8. 100% FINAL Design Drawings_8-7-24.pdf
PDF 73 MB Posted
- Solicitation number
- 47PH0825R0006
About this file
The file "8. 100% FINAL Design Drawings_8-7-24.pdf" appears to be the final design drawings for the Colombia Land Port of Entry (LPOE) Border Roadway Improvement & Construction (BRIC)/Paving Project in Laredo, TX. This project, issued by the U.S. General Services Administration (GSA), involves comprehensive pavement repair and replacement covering approximately 470,000 square feet, including vehicular traffic lanes, shoulders, and parking areas.
The project scope encompasses surface reconstruction, joint and crack seals, jointed reinforced concrete pavement (JRCP) patching, and earth embankment stabilization. Pavement replacement will involve removing existing concrete and base material, with reconstruction depths ranging from 10 to 13 inches. The project requires complex traffic control measures to maintain lane access and flow. Classified as a small business set-aside under NAICS code 237310 (Highway, Street, and Bridge Construction), the project is anticipated to take 360 calendar days to complete, with a small business size standard of $45 million.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .