47PC5326R0017 A0001 RFIs Ogdensburg Customs House Sally Port Heat- Final.pdf
PDF 82 KB Posted
- Attached to
- Ogdensburg Customs House Sally Port Heat project
- Solicitation number
- 47PC5326R0017
- Issued by
- Not on record
About this file
This document is a compilation of Questions and Answers (Q&A) from two separate solicitations related to federal contract opportunity 47PC5326, specifically addressing facility modifications involving spray foam insulation, thermal barriers, and heating systems for a sally port space.
The Previous Solicitation RFIs (47PC5326R0006) address structural and construction details for the spray foam insulation project. Key specifications include: exterior wall height of 129 inches to ceiling with gable end walls reaching 170 inches at center point; tin construction for both walls and ceiling; designated working hours from 7:00 AM to 3:30 PM; underground gas line routing to the sally port with above-ground electrical service; requirement for a work procedure for spray foam application; removal and reinstallation of existing face-screwed wall boards to accommodate spray foam application; thermal barrier application required for all exposed spray foam surfaces; and confirmation that spray foam will not be applied to metal beams. Obstructions for ceiling work include sprinkler systems, lighting, electrical systems, and exhaust fans.
The Current Solicitation RFIs (47PC5326R0017) focus on heating and electrical infrastructure. The contractor must ensure two natural gas heaters are rated to maintain a minimum temperature of 66 degrees Fahrenheit within the sally port space while overhead doors are closed. The closest electrical panel is located in B112 Cold Weather/Marine Storage room, approximately 120 feet away. Vetting clearance is required prior to work commencement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Previous Solicitation RFIs (47PC5326R0006) Number Quetion Answer
1 What is the ceiling height of the heated area?
The exterior walls have a height of 129 inches to the ceiling. The ceiling height measures 170 inches at the center point.
2 Can the gas and power be routed above ground?
The gas line will be routed underground to the sally port.
Electrical service will be routed above ground and tied into the current electrical system.
3 Is clearance required? Vetting will be required.
4 Is a work procedure required for SPF? Yes a work procedure is required for SPF.
I estimate 3days (10hr) to complete insulation work, will I have this entire window available consecutively or is work day limited ? The designated working hours are 7:00 AM to 3:30 PM.
6 Is there room for scaffold Yes there is room for scaffolding in the area.
7 What are walls made of ?
The spray foam will be applied to tin. To facilitate spray foam application to the tin, the existing face-screwed wall boards will require removal and reinstallation.
8 What is ceiling made of? The ceiling consists of tin.
What will be in way of ceiling work? ie duct work/electrical/drop ceiling Sprinkler system, lighting, electrical, exhaust fans.
10 What will be in way of wall work? ie duct work/appliances Face screwed wall boards will have to be removed and reinstalled.
The work scope includes a thermal barrier over foam , is this a combination of ceiling and walls ?
Application of a thermal barrier is required for all exposed spray foam surfaces.
13 Wall height
The exterior walls have a height of 129 inches to the ceiling. The gable end walls are 170 inches high at the center point where they meet the ceiling.
14 Will the spray foam be applied to the metal beams. The spray foam will not be applied to the metal beams.
Current Solicitation RFIs (47PC5326R0017)
15 What sizes are the gas heaters?
The contractor shall ensure that the two (2) natural gas heaters are rated to heat the exiting sally port space. They must be capable of maintaining a minimum temperature of 66 degrees within the space while the overhead doors are closed.
16 Where is the location of the closest panel?
The closest electrical panel is located in B112 Cold Weather/Marine Storage room. 120 feet plus or minus