This document provides an amendment and responses to questions regarding a solicitation for HVAC unit replacements at two federal buildings in Indianapolis, Indiana. The General Services Administration is seeking a contractor to remove and replace approximately 12 existing R-22 HVAC units at the Major General Emmett J. Bean Federal Center and 10 units at the co-located Daycare. The amendment extends the response due date from August 8 to August 12, 2022 at 4:00 PM CDT and responds to contractor questions about unit counts, tax exemption, work schedules, drawings, equipment availability, pricing adjustments, and existing control systems.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 02.pdf | ||
| RFP 47PF0022R0068_EJB R22 HVAC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
R10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
R5 AMD Southern Construction Contracting Team 230 S. Dearborn St.
Room 3500 Chicago, IL 60604 USA
R5 AMD Southern Construction Contracting Team 230 S. Dearborn St.
Room 3500 Chicago, IL 60604 USA
47PF0022R0068
1 1
08/01/2022
08/30/2022
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 01, Solicitation #47PF0022R0068 EJB R-22 HVAC Unit Replacements, Major General Emmett J. Bean Federal Center, 8899 E. 56th Street, Indianapolis, IN
Amendment 01 is hereby issued to respond to RFI's (see attached) and extend the due date from August 8, 2022 to August 12, 2022 at 4:00 PM CDT.
You must acknowledge receipt of this and all amendments.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Responses to RFI’s
RFQ 47PF0022R0068
EJB R-22 HVAC Units Replacement
Major General Emmett J. Bean Federal Center Indianapolis, Indiana
1) How many Air Conditioning Units are being replaced in the Daycare Center?
Response: 8 units are being removed. 10 new units to be installed.
2) Is this project sales tax exempt?
Response: The General Services Administration (GSA) has no authority to exempt contractors from Federal, State, or Local taxes. GSA can only certify that a firm is performing services under a contract.
It is the responsibility of the contractor working with the Indiana Department of Revenue to determine whether or not work performed under the contract qualifies for a tax exemption.
3) Would 4 days / wk. @ 10 hours /Day work be allowed? It makes it easier for out-of-town companies in travel.
Response: Yes, that is acceptable.
4) Can we get existing drawings to scale?
Response: The drawings are to scale so long as you print them on the correct sheet size of 24x36.
5) The equipment (especially "Liebert") is not available within the time allowed to finish project. Would the project completion date be extended?
Response: The time allowed to finish the project is based on issuing the on-site NTP (Notice to
Proceed). This NTP will not be issued until new equipment is either on-site or due to be on-site.
Contractor to determine.
6) "Liebert" and other suppliers are not providing "Guaranteed" pricing due to long deliveries. Would government entertain changing the awarded contract due to price increases.
Response: There is no guarantee on a price adjustment for material escalation. If unable to lock down a price with the supplier, submit documentation post award to support the cost increase and GSA will consider.
7) The specs state “extension of existing JCI N4 System” as the only acceptable bidder. But the existing building system is Schneider Electric installed by Precision Controls. Please advise.
Response: Correct. Both the EJB & Daycare have N4 building management systems by Schneider Electric.
8) Specifications are for all Trane equipment. Trane currently will not give delivery dates on orders. Their best guess on new equipment orders is estimated as mid to late next year.
Response: Noted. The design intent is Trane. You are welcome to submit for substitutions of other manufacturers. However, we anticipate long lead times for those as well.