PUBLIC BUILDING SERVICES, REGION 7

OPERATIONS AND MAINTENANCE

STATEMENT OF WORK

Adapted from

National Operations & Maintenance Specification

SOLICITATION NUMBER: 47PH0220R0009

SERVICE: OPERATIONS AND MAINTENANCE SERVICES

LOCATION(S): JJ Pickle Judicial Building 300 E. 8th St Austin, TX 70701 (TX0227AU)

Homer Thornberry Fedl Building 903 San Jacinto Blvd. Austin, TX 78701

(TX0250AU)

Austin Federal Courthouse 501 W. 5th St. Austin, TX 78701 (TX0397ZZ)

PERIOD OF PERFORMANCE:

Base: 1 Oct 2020 through 30 Jun 2021 Option I: 1 Jul 2021 through 30 Jun 2022 Option II: 1 Jul 2022 through 30 Jun 2023 Option III 1 Jul 2023 through 30 Jun 2024 Option IV: 1 Jul 2024 through 30 Jun 2025

SOLICITATION ISSUE DATE: 16 March, 2020

OFFER RECEIPT DATE/TIME: 1 July 2020

*NOTES:

1. This is a 100% set-aside for Service Disable Veteran Owned Small Business

2. Refer to Section L.3 for Site Visit information

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

47PH0220R0009-0007, Attachments Page 14

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

47PH0220R0009-0007, Attachments Page 15

Description of Modification Continuation Page

... years period of performance are as indicated on attached revised cover sheet and revised in the SF33 item number descriptions.

3. Attached the answered questions that were received.

4. Attached a revise copy of Figure L-2 Management Plan Baseline.

5. Attached copy of Section CM, revisions made to paragraphs CM.5.13.2.2 Labor and paragraph CM.5.13.4 Indirect Costs (Markup)

6. All other terms and conditions remains the same.

47PH0220R0009/0007

47PH0220R0009-0007, Attachments Page 16

SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. E-MAIL ADDRESS

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECS./WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)

DATEAMENDMENT NO.AMENDMENT NO. DATE

15A. NAME AND

ADDRESS

OF OFFER-

OR

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER SUCH

ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:

10 U.S.C. 2304 (c) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 6/2014)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB)

NEGOTIATED (RFP)

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

47PH0220R0009-0007, Section A Page 1

PAGE

GENERAL SERVICES ADMINISTRATION

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Austin, TX. The building are the JJ Pickle Judicial

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Austin, TX 78701 (TX0397ZZ).

Operations and Maintenance Services Option II Operation and

Operation and Maintenance for three (3) facility location in

MO

Austin, TX. The building are the JJ Pickle Judicial

Deliverable

Deliverable

(TX025AU) and the Austin Federal Courthouse, 501 W. 5th St., Operations and Maintenance Services Option II

Courthouse, 501 W. 5th St., Austin, TX 78701 (TX0397ZZ).

Operation and Maintenance for three (3) facility location in

Austin, TX 78701 (TX025AU) and the Austin Federal

Operations and Maintenance Services Option I

Courthouse, 501 W. 5th St., Austin, TX 78701 (TX0397ZZ).

Federal Building 903 San Jacinto Blvd., Austin, TX 78701

MO

Operations and Maintenance Services Base Year

St., Austin, TX 70701 (TX0227AU), the Homer Thornberry

Austin, TX 78701 (TX025AU) and the Austin Federal

PoP: 07/01/2021 - 06/30/2022

Homer Thornberry Federal Building 903 San Jacinto Blvd., PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

The building are the JJ Pickle Judicial Building, 300 E. 8th

Building, 300 E. 8th St., Austin, TX 70701 (TX0227AU), the

Homer Thornberry Federal Building 903 San Jacinto Blvd., MO

PoP: 10/01/2020 - 06/30/2021

Contract Type: Firm Fixed Price

Contract Type: Firm Fixed Price

Deliverable

Maintenance for three (3) facility location in Austin, TX.

Building, 300 E. 8th St., Austin, TX 70701 (TX0227AU), the

47PH0220R0009-0007, Section B Page 17

PAGE

GENERAL SERVICES ADMINISTRATION

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Austin, TX 78701 (TX025AU) and the Austin Federal

Austin, TX 78701 (TX025AU) and the Austin Federal

PoP: 07/01/2024 - 06/30/2025

PoP: 07/01/2023 - 06/30/2024

Homer Thornberry Federal Building 903 San Jacinto Blvd., Homer Thornberry Federal Building 903 San Jacinto Blvd., Contract Type: Firm Fixed Price

Building, 300 E. 8th St., Austin, TX 70701 (TX0227AU), the

PoP: 07/01/2022 - 06/30/2023

MO

Austin, TX. The building are the JJ Pickle Judicial

Contract Type: Firm Fixed Price

Building, 300 E. 8th St., Austin, TX 70701 (TX0227AU), the

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Contract Type: Firm Fixed Price

Austin, TX. The building are the JJ Pickle Judicial

Deliverable

Operation and Maintenance for three (3) facility location in

Operations and Maintenance Services Option IV

Operation and Maintenance for three (3) facility location in

Deliverable

Courthouse, 501 W. 5th St., Austin, TX 78701 (TX0397ZZ).

Courthouse, 501 W. 5th St., Austin, TX 78701 (TX0397ZZ).

MO

Operations and Maintenance Services Option III

47PH0220R0009-0007, Section B Page 18

Amendment #0007 47PH0220R0009

Number Question

Please provide what the current annual spending is for the current contract (if there is one) and who the incumbent is?

Answer Current Contractor is Crystal Clear Management; Annual+3 month extension $1,939,046.43

L.4.2.1 Proposals shall be submitted in (3) separate parts (Page 132): Part 3 appears to be included with Part 2. Please clarify.

Answer

Submit Proposals in 3 separate parts, Part 1 - Technical Proposal; Part 2 - Price Proposal; Part 3

- Miscellaneous. See amendment #0005

L.4.2.3 Submission (Page 133): Part 3 is not specifically stated. Part 3 “Miscellaneous

Documents” is stated as a “Note”. Please confirm Part 3 is contained in the “Note”. Also, should

SAM Registration and a current printed copy of the SAM data be included?

Answer

See question #2. Include System for Award Management (SAM) registration; L.4.2.5 include a complete current printed copy of SAM data. See amendment #0005

L.4.2.3 Submission (Page 133): Should Part 3 be submitted on an Electronic CD-R by itself or combined with Part 1 or Part 2 CD-Rs? Please advise.

Answer See question #2. Submit proposal in 3 separate parts. See amendment # 0005

Please clarify if we are to provide 3 separate binders or just CD-Rs. If binders, how many? How many CD-Rs?

Answer

Submit Proposals in 3 separate parts, Part 1 - Technical Proposal; Part 2 - Price Proposal; Part 3

- Miscellaneous and shall be submitted Electronically per L.4.2.3 Submission. See amendment

#0005

L.6 Pricing Proposal Requirements (Page 139): Figure B-3 appears to be missing. Please provide. Is a Table of Contents, Proposal Cover, Disclaimer Page, and Transmittal Letter permitted for inclusion in Technical and Price Volumes? If yes, are these included in the page count?

Answer

Figure B-3 Price Proposal was provided in amendment 0005. The items listed are allowed for inclusion of Offerors proposals and will not be included in the page count.

L.4.2.1 Part 2 (Page 132): Includes “List of offeror key personnel and point of contact information”. G.8 Key Contractor Personnel indicates that key personnel will be provided to the

CO at time of award. Is the Contract Project Manager the only Key Personnel, and does his/her resume need to be included in the proposal? If yes, where should the resume be inserted and how many pages?

Answer

Only a List of Offeror Key Personnel and Point of Contact information; submisison of resume(s) are not required with proposal.

8 Are Building Information Sheets available for the three buildings?

Answer Yes, It was provide via amendment 0006

9 Is there a Collective Bargaining Unit at these locations? If yes, please provide agreement(s).

Answer Yes, It was provide via amendment 0005

Section CM.6.4.4 states “Chillers with tube and shell heat exchangers, both evaporator and condenser, shall have an eddy current test performed every three years.” When was the most recent eddy current testing/inspection completed?

Answer It has been completed during the last 3 years;

RFP Section CM.5.9.8 Portable Fire Extinguishers RFP Section CM.5.9.8 states “The Contractor shall ensure compliance with NFPA 10, Standard for Portable Fire Extinguishers; in the inspection, testing, preventive maintenance and repairs of all portable fire extinguishers.”. When was the most recent 6-year fire extinguisher test performed?

Answer This PM will come due once with in the next 5 year contract

47PH0220R0009-0007, Attachments Page 4

RFP Section CM.5.9.9 Non-Water-Based Fire Extinguishing Systems Are there any expired CO2 sensors?

Answer This is an annual PM and will be due within the first year of the contract

RFP Section CM.5.9.9 Non-Water-Based Fire Extinguishing Systems How many expired CO2 sensors are there?

Answer This is an annual PM and will be due in the first year of the contract

RFP Sections CM.5.5.5 Fuel Storage Tank Management and CM. 6.5 Cooling Towers When were the most recent environmental requirements performed:

a. UST tests and certifications

b. Cooling tower city certification

Answer This is an annual requirement

RFP Section CM.6.9 Electrical Switchgear and Switchboards When was the most recent Electrical 3-year bench test Completed?

Answer This PM will come due once with in the next 5 year contract

RFP Section CM.6.10 Emergency Power Equipment. Is the contractor responsible for City of

Austin generator certification and/or fees in addition to annual testing? If so, what are those certification(s)/fees?

Answer This is an annual PM and will be due in the first year of the contract

RFP Section CM.5.5.8 Asbestos Management. How much asbestos-containing material is present and in which locations?

Answer

This information will become available on award of contract, at that time the asbestoes managment plan will be shared

RFP Section L.4.2.3 Submission Section L.4.2.3 states that both Part One – Technical Proposal and Part Two – Price Proposal and Miscellaneous Documents require offerors to submit their proposals electronically on a CD-R or a USB thumb drive. However, due to the COVID-19 pandemic, Government offices are dealing with either complete closures or only being staffed by essential personnel.

a. Will GSA have someone on site to receive proposal deliveries?

b. Alternately, in light of the threats posed by the potential transmission of COVID-19, will the

Government consider allowing offerors to submit their proposals electronically via email?

Answer a.) No b.) Yes, proposals shall be emailed to Sandy Nixon at sandy.nixon@gsa.gov and Sharon

McCreary at sharon.mccreary@gsa.gov; See amendment #0005"

RFP Section CM.5.8 Building Automation Systems and IT Controls It is our understanding that all three (3) facilities have a BAS Niagara front-end. However, the back-end programs are not identified.

a. Please provide the back-end programs for each BAS (e.g., Siemens, Honeywell, Trane, etc.).

b. Are any of these back end programs on the BAS proprietary? If so, please advise which company(ies)?

Answer

USCH: Honeywell Pickle/ Thornberry: Trane/ Andover continum;

Honeywell system has proprietary portions.

RFP Section CM.5.8 Building Automation Systems and IT Controls. Can the BAS system in any of the buildings be accessed/monitored externally/from the other buildings?

Answer

The BAS is a web based system and once credentials are established the buildings can be viewed from other buildings on a GSA provided computer

47PH0220R0009-0007, Attachments Page 5

RFP Section HM.1.1.6 Administrative Functions Section HM.1.1.6 requires that the contractor

“Address GSALink spark data.” How many of the buildings are presently Spark buildings? Is it

GSA’s intent to add the remaining buildings in the foreseeable future? If so, under what timeline?

Answer

JJ Pickle and Homer Thornberry currently have GSA Link. No current plans to add additional buildings.

RFP Section HM.1.1.6 Administrative Functions Section HM.1.1.6 requires that the contractor

“Address GSALink spark data.” For each building that is presently a Spark building, please provide the average number of Sparks for the past three (3) years.

Answer This information will be available after award

Building Library 2, Austin Asset List. Does the JJ Pickle Building equipment inventory currently include all of the equipment changes from the recently completed Prospectus project?

Answer No, The contractor will be required to update the equipment list per section CM-1.9 & CM-5.3

RFP Section CM.5.9 Fire Protection and Life Safety Equipment and Systems. When was the last 5-year standpipe inspection performed?

Answer This PM will come due once with in the next 5 year contract

RFP Section L.5.1.2 Management Plan Worksheet and Narrative and Figure L-1, Management

Plan Worksheet Section L.5.1.2 states “Figure L-1 indicates the government’s baseline manpower projection… If the offeror elects to deviate from the government’s manpower projection, the offer must submit a Worksheet Narrative explaining how their proposed manpower approach will meet the requirement of the solicitation.”

Figure L-1 provides an example Management Plan but does not provide baseline staffing.

Additionally, the RFP package does not include Figure L-2, Management Plan Baseline. Please provide Figure L-2, Management Plan Baseline so that offerors have a staffing baseline and are able to determine whether or not their proposal staffing deviates from the Government’s baseline.

Answer Figure L-2 Management Plan Baseline was provided via amendment 0006

RFP Section CM.5.9 Fire Protection and Life Safety Equipment and Systems Are there any expired fire gauges?

Answer

Fire system gauges are to be replaced every five years and will come due once during the next five year contract

RFP Section CM.5.9 Fire Protection and Life Safety Equipment and Systems How many expired fire gauges are there?

Answer This PM will come due once during the course of this 5 Year contract

RFP Section CM.3 Government-Furnished Property This section does not address contractor parking. Does the Government provide contractor parking? If so, how many spaces will be provided?

Answer No

RFP Section CM.6.2 Boiler Systems. The boilers in the Thornberry Building and Austin Federal

Courthouse require the contractor to remove the core every two years. Is the contractor responsible for this cost?

Answer

Preventative Mainteance is to be performed to manufacturer's recommendations. Inspections and costs for regular maintenance are the responsibility of the contractor

RFP Section CM.6.4 Chiller Systems The chillers require additional services that are not listed in the RFP. Will the Government consider listing the additional chiller maintenance services?

Answer Contractor is responsible for chiller maintenance as listed in CM.6.4.3

47PH0220R0009-0007, Attachments Page 6

Ref. L.6. Pricing Proposal Requirements – this section states that offerors must utilize the

“Pricing Template” Figure B-3 however, Figure B-3 was not provided. Please post Figure B-3.

Answer Figure B-3 Price Proposal included in Amendment #0005

32 Please post Figure L-2 Management Plan Baseline for this contract.

Answer Figure L-2 Management Plan Baseline included in amendment #0006

Ref. L.5.3.2 Past Performance Questionnaires – please confirm that offerors are to submit completed questionnaires with their proposal rather than having the contract reference POC submit the questionnaire directly to the GSA POC for this solicitation.

Answer Confirmed; Submit Past Performance Questionnaires in accordance with L.5.3.2 of the solicitation.

L.4.2.1 Proposals shall be submitted in (3) separate parts (Page 132): Part 3 appears to be included with Part 2. Please clarify.

Answer

Submit Proposals in 3 separate parts, Part 1 - Technical Proposal; Part 2 - Price Proposal; Part 3

- Miscellaneous; see amendment #0005

L.4.2.3 Submission (Page 133): Part 3 is not specifically stated. Part 3 “Miscellaneous

Documents” is stated as a “Note”. Please confirm Part 3 is contained in the “Note”. Also, should

SAM Registration and a current printed copy of the SAM data be included?

Answer See questions #2 and #3. Yes, include SAM Registration with proposal

L.4.2.3 Submission (Page 133): Should Part 3 be submitted on an Electronic CD-R by itself or combined with Part 1 or Part 2 CD-Rs? Please advise. Please clarify if we are to provide 3 separate binders or just CD-Rs. If binders, how many? How many CD-Rs?

Answer See questions #2 and #3.

L.6 Pricing Proposal Requirements (Page 139): Figure B-3 appears to be missing. Please provide. Is a Table of Contents, Proposal Cover, Disclaimer Page, and Transmittal Letter permitted for inclusion in Technical and Price Volumes? If yes, are these included in the page count?

Answer See Question #6

L.4.2.1 Part 2 (Page 132): Includes “List of offeror key personnel and point of contact information”. G.8 Key Contractor Personnel indicates that key personnel will be provided to the

CO at time of award. Is the Contract Project Manager the only Key Personnel, and does his/her resume need to be included in the proposal? If yes, where should the resume be inserted and how many pages?

Are Building Information Sheets available for the three buildings?

Is there a Collective Bargaining Unit at these locations? If yes, please provide agreement(s).

Answer

Only a List of Offeror Key Personnel and Point of Contact information; submisison of resume(s) are not required with proposal. See amendment 0006 for building sheets; see amendment 0005 for CBA

RFP Section CM.5.9.9 Non-Water-Based Fire Extinguishing Systems What are the expiration dates for the CO2 sensor expiration dates?

Answer This is an annual PM and will be due in the first year of the contract

RFP Section CM.6.10 Emergency Power Equipment What certifications are required for the generators? Do they differ by city (i.e., San Antonio vs. Pearsall)? If so, please provide all applicable certifications.

Answer See solicitation for certification requirements

Will the Government please provide the square footage for each of the buildings for which the offeror is responsible?

Answer The building data sheet was provided with amendment 0006

Is there a CBA for this contract? We see two WDs with the same number (Attachment 1 and

Attachment 3) but no CBA.

Answer A CBA was provided with amendment 0005

47PH0220R0009-0007, Attachments Page 7

Is parking available at each building for contractor employees.

a.) If so, how many spots do contractors get at each facility?

b.) If not, will GSA reimburse the service provider for parking?

Answer No

44 What is the make/model of the cooling tower in JJ Pickle?

Answer Refer to the equipment inventory

Is the contractor responsible for the high-end security keycard system in use at the Austin

Federal Courthouse?

a.) If so, are they responsible for both PMs and repairs?

b.) If repairs are required by a qualified vendor is the contractor fully reimbursed for all costs?

Answer Contractor is responsible for security systems per section CM.6.14.1

46 Is there a collective bargaining agreement in place? If so, please incorporate to the solicitation.

Answer Yes, it was provide with amendment 0005

What are the hours of operation for the testing and inspections on the fire & sprinkler alarm system for all three buildings?

Answer Please see section CM.5.9.2

48 Can we obtain a copy of the sign in sheet from the site visit?

Answer Sign-in Sheet was included with amendment 0005

Please provide manufacturer information for the BAS systems located at JJ Pickle, Austin USCH and the Homer Thornberry FB.

Answer Please see question #38

Are there any special underlying controls or software associated with the BAS system located at the following buildings: JJ Pickle, Austin USCH and the Homer Thornberry FB that are aside from orginal manufacturer controls which require special handling? If so please provide sufficient details to allow a comprehensive subcontractor quote.

Answer Honeywell, Niagra, andover continuum, Trane Tracer

Please provide the name of the current Manufacturer representative servicing the BAS systems at the three locations.

Answer We do not control the contractors being used by the O & M

Section L.4.2.1 states there are 3 parts to the proposal; however, L.4.2.3 only lists two parts.

Please clarify.

Answer See question #2

Per Section L.4.2.3 Submission, The Miscellaneous Document section request a copy of our

SAM registration. Are you requesting only proof of our registration, or the complete registration with reps and certs?

Answer

L.4.2.3 include System for Award Management (SAM) registration; L.4.2.5 include a complete current printed copy of SAM data.

54 Who is the current contractor and what is the current monthly price?

Answer See question #1

55 Is there any parking space available for the O&M personal at any of the three locations?

Answer No

Will GSA consider allowing contractors to submit their proposals via email considering the delays with shipment of UPS and Fed-Ex?

Answer Yes, see amendment 0005 for more details

57 CM.1.2- Please provide number and job classification for current onsite staff.

Answer See Figure L-2 Management Plan Baseline that was provided with amendment 0006

58 CM.5.5.3 Are there any current AQMD permits.

Answer This information is available after award

47PH0220R0009-0007, Attachments Page 8

CM.5.7 Advanced Metering Systems is Reserved. Are there any advanced meters at these facilities.

Answer No

60 CM.6.13.8 Roof Anchorages. When was the last 10 year inspection completed?

Answer This will become due during this 5 year contract

L.5.1.2 States “Figure L-1 indicates the government’s baseline manpower projection”. The provided Figure-L-1 does not indicate a baseline. Is it GSA’s intention to provide the baseline?

Answer Yes, Figure L-2 Management Plan Baseline was provided with amendment 0006

62 Is there a CBA associated with this contract?

Answer Yes, CBA included with amendment #0005

Is the current O&M staff fully qualified with certificates for the positions they are currently in on the current contract.

Answer No

CM.1.2.7.2 States “The Contractor shall ensure that all….. Does this imply that our sub-contractors also need this training or is this specific to O&M Contractor personal only?

Answer This is covered in the solicitation

CM.1.2.7.3; Do any of the current O&M Staff possess a current certification in any of the four education requirements listed under this section. If they do not, how long will GSA give the incumbent personal to obtain such certification?

Answer No

CM.1.2.7.4; If the PM and On-Site Supervisor are two different people and the PM is located off site at the Corporate Office, is this training still required by the PM.

Answer This information is included in the solicitation

CM.1.7.2; Is the O&M required to have staff onsite at each of the buildings during the coverage hours?

Answer Yes

Section CM.5.4.5- are there any powered platforms located at any of the buildings in this solicitation. Please list building and type of powered platform equipment.

Answer O&M equipment is owned by the company and not GSA

70 CM.5.4.7- are the current confined spaces properly identified and labeled?

Answer Yes

CM.5.5.3; Are there any AQMD permits required for any of the equipment covered under this contract?

Answer Please refer to the solictation

CM.5.5.6; is this the responsibility of the O&M contractor or is this part of the Janitorial Contract.

Are we to provide recycling of waist for all three buildings under this contract?

Answer

CM.5.5.6 refers to waste generated by the contractor or their sub-contractors; including but not limited to construction debris, light bulbs, refrigerants, maintenance items, etc..

Section CM.5.7.4- Will GSA be providing the O&M with a copy of the monthly utility bill for each location under this solicitation for comparison to the AMS?

Answer This will be provided upon request after award

CM.5.8.4; Re-Tuning is a costly and time-consuming requirement that has been removed from many contracts. Would GSA consider removing it from this solicitation?

Answer This is a requirement of this solicitation

CM.5.8.6- Are any of the buildings under this solicitation considered smart buildings. Please list the smart buildings.

Answer Not designated as national smart buildings

47PH0220R0009-0007, Attachments Page 9

CM.5.9.2-It’s stated that the O&M will be responsible for all local fees associated with unwanted fire alarm activations. This paragraph does not specify that the O&M is responsible for all local fees IF the unwanted fire alarm activation is caused by the O&M which leaves the O&M responsible for all unwanted activations regardless of it being caused by a third party. Please reconsider the wording of this paragraph to specify the O&M is responsible if caused by them.

Answer This is a requirement of this solicitation

CM.5.9.3- Please provide dates for each building under this solicitation of when the last internal sprinkler pipe inspection was performed.

Answer This PM will become due during the course of this 5 year contract

CM.5.9.15; Are there any chemical sensors in any of the three buildings under this solicitation?

Please provide a list of manufacturers for any chemical sensors so appropriate price quotes can be obtained for proper testing according to this section.

Answer Refrigerant Monitors in each Chiller area

CM.5.14.1/ CM.5.14.3/ CM.5.14.4- These sections have language entailing the O&M contractor perform an unknown number of hours of work without being able to charge for the time taken away from our regular duties. Can GSA at a minimum limit the amount of hours per month these services are required by the O&M or revise the sections to allow the O&M to charge for their services when requested by GSA or a combination of the two.

Answer No

CM.6.13.8; Are there any roof anchorage points on any of the three buildings that require the third party annual and ten year recertification testing. Please provide the manufacturers specks on any roof anchorage points that need to be tested so proper price quotes can be obtained from a qualified third party.

Answer This will become due during the course of the 5 year contract

CM.6.14.1- Please provide as much information as possible as to what security equipment the

O&M is responsible for at each location under this solicitation in order to get proper price quotes on this equipment.

Answer Security bollards, wedge and gate barriers, exterior doors

82 When was the last time a load test was performed on the switchgear?

Answer This is a 3 year PM and will become due during the next five year contract

L.5.1.2 states that Figure L-1 indicates the government’s baseline manpower projection. The only data included in Figure L-1 is the gray example provided at the top. Are the numbers provided in the example the government’s baseline manpower projection or is this attachment missing altogether?

Answer Figure L-2 Management Baseline was included in amendment 0006

Pricing Template FIGURE B-3 was not included in the solicitation. Will the government please provide this?

Answer Figure B-3 was included in amendment 0005

Have there been any significant changes to the scope from the incumbent contract to this solicitation? If so, can the government please provide additional details on what has changed?

Answer The previous contract terms do not change the terms of this solicitation

The Management Plan Worksheet accounts for Holiday, Sick, and Vacation hours that may not be in-line with our FTE calculations. Can bidders make changes to ensure the Baseline matches our price and labor buildup as long as the total hours per FTE do not exceed 2080?

Answer Yes as long as FTE doesn't exceed 2080.

47PH0220R0009-0007, Attachments Page 10

Can the government please clarify the intent behind CM 5.11.2.1 Non Reimbursable Repairs where it states, in part: “A non-reimbursable repair is a repair or replacement requiring no more than $2500 in cost for repair parts and materials ONLY but no labor cost is included (including any approved subcontracting costs.” As the government is aware, labor (whether in-house or subcontracted) is often the most expensive portion of any repair and by not allowing these costs to be calculated into the $2,500 liability limit the government is placing significant unknown liability on the contract. For instance, a realistic repair of $12,000 with $2,000 in parts and

$10,000 in labor would be completely non-reimbursable to the contractor. Would the government please consider including labor in the $2,500 liability calculation, as is seen in the majority of other facility service contracts, to reduce unforeseen liability burden by the contractor which will help lower overall proposal pricing?

Answer This is the requirement for this solicitation

Section CM.5.13.2.2 discusses “labor categories and rates from the price schedule in this

Contract.” Can the government please identify this price schedule and provide if necessary?

Answer A price schedule does not apply. Amendment 0007 revised the language to this section.

Per Section CM.5.14.2 how will the contractor be reimbursed for Miscellaneous Work in excess of the 20 hours and $50 in parts? Does all non-routine escorting, room set-up, spot cleanup, furniture removal and replacement, etc. that is not part of the fixed price maintenance scope count as Misc. Work? It appears from the Building Library of CMMS Work Orders provided with this solicitation that the government is using WOs, which are subject to the $2,500 liability limit for performance of Misc. Work. Can the government please clarify how they will be differentiated under this contract?

Answer

The COR is only authorized to order this amount of hours per month within the dollar threshholds. If a misc. hour cost exceeds $50 in parts, a request for funding with appropriate docuementation (proposal written per the contract) must be provided to the COR in advance.

Is there currently a WO Backlog in the CMMS and does the government anticipate the gaining contractor inheriting WOs from the prior contractor? If so, will these be 100% reimbursable to the gaining contractor?

Answer No / No

Section CM.5.11.2.3 Fully Reimbursable Repairs makes no mention of items outside of those assets provided in the building inventory included with the solicitation. Will the government please confirm that any repair or maintenance to any asset NOT included in the provided inventory will be considered fully reimbursable? The contractor cannot be expected to include pricing for preventative maintenance or repair liability on items not identified in the contract or after identified and modified into the contract after the Existing Deficiency Report

Answer

Equipment not listed in the building inventory would need to be added into the equipment inventory and NCMMS. Any modifications, additions or deletions from the Equipment Inventories may require equitable adjustments through the CO/CS; see CM.5.3.1.

The inventories provided for each of the 3 buildings (USCH, TB, and JJ Pickle) have several items with a description that is insufficient. Can the Government please provide a more sufficient description of these listed items so the contractor may better estimate the amount of labor/materials that will be required to maintain these items -a.) Assets 379634 thru 379710, description “AMB FOR VAV #”. What does “AMB” stand for?

b.) Assets 379189 thru 974818, description is “Needs Description”.

c.) Assets 1806205 thru 1806211, 974101, and 974106, description is “Description”.

Answer See solicitation inventory list.

Are the fire extinguisher reports provided in Library 1 accurate (inspections last completed

2016)? If not, what date(s) were fire extinguisher inspections last completed?

47PH0220R0009-0007, Attachments Page 11

Answer There are Monthly, Annual and 6-year PMs required

94 Will office and storage space be made available to the contractor?

Answer Yes please refer to the solicitation, see CM.3.3 and CM.3.4

95 Does the government have a preference as to which building has the contractor’s PMO office?

Answer Office was shown during the pre-bid solicitaion tour

96 Will there be designated parking for contractor personnel?

Answer No

Will the contractor be responsible for maintaining the parking garages and covered parking areas?

Answer Yes please refer to the solicitation

At the site visit, it was noted that this is a union contract. If so, can the government provide a

CBA?

Answer CBA was provided with amendment #0005

At the site visit, it was observed that various construction projects are underway. Will the contractor be involved in those projects?

Answer No please refer to the solicitation

Section J - Appendix - List of Attachments; RFP Sections B.1. Pricing of Services; B.1.1. Basic

Services; L.6. Pricing Proposal Requirements; and L.4.2.2.5. Section J, List of Attachments lists

Figure B-3 Pricing - Operation & Maintenance as an RFP attachment. RFP Sections B.1, B.1.1, L.6, and L.4.2.2.5 all require offerors to submit their proposed pricing on Figure B-3, Pricing -

Operation & Maintenance. Figure B-3, Pricing - Operation & Maintenance was not included in the RFP package. Please provide the Figure B-3 pricing template spreadsheet.

Answer Figure B-3 was provided with amendment #0005

RFP Attachments 1 and 3 Aside from the file names, Attachments 1 and 3 are identical. It is our understanding that there is currently a collective bargaining agreement (CBA) in place at these locations. Please clarify the following:

1. Please confirm that Attachment 2 was not omitted from the RFP package. And if it was, please provide Attachment 2.

2. Please confirm whether or not there is currently a CBA in place. And if there is, please povide the current CBA for offerors to factor into their proposals

Answer CBA was provided with amendment #0005

CM.5.14.5, Flag Procedures and GSA Flag Policy, Section 9, Flying the Flag

RFP Section CM.5.14.5 states, “The Contractor shall raise, lower and place at half-staff the

United States Flag, agency pennants, and other flags (POW flag). This service shall be provided when directed by the CO or their designee and shall comply with requirements in the Flag

Policy.” GSA Flag Policy, Section 9 outlines when the flag should be flown, including from sunrise to sunset on all workdays. Please clarify the following:

1. Is it the Government’s intent for the contractor to raise, lower, and place at half-staff the flag every workday, as outlined in GSA Flag Policy Section 9, or only when directed by the CO, as described in RFP Section CM.5.14.5?

2. If only when directed by the CO, please provide historical data on the frequency with which this is required? Alternatively, if historical data is not available, please advise how many times per year the Government anticipates this being required.

3. Also, if only when directed by the CO, please advise the hours when the flag should be raised and lowered. Will this be sunrise to sunset, set start and end times, or fluctuating start and end times?

Answer Please refer to the solicitation

47PH0220R0009-0007, Attachments Page 12

Section L requires Figure B-3 Pricing Template to be submitted with our proposals; however, it was not provided with the Solicitation documents. Please provide Figure B-3, Pricing Template.

Answer Figure B-3 was provided with amendment #0005

Thank you for releasing Figure L-2 Management Plan Baseline. There is an error in the document, however. The number of FTE stated at the bottom of the list of personnel shows 8.0

FTE but the number of FTE listed actually totals 9.0. Please clarify

Answer Revised Figure L-2 Management Plan Baseline Included with Amendment 0007

47PH0220R0009-0007, Attachments Page 13

Solicitation No. 47PH0220R0009

Amendment #0007

120 80 48 2080

LOCATION

POSITION TITLE

(DOL Wage Classification or CBA)

Annual

Productive

Annual

Vacation

Annual

Holiday

Annual

Sick Annual Total

Total

FTE Anticipated Work Schedule

All Locations Project Manager 1,832.0 119.5 79.7 39.8 2,072.0 1.0 8:00 a - 5:00 p, Monday - Friday

Federal Building Custodian 1,832.0 119.5 79.7 39.8 2,072.0 1.0 5:00 p - 9:00 pm, Monday - Friday

Groundskeeper 625.8 40.8 27.2 13.6 707.7 0.3 11:00 am - 3:00 pm, Monday

Maintenance Mechanic 3,664.0 239.0 159.3 79.7 4,143.9 2.0 6:00 am - 3:00 pm, Monday through Friday

HVAC Mechanic 60.7 4.0 2.6 1.3 68.7 0.0 8:00 am - 5:00 pm, Monday through Friday

U S Courthouse Custodian 5,046.7 329.1 219.4 109.7 5,707.7 2.7 5:00 p - 9:00 pm, Monday - Friday

Custodian 1,832.0 119.5 79.7 39.8 2,072.0 1.0 11:00 am - 3:00 pm, Monday

Maintenance Mechanic 11,915.5 777.1 518.1 259.0 13,476.1 6.5 6:00 am - 3:00 pm, Monday through Friday

HVAC Mechanic 1,832.0 119.5 79.7 39.8 2,072.0 1.0 8:00 am - 5:00 pm, Monday through Friday

CBA EMPLOYEES 1840 120 80 40 2080

LOCATION POSITION TITLE

Annual

Productive

Annual

Vacation

Annual

Holiday

Annual

Sick Annual Total

Total

FTE Anticipated Work Schedule

All Locations Project manager 1,832.0 119.5 79.7 39.8 2,072.0 1.0 8:00 a - 5:00p Monday - Friday

Admin 1,832.0 119.5 79.7 39.8 2,072.0 1.0 8:00 a - 5:00p Monday - Friday

0.0 0.0 0.0 0.0 0.0

Pickle/Thornberry TXAU HVAC 1,832.0 119.5 79.7 39.8 2,072.0 1.0 6:00 a - 3:00 p, Monday - Friday

HVAC 1,832.0 119.5 79.7 39.8 2,072.0 1.0 9:00 a - 6:00p Monday - Friday

HVAC 1,832.0 119.5 79.7 39.8 2,072.0 1.0 8:00 a - 5:00p Monday - Friday

GMW 1,832.0 119.5 79.7 39.8 2,072.0 1.0 6:00 a - 3:00 p, Monday - Friday

GMW 1,832.0 119.5 79.7 39.8 2,072.0 1.0 9:00 a - 6:00p Monday - Friday

0.0 0.0 0.0 0.0 0.0

Austin Courthouse TX0397ZZ HVAC 1,832.0 119.5 79.7 39.8 2,072.0 1.0 8:00 a - 5:00p Monday - Friday

GMW 1,832.0 119.5 79.7 39.8 2,072.0 1.0 6:00 a - 3:00 p, Monday - Friday

0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0

TOTALS 16,488.0 1,075.3 716.9 358.4 18,647.6 9.0

MANAGEMENT PLAN BASELINE

OPERATION AND MAINTENANCE - AUSTIN, TX

EXAMPLE OF MANAGEMENT PLAN

FIGURE L-2

47PH0220R0009-0007, Attachments Page 2

Solicitation No. 47PH0220R0009

Amendment #0007

DOL SCA WAGE DETERMINATION EMPLOYEES 1896 104 80 0 2080

LOCATION POSITION TITLE

Annual

Productive

Annual

Vacation

Annual

Holiday

Annual

Sick Annual Total

Total

FTE Anticipated Work Schedule

0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0

TOTALS 0.0 0.0 0.0 0.0 0.0 0.0

GRAND TOTALS 16,488.0 1,075.3 716.9 358.4 18,647.6 9.0

47PH0220R0009-0007, Attachments Page 3

L. INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1 FAR and GSAR Provisions in Full Text

52.216-1 -- Type of Contract (Apr 1984)

The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.

(End of Provision)

52.233-2 -- Service of Protest. (Sep 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from 819 Taylor St, Fort Worth TX 76102.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

52.252-1 -- Solicitation Provisions Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address: http://farsite.hill.af.mil/vffara.htm

L.2 FAR and GSAR Provisions incorporated by reference.

52.204-16 Commercial and Government Entity Code Reporting JUL 2016

52.204-22 Alternative Line Item Proposal JAN 2017

52.204-7 System for Award Management OCT 2018

52.204-7 System for Award Management--Alternate I OCT 2018

52.214-34 Submission of Offers in the English Language APR 1991

52.214-35 Submission of Offers in U.S. Currency APR 1991

52.215-1 Instructions to Offerors—Competitive Acquisition JAN 2017

47PH0220R0009-0007, Section L Page 88

52.215-1 Instructions to Offerors—Competitive Acquisition--Alternate I OCT 1997

52.215-20 Requirements for…