Amendment 0002 - Questions and Answers.pdf

PDF 106 KB Posted

Attached to
Fall River and Houlton JACE Upgrades and Other Services
Solicitation number
47PB0023Q0025
Issued by

About this file

This document contains questions and answers regarding Amendment 0002 to Solicitation 47PB0023Q0025 for JACE upgrades and other services at the Fall River and Houlton facilities. The amendment provides additional details on the scope of work, including that the Fall River location requires a JACE with a 25 device license to connect 10 existing devices and approximately 170 points, while the Houlton location needs a 100 device JACE with a 5 year SMA to connect over 25 existing devices. Neither site requires a special JACE driver. The amendment also specifies control equipment brands and models at each site, confirms there are no server requirements, and provides details on graphics requirements including floor plans to be added.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0002 - Questions and Answers:

Question 1. Please provide the quantity of points and devices per JACE.

Answer 1.

At Fall River location there are 10 devices. Please provide a JACE with 25 Device License. There are approximately 170 Points.

At the Houlton location there are over 25 Devices and under 100 at Houlton.

Please Price the JACE as a 100 Device JACE with a 5 Year SMA.

Question 2. Please indicate if any JACE requires a specific driver

Answer 2. Neither requires a special driver, all are native BACnet MSTP trunks.

Question 3. Please indicate the field controller brand and models for each building a JACE

Answer 3.

Fall River:

3 Fan Power Boxes;

1x Tran VSEF12 2x Trane VSE10

5 VAVs 2x Trane VCEF06 3x Trane VCEF08

2 RTUS

1x Trane YHC0292F3RHA 1x Trane YCH120F3RHA

Houlton: Not Required for simple JACE replacement.

Question 4. Please provide the JACE Station Version and the Server Station Version.

Answer 4. There are no servers involved with either facility, everything resides on the JACE and the JACE connects to a GSA provided ethernet switch.

Question 5. Please confirm if the Sequence verification is on the Field controller or on the JACE.

Answer 5. Sequences are in the Field Controller in Fall River, a Mix in Houlton.

Question 6. Please provide amount of graphics to be considered.

Answer 6. Example Screen shots for Fall River will be posted to the RFQ Amendment 0002. In addition to modernizing the 2 RTUs, 5 VAVs, and 3 FPB graphics, a VAV/FBU summary screen will be added as well as a floor plan (CAD drawing of floor plan for this 5000 sqft will be provided by the GSA.) Graphics for Houlton will remain as is.