RFI.pdf

PDF 12 KB Posted

Attached to
East Richford LAN Room Federal contract opportunity
Solicitation number
47PB0418R0026
Issued by
General Services Administration Public Buildings Service Region 1

About this file

RFI responses

View the file

Other files for this federal contract opportunity

Other files attached to East Richford LAN Room, newest first.
File Type Posted
Amendment_0002_signed.pdf PDF
47PB0418R0026_Amendment_0001.pdf PDF
47PB0418R0026__SF1442.pdf PDF
CRQ.pdf PDF
Checklist.pdf PDF
Offeror_Representations_and_Certifications.pdf PDF
E_Richford_Drawings_and_Revised_SOW__07-05-2018.pdf PDF
The_Agreement.pdf PDF
CAVSS_DESIGN_GUIDE_STANDARDS_Final_1-10-14_(002).pdf PDF
The_Solicitation.pdf PDF
Wages.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA New England Region

U.S. General Services Administration Public Buildings Service

50 South Main Street, RM: 134 St. Albans, VT 05478 www.gsa.gov

November 14, 2018

From: Alan Bombardier

To: Solicitation Amendment

RE: RFI Responses

1. The CBP SOW states "GSA will review the need for a 4 inch raised platform to set both the LAN and DVR rack above the floor level, in the event of the basement flooding." GSA will require the installation of a 4" Concrete poured pad for the LAN & DVR Rack's to sit on.

2. The CBP SOW does not specify the height of the fence that is being installed in the LAN room. GSA confirmed with CBP that the fence is to be installed up to the lowest pipe in the room, which is 92 inched above the floor.

3. The current CBP floor plan sketch has the outside condensing unit being installed on the exterior wall on the North side of the building. This has changed. The exterior condensing unit is to be installed on the outside wall of the building on the West side of the building, adjacent to the mechanical room door. This adds and additional 25 feet from the original location to the new location. Exact placement to be field verified with GSA upon installation.

4. The current CBP SOW also asks for the installation of 2 exterior bollards to protect the exterior Condensing units. With the new location of the condensing unit, these bollards are no longer required and should be removed from the scope.