MJPCH_Fire_Alarm_Panel_Replacement_Pre-bid_Questions_Answered_4122019.docx

DOCX document 16 KB Posted

Attached to
MJPCH Fire Alarm Panel Replacement
Solicitation number
47PE0619Q0010
Issued by

About this file

Not Listed

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MJPCH Fire Alarm Panel Replacement - EQ4PPC-18-0032

1. Are Scaled Drawings available? No

2. Are Ceilings Suspended? Or Hard Lid? The building has a mix of hard and suspended ceiling systems. Please note that this building is hard metric.

3. Are there existing Cable Trays for wiring above ceilings? In some areas 4 .Can Existing Wiring be utilized? Yes

5. Is a “UPS” required? If so, What Time/Power Duration is required? No. Internal battery backup is required per NFPA.

6. Are “Or Equal” Equipment substitutions allowed? Any “Or Equal” equipment would have to be approved prior to purchase.

7. Is “Plenum Wire” acceptable? Yes

8. Is “After Hours Access” for said work, available to contractor at no add’l cost to the Gov’t? After hours work would be available but contractor will have to be escorted by Court Security Officers. There would be additional costs for this escorting that the contractor would be responsible to pay.

9. What is the height of Exterior Cameras? (If any) No camera work for this project.

10. Please provide/post other “Q & A” requests. See attached program sheet for system infprmation.

11.Please provide a BILL OF MATERIALS. See attached program sheet for system infprmation.

R. DANIELS

File details come from the government source that posted it.