Amendment 0002, sign-in sheet and agenda
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Description of Amendment/Modification
Amendment 0002 hereby incorporates a revised Bid Sheet, questions and answers sheet, as well as the agenda and sign-in sheet from the June 04, 2019, pre-proposal meeting. This amendment also requires that the Mercer County, NJ, Wage Determination NJ190035 01/04/2019 NJ35 be used to provide pricing.
Please note questions regarding this procurement are due by COB, Monday, June 10, 2019. Questions submitted after this date will not be entertained. An amendment to address questions will be issued after June 10.
The proposal due date for this procurement remains the same at June 20, 2019. All other terms and conditions remain the same.
47PD0319R0020/0002
Pre-Proposal Conference June 04, 2019
Solicitation 47PD0319R0020
East Field Office Large Term Multiple Award IDIQ for Construction Services With Design Build Capabilities
I. Sign-In/Welcome/Introduction of GSA Personnel A. Daniel Langan, GSA Contracting Officer B. Samantha Bohne, GSA Contract Specialist C. Anthony Harper, GSA SSEB Chair D. James O’Neill, GSA SSEB Member E. Brett Thomas, SSEB Member F. Stephen Grisi, SSEB Member
II. Purpose
The purpose of this conference is to answer any questions and to give offerors the opportunity to identify ambiguities in the specs or solicitation requirements, When possible, prospective offerors’ questions shall be answered. Those answers which require further study shall be deferred. Questions should be emailed to Sam Bohne at samantha.bohne@gsa.gov and Daniel Lanagan at daniel.langn@gsa.gov.by COB MONDAY, June 10, 2019.
This indefinite delivery indefinite quantity (IDIQ) multiple award term contract is to provide general construction services. In addition, design work incidental to construction as well as design-build work are included. The applicable NAICS code is 236220 (Commercial and Institutional Building Construction.
Individual task orders to be placed under this contract will range in value from $30,000 to $3,000,000, however there may be individual orders with lower or higher costs placed against this contract. The contract term will be for one (1) base year with four (4), one-year options. The aggregate Maximum Ordering Limitation (MOL) over the entire life of the contract (base and option years) is approximately $75,000,000. In other words, there is no single MOL per contractor nor a single MOL per year, other than the MOL of the entire contract.
Services under this contract will include general repair and alteration services to Government-owned and leased facilities as identified in the solicitation. This contract may also be used to procure design-build task orders. Projects will be evaluated separately on a task order basis and offerors may be required to submit additional information pertaining to their ability to successfully perform these projects as necessary and required.
The contracts will include pre-negotiated line item pricing and also include the authority to negotiate non-line item work as necessary.
This contract will be utilized by both the Regional and Field Office personnel.
This Solicitation is set-aside for Small Businesses (with one (1) contract reserved for an 8(a) firm and one (1) contract reserved for a Service Disable Veteran Owned Small Business (SDVOSB), in accordance with FAR 19. The Government will only meet this concern if a proposal is received from a Service Disabled Veteran Owned Small Business and/or an 8(a) business if the firms are responsive, responsible and received an overall technical score of "Acceptable" or greater and represents a fair and reasonable price. If it is determined that no SDVOSB and/or 8(a) offeror proposes an acceptable proposal at a fair and reasonable price, a SDVOSB and/or 8(a) firm will not be recommended for an award and the government is no longer bound to make an award to this concern.
III. Word Of Caution: Please note contractors are not to call the COR or other board members directly. Offerors are advised that oral remarks and explanations made by government representatives during this conference do not qualify the written provisions of the Request for Proposal Specs. Only those changes to the provisions of the RFP Specs that are covered by a written amendment shall be considered official. When the amendment is issued, procedures related to the acknowledgment mailto:samantha.bohne@gsa.gov mailto:daniel.langn@gsa.gov.by and receipt of the solicitation amendments shall be noticed. An amendment will be issued after this conference which will include the agenda, minutes and sign-in sheets.
IV. Solicitation Information A. Solicitation No. 47PD0319R0020 B. Contract Type: Multiple Award, Firm Fixed Price IDIQ C. NAICS: This procurement is under NAICS code 236220, Commercial and Institutional Building Construction.
D. Small Business Size Standard: $36.5 million E. Procurement Preference: Total Small Business Set-Aside with one contract reserved for a Service Disabled Veteran
Owned Small Business (SDVOSB) and one contract reserved for an 8(a) firm.
F. Number of Awards: The requirement of this procurement is for the award of up to six (6) Indefinite Delivery/ Indefinite
Quantity (IDIQ) contracts. A minimum of three (3) contracts will be awarded, however the Government has the discretion to make award to a maximum of six (6) firms.
G. Period of Performance: One (1) year base with four (4), one (1) year options.
H. Service Area: Pennsylvania: Counties of Philadelphia, Delaware, Chester, Montgomery and Bucks; New Jersey: All counties excluding Bergen, Passaic, Morris, Essex, Hudson, Monmouth, Middlesex and Union; and Delaware: Entire State
I. Bonding Requirements: Bonding may be required on a task order basis. However, offerors are required to provide a Bonding Capacity Letter proving the firm can be bonded for at least $3 million.
1. A bid bond in the amount of 20% of the proposed price must be submitted along with the actual bid.
2. A performance bond in the amount of 100% of the contract price, and payment bond in the amount of 100% of the contract price will be required within ten (10) days after award of the project.
J. Insurance Requirements: After contract award, the contractor must furnish the Contracting Officer with a current
Certificate of Insurance, listing the Government as co-insured party and meeting the requirements specified in this solicitation (DB 101, Sec. III.F. Insurance Requirements). The contractor may not begin actual work onsite until this certificate has been received and found acceptable.
K. Financial Information: The offeror must provide financial information in the form of the GSA 527. This form must be submitted with the offeror’s proposal.
L. Other Submission Requirements:
1. C. 301, Offeror Representations and Certifications
2. Signed Amendments
3. GSA Form 527
4. Technical Proposal
5. Past Performance Sheets (Completed and submitted to GSA by reference. GSA will not accept reference forms from the offeror.)
6. Letter from Bank Confirming Bonding Capacity of at least $3 million.
M. Minimum Wage: Contractors are to pay the Minimum Wage and Fringe Benefits required by the Davis-Bacon Act.
The IDIQ will have Task Orders for locations in different counties.
N. Proposal Due Date: 5 p.m. Eastern, Thursday, June 20, 2019.
O. Submit Offers to: samantha.bohne@gsa.gov and daniel.langan@gsa.gov.
P. All contractors are reminded that anything said at this meeting or at any time before the proposal due date does not constitute a change in the solicitation. The only changes to the solicitation will be those made in a formal amendment issued only on fbo.gov.
V. Questions mailto:samantha.bohne@gsa.gov mailto:daniel.langan@gsa.gov
Question Answer Furnish and install partition or ceiling 3⅝", 25 gage metal stud 16" O.C., ⅝" drywall on both sides, including tape and spackle finish of drywall with primer or sealer coat of paint and two finish coats of paint. Furnish and install 4" cove base. This line item shall also be used to close openings in the wall, where doors, window, etc. are removed. Price shall be determined by the square feet of one side. Please clarify what kind of cove base.
A vinyl cove 4" or 6" with molded corners (same as cove standard in previous line item) shall be use.
Furnish and install partition or ceiling ⅞", 25 gage metal furring strip 16" O.C., ⅝" drywall on one side, including tape and spackle finish of drywall with primer or sealer coat of paint and two finish coats of paint. Furnish and install 4" cove base. Price shall be determined by the square feet of drywall installed.This line item combines Gypsum ceiling as well. But the ceiling portion would not require the cove base. Please clarify. Cove base is not be required on the ceiling.
Disassemble and remove existing system furniture cubicle including sorting all parts and transporting to building storage area as designated by Government. Price determined by square footage of cubicle. – this line item states it needs to be calculated per SF but the excel sheet provided provides a unit pricing in LF.
Please clarify
SF is the correct price calculator. The bid sheet has been updated to include a measurement of SF for Line item 21.
Once the General Contractors are selected for the IDIQ, does every General Contractor on the IDIQ Contract have to bid every Task Order that is issued?
Your firm is not required to bid on every project that gets sent out, however, if you do not respond to a project during the based year and do not receive an award, your firm will not reccieve the minimum guarentee. In additon, Consistant unresponsiveness will be factored into GSA's determination whether or not to exercise an option.
Line 18- To what elevation are we to figure for the light removal? Office ceiling height.
Line 80- How far are we to figure the relocation of the fire alarm device? Relocation is within 50 LF Line 92- Are we to assume the other circuit is near the rezoned light fixtures? Assume that it is in close proximity.
Lines 93 to 95- How far are we to figure for the relocation? Relocation is within 50 LF Line 96- Are these modules for a floor duct system? They are for whips connected to PDU's.
Line 97- Is the branch circuit already in place? If not how far for new branch circuit? The circuit will be within 50 LF.
Line 98- What is the distance for the branch circuit? The circuit will be within 50 LF.
Line 100- How far is the electrical closet?
Electrical closet locations will vary. Pricing should include up to 50 LF. For project over 50 LF, line item 112 will be used.
Line 102 & 103- Are the floor outlets Poke-Thru, or does the floor have to be saw cut and patched?
No poke through oulets will be used. Floor outlets shall be run through a floor duct systerm.
With regard to the referenced RFP, could your office kindly provide a list of the buildings involved in each of the counties. We did try to get the information ourselves on the GSA website but we do not find buildings in all of the counties cited in the RFP.
GSA does not provide this information as there are many buildings in our inventory and these buildings may change over time.
The intent of this contract is to compete RFP's for each project among the awardees, and in situations where adequate price competition is available, the Government will generally not request a price breakdown. Rather, GSA envisions that most project proposals will be submitted on a lump sum basis and the offerors shall include all mark-ups related to that project and all proposed preparation costs within that lump sum price. While some circumstances may arise in which a price breakdown is required for a specific RFP, it is the Government's intent to use the not-to exceed mark-up rates requested only in situations where GSA and the offeror/awardee are negotiating a price in a sole source environment.”1. In regards to the above paragraph found in attachment DB201A-SB/APRIL 2019- it is our understanding that “it is Government’s intent to use the not-to exceed mark-up rates requested only in situations where GSA and the offeror/awardee are negotiating a price in a sole source environment”. On the previously held contact, most task orders are utilizing unit pricing within the competitive RFP and not in the context stated above. Please clarify the use of the unit prices under this follow on contract.
The intent of this contract is to compete RFP's for each project among the awardees. RFP's may include pre-negotiated line items, negotiated line items, or a mix of pre-negotiated and negotiated line items,. "Sole Source Negotiations" as mentioned in this section means either sole source for new task orders or for modifications to existing (awarded) task orders.
The RFP states that task orders will range from $30K-$3M. However, under the previously held contract, many of the task orders fall under the Simplified Acquisition Threshold. Please provide a more concise cost range under which task orders will be given.
The intent of this contract is to award task orders ranging from $30k-$3m, however there may be individual orders with lower or higher costs placed against this contract.
Bid documents DB201A-SB/April 2019 page 9 paragraph B state that “Completed PPQ’s should be submitted with the proposal”, the pre-proposal conference agenda states in Section IV paragraph L/5 that the PPQ’s should be submitted to GSA and will not be accepted from the Offeror. Which is the correct method of submission of PPQ’s?
Completed Past Performance Questionnaires shall be submitted by the proposal due date by the reference. GSA will not accept past performance questionnaires submitted by the offeror.
SF1442 section 17 for amount, do we use the term “SEE ATTACHED” to reference the Line Item Bid Sheet?
Please place the total evaluated price (extended pricing for Base and All Options) in this box.
For Bid Submission, is a downloadable link (OneDrive/drop box) acceptable or are individual files as attachments requirements?
Please provide your submission as invidual attachments or a zip file.
What is the timeline for award?
The current Contract ends in Decemeber, therefore GSA hopes to award the contracts before December 2019.
The entire bid package can be sent by email?
Yes, please submit via email to both daniel.langan@gsa.gov and samantha.bohne@gsa.gov
WIll task orders be based on line items?
Some task orders will use line item pricing, some projects will use line item pricing and negotiated line items and some projects will strictly use negotiated line items.
Should we be proposing as the most expensive county would be?
Yes, line item pricing shall be based on the highest Wage Determination, which is Montgomery County. A revised bid sheet will be included in the amendment to remove references to Travel Multipliers. Wage Determination NJ190035 01/04/2019 NJ35 shall be used for pricing purposes. Please note offerors will have the opportunity to discount line item pricing on task orders.
Please consider accepting more than 3 relevant projects. It is difficult to meet the nine project characteristics cited in II.D. Factor 1 with just 3 projects
GSA will only accept a total of three relevant projects. Projects exceeding the 3 requested relevant projects will not be reviewed.
I.H. Receipt of Offers states both 4pm and 5pm on June 20. The SF1442 and the RFP cover page both say 5pm as well. Please advise which is correct. Please see Amendment 0001.
Daniel Langan's email on the RFP cover is written danile.langan. Please submit proposals to daniel.langan@gsa.gov What are you looking for in those percentage boxes? Travel Multiplier is normally based on the size and timeframe for the projects. Along with team members traveling. This area is a little gray. Or do you want us to make some rough estimates that would be negotiated?
Travel Multipliers have been removed. The Mercer County Wage Determination shall be used for pricing purposes. An updated Bid Sheet has been provided that removes these boxes.
Will task orders be issues to insert a single outlet?
No, projects will be within the $30k-$3m range and will be for a project and not a single line item.
Will there be a Quality Assurance Control person on each task order? This may be determined on a task order basis.
How does it work with permits and inspections; are townships included in that?
This may be required in lease property depending on the municipality. Projects in federal space should not require permits to be pulled.
Will we need local licensing? Yes, if yuo are performing work in a lease space.
If you have two firms that are 8(a) and have the same price, how do you choose?
In this scenario, the firm that is the best value to the government would be awarded the "reserved" 8(a) award as long as pricing is determined to be reasonable and the firm has a rating of "acceptable" or higher. After chosing firms for the one reserved 8(a) award and one reserved SDVOSB firm, GSA will make awards based on best value, pooling from all firms who submitted (excluding the possible 2 reserved firms).
In relation to Section II.D, (b) Factor 2 – Past Performance on Relevant Projects – Paragraph C states that offerors shall NOT incorporate by reference in to their proposal PPQs previously submitted for other RFPs. However, Paragraph E states that the Government may review any other sources of information for evaluating past performance. Other sources may include …, previously submitted PPQ information, …May we submit previously completed PPQs with our proposal?
Offerors shall not submit PPQs with their proposal. Past PPQ's submitted by your firm with your proposal will not be evaluated.
PPQs shall come directly from references on the PPQ sheet provided in the solicitation, only.
Shall we place the SFLLL_1_2_P-V12a - Disclosure of Lobbying Activities form in the Price proposal or the Technical proposal? You can place the SFLLL forms in your price proposal.
| topmostSubform[0]: |
| Page1[0]: |
| Code[0]: 3PQBS |
| Copies[0]: |
| CheckBox9[0]: 1 |
| Code[2]: 3PQBS |
| NameandTitleOfficer[0]: Daniel Langan, Contracting Officer |
| Is[0]: 1 |
| CheckBox10[0]: Off |
| NameandAddress[0]: |
| DateSigned[1]: |
| Pages[0]: 7 |
| AmendmentNo[0]: 0002 |
| Dated10B[0]: |
| ModificationNo[0]: |
| AdministeredBy[0]: GSA ACQ SVCS BUILDING SERVICES SECTION |
100 S. INDEPENDENCE MALL WEST
PHILADELPHIA, PA 19106-2320 USA
| FacilityCode[0]: |
| CheckBox13B[0]: Off |
| CheckBox13D[0]: Off |
| ReqNumber[0]: EQ3PCN-19-0036 |
| Dated9B[0]: 5/3/2019 |
| C13[0]: |
| Description[0]: Please see attached |
| NotExtended[0]: 1 |
| Code[1]: |
| AmendmentNo[1]: 47PD0319R0020 |
| ContractIDCode[0]: |
| DateSigned[0]: |
| CheckBox11[0]: 1 |
| Page[0]: 1 |
| AccountingData[0]: |
| CopiesReturned[0]: 1 |
| CheckBox13A[0]: Off |
| IsNot[0]: Off |
| EffectiveDate[0]: 6/6/2019 |
| A13[0]: |
| ProjectNo[0]: |
| CheckBox13C[0]: Off |
| Extended[0]: Off |
| D13[0]: |
| IssuedBy[0]: GSA ACQ SVCS BUILDING SERVICES SECTION |
100 S. INDEPENDENCE MALL WEST
PHILADELPHIA, PA 19106-2320 USA
NameandTitleSigner[0]:
File details come from the government source that posted it.