q5 and Q30
Response to from Q&A #1, Questions 5 and 30 clearly state that the Transition Plan is a requirement of Element B and can be cross-referenced under Elements A and C.
However, the Element C evaluation criteria in the amended RFP (pg. 49) states in blue text “inclusive of the transition plan”. Can the Government please clarify whether the actual Transition Plan should be included in Element B or C?
Removed “inclusive of the transition plan” from Element C evaluation criteria of the RFP. See RFP rev 2.
The transition plan is to be included in Volume II, Factor II, Element B.