Waste Mgmt Plan Reporting Template.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- 70159 GSA Fire Alarm Upgrade Federal contract opportunity
- Solicitation number
- 47PH0623R0011
About this file
This document outlines a forthcoming solicitation for a fire alarm system upgrade project at the Gallup Federal Building in Gallup, New Mexico. The General Services Administration Public Buildings Service Region 7 intends to issue a request for proposal to replace the existing fire alarm system with a new intelligent, addressable, and emergency voice/alarm system in compliance with NFPA 72 and P-100 standards. The project scope includes new panels, detectors, notification appliances, networking components, and integration with security, elevator, HVAC, and kitchen systems to provide audible and visible alarms throughout the building. The solicitation number is 47PH0623R0011 and will be issued on or around December 6th 2022 with proposals due January 10th 2023 and award by March 6th 2023. The period of performance is 225 calendar days. The procurement is set aside for small businesses with a NAICS code of 238210 and size standard of $16.5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 1.pdf | ||
| Bid Schedule Template.xlsx | XLSX spreadsheet | |
| Past Performance Questionnaire.pdf | ||
| Vendor Fitness Determination Training Manual.pdf | ||
| SF1442 Gallup Fire Alarm 47PH0623R0011.pdf | ||
| Fire Alarm Drawings 02-14-22.pdf | ||
| GSA 527.pdf | ||
| Fire Alarm Specifications 11-03-2022.pdf | ||
| Wage Determination NM20220024 dated 02-25-2022.pdf | ||
| SOW GSA Fire Alarm Upgrade 11-15-2022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Waste Diversion Plan
: +christopher.clever@gsa.gov +walter.tersch@gsa.gov
(For consideration as an alternate). Anticipated sections match Actual to the right for 1:1 comparison.
-Jake Begnaud - WPIDBB Fine with either, will defer to +walter.tersch@gsa.gov Seems like it only boils down to estimating method or not.
-Christopher Clever - PCBL That's correct.
| -Jake Begnaud - WPIDBB | Project Waste Management Plan | Submittal Type: | Waste Diversion Plan (Anticipated): | Waste Diversion Report (Final) : | |||
| The general info in these gray cells replicates onto the Report tabs. | |||||||
| Project Name: | ECC (estimated construction cost): | Project Manager: | ePM/ePMX Project # : | ||||
| Project Short Description: | PM email or phone: | gBUILD Project # : | |||||
| Building Number: | Service Center / Field Office: | Budget Activity: | (list all applicable) | RWA # : |
Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction, with final Construction Documents (PM or contractor populates this pink section) Actual Waste Diversion Report To be submitted during Project Close-Out (Reports tab figures auto-populate this green section)
| Material* | |||||
| (see weight conversion factors below) | Diversion Method | Target Diversion Rate for each material, by weight | |||
| (Change to actual target(s) as needed) | Diverted (lbs) | Landfilled (lbs) | Total C&D material weight (Diverted + Landfilled) (lbs) | Diversion |
Rate
| Reuse* | Recycle or Compost | Donation | ||||||
| Asphalt | 50% | 0 | 0 | 0 | n/a | |||
| Brick, Masonry, and Tile | 50% | 0 | 0 | 0 | n/a | |||
| Cardboard | 50% | 0 | 0 | 0 | n/a | |||
| Carpet, including Padding | 50% | 0 | 0 | 0 | n/a | |||
| Ceiling tile | 50% | 0 | 0 | 0 | n/a | |||
| Concrete | 50% | 0 | 0 | 0 | n/a | |||
| Drywall/ sheetrock (unpainted) | 50% | 0 | 0 | 0 | n/a | |||
| Metals | 50% | 0 | 0 | 0 | n/a | |||
| Painted wood, drywall, or plywood | 50% | 0 | 0 | 0 | n/a | |||
| Reusable items | 50% | 0 | 0 | 0 | n/a | |||
| Roofing | 50% | 0 | 0 | 0 | n/a | |||
| Soil, Rock, Land Clearing Debris | 50% | 0 | 0 | 0 | n/a | |||
| Wood (unpainted) | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Total**: | 0 | 0 | 0 | n/a |
| Reuse is encouraged. Please list any items such as cabinets, doors, shelves, bricks, framing lumber, siding, fill material, misc. millwork, etc. planned for reuse. | |||
| Item | Reuse Onsite | Reuse Offsite | Off-Site Recipient or Salvage/ Deconstruction Company |
| Volume-to-Weight Conversion Factor Reference Table |
| If a hauler reports materials by volume, this table enables conversion to weight, for reporting actual diversion and disposal. |
| Asphalt paving: 1 cubic yard = 773 lbs | Dirt or sand: 1 cubic yard = 929 lbs |
| Asphalt or composite roof shingles: 1 cubic yard = 731 lbs | Fiberglass insulation, loose: 1 cubic yard = 17 lbs |
| Brick, laid flat: 1 flat square foot = 20 lbs | Mixed (composite) C&D material: 1 cubic yard = 417 lbs |
| Brick, loose: 1 cubic yard = 3,200 lbs. (1 cubic foot = 120 lbs) | Sheetrock (drywall), loose: 1 cubic yard = 393.5 lbs |
| Ceramic tile, scrap, loose: 1 cubic yard = 1,214 lbs | Rock, crushed: 1 cubic yard = 2,570 lbs |
| Concrete: 1 cubic yard = 860 lbs | Wood: 1 cubic yard = 169 lbs |
| *Only non-hazardous materials need to be included in this document. C&D mandates governing GSA exclude hazardous materials such as asbestos or lead-containing paint. |
| **At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics. |
File details come from the government source that posted it. Updated .