Page 1 of 4 Rev 0
AFB Window Replacement – Earthquake Damage
Statement of Work
U.S. GENERAL SERVICES ADMINISTRATION, NORTHWEST/ARCTIC REGION 10
Section 1:
Project Location & Building Number
Anchorage Federal Building & U.S. Courthouse 222 W 7th Ave Anchorage, AK 99513
AK0031AA & AK0032ZZ
Section 2:
Project Background
The United States General Services Administration requests the demolition, preparation, and installation of 143 insulated exterior windows (varies in SF) and two
(2) single paned glass that have cracked or broken within the Anchorage Federal Building and Annex. All windows will comply with the security blast film requirements through mechanical or manual installation. The purpose of the project is to replace fogged windows with compromised seals at the building’s exterior and interior windows that have been damaged by recent earthquakes.
Section 3:
Work Hours
This project shall be accomplished during normal AFB weekday working hours of 7:00 AM to 5:00 PM, depending on the Agency.
Contractor shall schedule the work in writing at least ten (10) business days in advance with the GSA Project Manager (PM).
Section 4:
Parking/ Loading Dock
Contractor parking at the AFB is not available. Access to the loading dock requires advance coordination with the GSA PM.
Section 5:
General Information
1. All work shall comply with the latest version of GSA PBS P-100, Facility Standards for the Public Buildings Service at https://www.wbdg.org/ffc/gsa/criteria/pbs-p100
2. Specific attention should be given to PBS P-100 Chapter One requirements including Laws, Regulations, Codes and Standards, and Key Sustainable Product requirements for carpet, interior paint, gyp board, ceiling tiles, and concrete.
3. Contractor shall provide all supplies, equipment, materials, services, and labor to perform the work.
4. Contractor shall be responsible for obtaining all necessary local, state, and federal permits, licenses, and clearances.
5. Field Verification: All code requirements, work dimensions, quantities, and locations shall be field verified by the contractor.
6. Contractor Use of Premises: The Contractor shall coordinate with the GSA PM to http://www.gsa.gov/portal/content/104821
Page 2 of 4 Rev 0 arrange a schedule for site access during construction. Construction processes disruptive to normal facility operations shall be coordinated with the GSA PM in writing at least 5 business days in advance. The Contractor shall be authorized to use building restrooms.
7. Utilities: Contractor shall be authorized to use utilities during the course of this project. The contractor is responsible for making connections to the existing utility systems. Temporary electrical work shall meet the requirements of NFPA 70.
When temporary connections are removed, the Contractor is responsible for restoring existing utility services to their original condition.
8. Utility Outages and Locates: No utility outages will be approved without the written consent and approval of the GSA PM. Requests for utility outages shall be coordinated in writing at least 5 business days in advance with the GSA PM.
9. Protection of Public: The building site will continue to be used by tenants. The contractor shall fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry.
10. Housekeeping: The project site shall be kept in a neat, orderly, and safe condition at all times and all work areas shall be cleaned at the end of each work day. A final cleaning of the entire construction area will be required at substantial completion of the project. Final Cleaning to include (1) Removal of all tools, equipment, surplus material, and rubbish/debris; (2) Restore or refinish, to original condition, surfaces that are damaged due to the work of this contract; (3) Removal of grease, dirt, stains, foreign materials, and labels from finished surfaces; and (4) thoroughly clean building interiors.
11. Disposal: Ensure all waste materials and debris is disposed at an Alaska
Department of Environmental Conservation (DEC) approved disposal site, in accordance with applicable environmental regulations. Unless otherwise specified, all material(s) removed becomes the property of the Contractor.
12. Painting/Staining: If necessary, all painting, staining, or other activity which may cause noxious or undesirable fumes must be performed outside of the normal working hours of 8AM-5PM. Painting/Staining shall be coordinated in writing with the GSA Project Manager at least 5 business days in advance. The Contractor is responsible for using “low or no VOC” paints and stains.
13. Communications: Contractor project designee must be available to provide project status updates to GSA each work day.
Section 6:
Project Description
Reference attached floorplan. Contractor shall provide all supplies, material, equipment, and labor required to perform this work:
• Conduct all operations with a minimum of noise and odors. The use of pneumatic or electric hammers for demolition and cutting purposes within the existing building will not be permitted during normal business hours.
• Preservation of existing features: Confine all operations to work limits of the project. Prevent damage to all adjacent areas and existing building surfaces and systems. Restore any damage to Government property due to the aforesaid
Page 3 of 4 Rev 0 work or replace in a manner satisfactory to the GSA Contracting Officer (CO) and GSA Project Manager (PM).
• Erect dustproof partitions where demolition work is in progress.
• The Contractor shall ensure that all HVAC grates, light fixtures, water fountains, fire extinguishers, and other permanent fixtures are either protected or removed prior to wall preparation and paint. Any items removed must be reinstalled upon completion.
• The materials are required to be kept clean and dry throughout the duration of the project.
• Contractor shall adhere to manufacturer’s recommended instructions for each product installed/applied.
• Provide and maintain suitable barricades during the progress of work. Assume the responsibility of barriers to completion of contract and remove same.
• Where openings are to be cut in existing frames or building walls, cut such openings with care. Where materials, equipment, frames, etc. are to be removed, remove such items with care to minimize damage to adjacent materials.
• Cut, move, or remove items as necessary for access to alterations and renovations work, replace and restore at completion.
• Prepare surfaces and remove surface finishes provide for proper installation of new work and new finishes.
• Where new work abuts or aligns with existing, make a smooth and even transition. New work shall match existing adjacent work in texture and appearance.
• Clean government occupied areas affected by work daily. Clean all surfaces affected by construction before the start of the next business day.
Execute the project as follows:
1. See Attachment AFB Window Replacement - Earthquake Damage Drawings
(window locations to be verified with project manager and building manager during site visit).
2. Follow the respective product manufacturer recommendations, as detailed on the product data sheets for each respective product. All work to be completed following standard industry practices and PBS-P100. Contractor shall ensure all work is completed in compliance with applicable environmental regulations
3. Protect adjacent finishes, equipment, and personnel against dust contamination.
4. Clean openings and prep for new window and assembly installation.
5. Exterior Windows:
a. Provide and install new window assemblies and seals in accordance with manufacturer instructions. Match existing Thermopane glazing with ¼” Sterling Silver outer pane, ½: airspace, and ¼’ clear inner pane.
b. Ensure blast security film (wet glaze seal) on new windows per manufacturer instructions via mechanical or manual installation methods.
c. Only black silicone window caulking shall be used.
Page 4 of 4 Rev 0
6. USAO (2nd Floor)
a. Glazing overlooking the atrium. Match and replace glazing that has cracked.
b. RM 207 - Provide and install new single glass pane that was broken.
7. Application temperature recommendations for adhesives will be verified and followed.
Protect window repairs from damage for not less than 12 hours while sealant cures.
Section 7:
Submittals
Submittals: Submittals verify design intent; however, approved submittals DO NOT automatically constitute a waiver to the contract document requirements. If a waiver or deviation from the contract document requirements is required the Contractor must submit a Request for Information (RFI) to the Contracting Officer. The Contracting Officer will determine if a waiver is permitted and respond to the RFI.
Submittals required by this contract are the following:
• Project schedule
• All product information
Section 8:
Closeout
Substantial Completion and Final Inspection
• Contractor shall complete an internal punchlist inspection prior to requesting
GSA substantial completion inspection. A list of any outstanding punchlist items will be provided to GSA at time of request.
• When project, or designated portion of project is complete, request a substantial completion inspection. Submit request for substantial completion inspection to GSA CO & PM seven (7) calendar days prior to requested date.
• Upon receipt of request that project is substantially complete, the GSA PM will proceed with the inspection or will advise the contractor of items that prevent the project from being designated substantially complete.
Close out Requirements:
• All items under this paragraph must be completed prior to submitting the final invoice for payment.
o Construction Debris, Contractor Tools, Equipment, and Materials shall be removed from the jobsite o Warranties - The contractor shall be responsible for installing all material and equipment in accordance with original manufacturer specifications and requirements.
o Contractor shall provide itemized equipment list and O&M materials.
o Submit Release of Claims per contract requirements.
o Return all security credentials and keys (HSPD12, access badges, etc.)
Section 9:
Attachments
Attachments (note all plans for reference only, Contractor responsible to verify accuracy):
1. AFB Window Replacement - Earthquake Damage Drawings
-End of Statement of Work-
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
WH
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 152A
AutoCAD SHX Text
AutoCAD SHX Text 152A
AutoCAD SHX Text 152B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text 152A
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
RAMP DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FD
AFB WINDOW REPLACEMENT 1ST FLOOR (~35)
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 263A
AutoCAD SHX Text 263B
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
AutoCAD SHX Text C296
AutoCAD SHX Text C277
AutoCAD SHX Text C279
AutoCAD SHX Text C281
AutoCAD SHX Text C283
AutoCAD SHX Text C284
AutoCAD SHX Text C285
AutoCAD SHX Text C286
AutoCAD SHX Text B260A
AutoCAD SHX Text B260B
AutoCAD SHX Text B247
AutoCAD SHX Text B255
AutoCAD SHX Text B254
AutoCAD SHX Text B253
AutoCAD SHX Text B252
AutoCAD SHX Text B251
AutoCAD SHX Text B250
AutoCAD SHX Text B262A
AutoCAD SHX Text
AutoCAD SHX Text B258
AutoCAD SHX Text B257
AutoCAD SHX Text A202
AutoCAD SHX Text A203
AutoCAD SHX Text A205
AutoCAD SHX Text A206
AutoCAD SHX Text A207
AutoCAD SHX Text A208
AutoCAD SHX Text A209
AutoCAD SHX Text A210
AutoCAD SHX Text A211
AutoCAD SHX Text A229
AutoCAD SHX Text A230
AutoCAD SHX Text A233
AutoCAD SHX Text A234
AutoCAD SHX Text A235
AutoCAD SHX Text B240
AutoCAD SHX Text A200
AutoCAD SHX Text A237
AutoCAD SHX Text A236
AutoCAD SHX Text A238
AutoCAD SHX Text A232
AutoCAD SHX Text A231
AutoCAD SHX Text A228
AutoCAD SHX Text A214
AutoCAD SHX Text A215
AutoCAD SHX Text A222
AutoCAD SHX Text A217
AutoCAD SHX Text A218
AutoCAD SHX Text A219
AutoCAD SHX Text A221
AutoCAD SHX Text
AutoCAD SHX Text C278
AutoCAD SHX Text C282
AutoCAD SHX Text C280
AutoCAD SHX Text C287
AutoCAD SHX Text C288
AutoCAD SHX Text C289
AutoCAD SHX Text C290
AutoCAD SHX Text C276
AutoCAD SHX Text C275
AutoCAD SHX Text C274
AutoCAD SHX Text C273
AutoCAD SHX Text C272
AutoCAD SHX Text C271
AutoCAD SHX Text C269
AutoCAD SHX Text C268
AutoCAD SHX Text C267
AutoCAD SHX Text C299
AutoCAD SHX Text C294
AutoCAD SHX Text C266
AutoCAD SHX Text C265
AutoCAD SHX Text C293
AutoCAD SHX Text C298
AutoCAD SHX Text C297
AutoCAD SHX Text C294
AutoCAD SHX Text C292
AutoCAD SHX Text C274
AutoCAD SHX Text B256
AutoCAD SHX Text
AFB WINDOW REPLACEMENT 2ND FLOOR (~15)
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AFB WINDOW REPLACEMENT 3RD FLOOR (~21)
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AFB WINDOW REPLACEMENT 4TH FLOOR (~22)
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text Fridge
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text 46%%C(E)
AutoCAD SHX Text 30%%C
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VFD
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
EXISTING COOLING COIL
AFB WINDOW REPLACEMENT 5TH FLOOR (~15)
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
AFB WINDOW REPLACEMENT GMOD - BASEMENT
AutoCAD SHX Text
SKYLITE
(~30)
DN
AutoCAD SHX Text
DN
AFB WINDOW RPMT GMOD GROUND FLOOR(~7)
| AFB Window Replacement Drawings EQ.pdf |
| Window Replacement 1st Floor |
| Sheets and Views |
| Layout1 |
| Window Replacement 2nd Floor |
| Sheets and Views |
| Layout1 |
| Window Replacement 3rd Floor |
| Sheets and Views |
| Layout1 |
| Window Replacement 4th Floor |
| Sheets and Views |
| Layout1 |
| Window Replacement 5th Floor |
| Sheets and Views |
| Layout1 |
| Window Replacement GMOD Basement |
| Sheets and Views |
| Layout1 |
| Window Replacement GMOD Ground Floor |
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it.