This synopsis notice announces a forthcoming solicitation for a firm fixed price construction contract to provide and install bullet resistant transaction windows and replace an entry turnstile for the U.S. District Court Clerk's Office in South Bend, Indiana. The General Services Administration intends to issue a request for proposals in February 2023 seeking a small business contractor to furnish labor, materials, equipment and supervision to complete the project for between $100,000 and $250,000. Offerors must be registered in the System for Award Management and meet small business size standards. The award is expected in April 2023 and will require payment and performance bonds.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable x
X
2. AMENDMENT/MODIFICATION NUMBER
5P2QCB
Aneesah Muhammad, Contracting Officer
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0003 for RFP 47PF0023R0023, New Transaction Windows for the U.S. District Court Clerk’s Office Reception Desk, located at the Robert Grant Federal Building & U.S. Courthouse, 204 S Main St, South Bend, IN 46601, is being issued to provide revised section to the specification and t extend the Proposal Due Date from April 7, 2023, to April 14, 2023.
Continue on next page
General Services Administration 230 S. Dearborn, Room 3500 Chicago, IL. 60604
General Services Administration 230 S. Dearborn, Room 3500 Chicago, IL. 60604
RFP 47PF0023R0023
1 2
03/312023
02/17/2023
USDC & USBC Transaction Windows and Turnstile Replacement PBS-REG-5 South Bend, Indiana 47PF0020F0874
TABLE OF CONTENTS
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
DIVISION
SECTION
TITLE
PAGES
THRU
01 GENERAL REQUIREMENTS
01 10 00 Summary 1 – 3 01 14 00 Work Restrictions 1 – 3 01 25 00 Substitution Procedures 1 – 4 01 29 00 Payment Procedures 1 – 3 01 31 00 Project Management and Coordination 1 – 8 01 31 20 Critical Path Method 1 – 7 01 32 00 Construction Progress Documentation 1 – 2 01 33 00 Submittal Procedures 1 – 7 01 35 10 Historic Building Treatment Procedures 1 – 3 01 35 25 Fire Prevention and Protection in Construction and Demo-lition Procedures 1 – 7
01 35 26 Safety and Health 1 – 8 01 40 00 Quality Assurance 1 – 6 01 42 00 References 1 – 10 01 59 30 Security Regulations 1 – 3 01 60 00 Product Requirements 1 – 4 01 70 00 User Execution Requirements 1 – 4 01 73 10 Cutting and Patching 1 – 4 01 73 20 Selective Demolition 1 – 8 01 73 50 Fire Prevention Precautions for Hot Work 1 – 3 01 74 19 Construction Nonhazardous Waste Management and
Disposal 1 – 6
01 78 10 Project Record Documents 1 – 3 01 78 22 Operation and Maintenance Documentation 1 – 8
02 EXISTING CONDITIONS
02 83 00 Lead-Based Paint Mitigation 1 – 13 02 83 00.1 August Mack Lead Based Paint Screening Report 1 – 12
06 WOOD
06 10 00 Rough Carpentry 1 – 4 06 40 23 Interior Architectural Woodwork 1 – 7
07 THERMAL AND MOISTURE PROTECTION
07 84 13 Penetration Firestopping 1 – 3 07 92 00 Joint Sealants 1 – 5
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
08 OPENINGS
08 14 16 Flush Wood Doors 1 – 5 08 41 23 Steel Framed Entrances and Storefronts 1 – 7 08 71 00 Door Hardware 1 – 9 08 88 53 Security Glazing 1 – 9
09 FINISHES
09 22 16 Non-Structural Metal Framing 1 – 7 09 29 00 Gypsum Board 1 – 4 09 91 23 Interior Painting 1 – 5
10 SPECIALTIES
10 14 23 Panel Signage 1 – 3
11 EQUIPMENT
11 14 39 Turnstiles 1 – 5
13 SPECIAL CONSTRUCTION
13 47 15 Bullet Resistant Products (Transaction windows, doors and frames) 1 – 6
23 HVAC
23 05 93 Testing, Adjusting, and Balancing for HVAC 1 – 9 23 07 13 Duct Insulation 1 – 9 23 31 13 Metal Ducts 1 – 12 23 37 13 Diffusers, Registers, and Grilles 1 – 3
26 ELECTRICAL
26 05 19 Low-Voltage Electrical Power Conductors and Cables 1 – 4 26 05 26 Grounding and Bonding for Electrical Systems 1 – 4 26 05 29 Hangers and supports for Electrical Systems 1 – 5 26 05 33 Raceways and Boxes for Electrical Systems 1 – 3 26 05 44 Sleeves and Sleeve Seals for Electrical Raceways 1 – 4 26 05 53 Identification for Electrical Systems 1 – 7 26 27 26 Wiring Devices 1 – 6 26 52 19 Emergency and Exit Lighting 1 – 4
27 COMMUNICATIONS
27 05 28 Pathways for Communications Systems 1 – 3 27 05 44 Sleeves and Sleeve Seals for Communications 1 – 5 27 05 53 Identification for Communications Systems 1 – 7
FOR OFFICIAL USE ONLY
Do not remove this notice
28 ELECTRONIC SAFETY AND SECURITY
28 05 28 Pathways for Electronic Safety and Security 1 – 8 28 05 44 Sleeves and Sleeve Seals for Electronic Safety 1 – 5
APPENDIX
Appendix A Building Specific COVID Information 1 – 2
END OF TABLE OF CONTENTS
USDC Transaction Windows and Turnstile Replacement PBS-RE South Bend - Indiana 47PF0020F0874
FLUSH WOOD DOORS 08 14 16
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
SECTION 08 14 16 - FLUSH WOOD DOORS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Solid-core doors with wood-veneer faces.
2. Factory fitting flush wood doors to frames and factory machining for hardware.
3. Factory installed glazing.
B. Related Requirements:
1. Section 08 41 23 for Steel Framed Entrances and Storefront
2. Section 08 71 00 for Door Hardware.
3. Section 08 88 53 for Security Glazing at glass view panels in flush wood doors.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product, including the following:
1. Door core materials and construction.
2. Door edge construction
3. Door face type and characteristics.
4. Door trim for openings.
5. Factory-machining criteria.
B. Shop Drawings: Indicate location, size, and hand of each door; elevation of each type of door; construction details not covered in Product Data; and the following:
1. Door schedule indicating door and frame location, type, size, and swing.
2. Door elevations, dimension and locations of hardware, lite cutouts, and glazing thicknesses.
3. Dimensions and locations of blocking for hardware attachment.
4. Clearances and undercuts.
5. Requirements for veneer matching.
6. Apply AWI Quality Certification or WI Certified Compliance Program label to Shop Drawings.
C. Samples for Initial Selection: Custom stain to match adjacent existing millwork.
D. Samples for Verification:
FLUSH WOOD DOORS 08 14 16
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
1. Factory finishes applied to actual door face materials, approximately 8 by 10 inches, for each material and finish. For each wood species and stain finish, provide set of three Samples showing typical range of color and grain to be expected in finished Work.
2. Framing for light openings, 6 inches long for each material, type and finish required.
1.3 CLOSEOUT SUBMITTALS
A. Quality Standard Compliance Certificates: AWI Quality Certification or WI Certified Compliance Program certificates.
1.4 QUALITY ASSURANCE
A. Manufacturer's Certification: Licensed participant in AWI's Quality Certification Program or WI's Certified Compliance Program.
1.5 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace doors that fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Warping (bow, cup, or twist) more than 1/4 inch in a 42-by-84-inch section.
b. Telegraphing of core construction in face veneers exceeding 0.01 inch in a 3-inch span.
2. Warranty shall also include installation and finishing that may be required due to repair or replace-ment of defective doors.
3. Warranty Period for Solid-Core Interior Doors: Life of installation.
PART 2 - PRODUCTS
2.1 FLUSH WOOD DOORS, GENERAL
A. Quality Standard: In addition to requirements specified, comply with "Architectural Woodwork Standards."
ANSI/WDMA I.S. 1A.
1. Provide labels and certificates from AWI or WI certification program indicating that doors comply with requirements of grades specified.
B. Low-Emitting Materials: Fabricate doors with adhesives and composite wood products that do not contain urea formaldehyde.
FLUSH WOOD DOORS 08 14 16
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
C. Low-Emitting Materials: Fabricate doors with adhesives and composite wood products that comply with the testing and product requirements of the California Department of Health Services' "Standard Practice for the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers."
2.2 INTERIOR DOORS, SOLID-CORE FIVE-PLY FLUSH WOOD VENEER-FACED
A. Interior Doors:
1. Acceptable Manufacturers:
a. Basis of Design: Masonite Architectural, Aspiro Series, a component of the Masonite Defendr Door System
b. Or Government-approved equal.
2. Security Standard:
a. ASTM F1233: Standard Test Method for Security Glazing and Systems.
b. HPW-TP-0500.03: Transparent Materials for Use in Forced Entry or Containment Barriers.
c. UL 972: Standard for Burglary Resisting Glazing Material.
3. Quality Standard: Provide WDMA I.S.1-A
a. Performance Grade: Extra Heavy Duty.
b. Aesthetic Grade: Premium, with Grade AA faces.
4. Faces: Single-plywood veneer not less than 1/50 inch (0.508 mm) thick.
a. Species: Veneer to match existing adjacent millwork.
b. Cut: Rotary cut to match existing adjacent millwork.
c. Match between Veneer Leaves: Book.
d. Assembly of Veneer Leaves on Door Faces: Center balanced.
5. Exposed Vertical and Top Edges: Matching / Compatible Hardwood Lumber over structural composite lumber - Architectural Woodwork Standards edge Type A.
6. Core: WDMA I.S. 10 Structural Composite Lumber
7. Construction: Five plies, hot-pressed bonded (vertical and horizontal edging is bonded to core), with entire unit abrasive planed before veneering.
8. Adhesives: Type I in accordance with WDMA T.M. 6.
2.3 FABRICATION
A. Factory fit doors to suit frame-opening sizes indicated.
FLUSH WOOD DOORS 08 14 16
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
1. Comply with clearance requirements of referenced quality standard for fitting unless otherwise indicated.
B. Factory machine doors for hardware that is not surface applied.
1. Locate hardware to comply with DHI-WDHS-3.
2. Comply with final hardware schedules, door frame Shop Drawings, ANSI/BHMA-156.115-W, and hardware templates.
3. Coordinate with hardware mortises in steel frames, to verify dimensions and alignment before factory machining.
4. For doors scheduled to receive electrified locksets, provide factory-installed raceway and wiring to accommodate specified hardware.
C. Openings:
1. Light Openings: Factory cut and install with vision kits indicated.
2. Security Glass: Factory install glass in doors per manufacturer’s instructions. Comply with applicable requirements in Section 08 88 53 Security Glazing.
2.4 FACTORY FINISHING
A. Comply with referenced quality standard for factory finishing.
1. Complete fabrication, including fitting doors for openings and machining for hardware that is not surface applied, before finishing.
2. Finish faces, all four edges, edges of cutouts, and mortises.
3. Stains and fillers may be omitted on top and bottom edges, edges of cutouts, and mortises.
B. Factory finish doors.
C. Transparent Finish:
1. Architectural Woodwork Standards or ANSI/WDMA I.S. 1A Grade: Premium.
2. Finish: ANSI/WDMA I.S. 1A TR-8 UV Cured Acrylated Polyester/Urethane
3. Staining: Match existing adjacent millwork.
4. Sheen: Satin.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Hardware: For installation, see Section 08 71 00 "Door Hardware."
FLUSH WOOD DOORS 08 14 16
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
B. Install doors to comply with manufacturer's written instructions and referenced quality standard, and as indicated.
C. Install frames level, plumb, true, and straight.
1. Shim as required with concealed shims. Install level and plumb to a tolerance of 1/8 inch in 96 inches (3.2 mm in 2400 mm).
2. Anchor frames to anchors or blocking built in or directly attached to substrates.
a. Secure with countersunk, concealed fasteners and blind nailing.
b. Use fine finishing nails for exposed fastening, countersunk and filled flush with woodwork.
1) For factory-finished items, use filler matching finish of items being installed.
D. Job-Fitted Doors:
1. Align and fit doors in frames with uniform clearances and bevels as indicated below.
2. Machine doors for hardware.
3. Seal edges of doors, edges of cutouts, and mortises after fitting and machining.
4. Clearances:
a. Provide 1/8 inch (3.2 mm) at heads, jambs, and between pairs of doors.
b. Provide 1/8 inch (3.2 mm) from bottom of door to top of decorative floor finish or covering unless otherwise indicated on Drawings.
5. Bevel non-fire-rated doors 1/8 inch in 2 inches (3-1/2 degrees) at lock and hinge edges.
E. Factory-Fitted Doors: Align in frames for uniform clearance at each edge.
F. Factory-Finished Doors: Restore finish before installation if fitting or machining is required at Project site.
3.2 ADJUSTING
A. Operation: Rehang or replace doors that do not swing or operate freely.
B. Finished Doors: Replace doors that are damaged or that do not comply with requirements. Doors may be repaired or refinished if Work complies with requirements and shows no evidence of repair or refinishing.
END OF SECTION 08 14 16
USDC Transaction Windows and Turnstile Replacement PBS-REG-5
STEEL FRAMED ENTRANCES AND STOREFRONT 08 41 23
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
SECTION 08 41 23 - STEEL FRAMED ENTRANCES AND STOREFRONT
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Framing systems for the following applications:
1. Interior vision lights and door frames.
1.2 RELATED SECTIONS
A. Section 08 14 16 – Flush Wood Doors for doors in steel frames.
B. Section 08 71 00 - Door Hardware at doors in steel frames.
C. Section 08 88 53 – Security Glazing for glazing in steel frames.
1.3 REFERENCES
A. ASTM International (ASTM):
1. ASTM A 1008/A 1008M - Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength, Low Alloy, and High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable.
2. ASTM A 1011/A 1011M - Standard Specification for Steel, Sheet and Strip, Hot- Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength.
3. ASTM F1233: Standard Test for Security Glazing Materials and Systems.
B. American Architectural Manufacturers Association (AAMA):
1. AAMA 2603 - Voluntary Specification, Performance Requirements and Test Procedures for Pigmented Organic Coatings on Aluminum Extrusions and Panels.
C. American Welding Society (AWS):
1. AWS D1.3 - Structural Welding Code - Sheet Steel.
STEEL FRAMED ENTRANCES AND STOREFRONT 08 41 23
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
D. Builders Hardware Manufacturers Association, Inc.:
1. BHMA A156 - American National Standards for door hardware; (ANSI/BHMA A156).
E. H.P. White (HPW)
1. HPW-TP-0500.03 – Transparent Materials for Use in Forced Entry or Containment Barriers.
F. Underwriters Laboratories, Inc. (UL):
1. UL 972: Burglary Resisting Glazing Material.
1.4 SUBMITTALS
A. Submit under provisions of Section 01 33 00 – Submittal Procedures.
B. Product Data: Submit manufacturer's descriptive literature, specifications, installation instructions, warranty, and laboratory test data.
C. Shop Drawings:
1. Include plans, elevations and details of product showing component dimensions;
framed opening requirements, dimensions, tolerances, and attachment to structure and other work.
2. Details of frame for each frame type, including dimensions and profile.
3. Details of electrical raceway and preparation for electrified hardware, access control systems, and security systems.
4. Provide templates for the location of embeds and anchor locations required any adjoining work.
5. Point-to-point wiring diagrams showing the following:
Power requirements for each electrically operated door hardware.
Location and types of switches, signal device, conduit sizes, and number and size of wires.
D. Test Reports: Certified test reports showing compliance with specified performance characteristics and physical properties.
E. Installer Qualification Data: For firms and persons specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.
STEEL FRAMED ENTRANCES AND STOREFRONT 08 41 23
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
F. Field Quality-Control Reports.
G. Operation and Maintenance Data.
H. Sample Warranties: Submit manufacturer's warranty for entrance door system.
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications: Manufacturer shall have five years’ experience manufacturing and fabricating products of similar type and scope as those specified in this section.
B. Installer Qualifications: An experienced installer who has completed glazing similar in material, design, and extent to that indicated for this Project; whose work has resulted in glass installations with a record of successful in-service performance; and who employs glass installers for this Project who are certified under the National Glass Association Glazier Certification Program as Level 2 (Senior Glaziers) or Level 3 (Master Glaziers).
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store and handle in accordance with manufacturer's recommendations.
1.7 PROJECT CONDITIONS
A. Field Measurements: Obtain field measurements prior to fabrication of frame units. If field measurements will not be available in a timely manner coordinate planned measurements with the work of other sections. Show recorded measurements on shop drawings. Coordinate field measurements and fabrication schedule with construction progress to avoid construction delays.
B. Coordinate the work of this section with others affected including but not limited to glazing components and door hardware beyond that provided by this section.
1.8 PRE-INSTALLATION MEETING
A. Conduct a pre-installation conference at least one week prior to the work of this section.
1.9 WARRANTY
A. Special Warranty: Manufacturer and Installer agree to repair or replace components of aluminum-framed entrance door systems that fail in materials or workmanship within specified warranty period.
B. Warranty Period: Five years from date of Substantial Completion.
STEEL FRAMED ENTRANCES AND STOREFRONT 08 41 23
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
PART 2 PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. General Performance: Comply with performance requirements specified, as determined by testing of steel-framed entrance door systems representing those indicated for this Project without failure due to defective manufacture, fabrication, installation, or other defects in construction.
B. Structural Performance:
1. ASTM F1233: Standard Test for Security Glazing Materials and Systems.
2. UL 972: Burglary Resisting Glazing Material.
3. HPW-TP-0500.03 – Transparent Materials for Use in Forced Entry or Containment
Barriers.
2.2 MANUFACTURERS
A. Basis of Design: Vetrotech, VDS ATTACK-RESISTANT PARTITIONS.
B. Or Government-approved equal.
2.3 MATERIALS
A. Steel Framing System for interior use reinforced for structural performance and hardware requirements:
1. Finish: Powder coated.
2. Steel Frame: Anchor profiled steel tubing inside each jamb for floor and head anchorage.
3. Steel Glazing Beads: Rolled steel beads with dimensions recommended by manufacturer to securely hold glazing material in place.
4. Fasteners: Type recommended by manufacturer.
5.
2.4 FABRlCATlON
A. Frame: Furnish frame assemblies pre-welded.
1. Field splice frames too large for shop fabrication or shipping or to fit in available building openings.
2. Fit with manufacturer approved fasteners.
STEEL FRAMED ENTRANCES AND STOREFRONT 08 41 23
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
3. Knock-down door perimeter frames are not permitted.
B. Door and Frame Assemblies: Field glazed.
C. Fabrication Dimensions: Fabricate fire rated assembly to dimensions verified in field.
D. Obtain Architect reviewed and approved Shop Drawings prior to fabrication.
2.5 FlNlSHES, GENERAL
A. Comply with NAAMM's (National Association of Architectural Metal Manufacturers) "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.
B. Finish frames after assembly.
C. Protect finishes on exposed surfaces from damage by applying a removable, temporary protective cladding before shipping.
D. Appearance of Finished Work: Variations in appearance of adjacent frame sections are acceptable. Noticeable variations in the same piece are not acceptable.
E. Color-Coated Finish: Apply manufacturer's standard powder coating finish system complying with AAMA 2603 applied to factory-assembled frames before shipping, complying with manufacturer's written instructions for surface preparation including pretreatment, application, and minimum dry film thickness.
1. Color and Gloss: As selected by Architect from manufacturer's full range.
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine areas, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
B. Clean surfaces thoroughly prior to installation.
C. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION
STEEL FRAMED ENTRANCES AND STOREFRONT 08 41 23
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
A. Comply with manufacturer's written instructions.
B. Do not install damaged components.
C. Install products in accordance with approved submittals, manufacturer's instructions, and requirements of UL 972.
1. Install equipment plumb, level, rigid and in true alignment.
2. Use proper anchoring devices.
3. Install hardware as required for a complete installation.
4. Adjust operating parts for proper operation, non-binding.
D. Installation Tolerances: Do not exceed the following installation tolerances:
1. Squareness: Plus or minus 1/16 inch (1.6 mm) measured on a line, 90 degrees from one jamb, at the upper corner of the frame at the other jamb.
2. Alignment: Plus or minus 1/16 inch (1.6 mm) measured on jambs on a horizontal line parallel to the plane of the wall.
3. Twist: Plus or minus 1/16 inch (1.6 mm) measured at face corners of jambs on parallel lines perpendicular to the plane of the wall.
4. Plumb: Plus or minus 1/16 inch (1.6 mm) measured on the jamb at the floor.
E. Fit joints to produce hairline joints free of burrs and distortion. Joints and connections shall be tight, providing hairline joints and true alignment of adjacent members.
F. Place door frame in prepared opening. Shim at anchor points. Plumb and level frame as required per manufacturer's instructions.
G. Install anchors with separators and isolators to prevent metal corrosion and electrolytic deterioration and to prevent impeding moving of moving joints.
H. Install components plumb and true in alignment with established lines and grades.
I. Install glass as required per manufacturer's glazing installation instructions. Modifications of framing material or glass in the field is not permissible.
3.3 ADJUSTING
A. Adjust door function and hardware for smooth operation. Coordinate with other hardware suppliers for function and use of any other attached hardware.
3.4 REPAIR AND TOUCH UP
A. Limited to minor repair of small scratches. Use only manufacturer's recommended products.
STEEL FRAMED ENTRANCES AND STOREFRONT 08 41 23
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
1. Such repairs shall match original finish for quality or material and view.
2. Repairs and touch-up not visible from a distance of 5 feet (1.5 m). Government and
Architect to approve.
B. Remove and replace glass that is broken, chipped, cracked, abraded, or damaged.
END OF SECTION 08 41 23
DOOR HARDWARE 08 71 00
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
SECTION 08 71 00 - DOOR HARDWARE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Cylinders for door hardware specified in other Sections.
2. Electrified door hardware.
B. Related Sections:
1. Section 08 14 16 for Doors in Burglary Resistant Products for mechanical door hardware for swinging doors.
2. Section 08 41 23 for Steel Framed Entrances and Storefronts.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.
2. Inspect and discuss preparatory work performed by other trades.
3. Inspect and discuss electrical roughing-in for electrified door hardware.
4. Review sequence of operation for each type of electrified door hardware.
5. Review required testing, inspecting, and certifying procedures.
B. Keying Conference: Conduct conference at Project site to comply with requirements in Division 01 Section "Project Management and Coordination." In addition to Owner, Contractor, and Architect, conference participants shall also include Installer's Architectural Hardware Consultant and Owner's security consultant. Incorporate keying conference decisions into final keying schedule after reviewing door hardware keying system including, but not limited to, the following:
1. Function of building, flow of traffic, purpose of each area, degree of security required, and plans for future expansion.
2. Preliminary key system schematic diagram.
3. Requirements for key control system.
4. Requirements for access control.
5. Address for delivery of keys.
DOOR HARDWARE 08 71 00
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product. Include construction and installation details, material descriptions, dimensions of individual components and profiles, and finishes.
B. Shop Drawings: For electrified door hardware.
1. Include diagrams for power, signal, and control wiring.
2. Include details of interface of electrified door hardware and building safety and security systems.
C. Samples: For each exposed product in each finish specified.
D. Door hardware schedule. Prepared by or under the supervision of Installer, detailing fabrication and assembly of door hardware, as well as installation procedures and diagrams. Coordinate final door hardware schedule with doors, frames, and related work to ensure proper size, thickness, hand, function, and finish of door hardware.
a. Submittal Sequence: Submit door hardware schedule after submissions of Product Data, Samples, and Shop Drawings. Coordinate submission of door hardware schedule with scheduling requirements of other work to facilitate the fabrication of other work that is critical in Project construction schedule.
b. Format: Comply with scheduling sequence and vertical format in DHI's "Sequence and Format for the Hardware Schedule." Double space entries, and number and date each page.
c. Format: Use same scheduling sequence and format and use same door numbers as in the Contract Documents.
d. Content: Include the following information:
1) Identification number, location, hand, fire rating, size, and material of each door and frame.
2) Locations of each door hardware set, cross-referenced to Drawings on floor plans and to door and frame schedule.
3) Complete designations, including name and manufacturer, type, style, function, size, quantity, function, and finish of each door hardware product.
4) Description of electrified door hardware sequences of operation and interfaces with other building control systems.
5) Fastenings and other pertinent information.
6) Explanation of abbreviations, symbols, and codes contained in schedule.
7) Mounting locations for door hardware.
8) List of related door devices specified in other Sections for each door and frame.
E. Keying schedule. Prepared by or under the supervision of Installer, detailing Owner's final keying instructions for locks. Include schematic keying diagram and index each key set to unique door designations that are coordinated with the Contract Documents.
Note: It is imperative that the Keying Schedule information be finalized early in the construction process to accommodate potential long-lead times for hardware and delay of completion.
DOOR HARDWARE 08 71 00
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
1.4 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer and Architectural Hardware Consultant or someone with two years experience who is available, at reasonable times during the course of the work, for consultation about project’s hardware requirements to Owner, Architect and Contractor.
B. Warranty: Special warranty specified in this Section.
1.5 MAINTENANCE SERVICE
A. Maintenance Tools and Instructions: Furnish a complete set of specialized tools and maintenance instructions for Owner's continued adjustment, maintenance, and removal and replacement of door hardware.
B. Maintenance Service: Beginning at Substantial Completion, provide six months' full maintenance by skilled employees of door hardware Installer. Include quarterly preventive maintenance, repair or replacement of worn or defective components, lubrication, cleaning, and adjusting as required for proper door and door hardware operation. Provide parts and supplies that are the same as those used in the manufacture and installation of original products.
1.6 QUALITY ASSURANCE
A. Installer Qualifications: Supplier of products and an employer of workers trained and approved by product manufacturers and of an Architectural Hardware Consultant who is available during the course of the Work to consult Contractor, Architect, and Owner about door hardware and keying.
1. Scheduling Responsibility: Preparation of door hardware and keying schedule.
2. Engineering Responsibility: Preparation of data for electrified door hardware, including Shop
Drawings, based on testing and engineering analysis of manufacturer's standard units in assemblies similar to those indicated for this Project.
B. Architectural Hardware Consultant Qualifications: A person who is experienced in providing consulting services for door hardware installations that are comparable in material, design, and extent to that indicated for this Project and who is currently certified by DHI as an Architectural Hardware Consultant (AHC) and an Electrified Hardware Consultant (EHC).
1.7 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of door hardware that fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Structural failures including excessive deflection, cracking, or breakage.
DOOR HARDWARE 08 71 00
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
b. Faulty operation of doors and door hardware.
c. Deterioration of metals, metal finishes, and other materials beyond normal weathering and use.
2. Warranty Period: Three years from date of Substantial Completion unless otherwise indicated below:
a. Exit Devices: Two years from date of Substantial Completion.
b. Closers: 10 years from date of Substantial Completion.
c. Hinges: Life of the Building
d. Locksets: 7 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Electrified Door Hardware: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
B. Means of Egress Doors: Latches do not require more than 15 lbf (67 N) to release the latch. Locks do not require use of a key, tool, or special knowledge for operation.
C. Accessibility Requirements: For door hardware on doors in an accessible route, comply with The U.S.
Architectural & Transportation Barriers Compliance Board's ADA-ABA Accessibility Guidelines.
1. Provide operating devices that do not require tight grasping, pinching, or twisting of the wrist and that operate with a force of not more than 5 lbf (22.2 N).
2. Comply with the following maximum opening-force requirements:
a. Interior, Non-Fire-Rated Hinged Doors: 5 lbf (22.2 N) applied perpendicular to door.
3. Bevel raised thresholds with a slope of not more than 1:2. Provide thresholds not more than 1/2 inch (13 mm) high.
4. Adjust door closer sweep periods so that, from an open position of 70 degrees, the door will take at least 3 seconds to move to a point 3 inches (75 mm) from the latch, measured to the leading edge of the door.
2.2 MECHANICAL LOCKS AND LATCHES
A. Lock Functions: As indicated in door hardware schedule.
B. Lock Throw: Comply with testing requirements for length of bolts required for labeled fire doors, and as follows:
DOOR HARDWARE 08 71 00
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
1. Bored Locks: Minimum 1/2-inch (13-mm) latchbolt throw.
2. Mortise Locks: Minimum 3/4-inch (19-mm) latchbolt throw.
3. Deadbolts: Minimum 1-inch (25-mm) bolt throw.
C. Lock Backset: 2-3/4 inches (70 mm) unless otherwise indicated.
D. Lock Trim:
1. Description: As indicated in Door Hardware Schedule.
2. Levers: Forged or Cast.
3. Escutcheons (Roses): Forged or Cast.
4. Dummy Trim: Match lever lock trim and escutcheons.
E. Strikes: Provide manufacturer's standard strike for each lock bolt or latchbolt complying with requirements indicated for applicable lock or latch and with strike box and curved lip extended to protect frame; finished to match lock or latch.
1. Flat-Lip Strikes: For locks with three-piece antifriction latchbolts, as recommended by manufacturer.
2. Extra-Long-Lip Strikes: For locks used on frames with applied wood casing trim.
3. Aluminum-Frame Strike Box: Manufacturer's special strike box fabricated for aluminum framing.
4. Rabbet Front and Strike: Provide on locksets for rabbeted meeting stiles.
F. Mortise Locks: BHMA A156.13; Operational Grade 1; stamped steel case with steel or brass parts;
Series 1000.
1. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on schedule and “As Specified”:
a. Corbin Russwin ML 2000 Series or equal to match existing and building standard.
b. Or Government Approved equal.
2.3 ELECTRIC STRIKES
A. Electric Strikes: BHMA A156.31; Grade 1; with faceplate to suit lock and frame.
2.4 LOCK CYLINDERS
A. Lock Cylinders: Tumbler type, constructed from brass or bronze, stainless steel, or nickel silver UL437 Listed and compliant with ANSI/BHMAA 156 standards. Provide cylinder from same manufacturer of locking devices.
B. Standard Lock Cylinders: BHMA A156.5; Grade 1 permanent cores; face finished to match lockset.
1. Core Type: Removable.
DOOR HARDWARE 08 71 00
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
C. Construction Master Keys: Provide cylinders with feature that permits voiding of construction keys without cylinder removal. Provide 10 construction master keys.
D. Construction Cores: Provide construction cores that are replaceable by permanent cores. Provide 10 construction master keys.
2.5 KEYING
A. Keying System: Factory registered, complying with guidelines in BHMA A156.28, Appendix A. Provide one extra key blank for each lock. Incorporate decisions made in keying conference.
1. Existing System:
a. Master key or grand master key locks to Owner's existing system.
b. Re-key Owner's existing master key system into new keying system.
B. Keys: Brass.
1. Stamping: Permanently inscribe each key with a visual key control number and include the following notation:
a. Notation: Information to be furnished by Owner.
2. Quantity: In addition to one extra key blank for each lock, provide the following:
a. Cylinder Change Keys: Two (2).
b. Master Keys: Two (2).
2.6 OPERATING TRIM
A. Operating Trim: BHMA A156.6; US10B bronze unless otherwise indicated.
2.7 MECHANICAL STOPS AND HOLDERS
A. Wall- and Floor-Mounted Stops: BHMA A156.16.
1. Hager
2. Ives
3. Rockwood
4. Or government approved equal.
2.8 AUXILIARY DOOR HARDWARE
A. Auxiliary Hardware: BHMA A156.16.
DOOR HARDWARE 08 71 00
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Don-Jo Mfg., Inc.
b. Hager Companies.
c. Rockwood Manufacturing Company.
d. Trimco.
e. Or government approved equal.
2.9 AUXILIARY ELECTRIFIED DOOR HARDWARE
A. Auxiliary Electrified Door Hardware:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. GE Security, Inc.
b. SARGENT Manufacturing Company; an ASSA ABLOY Group company.
c. Schlage Commercial Lock Division; an Allegion company.
d. Securitron Magnalock Corporation; an ASSA ABLOY Group company.
e. Security Door Controls.
2.10 FINISHES
A. Provide finishes complying with BHMA A156.18 as indicated in door hardware schedule.
B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.
C. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples. Noticeable variations in the same piece are not acceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Mounting Heights: Mount door hardware units at heights indicated on Drawings unless otherwise indicated or required to comply with governing regulations.
1. Wood Doors: DHI's "Recommended Locations for Architectural Hardware for Wood Flush Doors."
B. Install each door hardware item to comply with manufacturer's written instructions. Where cutting and fitting are required to install door hardware onto or into surfaces that are later to be painted or finished in
DOOR HARDWARE 08 71 00
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed another way, coordinate removal, storage, and reinstallation of surface protective trim units with finishing work. Do not install surface-mounted items until finishes have been completed on substrates involved.
C. Door Closer: Install on secure side.
D. Hinges: Install types and in quantities indicated in door hardware schedule, but not fewer than the number recommended by manufacturer for application indicated or one hinge for every 30 inches (750 mm) of door height, whichever is more stringent, unless other equivalent means of support for door, such as spring hinges or pivots, are provided.
E. Lock Cylinders: Install construction cores to secure building and areas during construction period.
1. Replace construction cores with permanent cores as directed by Owner.
2. Furnish permanent cores to Owner for installation.
F. Key Control Cabinet: Tag keys and place them on markers and hooks in key control system cabinet, as determined by final keying schedule.
G. Boxed Power Supplies: Locate power supplies as indicated or, if not indicated, above accessible ceilings.
Verify location with Architect.
H. Stops: Provide floor stops for doors unless wall or other type stops are indicated in door hardware schedule. Do not mount floor stops where they will impede traffic.
I. Perimeter Gasketing: Apply to head and jamb, forming seal between door and frame.
1. Do not notch perimeter gasketing to install other surface-applied hardware.
J. Door Bottoms: Apply to bottom of door, forming seal when door is closed.
3.2 ADJUSTING
A. Adjust and check each operating item of door hardware and each door to ensure proper operation or function of every unit. Replace units that cannot be adjusted to operate as intended. Adjust door control devices to compensate for final operation of heating and ventilating equipment and to comply with referenced accessibility requirements.
3.3 DOOR HARDWARE SCHEDULE.
HARDWARE SET for all doors 1 EA CONTINUOUS HINGES SL-11 Heavy Duty SELECT 1 EA LOCKSET ND 80 Series Lockset with Storeroom Function
SCHLAGE
1 EA RIM EXIT DEVICE Narrow Stile 9700 Series DORMA 1 EA CLOSER Heavy Duty Closer LSDA
DOOR HARDWARE 08 71 00
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy document when no longer needed
1 EA WALL STOP 409 630 ROCKWOOD
1 EA ELECTRIC STRIKE 1600CDB 630 HES
CARD READER BY OTHERS
OPERATIONAL DESCRIPTION: DOOR ALWAYS LOCKED FROM THE OUTSIDE, WITH DEADBOLT
RETRACTED. AUTHORIZED USE OF THE CARD READER SHALL UNLOCK ELECTRIC STRIKE AND
RELEASE LOCK. UPON ENTRY, END-USER SHALL THROW DEADBOLT. WHEN THE DEADBOLT IS
THROWN, THE ELECTRIC STRIKE WILL NOT RELEASE THE LOCK, PROVIDING PRIVACY FOR THE
END USER. EGRESS FROM THE ROOM IS ALLOWED AT ALL TIMES USING THE INSIDE LEVER.
AN EMERGENCY KEY SHALL ALLOW EMERGENCY ENTRY FROM THE OUTSIDE.