Amendment 47PD5326R0051_0001.pdf

PDF 222 KB Posted

Attached to
RFP 47PD5326R0051 ND0047ZZ Domestic Recirculation Repairs Fargo, ND
Solicitation number
47PD5326R0051
Issued by
Not on record

About this file

This is an Amendment 0001 to GSA Solicitation No. 47PD5326R0051, issued by the PBS Office of Acquisition Management on July 29, 2026. The amendment covers domestic recirculation repairs (ND0047ZZ) and does not extend the proposal submission deadline, which remains 10:00 a.m. CDT on Monday, August 10, 2026. The requisition number is EQPMBA-26-0268, and the contract ID is 47PD5326R0051.

The amendment includes three contractor questions and government answers addressing project execution details. Key clarifications provided are: (1) work will be performed during normal business hours (8:00 AM to 5:00 PM, Monday–Friday) with potential intermittent stoppages due to court activity, requiring contractors to provide advance notice of noisy or disruptive work; (2) the government will arrange cubicle removal and reinstallation where necessary, though contractors should provide alternative methods to minimize disruption to modular workstations; and (3) the project delivery type is definitively design-bid-build with completed plans and specifications provided, requiring no design team. The amendment also includes a site visit sign-in sheet documenting attendees from companies including TF Powers. All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PQCC

Chanel Bennett, Contracting Officer

Amendment 0001 Includes:

-Contractor questions and Government Answers -Site Visit Sign-in Sheet The proposal due date has not been extended and will remain by 10:00 a.m. CDT on or before Monday, August 10, 2026.

All other terms and conditions remain unchanged.

PQCC

PBS Office of Acquisition Management/Acquisition Project Delivery Contracting Division West/Contracting Branch C 1800 F Street NW W hi DC 2040 USA

PBS Office of Acquisition Management/Acquisition Project Delivery Contracting Division West/Contracting Branch C 1800 F Street NW W hi DC 2040 USA

EQPMBA-26-0268

47PD5326R0051

1 3

7/29/2026

7/8/2026

7/29/2026

GSA Solicitation No. 47PD5326R0051 Amendment 0001

Contractor’s Questions & Answers

1. Will the work be performed during normal working hours (Monday – Friday, 8:00 am – 5:00 pm)?

If so, should we anticipate any intermittent shutdowns related to court proceedings (or any other operational items)?

a. It is the intent that, To the extent possible, the work will be performed during normally hours, 8:00AM to 5:00PM. There may be intermittent work stoppages due to courts activity. Prompt communication of schedule for any noisy or disruptive work 2 weeks in advance can minimize this impact. The courts schedule will be available for the contractor to assist in planning.

2. During the site visit, it was noticed that several areas have cubicle workstations below the area designated for the new plumbing recirculation line. Is the owner responsible for removal and reinstallation of the cubicles? Or is the contractor responsible?.

a. The Government will arrange for moving cubicles where necessary. However, the contractor is expected to provide alternative methods to minimize moving or disassembly of modular workstations to the extent possible.

3. We believe the intended project delivery type to be Design-Bid-Build since completed plans and specifications have been provided. However, the project has been described as “Design Build” in the following locations.

a. The project is design-bid-build, a design team is not needed for the construction described in the solicitation documents.

Solicitation Amendment 47PD5326R0051_0001
RFI
47PD5326R0051 RFP Site Visit Sign In
2026-07-29T08:33:04-0500
Chanel Bennett

File details come from the government source that posted it. Updated .