About this file

This pre-solicitation notice describes a construction project to renovate portions of the East Richford Land Port of Entry facility and replace inspection booths at two other Vermont land ports of entry. The project includes renovating areas of the East Richford LPOE for Customs and Border Protection use, including new bathrooms, offices, and security upgrades, along with lead and asbestos abatement. Temporary trailers are also required during construction for CBP and restrooms. Inspection booths will be replaced at the Richford and West Berkshire LPOEs, along with associated HVAC, electrical, lighting, security and site work. The estimated construction value is between $1-2 million. The solicitation and contract will be awarded as a 100% small business set-aside to the lowest priced responsive responsible bidder. The pre-bid site visit is scheduled for October 29, 2019, with bids due on November 29, 2019. The General Services Administration is the contracting agency.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EAST RICHFORD LAND PORT OF ENTRY NOVEMBER 6, 2019

PORT REFRESH AT EAST RICHFORD LPOE BID DOCUMENT (supplemental section)

SAFETY AND HEALTH 015460 - 1

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

SECTION 015460 - SAFETY AND HEALTH

PART 1 - GENERAL

1.1 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

B. Code of Federal Regulations (CFR):

1. OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both Parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402.

2. National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).

3. Environmental Protection Agency (EPA) Final Rule (40 CFR Part 761) dated July 17, 1985.

C. Federal Standard (Fed. Std.):

1. 313A Material Safety Data Sheets, Preparation and the Submission of.

D. National Fire Protection Association (NFPA)

1. NFPA 101 Life Safety Code (Most Recent Version)

1. NFPA 241 – 2013: Standard for Safeguarding Construction, Alteration, and Demolition Operations

E. International Code Council – Note: NFPA 101Life Safety takes precedence.

1. International Building Code (IBC) 2012

2. International Fire Code (IFC) 2012

1.2 WORK COVERED BY THIS SECTION

A. This section is applicable to all work covered by this contract.

B. Fire Protection Systems: The contractor shall provide formal notification to the GSA at least one week in advance of any outage to the fire protection systems in the existing building.

The operation of the sprinkler control valve shall be permitted only by properly authorized personnel and shall be accompanied by the notification of designated parties. The building fire protection systems shall be operational at all time during construction unless prior approval is granted. The contractor shall provide fire watch by a qualified individual while any fire protection system is inoperable.

C. Owner’s Responsibility for Fire Protection: The owner shall designate a person who shall be responsible for the fire prevention program and who shall ensure that it is carried out to

EAST RICHFORD LAND PORT OF ENTRY NOVEMBER 6, 2019

SAFETY AND HEALTH 015460 - 2

completion. The fire prevention program manager shall have the authority to enforce the provisions of this and other applicable fire protection standards. The fire prevention program manager shall have knowledge of the applicable fire protection standards, available fire protection systems, and fire inspection procedures

1.3 DEFINITION OF HAZARDOUS MATERIALS

A. Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR

1910; and to others as additionally defined in Fed. Std. 313. Those most commonly encountered include asbestos, lead-based paint, polychlorinated biphenyls (PCB'S), explosives, and radioactive material, but may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging, old plaster, vinyl asbestos tile, pipe covering and likely products to contain PCB's are transformers, light fixture ballasts, capacitors, voltage regulators, and oil switches.

1.4 QUALITY ASSURANCE

A. Safety Meeting: Representatives of the Contractor shall meet with the Contracting Officer and his/her representative(s) prior to the start of work under this contract for the purpose of reviewing the Contractor's safety and health programs and discussing implementation of all safety and health provisions pertinent to the work to be performed under the contract. The Contractor shall be prepared to discuss, in detail, the measures he/she intends to take in order to control any unsafe or unhealthy conditions associated with the work to be performed under the contract. If directed by the Contracting Officer, this meeting may be held in conjunction with other meetings which are scheduled to take place prior to start of work under this contract. The level of detail for the safety meeting is dependent upon the nature of the work and the potential inherent hazards. The Contractor's principal on-site representative(s), the general superintendent and his/her safety representative(s) shall attend this meeting.

B. Compliance With Regulations: All work, including contact with and handling of hazardous materials, the disturbance or dismantling of structures containing hazardous materials and/or the disposal of hazardous materials shall comply with the applicable requirements of 29 CFR 1926/1910 and 40 CFR 761. Work involving the disturbance, dismantling of asbestos or asbestos containing materials; the demolition of structures containing asbestos; and/or the disposal and removal of asbestos, shall also comply with the requirements of 40 CFR, Part 61, Subparts A and M. All work shall comply with applicable state and municipal safety and health requirements. Where there is a conflict between applicable regulations, bring the conflict to the attention of the Contracting Officer for determination.

C. Contractor Responsibility: The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part or that of his/her employees or subcontractors, which results in illness, injury or death.

D. Fire Safety: Fire safety during construction and renovation projects shall comply with the requirements in the International Building Code (IBC), International Fire Code (IFC), and National Fire Protection Association (NFPA) 241.

EAST RICHFORD LAND PORT OF ENTRY NOVEMBER 6, 2019

SAFETY AND HEALTH 015460 - 3

1.5 SUBMITTALS

A. Submittals shall comply with the requirements of the Constructions Contract Clauses, Division 01 Section "Submittals" and the individual sections specifying the work.

B. Accident Reporting: A copy of each accident report, which the Contractor or subcontractors submit to their insurance carriers, shall be forwarded through the Construction Engineer to the Contracting Officer as soon as possible, but in no event later than seven (7) calendar days after the day the accident occurred.

C. Permits: If hazardous materials are disposed of off-s i te, submit copies of permits from applicable, Federal, state, or municipal authorities and necessary certificates that the material has been disposed in accordance with applicable regulations.

D. Fire Safety Program: An overall construction or demolition fire safety program shall be developed.

1. All of the following items shall be addressed in the fire safety program:

a. Good housekeeping

b. On-site security

c. Fire protection systems

d. For construction operations, installation of new fire protection systems as construction progresses

e. For demolition operations, preservation of existing fire protection systems during demolition

f. Organization and training of an on-site fire brigade

g. Development of a prefire plan with the local fire department

h. Rapid communication

i. Consideration of special hazards resulting from previous occupancies

j. Protection of existing structures and equipment from exposure fires resulting from construction, alteration, and demolition operations

E. Other Submittals: If agreed to in writing at the safety meeting, other submittals shall be required. One such submittal which may be included is a plan of action for handling hazardous materials, which shall contain the following:

1. Number, type, and experience of employees to be used for the work.

2. Description of how applicable safety and health regulations and standards are to be met.

3. Type of protective equipment and work procedures to be used.

4. Emergency procedures for accidental spills or exposures.

5. Procedures for disposing of or storing the toxic/hazardous materials.

6. Identification of possible hazards, problems, and proposed control mechanisms.

7. Protection of public or others not related to the operation.

8. Interfacing and control of subcontractors, if any.

9. Identifications of any required analyses, test demonstrations, and validation requirements.

10. Method of certification for compliance.

EAST RICHFORD LAND PORT OF ENTRY NOVEMBER 6, 2019

SAFETY AND HEALTH 015460 - 4

The above requirements shall not limit or supersede requirements that may be specified elsewhere in this specification, or requirements of regulatory authorities having jurisdiction for the handling and disposal of hazardous materials.

PART 2 - PRODUCTS

2.1 MATERIALS AND EQUIPMENT

A. Special facilities, devices, equipment, clothing, and similar items used by the Contractor in the execution of work shall comply with the applicable regulations.

2.2 HAZARDOUS MATERIALS

A. Refer to 015460 Attachment 1 “U.S. Border Patrol Station, East Richford, VT. HAZMAT

Survey.” for asbestos and lead survey results.

B. Refer to 015460 Attachment 2 “Work Plan - Asbestos Containing Materials & Lead-Based

Paint” for asbestos and lead abatement specifications.

PART 3 - EXECUTION

3.1 STOP WORK ORDERS

A. When the Contractor or his/her subcontractors are notified by the Contracting Officer's representative(s) of any noncompliance with the safety provisions of the contract and the action(s) to be taken, the Contractor shall immediately, if so directed, or within 24 hours after receipt of a notice of violation, correct the unsafe or unhealthy condition. If the Contractor fails to comply promptly, all or any part of the work being performed may be stopped by the Contracting Officer or his/her representative(s) with a "Stop Work Order." When, in the opinion of the Contracting Officer or his/her representative(s), satisfactory corrective action has been taken to correct the unsafe and unhealthy condition, a start order will be given immediately. The Contractor shall not be allowed any extension of time or compensation for damages by reason of or in connection with such work stoppage.

3.2 PROTECTION

A. The Contractor shall take all necessary precautions to prevent injury to the public, building occupants, or damage to property of others. For the purposes of this contract, the public or building occupants shall include all persons not employed by the Contractor or a subcontractor working under his/her direction.

B. Storing, positioning or use of equipment, tools, materials, scraps, and trash in a manner likely to present a hazard to the public or building occupants by its accidental shifting, ignition, or other hazardous qualities is prohibited.

C. Obstructions: No corridor, aisle, door, or exit shall be obstructed or used in such a manner as to encroach upon routes of ingress or egress utilized by the public or building occupant, or to present unsafe or unhealthy condition to the public or building occupant.

EAST RICHFORD LAND PORT OF ENTRY NOVEMBER 6, 2019

SAFETY AND HEALTH 015460 - 5

D. Work shall not be performed in any area occupied by the public or Federal employees unless specifically permitted by the contract or the Contracting Officer and unless adequate steps are taken for the protection of the public or Federal employees.

E. Wherever practicable, the work area shall be fenced, barricaded, or otherwise blocked off from the public or building occupants to prevent unauthorized entry into the work area.

F. Alternate Precautions: When the nature of the work prevents isolation of the work area and the public or building occupants may be in or pass through, under or over the work area, alternate precautions such as the posting of signs, the use of signal persons, the erection of barricades or similar protection around particularly hazardous operations shall be used as appropriate.

G. Public Thoroughfare: When work is to be performed over a public thoroughfare such as a sidewalk, lobby, or corridor, the thoroughfare shall be closed, if possible, or other precautions taken such as the installation of screens or barricades. When the exposure to heavy falling objects exists, as during the erection of building walls or during demolition, special protection of the type detailed in 29 CFR 1910/1926 shall be provided.

H. Fences and barricades shall be removed upon completion of the project, in accordance with local ordinance and to the satisfaction of the Contracting Officer or his/her representative(s).

END OF SECTION 015460

American Industrial Hygiene American Conference of Governmental Association Industrial Hygienists

Indoor Air Quality Association Inc American Council for Accredited Certification

124 Heritage Avenue #16 | Portsmouth, NH 03801 | 603.436.2001 | absoluteresourceassociates.com

Absolute Resource Associates 124 Heritage Ave #16 Portsmouth NH 03801

Nick Charles Project ID#: 42071 Colby Co. Engineering Date of Assessment: Oct. 11, 2017 47A York St. Type of Assessment: HAZMAT Portland, ME 04101 nickc@colbycoengineering.com

Project: U.S. Border Patrol Station, East Richford, VT. HAZMAT Survey.

Unless otherwise noted in the attached report, the assessment performed met the requirements of Absolute Resource Associates Standard Operating Procedures or industry guidelines and standards for the investigation of hazardous materials within a building. The Standard Operating Procedures for sampling and investigations are based upon OSHA and EPA standards and adhere to all state regulations. The results in this report pertain only to the samples as indicated on the chain of custody.

Absolute Resource Associates does not engage in “Lead Risk Assessments”, rather lead determinations within a facility. Absolute Resource Associates does not carry New Hampshire Licenses for the Lead Risk Assessor. Absolute Resource Associates maintains certification and/or membership with the agencies listed below. We appreciate the opportunity to provide services to you. If you have any questions regarding the enclosed report, please contact us and we will be glad to assist you.

Sincerely, Absolute Resource Associates

____________________________ Oct. 26, 2017 Jason Muchmore, CIE Date Manager, Indoor Air Quality Council-certified Indoor Environmentalist VT Asbestos Inspector# AI046681

Absolute Resource Associates Certifications and Memberships

124 Heritage Avenue #16 | Portsmouth, NH 03801 | 603.436.2001 | absoluteresourceassociates.com

Table of Contents

I. Job and Contact Information II. Scope of Work III. Asbestos Findings IV. Lead Findings V. Mercury Findings VI. PCB Findings VII. Additional Observations VIII.References IX. Limits of Liability X. Attachments (as applicable):

A.Photos B.Test Results C.Chain of Custody

I. Job and Contact Information A. Contact Information:

Contact: Nick Charles Firm: Colby Co. Engineering Address 47A York St.

Address: Portland, ME 04101 Email: nickc@colbycoengineering.com Phone: 207-553-7753

B. Site Information Contact: Nick Charles Firm: Colby Co. Engineering Address U.S. Border Station Address: 357 Glen Sutton Rd.

Address: East Richford, VT 05476 Phone: 207-553-7753

Project#: 42071

II. Scope of Work The HAZMAT assessment was conducted on Oct. 11, 2017 at the request of Colby Engineering. The site of the assessment was the U.S. Border Station in East Richford, VT. The areas inspected included the basement, first and second floors, attic, public restrooms, garage bays, and exterior. The object of the assessment was to inspect the areas for hazardous materials. The materials inspected for included asbestos, lead paint, PCBs, and Mercury.

The building assessment was conducted to establish the following:

● Assess the potential for Asbestos Containing Materials (ACM) in the building.

● Physically inspect building materials, sample and analyze materials.

● Collect environmental samples and analyze via Polarized Light Microscopy to determine if the material has ACM.

● Identify interior areas with elevated levels of lead containing paint (Pb) that exceed 1.00 mg/cm² using an X-Ray Fluorescence (XRF) analyzer.

● Inspect materials that may contain PCBs.

● Inspect materials that may contain Mercury.

● Throughout the process, consult other qualified professionals if necessary or desired.

III. Asbestos Findings:

Asbestos containing material (ACM) is material containing >1% asbestos.

The type of ACM is categorized as Surfacing (Surf.), Miscellaneous (Misc.), and Thermal System Insulation (TSI). The ACM is also determined to be either friable or non-friable.

Additional asbestos sampling was conducted by another firm prior to ARA conducting this inspection (GSA, 2013a). Those materials that tested positive for asbestos in prior inspections and detailed in the site’s Asbestos Management Plan (GSA, 2013a) are included in the summary below.

Two materials that tested positive for asbestos in prior inspections were not observed by ARA on Oct. 11. 2017. Those two items were:

1. Brown pipe insulation under floor in 1st floor southwest bedroom.

ARA inspected under an accessible hatch in the floor, but did observe pipe insulation.

2. Grey pebble flooring in hallway in public restrooms. According to Border Patrol personnel, this restroom area was recently renovated. A grey floor was present, but appeared to be a newer rubber flooring.

The current flooring material was not deemed by ARA to be suspect

ACM and was not consistent with pebble-pattern flooring that is commonly known to contain asbestos.

1. Summary of present ACM as of Oct. 11, 2017:

Material Location Result Amount Condition Grey pipe insulation

Basement Vault, Locker Room, and Storage Room.

At ceiling along exterior wall.

Asbestos Detected.

30% Chrysotile 10% Crocidolite

Estimated 5 linear feet total. 1 pipe observed in each of the rooms.

Poor

Pipe insulation painted green

1st floor former Kitchen at ceiling, some debris under sink in cabinet.

Assumed ACM Estimated 25 linear feet

Fair

Yellow/tan pebble-pattern sheet flooring

1st floor entry foyer Assumed ACM.

Previously tested positive.

115 square feet Poor

Black sink undercoat

1st floor former Kitchen Assumed ACM.

Previously tested positive.

6 square feet Good

Window caulking

Exterior windows around perimeter of window frames

Asbestos Detected.

2% Chrysotile

Estimated 512 linear feet total. Roughly 32 windows

Good

2. Materials sampled and analyzed for ACM on Oct. 11, 2017:

● A total of 47 samples were collected from the following materials by ARA:

Sample Number

Material Location Asbestos Analytical Result

Type Friability

1, 2 Pipe insulation at ceiling along exterior wall

Basement Vault, Storage Room, Locker Room

Asbestos Detected.

30% Chrysotile.

10% Crocidolite.

TSI Friable

3 Corrugated Wall Material

Basement Vault, Storage Room, and Basement Office

None Detected Misc. Non-Friable

6, 7, 8 Gray Plaster walls 1st Floor None Detected Misc. Non-Friable 9, 10 Textured Cement in Wall-box Southwest Bedroom None Detected Misc. Non-Friable

11, 12 Brown Mastic on Tub

Southwest restroom None Detected Misc. Non-Friable

13, 14, 15 White 12” Ceiling Tile

1st Floor Break Room and adjacent office

None Detected Misc. Friable

Sample Number

Material Location Asbestos Analytical Result

Type Friability

16, 18, 20 Gray Speckled Countertop

2nd Floor Kitchen None Detected Misc. Non-Friable

17, 19, 21 Associated Brown mastic under countertop

2nd Floor Kitchen None Detected Misc. Non-Friable

22, 23, 24 Tan Shelf Lining 2nd Floor Kitchen under sink None Detected Misc. Non-Friable 25, 26, 27 Tan Pebble

Flooring 2nd floor restroom closet None Detected Misc. Non-Friable

28, 29, 30 Black floor mastic 2nd floor restroom None Detected Misc. Non-Friable 31, 32, 33 Roof Shingle

Material Exterior roof None Detected Misc. Non-Friable

34, 35, 36 Window Glazing Front exterior windows None Detected Misc. Non-Friable 37, 38 Window Glazing Rear exterior windows None Detected Misc. Non-Friable 39, 40, 41 Brown sheathing board Attic None Detected Misc. Non-Friable

42, 43, 44 Texture Cement Attic floor None Detected Misc. Non-Friable 45, 46, 47 Window Caulking Exterior windows around frame Asbestos Detected.

2 % Chrysotile Misc. Non-Friable

IV. Lead Findings Painted materials were tested using an XRF on the interior and exterior surfaces of the building for levels exceeding 1.00 mg/cm² of lead. The XRF was calibrated onsite before use on Oct. 11, 2017.

A previous lead survey was conducted by a contracted representative of Federal Occupational Health (FOH) on March 29, 2013 (GSA, 2013b). The report from FOH was used as guidance during the lead-paint determination conducted by ARA on Oct. 11, 2017. The goal of this survey was essentially to confirm the results from the survey conducted in 2013. (GSA, 2013b) The XRF readings collected by ARA were consistent with those collected by

FOH.

In addition, the following materials were tested by ARA that were not observed in the FOH report.

Directional key:

• Wall A= Front of building, east

• Wall B= Facing south

• Wall C= Back of building.

• Wall D= Facing north

Interior/Exterior Room Wall Structure Paint Condition

Substrate Paint Color

Lead (mg/cm2)

Result

Exterior Front A Window 1 Fair Wood White 22.1 Positive

Exterior Front A Window 2 Fair Wood White 32.40 Positive

Exterior Front A Window 3 Fair Wood White 13.63 Positive

Exterior Front A Entry Door Good Wood Green 6.70 Positive

Exterior Front A Fascia trim south

Fair Wood White 19.90 Positive

Exterior Front A Fascia trim north

Fair Wood White 20.80 Positive

Interior Basement Stairway Baluster Fair Wood White 12.80 Positive

Interior 1st Floor B Porch Wall Fair Drywall White 0.00 Negative

Interior 1st Floor C Porch Wall Fair Drywall White 0.00 Negative

Interior 1st Floor D Porch Wall Fair Drywall White 0.00 Negative

Interior 1st Floor B Porch Trim Vertical

Fair Wood Green 14.20 Positive

Interior 1st Floor C Porch Trim Horizontal

Fair Wood Green 0.00 Negative

Interior 1st Floor C Porch Baseboard

Fair Wood Green 0.00 Negative

Interior 1st Floor A Porch Window Sash

Fair Wood Green 0.00 Negative

Interior 1st Floor A Porch Door

Fair Wood Green 0.00 Negative

Interior 1st Floor A SW Bedroom Baseboard

Poor Wood Brown >1.0 Positive

Interior 1st Floor B SW Bedroom Baseboard

Poor Wood Brown >1.0 Positive

Interior 1st Floor C SW Bedroom Baseboard

Poor Wood Brown >1.0 Positive

Interior 1st Floor D SW Bedroom Baseboard

Poor Wood Brown >1.0 Positive

Interior 2nd Floor Restroom Locker

Fair Metal Tan 0.45 Negative

Interior 2nd Floor Hallway Ceiling

Poor Plaster White 10.80 Positive

Interior Men's Public Restroom C Window Sash

Poor Wood Tan 2.40 Positive

Interior/Exterior Room Wall Structure Paint Condition

Substrate Paint Color

Lead (mg/cm2)

Result

Interior Men's Public Restroom C Window Frame

Poor Wood Tan 4.40 Positive

Interior North Garage B Wall (took 3 readings)

Poor Drywall White 0.00 Negative

Interior North Garage C Window Frame

Poor Wood Tan 4.20 Positive

Interior North Garage C Window Sash

Poor Wood Tan 3.40 Positive

V. Mercury Findings Items inspected that were suspected to contain mercury included thermostats, light switches, and light bulbs.

Below is an overview of the findings:

• The thermostats on the second floor are assumed to contain Mercury

• The fluorescent light in the second floor Kitchen ceiling fixture is assumed to be Mercury-containing. There was no “low-Mercury” stamp on this fixture.

VI. PCB Findings:

Items inspected that were suspected to contain PCBs include light ballasts and caulking. A representative number of fluorescent light ballasts were checked for PCBs and window caulking samples were collected from the exterior.

Below is an overview of the findings:

• The light ballast in the second floor Kitchen is assumed to contain PCBs. There was no label on the ballast suggesting otherwise.

• The following caulking materials were sampled for PCBs. Four window caulking samples were collected from exterior windows on the front of the building. Windows are labeled going from south to north along the front of the building with Window 1 being on the south side of the building, next to the Garage door. All arachlors results at approximately less than 1 µg/g.

Sample Number

Material Color Location Analytical result

1 Exterior window caulking

Light grey Front of building Window 1, next to roll-up door on South Garage

All arachlors at approximately less than 1 µg/g

2 Exterior window caulking

Light grey Front of building. Window 2.

All arachlors at approximately less than 1 µg/g

3 Exterior window caulking

Light grey Front of building. Window

All arachlors at approximately less than 1 µg/g

4 Exterior window caulking

Light grey Front of building. Window 8, north side near public restrooms

All arachlors at approximately less than 1 µg/g

VIII. References

a) Final, GSA-2013 Asbestos Management Plan, United States Border

Station, East Richford, VT (2013)

b) Final, GSA-2013 Lead Based Paint Survey Report, United States Border

Station, East Richford, VT (2013)

c) ACGIH; American Conference of Governing Industrial Hygienist

d) AIHA; American Industrial Hygiene Association

e) EPA; Environmental Protection Agency

f) AIHA/ACGIH Journal of Occupational & Environmental Hygiene.

g) OSHA; Technical Manual

h) VTDOH; Vermont Dept. of Health

i) NHDHHS; New Hampshire Dept. of Health and Human Services

j) RSA 130-A; NH General Court Title X, Chpt. 130-A

IX. Limits of Liability The IAQ assessment does not cover concealed areas or items not inspected. The extent of the limited area also depends on the building construction and conditions, weather, building usage and other factors. Areas that were inaccessible during the investigation were not inspected. Due to the nature of the investigation and the limited data available, Absolute Resource Associates cannot warrant against undiscovered environmental liabilities.

RSA 130-A:1 XVI-b. ""Lead risk assessor'' means an individual who conducts risk assessments, as defined in He-P 1602.44, develops lead hazard reduction plans, as defined in paragraph XVI-a, and issues final risk assessment reports. Absolute Resource Associates does not engage in “Lead Risk Assessments” , but rather lead determination within a facility. Absolute Resource Associates does not carry New Hampshire Licenses for the Lead Risk Assessor.

Absolute Resource Associates is Board Certified through the American Council for Accredited Certification, Specific to Indoor Environmental Consulting and Investigations.

Any use which a third party makes of this report, or reliance on decisions made based upon it, is the responsibility of such third parties. Absolute Resource Associates accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this report.

The conclusions presented in this report represent the best technical judgment of Absolute Resource Associates based on the data collected from the work. The conclusions are based on the site conditions encountered by Absolute Resource Associates at the time the assessment was performed. The assessment does not cover concealed area or items not inspected. The assessment does not cover information that was concealed, or information that was not revealed during the assessment.

X. Attachments A. Photos B. Test Results C. Chain of Custody

Photos of Asbestos Containing Material

ARA Project# 42071

Site Address: U.S. Border Patrol Station, East Richrd, VT

Date of Inspection: Oct. 11, 2017

Fig.4 Close up of pipe insulation in former Kitchen

Fig.2 Tan pebble-pattern flooring 1st floor Entry Foyer

Fig.5 Pipe insulation debris under sink in 1st floor former Kitchen

Fig.1 Pipe insulation in Basement Vault Room going up through ceiling

Fig.3 Pipe insulation in 1st floor former Kitchen

Fig.7 Exterior window caulk

Fig.6 Sink undercoat in 1st floor former Kitchen

Fig.8 Close up of window caulk

Caulking where window meets wall

Project: GSA Port Refresh East Richfield LPOE 285.040.001

42071Job ID:

PO Number: 285.040.001-1

10/18/17Date Received:

Nick Chales

47A York Street

Colby Co. Engineering

Portland, Maine 03804

Unless otherwise noted in the attached report, the analyses performed met the requirements of Absolute Resource Associates' Quality Assurance Plan. The Standard Operating Procedures are based upon USEPA SW-846, USEPA Methods for Chemical Analysis of Water and Wastewater, Standard Methods for the Examination of Water and Wastewater and other recognized methodologies. The results contained in this report pertain only to the samples as indicated on the chain of custody.

Absolute Resource Associates maintains certification with the agencies listed below.

We appreciate the opportunity to provide laboratory services. If you have any questions regarding the enclosed report, please contact the laboratory and we will be glad to assist you.

Total number of pages:

Date of Approval:

Sincerely, Absolute Resource Associates

Attached please find results for the analysis of the samples received on the date referenced above.

10/26/2017

Sue Sylvester

Principal, General Manager

124 Heritage Avenue Portsmouth NH 03801

Laboratory Report

124 Heritage Avenue | Portsmouth, NH 03801 | 603-436-2001 | absoluteresourceassociates.com

Absolute Resource Associates Certifications

New Hampshire Maine NH903

1732 Massachusetts M-NH902

GSA Port Refresh East Richfield LPOE 285.040.001Project ID:

#1 -Window

Bulk Material

Sample ID:

Matrix:

Parameter Result Analysis

Date Time

Sample#:

Reporting Limit Reference

10/11/17 0:00Sampled:

42071-001

Analyst Instr Dil'n

FactorUnits Prep Date Batch

Results expressed on a weight as received basis.

PCB-1016 10/20/17< 0.2 0.2 SW3540C8082A1 22:06ug/g AAG 10/19/17 10142

PCB-1221 10/20/17< 0.2 0.2 SW3540C8082A1 22:06ug/g AAG 10/19/17 10142

PCB-1232 10/20/17< 0.2 0.2 SW3540C8082A1 22:06ug/g AAG 10/19/17 10142

PCB-1242 10/20/17< 0.2 0.2 SW3540C8082A1 22:06ug/g AAG 10/19/17 10142

PCB-1248 10/20/17< 0.2 0.2 SW3540C8082A1 22:06ug/g AAG 10/19/17 10142

PCB-1254 10/20/17< 0.2 0.2 SW3540C8082A1 22:06ug/g AAG 10/19/17 10142

PCB-1260 10/20/17< 0.2 0.2 SW3540C8082A1 22:06ug/g AAG 10/19/17 10142 tetrachloro-m-xylene SUR 10/20/1771 SW3540C8082A1 22:06% AAG 10/19/1730-150

Surrogate Recovery Limits

10142 decachlorobiphenyl SUR 10/20/1767 SW3540C8082A1 22:06% AAG 10/19/1730-150 10142

SPACE

#2 -Window

Bulk Material

Sample ID:

Matrix:

Parameter Result Analysis

Date Time

Sample#:

Reporting Limit Reference

10/11/17 0:00Sampled:

42071-002

Analyst Instr Dil'n

FactorUnits Prep Date Batch

Results expressed on a weight as received basis.

PCB-1016 10/20/17< 0.8 0.8 SW3540C8082A1 23:23ug/g AAG 10/19/17 10142

PCB-1221 10/20/17< 0.8 0.8 SW3540C8082A1 23:23ug/g AAG 10/19/17 10142

PCB-1232 10/20/17< 0.8 0.8 SW3540C8082A1 23:23ug/g AAG 10/19/17 10142

PCB-1242 10/20/17< 0.8 0.8 SW3540C8082A1 23:23ug/g AAG 10/19/17 10142

PCB-1248 10/20/17< 0.8 0.8 SW3540C8082A1 23:23ug/g AAG 10/19/17 10142

PCB-1254 10/20/17< 0.8 0.8 SW3540C8082A1 23:23ug/g AAG 10/19/17 10142

PCB-1260 10/20/17< 0.8 0.8 SW3540C8082A1 23:23ug/g AAG 10/19/17 10142 tetrachloro-m-xylene SUR 10/20/1783 SW3540C8082A1 23:23% AAG 10/19/1730-150

Surrogate Recovery Limits

10142 decachlorobiphenyl SUR 10/20/1760 SW3540C8082A1 23:23% AAG 10/19/1730-150 10142

Note: Elevated reporting limit due to matrix interference.

SPACE

GSA Port Refresh East Richfield LPOE 285.040.001Project ID:

#3 -Window

Bulk Material

Sample ID:

Matrix:

Parameter Result Analysis

Date Time

Sample#:

Reporting Limit Reference

10/11/17 0:00Sampled:

42071-003

Analyst Instr Dil'n

FactorUnits Prep Date Batch

Results expressed on a weight as received basis.

PCB-1016 10/20/17< 0.7 0.7 SW3540C8082A1 22:21ug/g AAG 10/19/17 10142

PCB-1221 10/20/17< 0.7 0.7 SW3540C8082A1 22:21ug/g AAG 10/19/17 10142

PCB-1232 10/20/17< 0.7 0.7 SW3540C8082A1 22:21ug/g AAG 10/19/17 10142

PCB-1242 10/20/17< 0.7 0.7 SW3540C8082A1 22:21ug/g AAG 10/19/17 10142

PCB-1248 10/20/17< 0.7 0.7 SW3540C8082A1 22:21ug/g AAG 10/19/17 10142

PCB-1254 10/20/17< 0.7 0.7 SW3540C8082A1 22:21ug/g AAG 10/19/17 10142

PCB-1260 10/20/17< 0.7 0.7 SW3540C8082A1 22:21ug/g AAG 10/19/17 10142 tetrachloro-m-xylene SUR 10/20/1777 SW3540C8082A1 22:21% AAG 10/19/1730-150

Surrogate Recovery Limits

10142 decachlorobiphenyl SUR 10/20/1767 SW3540C8082A1 22:21% AAG 10/19/1730-150 10142

Note: Elevated reporting limit due to matrix interference.

SPACE

#4 -Window

Bulk Material

Sample ID:

Matrix:

Parameter Result Analysis

Date Time

Sample#:

Reporting Limit Reference

10/11/17 0:00Sampled:

42071-004

Analyst Instr Dil'n

FactorUnits Prep Date Batch

Results expressed on a weight as received basis.

PCB-1016 10/20/17< 0.1 0.1 SW3540C8082A1 22:37ug/g AAG 10/19/17 10142

PCB-1221 10/20/17< 0.1 0.1 SW3540C8082A1 22:37ug/g AAG 10/19/17 10142

PCB-1232 10/20/17< 0.1 0.1 SW3540C8082A1 22:37ug/g AAG 10/19/17 10142

PCB-1242 10/20/17< 0.1 0.1 SW3540C8082A1 22:37ug/g AAG 10/19/17 10142

PCB-1248 10/20/17< 0.1 0.1 SW3540C8082A1 22:37ug/g AAG 10/19/17 10142

PCB-1254 10/20/17< 0.1 0.1 SW3540C8082A1 22:37ug/g AAG 10/19/17 10142

PCB-1260 10/20/17< 0.1 0.1 SW3540C8082A1 22:37ug/g AAG 10/19/17 10142 tetrachloro-m-xylene SUR 10/20/1762 SW3540C8082A1 22:37% AAG 10/19/1730-150

Surrogate Recovery Limits

10142 decachlorobiphenyl SUR 10/20/1752 SW3540C8082A1 22:37% AAG 10/19/1730-150 10142

SPACE

PAGE OF

Absolute

,\
7k.124 Heritage Avenue #16

i Portsmouth, NH 03801

Resource k - 603-436-2001

CHAIN

AND

-OF

ANALYSIS

-CUSTODY

REQUEST

RECORD

ANALYSIS

910'7

REQUEST

I associates-L --2) absoluteresourceassociates.com

Company Name:

MIA-

Project Name: 6.c 1 by 12.\ c... h c--0 r 4 Project #: /-0_01-71

VO

C

0 U V

O C

NH

DE

S U

VO

C

M

AD

EP

1-

VO

C

:I

VO

C

BT

E X

M tB

E, o nl y

VO

C 8

1V

T

VP

H

M

AD

EP

U

G

RO

1, 4-

Di ox an e

O

VO

C

4.

U V

O C

4.

NH

L ist Ga se s-

Li s t:

TP

H

U D

RO

E

PH

M

ADE

P

U

TP

H Fi ng er pr int

P A

H U

7O

A B

N

J E

D B k£T W

- 12 P

C B

P es tic id es

8 Pe st/

PC

B

O &G

M in er al

O& G

SM

F

D p H

B O

D Co nd uc tiv ity

T u r b i di ty

A pp ar en t C olo r

TS

S U

TD

S

I S

U T

V S

Z ) A lka lin ity

A ci di ty

RC

R

A M et al s a

Pr io rit y Po llu ta nt M et al s U

T

AL

M et al s

H ar dn es s

D To ta l M et al s-lis t:

D i ss ol ve d

M et al s-lis t:

Am m on ia

C

O D

TK

N D

IN

T O

N

TO

C

F- F6 T

- Ph os ph or us C l P he no ls

B ac te ria P

M D B ac te ria M

PN

— 3 C ya ni de

Su lfi de

N itr a te

N itr ite

O rth o P

Ni tra te U

N itr ite

Ch lo rid e

S ul fa te

U B ro m id e

F lu or id e

Co rro siv ity

Re ac tiv e C N

Re ac tiv e S-

U lg ni tib ili ty

/F P

'0

TC

L P M eta ls

T

CL

P

VO

C

TC

L P

SV

OC

U

T

CL

P Pe sti ci de

Su bc on tra ct

G ra in S ize

H e rb ici de s U

Fo rm al de hy de

U

PF

C

Gr ab

(G ) o r Co m po sit e

(C

Company Address:

Project Location: NH MA ME 6)

Report To: ,--- Accreditation Required? N/Y:

s...c‘.Soirk /1/4"1 elk KA012E Protocol RCRA SDWA NPDES

Phone #:

MCPNHDESDOD
ReportingQAPPGW-1S-1

Invoice to: Limits: EPA DW Other

0 Email: Quote #

0 Hard Copy Invoice Required U PO # U NH Reimbursement Pricing

Lab Sample

ID

(Lab Use Only)

Field

ID

co cr Lu z z

Preservation z

Method o ici 2

I

I

TI

M E to

L 20171:01 * I - LA.) WOO lA) '11/ l# D• - lni ins? o LA., . I \ I r

703 A- -S - LAJ 1 tA .90_yes.,) k

•"--01-k k LI - (A/1090 1 /4A.)

TAT REQUESTED

Priority (24 hr)*u
Expedited (48 hr)*LI
StandardLI

See absoluteresourceassociates.com for sample acceptance policy and current accreditation lists.

SPECIAL INSTRUCTIONSScaA le 5 “e, kke..... --Vo C OA 4-A A Ck S 6e.S40 5. _(:). c+ (&c id f't (9 fejt; 05,

!REPORTING INSTRUCTIONS....I PDF (e-mail address) RECEIVED ON ICE LIVESLINO Business Days},
*Date Needed1aid:1 iLi'i' HARD COPY REQUIRED0 EDDTEMPERATUREI°C

CUSTODY

RECORD

OSD-01 Revision 12/22/16

Relinpuisljed by Sa ler:

'-x_--,_).--- /6 - Date

to(t-n
1Time

i /it 36

Received by: Date

I

1 Time elinquished by: Date 1 Time

Received by:

i Date 1 Time

I Relinquished by: Date Time Received by Labor i - Date vlolt7111q3O . Time

Batch: 26733

165 New Boston St., Ste 227 Woburn, MA 01801

781-932-9600 Web: www.asbestosidentificationlab.com

Email: mikemanning@asbestosidentificationlab.com

Asbestos Identification Laboratory

Dear Jason Muchmore, Thank you Jason Muchmore for your business.

Michael Manning Owner/Director

Asbestos Identification Laboratory has completed the analysis of the samples from your office for the above referenced project .

The information and analysis contained in this report have been generated using the EPA /600/R-93/116 Method for the Determination of Asbestos in Bulk Building Materials. Materials or products that contain more than 1% of any kind or combination of asbestos are considered an asbestos containing building material as determined by the EPA. This Polarized Light Microscope (PLM) technique may be performed either by visual estimation or point counting. Point counting provides a determination of the area percentage of asbestos in a sample. If the asbestos is estimated to be less than 10% by visual estimation of friable material, the determination may be repeated using the point counting technique. The results of the point counting supersede visual PLM results. Results in this report only relate to the items tested. This report may not be used by the customer to claim product endorsement by NVLAP or any other U.S. Government Agency.

Laboratory results represent the analysis of samples as submitted by the customer. Information regarding sample location, description, area, volume, etc., was provided by the customer. Asbestos Identification Laboratory is not responsible for sample collection activities or analytical method limitations. Unless notified in writing to return samples, Asbestos Identification Laboratory discards customer samples after 30 days. Samples containing subsamples or layers will be analyzed separately when applicable. Reports are kept at Asbestos Identification Laboratory for three years. This report shall not be reproduced, except in full, without the written consent of Asbestos Identification Laboratory.

Work Received:

2017-10-17

2017-10-13

Colby Richford

Jason Muchmore Absolute Resource Associates 124 Heritage Ave Apt 10 Portsmouth, NH 03801 2017-10-11

42071Project Number:

Project Name:

October 17, 2017

Date Sampled:

Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116

Work Analyzed:

• NVLAP Lab Code: 200919-0

• Massachusetts Certification License: AA000208

• State of Connecticut, Department of Public Health Approved Environmental Laboratory Registration Number: PH-0142

• State of Maine, Department of Environmental Protection Asbestos Analytical Laboratory License Number: LB-0078(Bulk) LA-0087(Air)

• State of Rhode Island and Providence Plantations. Department of Health Certification: AAL-121

• State of Vermont, Department of Health Environmental Health License AL934461

Work Received:

2017-10-17

2017-10-13

Colby Richford

Jason Muchmore Absolute Resource Associates 124 Heritage Ave Apt 10 Portsmouth, NH 03801 2017-10-11

42071Project Number:

Project Name:

October 17, 2017

Date Sampled:

Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116

Work Analyzed:

Asbestos % Material Color Non-Asbestos % Location FieldID

LabID Detected Chrysotile 30 Crocidolite 10 white Non-Fibrous 60

300847

1 Basement Storage RoomPipe Wrap above Ceiling

Detected Chrysotile 30 Crocidolite 10 white Non-Fibrous 60

300848

2 Vault 1Pipe Wrap above Ceiling brown Non-Fibrous 100

300849

3 Vault 1Corrugated Wall Material None Detected brown Non-Fibrous 100

300850

4 Basement Storage RoomCorrugated Wall Material None Detected brown Non-Fibrous 100

300851

5 Basement OfficeCorrugated Wall Material None Detected gray Hair 3 Non-Fibrous 97

300852

6 1st FloorGray Plaster None Detected white Non-Fibrous 100

300853

7 1st FloorGray Plaster None Detected gray Non-Fibrous 100

300854

8 1st FloorGray Plaster None Detected gray Non-Fibrous 100

300855

9 Bedroom 3Textured Cement in Wall- Box

None Detected gray Non-Fibrous 100

300856

10 Bedroom 3Textured Cement in Wall- Box

None Detected brown Non-Fibrous 100

300857

11 Restroom # 6Brown Mastic on Tub None Detected brown Non-Fibrous 100

300858

12 Restroom # 6Brown Mastic on Tub None Detected gray Fiberglass 60 Cellulose 30 Non-Fibrous 10300859

13 1st Floor OfficesWhite 12" Ceiling Tile None Detected

Page 1 of 3Tuesday 17 October

Asbestos % Material Color Non-Asbestos % Location FieldID

LabID gray Fiberglass 60

Cellulose 30 Non-Fibrous 10300860

14 1st Floor OfficesWhite 12" Ceiling Tile None Detected gray Fiberglass 60 Cellulose 30 Non-Fibrous 10300861

15 1st Floor OfficesWhite 12" Ceiling Tile None Detected multi Cellulose 55 Non-Fibrous 45

300862

16 2nd Floor KitchenGray Speckled Countertop None Detected brown Non-Fibrous 100

300863

17 2nd Floor KitchenAssociated Brown Mastic None Detected multi Cellulose 50 Non-Fibrous 50

300864

18 2nd Floor KitchenGray Speckled Countertop None Detected brown Non-Fibrous 100

300865

19 2nd Floor KitchenAssociated Brown Mastic None Detected multi Cellulose 55 Non-Fibrous 45

300866

20 2nd Floor KitchenGray Speckled Countertop None Detected brown Non-Fibrous 100

300867

21 2nd Floor KitchenAssociated Brown Mastic None Detected multi Cellulose 60 Non-Fibrous 40

300868

22 2nd Floor KitchenTan Shelf Lining under Sink

None Detected multi Cellulose 50 Non-Fibrous 50

300869

23 2nd Floor KitchenTan Shelf Lining under Sink

None Detected multi Cellulose 60 Non-Fibrous 40

300870

24 2nd Floor KitchenTan Shelf Lining under Sink

None Detected multi Cellulose 50 Non-Fibrous 50

300871

25 Restroom 1, 2nd Floor Closet

Tan Pebble Flooring None Detected multi Cellulose 50 Non-Fibrous 50

300872

26 Restroom 1, 2nd Floor Closet

Tan Pebble Flooring None Detected multi Cellulose 50 Non-Fibrous 50

300873

27 Restroom 1, 2nd Floor Closet

Tan Pebble Flooring None Detected multi Non-Fibrous 100

300874

28 Restroom 1Black Mastic None Detected multi Non-Fibrous 100

300875

29 Restroom 1, 2nd FloorBlack Mastic None Detected multi Non-Fibrous 100

300876

30 Restroom 1, 2nd FloorBlack Mastic None Detected black Fiberglass 30 Non-Fibrous 70

300877

31 RoofRoof Shingle Material None Detected

Page 2 of 3Tuesday 17 October

Asbestos % Material Color Non-Asbestos % Location FieldID

LabID black Fiberglass 25

Non-Fibrous 75 300878

32 RoofRoof Shingle Material None Detected black Fiberglass 25 Non-Fibrous 75

300879

33 RoofRoof Shingle Material None Detected gray Non-Fibrous 100

300880

34 Front ExteriorWindow Glazing None Detected gray Non-Fibrous 100

300881

35 Front ExteriorWindow Glazing None Detected gray Non-Fibrous 100

300882

36 Front ExteriorWindow Glazing None Detected gray Non-Fibrous 100

300883

37 Rear ExteriorWindow Glazing None Detected gray Non-Fibrous 100

300884

38 Rear ExteriorWindow Glazing None Detected brown Cellulose 98 Non-Fibrous 2

300885

39 AtticBrown Sheathing Board None Detected brown Cellulose 98 Non-Fibrous 2

300886

40 AtticBrown Sheathing Board None Detected brown Cellulose 98 Non-Fibrous 2

300887

41 AtticBrown Sheathing Board None Detected gray Non-Fibrous 100

300888

42 AtticTexture Cement None Detected gray Non-Fibrous 100

300889

43 AtticTexture Cement None Detected gray Non-Fibrous 100

300890

44 AtticTexture Cement None Detected white Non-Fibrous 100

300891

45 1st Floor Exterior FrontWhite Exterior Window Caulk

None Detected

Detected Chrysotile 2 white Non-Fibrous 98

300892

46 1st Floor Exterior FrontWhite Exterior Window Caulk

Detected Chrysotile 2 white Non-Fibrous 98

300893

47 1st Floor Exterior FrontWhite Exterior Window Caulk

Analyzed by: 26733Batch:

Page 3 of 3Tuesday 17 October End of Report

,&'*-./01$2.3/+$4!545 64"78897""89 :&-;<:&+/=3/++'3/=7:&>

Clay Point Associates, Inc.

Lead-Based Paint Inspection

December 5, 2017

64"78897""89 :&-;<:&+/=3/++'3/=7:&>

Clay Point Associates, Inc.

64"78897""89 :&-;<:&+/=3/++'3/=7:&>

CLOSET

212A

HALL

Clay Point Associates, Inc.

Work Plan Asbestos Containing Materials & Lead-Based Paint

U.S. Land Port of Entry (LPOE) 357 Glen Sutton Road

East Richford, Vermont

Prepared for:

Colby Co. Engineering

47A York Street, Portland, Maine 04101

Prepared by:

Clay Point Associates Inc.

Todd Hobson, VT Asbestos Project Designer License #PD262143 25 Bishop Avenue

Williston, Vermont 05495 CPAI Project No.: 1362619

And

Absolute Resource Associates 124 Heritage Ave, Portsmouth, New Hampshire 03801

015460.1 - Attachment 1 GSA East Richford VT HazMat Survey.pdf
Insert from: "42071 FinalRpt 102617.pdf"
Coverletter w Signature
Results - All
zCoC42071
Page 1

File details come from the government source that posted it. Updated .