PPQues_-_Tuttle_5th_Floor_MOS_-_7.2.18_(1).pdf
PDF 106 KB Posted
- Attached to
- General Construction Court of Appeals 5th Floor Multifunctional Office Suite , Tuttle Federal Courthouse
- Solicitation number
- 47PE0218R0009
About this file
Responses to questions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_47PE0218R0009_0001.pdf | ||
| GA0008ZZ_-_Atlanta_USCoA_FY2016_ACM_Final_Report.pdf | ||
| GC_Agreement_(revised).pdf | ||
| C301_GC_Reps_&_Certs.pdf | ||
| Document_Security.pdf | ||
| 170912_Tuttle_MOS_Final_Submission.zip | ZIP file | |
| Price_Form1.xlsx | XLSX spreadsheet | |
| 47PE0218R0009__Form.pdf | ||
| GC_Solicitation.pdf | ||
| RFP._COA__Tuttle_Federal_Courthouse.pdf | ||
| www.wdol.gov_-_GA146.pdf | ||
| GSA527-15b.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Questions
Project #: 1675
Project Name:
Date Resolution
Item Individual Sheet Detail Review Comment Initiated Individual Resolution/Comments
1. SOL Documents eludes to a PPQ, but one was not provided. Can contractor submit CCAS/CPARS in lieu of providing PPQ's?
The submission of CCAS/CPARS will be acceptable.
2. General Is there laydown space available on the groud floor; if so where? Only as necessary for drop off and then taking up to the work site on the same day
3. General Is there space available at ground floor for dumpster; if so where? Only as necessary for drop off and then taking up to the work site on the same day
4. General Will it be required to x-ray floor for core drilling? Only as required by the contractor
5. General What is the construction of the existing exterior (perimiter) walls? If they are plaster, is there a cavity interior to the walls for running cables/conduit/piping/etc up to/through ceiling?
Masonry walls with plaster. No cavity. Plaster is
3/4" to 1-1/2" thick.
6. General Please confirm that suite signage will be provided and installed by the agency or by others.
Yes, by the Court
7. G001 Bid Option 3 Option states restoration per building standard restoration; is there a historical standards document outlining requirements?
No. Strip the paint to expose the copper.
Examples done in the past are in the building
8. AD100 Please provide the latest ACM Survey Report for the renovation space. The latests survelliance report is included with this transmission.
9. AD100 Note B Is an ACM additional survey required as part of this project? The pre-renovation assessment conducted by the A/E has tested the materials that were accessible at the time. If the contractor deems that other items need to be tested it is incumbent of the contractor to take all necessary precautions. Direction has been given regarding the known hazards.
10. AD100 Note B Indicates lead based paint has been identified on walls and celings; can you provide qualtities requiring encapsulation?
The contractor shall assume that all LBP will be abated. The contractor shall provide a condition survey prior to the LBP abatement that would be the basis for the direction that will be followed.
Once determined, the contractor will provide a deductive change to the govermnent should it be less than the original cost of abatement.
11. AD100 Note 5 Existing masonry wall is stated to have opening through floor in middle; what are dimensions of opening and how is opening to be filled for new wall/flooring placement?
Approximately 6" wide. Varies in size and location. Fill void with concrete.
12. A020 Door
Schedule
Currently there are no door manufacturers that produce a stile and rail
STC55 door; can you please provide source.
It is acceptable to use STC 40 for stile and rail raised panel acoustical door, Manufacturer
Eggers.
13. A020 Door
Schedule
E001 states that security hardware and programming not included in this scope; or electric door strike indicated on door schedule, please confirm no tie in to existing remain security system is required beyond physical placement
Contractor is providing the electric strike.
Correct, no tie into existing main security system.
14. A100 New electrical being installed in existing plaster base building exterior walls will require heavy plaster removal - we recommend laminating walls with 1/4"
- 1/2" drywall in lieu of plaster repair- please confirm this is exceptable It is recommend that the contractor trench and patch the plaster.
15. A500 Please provide connection detail for jhanger wires at acoustical ceiling to plaster sub ceiling above - recommend pre drilling 1/2" holes and installing toggle eyebolts with washers 48" oc
None of the plaster should be suspended plaster, it should all be directly adhered to the clay tile, so the contractor would be anchoring to clay tile, not suspended plaster.
Tuttle 5th Floor Multifuncational Office Suite
Pre-Bid Questions
Project #: 1675
Project Name:
Date Resolution
Item Individual Sheet Detail Review Comment Initiated Individual Resolution/Comments
Tuttle 5th Floor Multifuncational Office Suite
16. A500 Please provide connection detail for metal framed soffits/gwb ceilings to plaster sub ceiling above - recommend pre drilling 1/2" holes and installing toggle bolts with washers - 12" oc
None of the plaster should be suspended plaster, it should all be directly adhered to the clay tile, so they are anchoring to clay tile, not suspended plaster
17. AI002 Please confirm that furniture shown in solid line (chairs) are not included in this contract
Chairs are provided by others.
18. Elec. Gen. Does the building have an emergency generator? No.
19. M100 Note 6 Indicates new recirculation fan in Room 508 per schedule but schedule only shows new bath fan; please clarify if fan for 508 is intended and basis model
TEF-1, Toilet Exhaust Fan for Toilet 507B, is scheduled on M500 Fan Schedule.
20. Mech.
Gen.
For tie in to existing BAS, is this building on Region 4 V3.0 LonWorks? The Tuttle Building is on Niagara 3.8
21. Mech.
Gen.
Who is the controls vendor for this building? Please contact Amanda Henderson with GSA regardig the controls system at the Tuttle
Building - 404-719-9592
22.
23.
File details come from the government source that posted it.