Q&A February 9, 2023
47PJ0023R0021
FDA Flooring Refresh
Question Answer
Is a pre-demolition asbestos report required?
While generally standard based on the Universal Scope Requirements, a pre-alteration assessment will not be required for this project because GSA is already aware that ACM is present in the mastic under the 9x9 tile. The new flooring will be installed over the top of this material and will be managed in place.