Questions Received from Pre-Proposal Site Visit for Solicitaton#47PH0219R0019 7/19/2019
1. Are the man lifts in the buildings GSA or contractor property? If they are GSA’s, will they be available for the new contractor to use as long the they keep the inspections up to date? Property of current contractor.
2. Are the hard surface floor and grout conditions in the buildings up to GSA standard at this time? (There seemed to be a lot of stained grout in several locations.)Yes
3. After the flame lockers in the buildings the property of the GSA or the contractor? If they are the GSA’s will they be available for the new contractor to use? Contractor
4. Can you please provide the last time the black Post Office floors were stripped down? (it is clear that they cannot be mechanically stripped due to the materials. Wax buildup on these type of floors can cause severe peeling.)NA, there are no black rubber floors in Texarkana
5. What if any are the IR Scan requirements for electrical components now that the 3 year switchgear inspection is included again?
There are no IR Scan requirements.
6. What are the requirements for the BAS Technician to perform maintenance should the contractor choose to have this done in house? This is being asked as the existing subcontractor for the BAS is not allowed to perform these tasks at this time and into the near future for a Service Disabled contract.
The Qualifications of the BAS Technicians are identified in the contract, HM.15.3.15 Qualifications of BAS Technicians.
7. Please clarify if any of the bins or other equipment/racks in the Post Office Areas are the responsibility of the contractor to clean or maintain. No, they are not.
8. Can you clarify the contractor’s recycling responsibilities at each building? Please see Solicitation Paragraphs: CC.10, CC10.2.1.
9. What is the current value of the contract? $3,832,407.95 per PS06
10. Can you provide a current seniority list for personnel? N/A
11. Please provide a list of current subcontractors being used? N/A
12. Can you provide the complete model and serial numbers of the generators?
The generator is a Caterpillar Engine Model # 3412 – D1, Serial # 81Z14865, Generator Set 600, 60Hz, 277/480volt
13. What type of building automation system is in the building? Niagra
14. Can you provide the complete model and serial numbers of the boilers?
Shreveport Boilers – Hurst – 2each – M# S4-G-70-100W – S# S350-100-2 – S# 350-100-3 Monroe Boilers – Teledyne Laars – 2 each – M#PH-1200-IN-09-T-1A-CX - S# C95A00525 – S# C95A00524
Alexandria Boilers– RBI – 2each – M# H5N-1370E-02 – S# 05999973 – S# 05999974 Texarkana Boilers – Bryan – 2each – M# CL-270-W-FDG – S# 76791 – S# 76796
15. Can you provide the current number of FTEs? 7.5
16. What are the normal working hours for each facility? Page: 166 Official working hours of
Building occupants – 7:30 A.M. – 5 P.M..
17. What are the opening and closing hours for each facility? 7 A.M – 5:30 P.M.
18. Can the proposals be submitted electronically via email or any other electronic means?
19. SF 33 lists line items; 0001: Base Year, 1001: FOY I, 2001: FOY II, 3001: FOY III and
4001: FOY III.
a. Should line item 4001 be FOY IV? Yes
b. What does FOY mean? Follow On Year
20. SF 33, each line item shows the PoP of 11/01/2019 – 10/31/2020. Should each line item be a separate PoP? Yes
21. SF 33, the solicitation number listed on the cover page of the solicitation, 47PH0219R0007, does not match the solicitation number in block 3 of SF 33, which shows 7PH0419R0007. Which solicitation number is correct? Correct#47PH0219R0019
22. B.1.1 Above Standard Services: Texarkana, AR Only.
a. Reference the item for washing exterior windows. Please consider making the
Rate Per Each for this item “per job” for one complete washing instead of per window. Does the Government anticipate washing less windows than the entire building at any time? Possibly, it depends on condition.
b. Reference the item for snow and ice removal for areas requiring heavy equipment. Please consider making the Rate Per Each for this item per hour instead of per square foot. A per square foot price is variable depending upon the amount of snow and how many square feet will be cleared. Hourly rates for pricing this type of equipment is industry standard practice. Correct. Heavy snow removal should be priced per hour and not square feet and will be changed.
i. CC.5.1.1 Floor Care. How many square feet of floor requires annual stripping, sealing and refinishing? All hard surface floors.
c. How many square feet of wood floor is there? Approximately 1500
23. With the short time period between the question due date and the submittal date for the proposal, please consider extending the due date for the proposal. Already extended the due date for the proposal August 2, 2019, 10. A.M. CST.
24. There are two Building Information sheets for the Texarkana building. One is labeled Exhibit 7 and the other is labeled as Exhibit JC.1. Since they each show a different amount of square feet for Net Cleaning Area, which Building Information Exhibit is the most current and correct? JC.1. is correct
25. Section L requires the contractor to submit its proposal in three separate parts:
Technical, Price and Miscellaneous Documents. Listed in Miscellaneous Documents is Standard Form 33, which happens to have pricing information to be filled in by the offeror. Should this form be part of Part Two - Price Proposal instead of Part Three – Miscellaneous Documents? Please clarify. Please put Standard Form 33 under Price Proposal..
26. L.4.2.3 Submission, section requires offerors to submit 5 original paper copies and 5 electronic CD-R disks of each of the three parts of the proposal, making for a total of 15 original paper copies and 15 electronic CD-R disks. Please consider the impact all the paper copies and shipping of packages causes on the environment. Within all of the regions of GSA it has become common practice to have offerors submit their proposals via email. Will you consider submission of this proposal via email? Please follow L.4.2.3 instruction.
27. CC.10.1.2 Solid Waste/Trash Disposal.
a. What is the size of the trash container being used? 3 CY
b. How often is this container serviced? 5 days/week
28. CC.10.2.0 Recycling
a. N
29. Section L.5.2 Experience states “Performing required services for building with approximately 350,000 square feet or greater”. Is this an aggregate SF or does each building under one contract have to be 350,000 SF? No, aggregate SF per each project.
30. Does every reference submitted need to have janitorial services? Only Texarkana has custodial requirements
31. Is a separate Figure B3 required for each building or should the price for all buildings be combined on one form? Combined on one form
32. Can you provide the Building Information Sheet for Shreveport, Alexandria and Monroe?
Texarkana is the only building with Interior and Ground Maintenance
33. There was a statement made that in Shreveport the elevator contract was separate from this solicitation. Is the same true for Alexandria and Monroe? I recognize that this question is being asked past the deadline, so if you don’t get to it, we understand.
All elevators are under a elevator contract.
34. Does the contractor still get paid during a government shut down (provided that the building still needs maintenance)? How was it handled during the most recent shut down?Yes, typically tenants work through shutdowns.
35. Is domestic water testing needed? If so, why?
The contract responsibilities are described in CM.1.1, item T., CM.36.4 and EXHIBIT
JM.6.
36. Is there a limit (cap) on the non-reimbursable repairs? For example: 10 work orders with the cost to repair of $2,400 each for a period of one week which would equal $24,000 for that one week. At what point can the cThere is no limit.
37. Has there been a trash audit conducted for these facilities?No
38. Please confirm that card readers, cameras and/or CCTV are not the contractor’s responsibility as listed under CM.1.3 of this solicitation?They are not the contractors responsibility.
39. Please confirm that the contractor is responsible for interior and exterior annual window washing for all locations? Only in Texarkana
40. Please confirm that GSA will provide IT equipment (i.e. computers, monitors, printers, etc.) for the contractor to use in order to perform their day to day duty as per HC.9.1?One computer at each site with exception of Shreveport,which has two. No printers are provided.
41. Paragraph L.5.1.2, Management Plan Worksheet, states, “Figure L-2, Management Plan Baseline, indicates the government’s baseline manpower.” The Figure L-2 provided with the RFP is the Past Performance Questionnaire. We are assuming the Government meant to reference Figure L-1, Management Plan Worksheet in this paragraph. However, the Figure L-1 provided with the RFP appears to be the baseline manpower for a different contract. Will the Government please provide a corrected Figure L-1 indicating the government’s baseline manpower for this solicitation?
Figure L-1 Management Plan Worksheet
Figure L-2 Past Performance Questionnaire
42. Paragraph L.6., Pricing Proposal Requirements, requires offerors to use the “Pricing Template” (Microsoft Excel Attachment) “Figure B-3, Pricing of Services”. We cannot find this attachment in the RFP documents provided to date. Will the Government please provide the Microsoft Excel Spreadsheet, Figure B-3, Pricing of Services, for this solicitation? Figure B-3 already listed/sent
43. CC.5.4 3. States trees and shrubs shall be maintained by an arborist or arborist trainee. Are trees and shrubs currently maintained by in-house Contractor personnel, or is a subcontractor providing this service? If by subcontractor(s), please provide contact information. SubContractor
44. CC.5.4.18. states the Contractor shall utilize the Integrated Pest Management Plan for controlling pests and diseases. Is pest control, to include application of chemicals, trapping of rodents, etc. performed by certified in-house contractor personnel, or is this function performed by a subcontractor? If by subcontractor, please provide contact information. Subcontractor
45. CM.2.14 references the Computerized Maintenance Management System (CMMS) and states that the National CMMS (N-CMMS) is a central repository (Database) for all maintainable GSA Assets.” Is the CMMS for all the facilities in this solicitation part of N- CMMS? YES Does each facility have its own CMMS link to N-CMMS, or is maintenance documented by the Contractor from one central location for all four (4) sites? If so, which location(s)? All facility are linked separately in NCMMS.
46. CM.35.4.1 i.) BAS Operating Standards, states, “…This log book will be used by the contractors BAS subcontractor, or qualified in-house staff as a work list…”. Is preventive maintenance to the BAS currently being performed by in-house Contractor staff at all four (4) locations, or a subcontractor(s)? Subcontractor If a mix, please provide which locations are in-house contractor maintained and which are subcontracted. If by subcontractor(s), please provide contact information.
47. CM.35.4.2, Reporting, states, ”…If the Contractor does not have a manufacturer trained or equivalent BAS operator onsite…, the contractor shall enter into a subcontract including regular scheduled support…” Is this repair and reprograming of the BAS currently being performed by in-house Contractor staff or subcontractor? If by subcontractor, please provide contact information. Subcontractor
48. HM.15.3.1, Qualifications of Fire Alarm System Technicians. Sub-paragraph a), requires Technicians to be NICET Level 2 trained and subparagraph b) requires Technicians modifying program software to be factory trained and certified. Are there current in-house Contractor NICET Level 2 factory trained and certified Fire Alarm System Technicians performing PMs, inspections, testing, repairs and programming modifications to the Fire Alarm Systems on this contract, or is the work currently being subcontracted? If subcontracted, please provide contact information. Subcontractor
49. HM.15.3.14 Qualifications of HVAC Technicians, requires N.A.T.E HVACR Certification, HVAC Excellence Professional Level Certification or UA Star HVACR Mastery Certification. Are the current HVAC Technicians working this contract certified in accordance with this requirement? Are they in-house Contractor personnel or subcontractors? If subcontractors, please provide contact information. Both
50. HM.15.3.15 Qualifications of BAS Technicians, requires Technicians involved in operations, adjustments and maintenance of the BAS to be certified in the building specific integrated systems controls. Are the BAS Technicians currently performing operations, adjustments and maintenance on the BAS at the required locations certified in accordance with this requirement? Are they in-house Contractor personnel or subcontractors? If subcontractors, please provide contact information. Subcontractor
51. HM.15.3.16 Qualifications of Electrical Technicians, requires Technicians involved in inspection, testing and maintenance of switchgear to be ANSI/NETA ETT-2000 Level 3 or 4 certified. Are the Electrical Technicians currently performing preventive maintenance, inspection and testing of switchgear certified in accordance with this requirement? Are they in-house Contractor personnel or subcontractors? If subcontractors, please provide contact information. Subcontractor
52. At the Texarkana location, is the WWI Memorial area part of the Grounds Maintenance and annual Tree Survey responsibility? No
53. CC.5.4.13, Fence Lines. Images of all locations indicate no fencing present. Please verify there is no workload associated with this paragraph or consider removing it from the RFP. No workload for fencing.
54. CC.5.4.16, Watering and CC.5.4.17, Adjust, Clean and Set Automatic Controllers Irrigation System Settings is a requirement which not supported by any equipment inventory provided for the Texarkana location. If there is no sprinkler system will the Government remove this requirement from the RFP? There are sprinklers
55. CC.7, Custodial Service Calls, indicates an historical 25 hours per month. Is this a Team response (multiple employees) of 25 hours times the number of employees, or a single employee response which is specific to one employee for 25 hours of work? One
56. CC.10.1.2, Solid Waste/Trash Removal and Disposal. How many trash receptacles and what size are presently used at each facility? Please provide this information by facility location. One 3CY dumpster
57. Paragraph L.5.1.2, Management Plan Worksheet, states, “Figure L-2, Management Plan Baseline, indicates the government’s baseline manpower.” The Figure L-2 provided with the RFP is the Past Performance Questionnaire. We are assuming the Government meant to reference Figure L-1, Management Plan Worksheet in this paragraph. However, the Figure L-1 provided with the RFP appears to be the baseline manpower for a different contract. Will the Government please provide a corrected Figure L-1 indicating the government’s baseline manpower for this solicitation?
Figure L-1 Management Plan Worksheet Figure L-2 Past Performance Questionnaire
58. Paragraph L.6., Pricing Proposal Requirements, requires offerors to use the “Pricing Template” (Microsoft Excel Attachment) “Figure B-3, Pricing of Services”. We cannot find this attachment in the RFP documents provided to date. Will the Government please provide the Microsoft Excel Spreadsheet, Figure B-3, Pricing of Services, for this solicitation? Figure B-3 already listed/sent
59. CC.5.4 3. States trees and shrubs shall be maintained by an arborist or arborist trainee. Are trees and shrubs currently maintained by in-house Contractor personnel, or is a subcontractor providing this service? If by subcontractor(s), please provide contact information. Subcontractor
60. CC.5.4.18. states the Contractor shall utilize the Integrated Pest Management Plan for controlling pests and diseases. Is pest control, to include application of chemicals, trapping of rodents, etc. performed by certified in-house contractor personnel, or is this function performed by a subcontractor? If by subcontractor, please provide contact information. Subcontractor
61. CM.2.14 references the Computerized Maintenance Management System (CMMS) and states that the National CMMS (N-CMMS) is a central repository (Database) for all maintainable GSA Assets.” Is the CMMS for all the facilities in this solicitation part of N- CMMS? Does each facility have its own CMMS link to N-CMMS, or is maintenance documented by the Contractor from one central location for all four (4) sites? If so, which location(s)? Same question as #45.
62. CM.35.4.1 i.) BAS Operating Standards, states, “…This log book will be used by the contractors BAS subcontractor, or qualified in-house staff as a work list…”. Is preventive maintenance to the BAS currently being performed by in-house Contractor staff at all four (4) locations, or a subcontractor(s)? If a mix, please provide which locations are in-house contractor maintained and which are subcontracted. If by subcontractor(s), please provide contact information. Subcontractor
63. CM.35.4.2, Reporting, states, ”…If the Contractor does not have a manufacturer trained or equivalent BAS operator onsite…, the contractor shall enter into a subcontract including regular scheduled support…” Is this repair and reprograming of the BAS currently being performed by in-house Contractor staff or subcontractor? If by subcontractor, please provide contact information. Subcontractor.
64. HM.15.3.1, Qualifications of Fire Alarm System Technicians. Sub-paragraph a), requires Technicians to be NICET Level 2 trained and subparagraph b) requires Technicians modifying program software to be factory trained and certified. Are there current in-house Contractor NICET Level 2 factory trained and certified Fire Alarm System Technicians performing PMs, inspections, testing, repairs and programming modifications to the Fire Alarm Systems on this contract, or is the work currently being subcontracted? If subcontracted, please provide contact information. Subcontractor
65. HM.15.3.14 Qualifications of HVAC Technicians, requires N.A.T.E HVACR Certification, HVAC Excellence Professional Level Certification or UA Star HVACR Mastery Certification. Are the current HVAC Technicians working this contract certified in accordance with this requirement? Are they in-house Contractor personnel or subcontractors? If subcontractors, please provide contact information. Subcontractor
66. HM.15.3.15 Qualifications of BAS Technicians, requires Technicians involved in operations, adjustments and maintenance of the BAS to be certified in the building specific integrated systems controls. Are the BAS Technicians currently performing operations, adjustments and maintenance on the BAS at the required locations certified in accordance with this requirement? Are they in-house Contractor personnel or subcontractors? If subcontractors, please provide contact information. Subcontractor
67. HM.15.3.16 Qualifications of Electrical Technicians, requires Technicians involved in inspection, testing and maintenance of switchgear to be ANSI/NETA ETT-2000 Level 3 or 4 certified. Are the Electrical Technicians currently performing preventive maintenance, inspection and testing of switchgear certified in accordance with this requirement? Are they in-house Contractor personnel or subcontractors? If subcontractors, please provide contact information. Subcontractor
68. At the Texarkana location, is the WWI Memorial area part of the Grounds Maintenance and annual Tree Survey responsibility? NO
69. CC.5.4.13, Fence Lines. Images of all locations indicate no fencing present. Please verify there is no workload associated with this paragraph or consider removing it from the RFP. No workload for fence line
70. CC.5.4.16, Watering and CC.5.4.17, Adjust, Clean and Set Automatic Controllers Irrigation System Settings is a requirement which not supported by any equipment inventory provided for the Texarkana location. If there is no sprinkler system will the Government remove this requirement from the RFP? There are sprinklers
71. CC.7, Custodial Service Calls, indicates an historical 25 hours per month. Is this a Team response (multiple employees) of 25 hours times the number of employees, or a single employee response which is specific to one employee for 25 hours of work? One
72. CC.10.1.2, Solid Waste/Trash Removal and Disposal. How many trash receptacles and what size are presently used at each facility? Please provide this information by facility location. One 3CY dumpster
Questions Received for Solicitaton#47PH0219R0019 on 7/12/2019
73. Reference: Section CC, page 16 of 266, paragraph CC.2.2, Building Information Data Sheet Estimates, “The figures contained in the Building Information Data Sheet are estimates”. Question: Can the government provide copies of the custodial floor plans for each facility? No
74. Reference: Section CC, page 29 of 266, paragraph CC.5.4.13, Fence Lines, “Grass, native grasses, weeds, and other growths at fence lines including Land Ports of Entry, shall be controlled and not exceed 6 inches in height.”. Question: Can the government clarify this statement? Is Land Ports of Entry included in this contract? There are no LPEs in this solicitation.
75. Reference: Section CC, page 31 of 266, paragraph CC.6.3, Tree Thinning, “Tree thinning shall reduce the density of live branches towards developing the natural branching structure. Thinning shall result in an even distribution of branches on individual limbs and throughout the crown, to provide free air circulation through the remaining limbs and branches. Not more than 25 percent of the crown should be removed annually”. Question: Can the government provide the average size tree that will require thinning each year? Trees are approximately 12” in diameter and 20’ tall
76. Reference: Section CC, page 31 of 266, paragraph CC.6.6, High Cleaning Above 10
Feet, “Surfaces above 10 feet shall be cleaned and free of dirt, dust, and cobwebs”.
Question: Can the government provide historically the frequency of high cleaning for each facility? High cleaning is an Above Standard Service that can be ordered by the COR, no historical data available.
77. Reference: Section CC, page 33 of 266, paragraph CC.10.1.2, Solid Waste/Trash
Removal and Disposal, “The custodial Contractor shall provide solid waste/trash removal and disposal services as described herein”. Question: Can the government provide historically the types and sizes of containers needed for each facility? There is a 3CY dumpster located at the Texarkana facility.
78. Reference: Section CM, page 63 of 266, paragraph CM.5.2 Adjustments and Corrections, “The Contractor shall be responsible for making immediate adjustments or corrections that fall within the scope of routine preventive maintenance required by this Contract at no additional cost to the Government”. Question: Is the contractor responsible for any backlog service orders or preventive maintenance services from the previous contract? Those items will be addressed during the deficiency walk through.
79. Reference: Section CM, page 64 of 266, paragraph CM.8.2 Minimum staffing and ability to contact and communicate with the CO or designee, “The Contractor shall:
Provide qualified staff and onsite technicians to ensure services are continued without disruption to the tenant.”. Question 1: Is the government requiring an onsite technician for each of the locations? Question 2: Are these full time requirements? NA
80. Reference: Section CM, page 65 of 266, paragraph CM.8.4 Service Request and
Administrative Support, “The Contractor shall operate a service request and administrative support function during normal working hours, to act as a central point of contact for the Government and building occupants to take service requests, and track and maintain service request records in the CMMS”. Question: Are costs for these services applied to B.1.1, Basic Services, in Figure B-3 Bid Schedule, or B.1.2, Service Order Dispatcher (DOL Wage Classification 01320)? It is up to the contractor on how this basic service requirement will be fulfilled.
81. Reference: Section CM, page 67 of 266, paragraph CM.10.c, Equipment Inventory, “Some asset identification systems include bar-coding, Radio Frequency identification (RFID), or other equipment tagging”. Question: Is bar-coding equipment included with the government provided CMMS? No
82. Reference: Section CM, page 74 of 266, paragraph CM.25, Demand Response
Programs, “If the Government participates in such a program and advises the Contractor of the requirements of the program, the Contractor must cooperate fully in the implementation of the program”. Question: Is the government participating in the Demand Response Programs for any facilities in this contract? NA
83. Reference: Section CM, page 77 of 266, paragraph CM.35.4, BAS Control Systems, “Control systems shall be maintained as designed. The Contractor is responsible for all system hardware; for keeping software functioning and for reloading software in computers or controllers (application specific controllers -ASC) as necessary; for making set point adjustments as necessary and appropriate; for other than reloading programs and for making operator level changes such as set point adjustments.”.
Question: Can the government provide the software manufacture of the BAS control system? Niagra
84. Reference: Section CM, page 77 of 266, paragraph CM.35.4, BAS Control Systems, “The Contractor shall not modify sequences of operation or control programs or run systems manually without prior approval of the CO or their designee and regional subject matter expert (SME)”. Question: Can the government provide the name of the regional subject matter expert (SME) for the BAS Control System? Bill Winger
85. Reference: Section CM, page 20 of 266, paragraph CM.38, Lamps and Ballasts, “The Contractor must replace failed lamps, to include appropriate ballasts if required, with the most efficient products available in accordance with existing building standards defined by the P100 or CO or Designee”. Note: GSA, Public Buildings Service Operations and Maintenance Standards-2012, ELEC-LTG-02-05Y requires Relamping of fluorescent light fixtures every five years. ELEC-LTG-02-02Y requires washing and Relamping of fluorescent light fixtures every two years. Question: Is Relamping and washing of fluorescent light fixtures applicable to this contract per standards ELEC-LTG-02-05Y and ELEC-LTG-02-02Y of the GSA Public Buildings Service Operations and Maintenance Standards-2012? Relamping and ballast replacement is required as needed.
86. Reference: Section CM, page 81 of 266, paragraph C.39.1, Architectural and Structural
Systems Maintenance, “The Contractor shall conduct routine inspection and minor maintenance and repair of interior and exterior architectural and structural systems components. Region 7 GSA sets the threshold of these type repairs at $200/3 hours of labor”. Question: Can the government provide the historic data on the number of these type of repairs? NA
87. Reference: Section CM, page 82 of 266, paragraph CM.39.7, Historic Building
Preservation, “The Contractor shall provide services that protect and preserve the historical integrity of the building. The Contractor shall consider any building 50 years old as historically significant, regardless of National Register status”. Question: Which buildings on this contract are over 50 years old? Monroe, Alexandria, and Texarkana
88. Reference: Section CM, page 82 of 266, paragraph CM.39.8, Vertical Transportation and Associated Equipment, “The Contractor will be responsible for maintaining light fixtures, ballasts, and lamps installed in elevator cars and within the ceilings of cars”.
Question: Is the contractor responsible for the maintenance and service of the elevators? No, but maintenance on lamps/ballasts is required.
89. Reference: Section CM, page 83 of 266, paragraph CM.40.1, Repairs, “However, the Government recognizes that occasionally there are certain specialized repairs that require specialized skills outside the skill sets of the in-house O&M personnel. If the Contractor identifies a repair that they believe is of such a specialized nature that a specialized subcontractor is required to properly complete the repair, the Contractor shall provide written justification in advance, to the CO or designee, for approval of the need to use a subcontractor”. Question: Can the government provide a list of subcontractors used on this contract for critical systems, specialized repair, and certifications? List will be provided upon award.
90. Reference: Section CM, page 83 of 266, paragraph CM.40.1, Repairs, “The Contractor shall repair exterior water leaks underground up to 48” deep unless leaks are below pavement”. Question: Can the government provide the historic data on the number of these type of repairs? NA
91. Reference: Section CM, page 83 of 266, paragraph CM.40.2, Non-Reimbursable
Repairs, “A non-reimbursable repair is a repair requiring under $2,500 in cost for repair parts, materials only but no labor cost is included (including approved subcontracting costs)”. Question: Can the government provide the number of non-reimbursable repairs per year? NA
92. Reference: Section CM, page 84 of 266, paragraph CM.40.3, Reimbursable Repairs, “Reimbursable repairs are reimbursable to the Contractor, once approved by the CO or designee, for the portion (shared liability) of the cost exceeding the non-reimbursable threshold of $2,500”.Question: Can the government provide the number of reimbursable repairs per year? NA
93. Reference: Section CM, page 84 of 266, paragraph CM.40.5, Repair Shared Liability
Example, “A repair is identified and estimated by the Contractor to cost $3,000.00 for repair parts and materials only”. Question: The repair shared liability example demonstrates reimbursement of only repair parts and materials. How is the contractor compensated for labor cost for services exceeding the liability amount? Refer to Section CM.40.2
94. Reference: Section CM, page 84 of 266, paragraph CM.40.5, Repair Shared Liability
Example, “In this example, the Contractor will pay the first $2,500 of the repair and GSA will pay the remaining $500.00.”. Question: How often can a contractor anticipate paying the shared liability amount of $2,500 each year? NA
95. Reference: Section CM, page 88 of 266, paragraph CM.41.14, Confined Spaces, “The
Contractor shall identify and label all confined spaces in accordance with OSHA requirements”. Question: Are all confined spaces currently identified for all locations in this contract? Yes
96. Reference: Section CM, page 94 of 266, paragraph CM.42.8, Portable Fire
Extinguishers, “All portable fire extinguisher inspections, tests, and maintenance performed under this contract shall comply with the NFPA 10, Standard for Portable Fire Extinguishers”. Question: Can the government provide hydrostatic test dates for the Portable Fire Extinguishers? January of 2017
97. Reference: Section CM, page 94 of 266, paragraph CM.42.9, Non-Water-Based Fire
Extinguishing Systems, “Services consist of, but are not limited to, the inspection, testing, and preventive maintenance of the following types of non-water-based fire extinguishing systems”. Question: Can the government provide hydrostatic test dates for all special hazard cylinders? NA
98. Reference: Section JC, page 166 of 266, paragraph Exhibit JC.1, Building Information
Sheet, “Location: 500 N. State Line, Texarkana, AR”. Question: Exhibit JC-1 only has building information for Texarkana. Can the government provide building information for the other facilities at Shreveport, Monroe, and Alexandria? Building information sheet are only provided for locations that require custodial services.