This is Amendment 02 to Request for Quotes (RFQ) 47PE5426Q0022 for roof replacement services at 11 West Quincy Court Federal Building in Chicago, Illinois, issued by the General Services Administration (GSA) Public Buildings Service. The amendment incorporates the pre-quote meeting minutes with sign-in sheet, responses to Requests for Information (RFI), and the PBS Interim Core Building Standards dated February 24, 2025. The amendment confirms that the closing date remains June 12, 2026 at 4:00 PM Central Time, with quotes to be electronically submitted to Contracting Officer Johanna Nieves at johanna.nieves@gsa.gov. This is a small business set-aside with an estimated price range between $1,000,000 and $3,000,000 under NAICS code 238160.

The scope of work includes removing existing roof drains and vegetated roof systems down to the concrete deck, performing concrete deck repair, and installing a new conventional roof system with vapor retarder, roof drains, insulation, roof membrane, and copings. The performance period is 225 calendar days to achieve Substantial Completion upon receipt of On-Site Notice to Proceed, with Contract Completion required within 20 calendar days thereafter. Liquidated damages are assessed at $1,469.73 per calendar day of delay. Contractor working hours are Monday through Friday 5:30 AM to 6:00 PM and weekends during government-occupied hours, unless otherwise specified. The RFI log addresses clarifications on material transportation methods (smaller format insulation and TPO rolls are acceptable), drawing scales, ceiling reconfiguration requirements, roofing membrane specifications (Carlisle SynTec acceptable; Duro-Last removed), permit responsibility, and night work provisions. Evaluation factors include Project Management Plan/Approach, past performance (three to five relevant references), and total evaluated price. Quoters must submit Standard Form 1442, Standard Form 24 (Bid Bond), project management plan, past performance references, and acknowledgment of amendments.

View the file

Other files for this federal contract opportunity

Other files attached to Roof Replacement, newest first.
File Type Posted
Amendment 01.pdf PDF
Attachment F - Wage Determination.pdf PDF
Combined Synopsis_Solicitation Roof Replacement.pdf PDF
Attachment B - Past Performance Questionnaire.pdf PDF
Attachment E- Drawings.pdf PDF
Attachment C - SF 24 - Bid Bond.pdf PDF
Attachment A - SF1442 47PE5426Q0022.pdf PDF
Attachment D - Technical Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PQDD

Johanna Nieves, Contracting Officer

Request for Quote 47PE5426Q0022, Roof Replacement, 11 West Quincy Court Federal Building, Chicago, Illinois

This amendment is being issued to incorporate the pre-quote meeting minutes (including sign-in sheet), responses to Requests for Information received, and the PBS Interim Core Building Standards. In...

[See Description of Modification Continuation Page]

PQDD

PBS Office of Acquisition Management/Acquisition Project Delivery Contracting Division Central/Contracting Branch D 1800 F Street NW W hi DC 2040 USA

PBS Office of Acquisition Management/Acquisition Project Delivery Contracting Division Central/Contracting Branch D 1800 F Street NW W hi DC 2040 USA

EQPXAEB-26-0014

47PE5426Q0022

1 325

5/29/2026

5/1/2026

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

Description of Modification Continuation Page

... addition, this amendment replaces the Standard Form 1442 (Attachment A), Specifications (Attachment D), and Drawings (Attachment E) with the attachments. Unit prices will either be accepted or rejected at the time of award.

The closing date of June 12, 2026 remains unchanged.

47PE5426Q0022/0002

Mee ng Agenda Pre-Quote Conference May 11, 2026 at 10am

SolicitaƟon No: 47PE5426Q0022 Roof Replacement

11 West Quincy Federal Building 11 West Quincy Court Street

Chicago, Illinois

ContracƟng Officer: Johanna Nieves ContracƟng Officer's RepresentaƟve: Bartosz Rolski Property Manager: Laura Rusiniak A/E (Wold Architects and Engineers): Ben Bercher

The purpose of this conference was to allow contractors the opportunity to ask quesƟons regarding the solicitaƟon and the technical elements of this project, including the forms that need to be included with their quote package.

No oral statement made by Government RepresentaƟves during this conference had the effect of amending the Request for Quotes (RFQ) . In the event the discussion during this conference indicated a need to modify the RFQ, an amendment to the RFQ would be issued in wriƟng.

Quoters are reminded that all amendments must be acknowledged by the me/date quotes are due.

● Quoters shall submit the following documentaƟon with their quote package:

̄ Standard Form 1442, SolicitaƟon, Offer, and Award ̄ Standard Form 24, Bid Bond ̄ Project Management Plan/Approach ̄ Three (no more than five) Relevant Past Performance References ̄ Acknowledgement of Amendment(s), if any ̄ Verify SAM.gov account is acƟve at the Ɵme of submiƫng quote

Evalua on Factors: Project Management Plan/Approach, Past performance, and Total Evaluated Price

The Government will perform a comparaƟve evaluaƟon to select the best suited vendor that provides the best value Quotes will be evaluated against each other, comparing strengths and weaknesses, rather than being assigned raƟngs.

Quotes are to be received no later than 4:00 PM (Central Time) on May 29, 2026. Quotes are to be electronically submiƩed by e-mail to Johanna Nieves, ContracƟng Officer at johanna.nieves@gsa.gov.

Scope of Work: The scope includes removing the exisƟng roof drains, removing the vegetated roof system, and associated construcƟon down to the exisƟng concrete roof deck, perform concrete deck repair, and install a new convenƟonal roof system including but not limited to vapor retarder, roof drains, insulaƟon, roof membrane, and copings.

Es mated Price Range: The esƟmated price for this construcƟon is between $1,000,000 and $3,000,000.

Period of Performance: The period of performance is 225 calendar days to achieve SubstanƟal CompleƟon upon receipt of On-site NoƟce to Proceed.

Liquidated Damages: $1,469.73 for each calendar day of delay unƟl the work is completed or accepted.

Working Hours: Contractor's General Working Hours: The Contractor working hours shall be established to occur during Government Occupied Hours which consist of weekend days and the following hours on weekdays, Monday through Friday, except for established Government Holidays: 5:30AM to 6:00PM, unless otherwise specified by the ContracƟng Officer (CO) or the ContracƟng Officer RepresentaƟve (COR).

Ques ons: To allow sufficient Ɵme to respond to quesƟons, contractors were asked to submit Request for InformaƟon (RFI) quesƟons no later than fiŌeen (15) days prior to the quote closing date and Ɵme.

REQUEST FOR INFORMATION (RFI) LOG

Solicitation No: 47PE5426Q0022 Project Title: Roof Replacement

Location: 11 West Quincy Court Federal Building, Chicago, Illinois

Master No. RFI / Clarification Response

1 I have questions concerning the methods for getting materials to the roof.

My team has been checking with the city and is getting stonewalled on using a crane. They said no because you can’t block the streets. They also asked about a helicopter; the answer was no again because of the Daley Center.

They also asked if we can use the court blocked off to the north of the building, but they said no because judges don’t want to look at them while eating lunch.

Is there an approved way to complete the job already? A freight elevator could be used; however, the problem is that the insulation they want to use comes in 4x8 sheets and you need 600 sheets to meet the city's energy code.

Also, the TPO rolls are 10 feet long and weigh 800 lbs each, so none of this will fit.

Would we be able to use smaller material formats? Instead of: 4x8 insulation boards switch to 4x4 or tapered smaller sections For 10' TPO rolls switch to 5' or 3' rolls?

We understand that internal access is very limited so would this method be approved?

Use of smaller material formats are acceptable from a transporation standpoint. Any applicable energy codes that this buildout should follow are outlined in PBS Interim Core Building Standards.

2 The scales for the Site Access Plan and the 01 Level Reference Plan, on Sheet A101, are incorrect as listed in the drawings. At these two Drawings the scales should be changed to read "Not to Scale". All other roof, demo and ceiling plans are drawn to the correct scale.

3 On page A103, Keynote 2, is the contractor responsible for reconfiguring the entire ceiling system in all areas where Keynote 2 is indicated?

Keynote #2 indicates to reconfigure above ceiling system as required to facilitate roof drain installation. Keynote #4 provides the geneal location of the roof drains. Ceilings and above ceiling compnents only need to be reconfigured in the general area of the roof drains, in order to complete the drain scope of work.

4 On page A103, what is the total square footage we should carry for the damaged ceiling areas requiring repair as identified by the keynote?

Assume 1/3 of the room area where Keynote 1 is listed.

5 The plans state torching a vapor barrier (F2), but the spec calls for an SA vapor barrier and primer.

Either method can be utilized.

6 Can you provide structural drawings notating uplift pressure requirements? Wind uplift criteria is noted per B6/A101.

7 What is the Rvaule the contractor needs to meet for code? Roof insulation thickness are to be provided as indicated in the Drawings.

8 Does the contractor need to pull a roofing permit for this project, or is GSA getting the permits?

Contractor is responsible for permits. Permits are not required for the roof replacement on federal property, but permits do apply on city property as applicable.

Want to send this one because I just came across it, the scale on the drawings is way off. Per my measurements on site and google earth. The scale that you have on the drawings are showing way less than what is there.

Will there be any update drawings with the correct scale? We will all need this in a timely manner due to the bid date being at the end of the month. Thank you.

REQUEST FOR INFORMATION (RFI) LOG

Solicitation No: 47PE5426Q0022 Project Title: Roof Replacement

Location: 11 West Quincy Court Federal Building, Chicago, Illinois

9 Per the specifications under Section 07 54 23 – Thermoplastic Membrane Roofing, the membrane is described as:

PVC per ASTM D4434, Type II Reinforced with non-woven fiberglass However, the listed acceptable manufacturers appear to conflict with this requirement:

Carlisle SynTec membranes utilize a woven fiberglass reinforcement, not non-woven Duro-Last membranes utilize a polyester reinforcement, not fiberglass Given this discrepancy between the specified reinforcement type and the listed manufacturers/products, can you please clarify the following:

Are Carlisle and Duro-Last systems acceptable as listed, despite not meeting the non-woven fiberglass reinforcement requirement exactly?

Is the intent of the specification to allow equivalent reinforcement types (woven fiberglass or polyester) provided they meet ASTM D4434 performance requirements?

Or should the membrane strictly comply with non-woven fiberglass reinforcement, in which case the approved manufacturers list should be revised?

Please advise on the intended basis of design and acceptable manufacturers so we can ensure compliance in our bid.

Duro-Last was removed from the specifications as an accpetalbe manufacturer during GSA SME review.

It is suspected that the incorrect project manual has been issued with the Bidding Documents. The most current Project Manual is dated July 31, 2025 and is incorporated herein.

10 Per Detail F3, it notes the use of cold tar. CAN night work be performed for this project?

Work accomplished during Governmnet Unoccupied hours shall be performed at no addtional cost and should be included in the base bid per Section 01 14 00 1.3.

11 Working hours are provided in Section 01 14 00 1.3Also, can you confirm the anticipated working hours? Are weekend work hours permitted as well?

GSA Public Buildings Service

February 24, 2025

MEMORANDUM FOR: Public Buildings Service Regional Commissioners;

Assistant Commissioners; and Directors of Design and Construction, Facilities Management, Project Delivery, and Portfolio Management

FROM: Charles Hardy, AIA, CCM, Chief Architect

Public Buildings Service Office of Architecture and Engineering (PA)

SUBJECT: Rescission of PBS P100 Facilities Standards, and Issuance of PBS Interim Core Building Standards

References:

A. EO 14148 - Recissions of Harmful Executive Orders and Actions B. EO 14154 - Unleashing American Energy C. Section 2309 of the Water Resources Development Act (WRDA), Public Law No. 118-272

Purpose: Pursuant to Executive Orders issued since January 20, 2025, and the subsequent cancellations of associated GSA and PBS orders, it has been determined that the current version of The Facilities Standards for the Public Buildings Service (P100) is no longer applicable and is rescinded, unless otherwise permitted herein or by written concurrence of the PBS Commissioner. Until a process is developed to update the P100 in accordance with the WRDA, this informational memorandum (memo) is being provided to assist project managers, contracting officers, and others involved in the preparation of contract documents for architects/engineers and general contractors. This document provides a list of laws, regulations, and codes for projects under design and construction.

Project delivery teams that have not yet reached the delivery milestone identified in the “Applicability” section below will use the list of laws, executive orders, codes, and regulations, as summarized in the attached Appendix A: PBS Interim Core Building Standards.

Applicability: This memo applies to projects that:

1. are in GSA-owned or lease-construction facilities, regardless of funding source, budget activity, or project contract value (e.g: design, construction, services, and study contracts); AND

2. have less than 50% of construction activity completed as of January 21, 2025, as measured in dollar value.

Projects that have completed 50% or more of construction activity, as measured in dollar value, may continue to utilize the P100 version per the contract documents and implement this memo to the greatest extent possible where it does not create significant adverse financial, life safety, security, and/or critical building operation impacts.

Effective Date: This memo is effective immediately and remains in effect until canceled by written notification.

APPENDIX A:

PBS INTERIM CORE BUILDING STANDARDS

February 24, 2025

The PBS Interim Core Building Standards lists laws, Executive Orders, codes, regulations, and standards for use by contracting officers, projects teams, and others involved with developing contract documents for design, construction, renovation, or maintenance projects. These standards are for reference only and do not intend to portray a fully complete list of all applicable laws and regulations that may need to be incorporated into the contract documents. They summarize key aspects of laws and regulations that are of particular relevance to these types of projects. Compliance with applicable laws and standards is the responsibility of the contractor.

Project teams must use these standards regardless of the funding source, including projects funded through BA51 New Construction, BA54 Minor Repairs and Alterations, BA55 Special Emphasis Programs, and BA55 Major Repairs and Alterations, BA61 Operating Funds (including work performed under operations and maintenance contracts), BA63 Energy Rebates, BA64 Historic Preservation, customer-funded projects through BA80 Reimbursable Work Authorizations, and privately-financed projects such as Energy Savings Performance Contracts.

Project teams must use the latest published edition of these authorities and references in effect at the time of project solicitation, along with any subsequent executive orders in effect as of the project’s solicitation date.

Please discuss any questions or concerns with the regional project management team. Items listed in Section 1:

General apply to all aspects of the project. Other sections denote specific requirements related to that section.

Designs must be developed under the direction of, and bear the seal of, a licensed design professional in the State, District, or Territory of the project location.

Section 1: GENERAL

Name Notes

Laws

Energy Act of 2020 Imposes energy performance standards, e.g. from ASHRAE and energy codes.

Energy Independence and Security Act of

2007 (EISA 2007)

433(a)(D)(i) (modifying 42 USC 6834): “For new Federal buildings and Federal buildings undergoing major renovations, with respect to which [GSA] is required to transmit a prospectus to Congress . . . sustainable design principles [see 401(13)] shall be applied to the siting, design, and construction of such buildings”.

433(a)(D)(i)(I): Comply with:

● 10 CFR 433.100 Energy Efficiency Performance Standard

● 10 CFR 433.101 Performance level determination

● 10 CFR 433.200 Scope 1 Fossil fuel-generated energy consumption requirement. Federal Building Energy Efficiency Performance Standards (phased approach, present - April 30, 2025; full compliance, no later than May 01, 2025); and

● Clean Energy Rule Implementation Guidance

438. Manage stormwater as detailed in Section 6 below.

Energy Policy Act of 2005 (EPAct) 103 requires Advanced Metering to the maximum extent practicable 104 (amending 42 USC 8259(b)) Federal Procurement of Energy Efficient Products: Specify Energy Star-certified or FEMP-designated energy-consuming products, except where unavailable or not life cycle cost-effective.

109 Federal Building Performance Standards: If life-cycle cost-effective, new Federal buildings must be designed to achieve energy consumption levels at least 30% below ASHRAE 90.1.

National Energy Conservation Policy Act 42 USC 8253: Energy and water management requirements

Clean Air Act (42 USC 7401 et seq.) Provides emissions standards for sources including HVAC and generators.

42 USC Chapter 85, Subchapter VI 7671l - Federal Procurement 42 USC Chapter 85, Subchapter VI §7671k - Safe Alternatives 40 CFR Part 82 Protection Of Stratospheric Ozone

Toxic Substances Control Act (TSCA) 15 USC 2601 et seq. Addresses hazardous substances including asbestos, lead, and PCBs

American Innovation and Manufacturing Act

42 USC 7676 Requirements for HVAC / refrigerant procurement

Buy American Act 48 CFR 25.2 Use only domestic construction materials in construction contracts

Trade Agreements Act of 1979 and FAR part 25 implementing regulations

Implements numerous multilateral and bilateral international trade agreements and other trade initiatives.

Randolph-Sheppard Act 20 USC 107a The Randolph-Sheppard Act provides qualified blind persons the opportunity to operate businesses on federal, state, or other property.

The design team must coordinate design with the state licensing agency.

Resource Conservation and Recovery Act of 1976 (RCRA)

6962 (42 USC 6962): procure applicable materials composed of the highest percentage of recovered materials practicable, where reasonably available within a reasonable period of time at a reasonable price, and meeting applicable performance specifications.

6966(b)(2) (as amended by EPAct 2005 section 108): “give priority to achieving greater use of recovered mineral component [e.g. recovered or diverted waste material or byproduct such as slag or fly ash] in cement or concrete projects for which recovered mineral components historically have not been used or have been used only minimally”.

2018 Agricultural Act § 9002 (Public Law No. 115-334)

Use Comprehensive Procurement Guidelines (CPG) to take a system approach to reducing life cycle material use and impacts.

Biobased markets program 7 USC 8102 Use the BioPreferred program to specify biobased products.

Trade Facilitation and Trade Enforcement Act of 2015 (TFTEA)

19 U.S.C. §§ 4301-4454. Prohibits products created with forced or child labor.

Uyghur Forced Labor Prevention Act (Pub. L. 117-78, 135 Stat. 1525)

The design team must specify products that do not use forced or child labor.

The National Historic Preservation Act (NHPA) of 1966 as amended, Pub. L.

89-665, 80 Stat. 915

54 U.S.C. § 300101 et seq. Federal agencies shall strive to rehabilitate historic properties in a manner that preserves their architectural character, in accordance with the Secretary of the Interior’s Standards for the Treatment of Historic Properties (36 CFR 68).

GSA Order ADM 1020.3A: Procedures for Historic Properties.

Disaster Resiliency Planning Act of 2022

(PL 117-220)

Incorporate natural disaster risk assessments provided by the agency or its contractors into real property investments.

The Architectural Barriers Act Accessibility Standard (ABAAS) (42 U.S.C. § 4152)

36 CFR §1191: ABA Chapters 1-10 and Appendices C and D ensure that federal facilities are accessible to persons with physical disabilities

GSA’s National Accessibility Program Standards Policies and Procedures fulfill the requirements of ABAAS F103 Modifications and Waivers by describing accessibility expectations and the process for administering waivers/modifications.

FMR Part 102-76, Subpart C, 41 CFR § 102-76.60 et seq.

Executive Orders

EO 14154: Unleashing American Energy §7(b): When procuring goods and services, making decisions about leases, and making other arrangements that result in disbursements of Federal funds, agencies shall prioritize cost-effectiveness, American workers and businesses, and the sensible use of taxpayer money, to the greatest extent.

EO 14148 - Recissions of Harmful Executive Orders and Actions

§2: Revoked EOs related to Federal Sustainability, Public Health and the Environment, Worker Health and Safety, and implementing the Infrastructure Investment and Jobs and Inflation Reduction Acts.

Codes, Regulations, and Standards

40 USC § 3312 - Compliance with nationally recognized codes

To the maximum extent feasible, use model building codes and other applicable nationally recognized codes. Cooperation With State and Local Officials

42 USC 6834 Energy Conservation and Resource Renewal

Federal building energy efficiency standards, renewable energy for water heating, water conservation technologies.

10 CFR Part 436 - Federal Energy Management and Planning Programs

Subpart A - Use Methodology and Procedures for Life Cycle Cost Analyses (436.10 – 436.24) to evaluate the cost-effectiveness of systems that impact energy or water use (e.g. HVAC, water heating, controls, lighting, enclosure).

Consider up-front, operating, and salvage costs over the life of equipment to identify the least costly alternatives.

See also National Institute of Standards and Technology (NIST) Life Cycle Costing Manual (NIST Handbook 135) Subpart B - Methods and Procedures for Energy Savings Performance Contracting Subpart C - Agency Procurement of Energy Efficient Products

National Institute of Building Sciences

(NIBS)

United States National CAD Standard

Construction Specification Institute (CSI) MasterFormat - Division/Section/Page Format

Specifications must follow this format

International Code Council (ICC) I-Codes The latest published edition of the ICC I-Codes in effect at the time of project solicitation must be used throughout design and construction.

Per 40 U.S. Code § 3312, GSA has adopted the technical requirements of the International Building Code (IBC), International Fire Code (IFC), International Plumbing Code (IPC), International Mechanical Code (IMC), International Fuel Gas Code (IFGC), International Existing Building Code (IEBC), International Property Maintenance Code, International Private Sewage Disposal Code (IPSDC), International Zoning Code (IZC), International Wildland-Urban Interface Code (IWUIC), International Residential Code (IRC), and International Code Council Performance Code (ICCPC).

National Fire Protection Association (NFPA) Codes

Per 40 U.S. Code § 3312, GSA has adopted the technical electrical requirements of the NFPA’s National Electrical Code (NFPA 70).

Per 40 U.S. Code § 3312, GSA has adopted the NFPA 101, Life Safety Code in lieu of the technical egress requirements of the IBC.

29 CFR 1926 Safety and Health Regulations for Construction

The design team must ensure that facilities can be constructed in a compliant manner.

29 CFR 1910 Occupational Safety and Health Standards

The design must ensure facility operations and maintenance can be performed in compliance with this section. The design must not subject building occupants to conditions in violation of these safety and health standards. (e.g. § 1910.146(b), Confined Space)

ANSI/ASSP Z10 - OSH Management Mitigate safety/ health risks in order of precedence: hazard elimination;

engineering controls; warning devices; and procedures and training.

29 CFR §1926.62 and 40 CFR §260 Addresses lead-based paint testing, management, abatement, and disposal, including in childcare centers.

29 CFR §1926.1101d Per OSHA Construction Standard, presume that surfacing and thermal systems insulation in buildings constructed before 1981 contains asbestos unless proven otherwise. GSA considers materials replaced by non-asbestos alternatives in 1981 or later and properly documented as exempt from this OSHA requirement.

National Emission Standard for Asbestos (40 CFR §61 Subpart M)

Pre-alteration assessments are required before construction or alteration to determine if asbestos will be impacted by the work. EPA Compliance Advisory

Interagency Security Committee Standard: Risk Management Process

Defines the criteria and processes facility security professionals should use to determine a facility's security level

Real Property Facility Design and Management 41 CFR Part 102-80

Safety And Environmental Management

Section 2: COMMUNITY PLANNING AND LANDSCAPING

Accommodating Federal Agencies 40 USC 3306 - Encourage Public Access

Clean Water Act, 33 USC §1251 et seq.

National Pollution Discharge Elimination System (NPDES) permit requirements related to Erosion and Sediment Control, Stormwater Pollution Prevention Plan, dewatering at construction sites, and stormwater / wastewater discharges.

§404 requires permits for development impacting wetlands. Regulates discharge of fill material into other waters of the U.S. Encourages avoidance, minimization, and mitigation of wetland impacts.

American National Standards Institute (ANSI) standards

A300 American National Standard for Arboricultural Operations - covers best practices for tree planting, soil management, and risk assessment.

Z60.1 American Standard for Nursery Stock and plant specification.

C136 American National Standard for Roadway and Area Lighting Equipment -performance and safety standards for streetlights and pedestrian areas.

ASABE S623 Determining Landscape Plant Water Demands/ irrigation sizing.

ASABE S627 Weather-Based Landscape Irrigation Control Systems.

American Society for Testing and Materials (ASTM) standards

D4972 - test method for pH of soils.

D5268 - standard specification for topsoil used for landscaping purposes.

Endangered Species Act 1973 (16 U.S.C. §§ 1531-1544)

Protects endangered and threatened species and their habitats, which can impact design

Section 3: ARCHITECTURE AND INTERIORS

Promoting Beautiful Federal Civic Architecture Memorandum

Federal public buildings should be visually identifiable as civic buildings and respect regional, traditional, and classical architectural heritage.

Wildland-Urban Interface (WUI) Federal Risk Mitigation (Executive Order 13728)

For new Federal buildings, and alterations to existing Federal buildings greater than 5,000 square feet, within the WUI and at moderate or greater risk to wildfire, Federal agencies must apply the wildfire-resistant design provisions outlined in the most current edition of the International Wildland-Urban Interface Code (IWUIC) promulgated by the International Code Council (ICC), or an equivalent nationally recognized code.

Section 2 of Governance and Integration of Federal Mission Resilience, 2020 (Executive Order 13961), National Security Memorandum-22 on Critical Infrastructure Security and Resilience

Incorporate resilience measures into real property investments that ensure Presidential Policy Directive 40 (PPD-40), National Continuity Policy, and the provisions of the Federal Continuity Directive (FCD) enumerated in 5 United States Code (U.S.C.) 101.

29 CFR §1926.501 Fall Protection

National Elevator Industry, Inc. (NEII) Elevator cab sizes per NEII-1 Building Transportation Standards & Guidelines

40 USC § 3318 Lactation room requirements

40 USC § 3314 Baby changing facilities

Building Enclosures

American Society for Testing and Materials (ASTM) Standards

E2813, Table A2.1 Standard Practice for Building Enclosure Commissioning;

including mitigation against air, water infiltration (moisture, mold) and anchor pull strength of facade elements; supporting human health and safety

E2947 Standard Guide for Building Enclosure Commissioning, in conjunction with E2813

D7877 Standard Guide for Electronic Methods of Detecting and Locating Leaks in Waterproofing Membranes

D8231 Standard Practice for the Use of Low Voltage Electronic Scanning System Detecting and Locating Breaches in Roofing and Waterproofing Membranes

National Roofing Contractors Association

(NRCA)

Roofing Manual Waterproofing Manual

Section 4: STRUCTURE

American Society of Civil Engineers (ASCE) / Structural Engineering Institute (SEI) Standards

ASCE/SEI 7-22: Minimum Design Loads and Associated Criteria for Buildings and Other Structures including Supplements 1, 2 and 3

ASCE/SEI 41-23: Seismic Evaluation and Retrofit of Existing Buildings

National Institute of Standards & Technology (NIST)

Standards of Seismic Safety for Existing Federally Owned and Leased Buildings; ICSSC Recommended Practice 10 (RP 10-22)

American Institute of Steel Construction

(AISC)

Design Guide 11: Vibrations of Steel-Framed Structural Systems Due to Human Activity (Second Ed. 2016) Revisions and Errata 2/16/2023

International Organization of Standards

(ISO)

ISO 2631-2:2003: Mechanical vibration and shock - Evaluation of human exposure to whole-body vibration, Part 2: Vibration in buildings (1Hz to 80Hz)

GSA Facility Security Requirements for Explosive Devices Applicable to Facility Security Levels III & IV

GSA’s Interpretation of the ISC Risk Management Process

GSA Alternate Path Analysis and Design Guidelines for Progressive Collapse Resistance

Section 5: MECHANICAL ENGINEERING

American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE)

All ASHRAE standards, guidelines and handbooks cited in the International Mechanical Code (IMC) shall be complied with in addition to the following:

Standards 52.2; 55; 62.1; 111; 113; 135; 140

Guidelines 0; 4; 12; 29; 44

ANSI Z223.1, National Fuel Gas Code

American Society of Plumbing Engineers

(ASPE)

Fundamentals of Plumbing Engineering, Plumbing Systems, Special Plumbing Systems, Plumbing Components and Equipment

Federal Data Enhancement Act Standards for Data Centers fall under the purview of GSA's IT Modernization Division, within OGP, as directed in the Federal Data Enhancement Act.

Sheet Metal and Air Conditioning Contractors’ National Association, Inc., (SMACNA)

All SMACNA standards cited in the International Mechanical Code (IMC) shall be complied with, in addition to:

HVAC Air Duct Leakage Test Manual; HVAC Systems Testing, Adjusting & Balancing; HVAC Systems Testing, Adjusting & Balancing; Fire, Smoke and Radiation Damper Installation Guide for HVAC Systems; Seismic Restraint

Section 5: MECHANICAL ENGINEERING

Manual Guidelines for Mechanical Systems; HVAC Systems Sound and Vibration Procedural Guide

Section 6: ELECTRICAL ENGINEERING

ASHRAE Standards 90.1: Lighting power density, automatic lighting control, automatic receptacle control, transformer efficiencies, and electrical energy monitoring (advanced metering)

IEEE (Institute of Electrical and Electronics Engineers)

IEEE 1584, Guide for Performing Arc-Flash Hazard Calculations IEEE C2, National Electrical Safety Code

UL (Underwriters Laboratories) UL96, Lightning Protection Components UL96A, Installation of Lightning Protection Systems

ANSI/IES (Illuminating Engineering Society)

IES Lighting Library IES G-1, Guideline for Security Lighting for People, Property, and Critical Infrastructure IES RP-1, Lighting Offices Spaces IES RP-10, Lighting Common Applications IES RP-43, Recommended Practice for Lighting Exterior Applications

Building Industry Consulting Services International (BICSI) Telecommunications Distribution Methods Manual (TDMM)

Standard for design and installation of information and communications technology

NFPA (National Fire Protection Association) Codes and Standards

70, National Electrical Code 70E, Standard for Electrical Safety in the Workplace 101, Life Safety Code (Emergency & Egress Lighting) 110, Standard for Emergency and Standby Power Systems 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems 780, Standard for Installation of Lightning Protection Systems 855, Standard for the Installation of Stationary Energy Storage Systems

Section 7: FIRE PROTECTION

National Fire Protection Association (NFPA) Codes and Standards

4, Standard for Integrated Fire Protection and Life Safety System Testing 13, Standard for the Installation of Sprinkler Systems

Section 7: FIRE PROTECTION

14,Standard for the Installation of Standpipe and Hose Systems 20, Standard for the Installation of Standpipe Pumps for Fire Protection 24, Standard for the Installation of Private Fire Service Mains and Their Appurtenances 30, Flammable and Combustible Liquids Code 45, Standard on Fire Protection for Laboratories Using Chemicals 72, National Fire Alarm and Signaling Code 75, Standard for the Fire Protection of Information Technology Equipment 88A, Standard for Parking Garages 90A, Standard for the Installation of Air-Conditioning and Ventilating Systems 232, Protection of Records 241, Standard for Safeguarding Construction, Alteration, and Demolition Operations

Federal Fire Safety Act of 1992 15 USC § 2227

Section 8: CIVIL

EO 11988: Floodplain Management Regulates federally-funded activities in or affecting the floodplain. This encompasses ALL permanent construction and other activities, including debris, roads, bridges, culverts, etc. The regulatory floodplain is defined by areas inundated by a 100-year or 500-year storm event. For most projects, any activities occurring in the 100-year floodplain will require analysis. For any activities associated with a critical action facility, such as a hospital or U.S.

Court, the 500-year floodplain triggers this EO.

American Society of Civil Engineers

(ASCE)

ASCE 24-24: Flood Resistant Design and Construction Standards

ASCE 38-02: Standard Guidelines for the Collection and Depiction of Existing Subsurface Utility Data

EISA 2007 Sec. 438: All major capital projects with a scope of site work exceeding 5,000 shall manage the 95th percentile stormwater event onsite and reduce runoff.

Reference: "Compliance with Section 438 (Stormwater) Requirements of the Energy Independence and Security Act of 2007"

American Association of State Highway and Transportation Officials

(AASHTO)

Policy on Geometric Design Highways and Streets (Green Book)

Section 9: SPECIALTY SPACES

U.S. Courts Design Guide (USCDG) Functional program requirements; Court and court-related adjacency relationships; accessibility; finish materials; performance criteria for acoustics; environmental systems (including special HVAC and lighting requirements); security; telecommunications; and audio-visual design.

MOA for Court Security 2019

U.S. Courts Courtroom Technology Manual

Reference is made to these systems only regarding the electrical service requirements in the areas where they are being installed.

Requirements and Specifications for Special Purpose and Support Space Manual (USMS Publication 64)

Criteria for USMS functional program requirements, spatial relationships, electronic and physical security, and hardware standards and special HVAC requirements within the U.S. Courts and court-related spaces.

NASA Facilities Design Standard

United States Land Port of Entry Design Standard

GSA Federal Courthouse Physical Security Best Practices Desk Guide 2023

GSA Mail Center Security Guide 5th Edition

GSA Indoor Firing Range Policy and Criteria

GSA Indoor Firing Range Cyclical Maintenance and Repairs Memorandum

Interagency Security Committee Appendix C: Child Care Level of Protection Template (FOUO)

Also use Child Care Center Design Guide (PBS-P140)

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

47PE5426Q0022

PBS Office of Acquisition Management/Acquisition Project Delivery Contracting Division Central/Contracting Branch D 1800 F Street NW Washington , DC 20405 USA

Request for Quotes 47PE5426Q0022, Roof Replacement, 11 West Quincy Court Federal Building, Chicago, Illinois

PQDD

PBS Office of Acquisition Management/Acquisition Project Delivery Contracting Division Central/Contracting Branch D 1800 F Street NW Washington , DC 20405 USA

EQPXAEB-26-0014

PQDD

Johanna Nieves 312-758-2467

1 3255/29/2026

6/12/2026

4:00 PM (CST)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

PQDD

PBS Office of Acquisition Management/Acquisition Project Delivery Contracting Division Central/Contracting Branch D 1800 F Street NW Washington , DC 20405 USA

PBS PAYMENTS BRANCH -https://finance.ocfo.gsa.gov/

P.O. BOX 17181

https://finance.ocfo.gsa.gov/

FORT WORTH, TX 76102-0181 USA

Johanna Nieves

$_________________(Base: Total Evaluated Price) Unit prices listed in page 3 of this form will either be accepted or rejected at the time of award

PAGE

GENERAL SERVICES ADMINISTRATION

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Request for Quote 47PE5426Q0022, Roof Replacement, 11 West

Deliverable

Place of Performance: 11 W QUINCY CT CHICAGO, IL 60604-2096

Quincy Court Federal Building, Chicago, Illinois - Unit

PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS

Route and Seal Concrete Cracks

Price 004 (006 Noted in Spec 01 27 00)

Contract Type: Firm Fixed Price

Lump sum price to perform roof replacement as outlined in

SF

PoP: 08/24/2026 - 04/06/2027

Request for Quote 47PE5426Q0022, Roof Replacement, 11 West

Deliverable

Quincy Court Federal Building, Chicago, Illinois - Unit

Place of Performance: 11 W QUINCY CT CHICAGO, IL 60604-2096

PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS

Quincy Court Federal Building, Chicago, Illinois - Base

PoP: 08/24/2026 - 04/06/2027

SF

Price 001

Contract Type: Firm Fixed Price

Shallow Depth Concrete Repair (1/2" - 1-1/2")

Request for Quote 47PE5426Q0022, Roof Replacement, 11 West

Deliverable

Quincy Court Federal Building, Chicago, Illinois - Unit

Request for Quote 47PE5426Q0022, Roof Replacement, 11 West

Place of Performance: 11 W QUINCY CT CHICAGO, IL 60604-2096

PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS

Price 002

Contract Type: Firm Fixed Price

Deeper Depth Concrete Repair (1 1/2" - 3")

PoP: 08/24/2026 - 04/06/2027

PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS

Place of Performance: 11 W QUINCY CT CHICAGO, IL 60604-2096

Deliverable

LS

Request for Quote 47PE5426Q0022, Roof Replacement, 11 West LF

Quincy Court Federal Building, Chicago, Illinois - Unit

SF

Price 003

Contract Type: Firm Fixed Price

Concrete Ceiling Repair

PoP: 08/24/2026 - 04/06/2027 the RFQ 47PE5426Q0022 package.

PAGE

GENERAL SERVICES ADMINISTRATION

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Place of Performance: 11 W QUINCY CT CHICAGO, IL 60604-2096

Price 005 (007 Noted in Spec 01 27 00)

PoP: 08/24/2026 - 04/06/2027

Contract Type: Firm Fixed Price

Quincy Court Federal Building, Chicago, Illinois - Unit

PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS

Contract Type: Firm Fixed Price

Request for Quote 47PE5426Q0022, Roof Replacement, 11 West

PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS

Deliverable

1 LF

Place of Performance: 11 W QUINCY CT CHICAGO, IL 60604-2096

Deliverable

Epoxy Injection of Concrete Cracks in Ceilings

PoP: 08/24/2026 - 04/06/2027

Commission No. 233089

Specifications General Service Administration Full Roof Replacement Design

11 W. Quincy Federal Building 11 W. Quincy Ct.

Chicago, Illinois 60604

100% Construction Documents February 16, 2024 June 16, 2025 July 17, 2025 July 31, 2025

Building: IL2125 Task Order: 47PF0023F0707

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THIS DOCUMENT

TO UNAUTHORIZED RECIPIENTS IS PROHIBITED

Do not remove this notice Properly destroy or return documents when no longer needed

SENSITIVE BUT UNCLASSIFIED (SBU) - PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY Do not remove this notice - Properly destroy or return documents when no longer needed

1.

2.

3.

4.

5.

6.

A.

S

1.1

3/4-inch (19-mm)

ACI 318 (ACI 318M)

1/2 inch (13 mm)

1/2 inch (13 mm)

3/4-inch (19-mm)

1/8 inch (3 mm)

3/4 inch (19 mm) 1/4 inch (6 mm)

1/4 inch (6 mm) 1 inch (25 mm)

0.003 inch (0.075 mm) 8 inches (200 mm)

SENSITIVE BUT UNCLASSIFIED (SBU) - PROPERTY OF THE UNITED STATES G