- Historical Preservation Plan for the Beecher, Canaan, East Richford, and Richford VT Land Ports of Entry
- Solicitation number
- 47PB0019Q0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2018-11-19_Att1-BPP_Data_Elements-VT_4_LPOEs.docx | DOCX document | |
| 2018-11-19_Att3_-_Guidelines_for_Zoning-VT_4_LPOEs.doc | DOC document | |
| 2018-11-19_Att2_-_Dig_Photo_Doc-VT_4_LPOEs.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTE
ACQUISITION STRATEGY: Total Small Business Set Aside
PROJECT: Historical Preservation Plan for the Vermont Land Ports of Entry (LPOEs)
DATE ISSUED: 4/26/2019
QUOTE DUE DATE: 4:30pm ET Monday May 17, 2019
QUESTIONS: Questions are due via email by 4:30pm ET on Friday, May 10, 2019
NAICS CODE: 541620
SUBMIT QUOTE VIA EMAIL TO: Erin Clark and Michele Valenza
Erin Clark Contract Specialist General Services Administration Email: Erin.Clark@gsa.gov
Michele Valenza Contract Specialist General Services Administration Email: Michele.Valenza@gsa.gov
This is a combined synopsis solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. The solicitation number is 47PB0019Q0004 and the solicitation is issued as a request for quotation (RFQ). A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-87.This requirement is being issued as a total small business set-aside. The associated NAICS code is 541620 – Environmental Consulting Service Contractors and small business size standard is $15 million.The Government intends to award a firm-fixed price, one-time service order for a Contractor to provide a historical preservation plan in accordance to the statement of work. Please see the attached statement of work for full requirement details and pricing submission.
Table of Contents
A. Identification of Agency
B. Statement of Work
C. Administration
C.1 Contracting Officer (CO)
C.2 Contract Specialist (CS)
C.3 Project Coordinator (PC)
C.4 Period of Performance
C.5 Security Requirements and Personal Identity Verification Procedures (Non-Classified
Contract)
C.6 Kickoff Meeting
C.7 Proprietary Information
D. Request for Quote
D.1 Instructions for Quotes
D.2 Prospective Contractors’ Questions
E. Evaluation Criteria
E.1 Evaluation Procedures
E.2 Past Performance
E.3 Technical
F. Summary of Deadlines
G. Contract Clauses
H. Solicitation Provisions
A. Identification of Agency
The General Services Administration (GSA), Public Buildings Service (PBS), Region 1 (New
England) is requesting a quote for a Historical Building Preservation Plan (HBPP) for three Land
Ports of Entry in Vermont. This requirement is a small business set aside. All services are to be provided in accordance to the statement of work. The Contractor will be required to submit a firm-fixed-price (FFP) quote due on May 17, 2019 at 4:30pm ET.
B. Statement of Work
PROJECT IDENTIFICATION
Building Names: VT – Beecher Falls LPOE Building Number: VT0002 Building Location: State Route 102
Beecher Falls, VT 05902
Approximate Areas: 8,970 gsf LPOE
Building Names: VT – Canaan LPOE Building Number: VT0007 Building Location: State Route 102
Canaan, VT 05903
Approximate Areas: 5,856 gsf LPOE
Building Names: VT – East Richford LPOE Building Number: VT0008 Building Location: 357 Glen Sutton Road
Richford, VT 05476
Approximate Areas: 8,714 gsf LPOE
Building Names: VT – Richford LPOE Building Number: VT0014 Building Location: 705 Province Street
Richford, VT 05476
Approximate Areas: 7,895 gsf LPOE
I. BACKGROUND
A. Currently GSA Region 1 is considering possible modifications to four Land Ports of Entry (LPOEs) in Vermont, all of which are listed in the National Register of Historic Places. Prior to implementing any modifications to any of the buildings, GSA requires a Building Preservation Plan (BPP) to understand the scope and priority of historically significant areas and features in order to preserve historic fabric.
B. The BPP program was developed to ensure that the material and cultural values of the U.S. General Services Administration’s historic buildings are correctly documented, understood and treated. The purpose of the BPP is to develop exterior and interior zones to guide preservation treatment levels, identify and evaluate selected architectural elements within each zone, and to provide appropriate treatment and repair guidelines.
C. GSA, through the Center for Historic Buildings in the Office of the Chief Architect, has recently completed the design and installation of a web-based electronic format for the preparation of BPPs. The new web-based electronic format dispenses with the original BPP requirement for quantifying building materials and elements, (e.g., area of a particular material, or number of a particular element), and focuses instead on the cultural and material significance of a historic building, the types and extent of material damage and deterioration, and the recommended treatments for repair and long-term maintenance. It retains the practice of establishing a hierarchy of significance (“Preservation Zones”) for a building’s site, exterior, facades and features and interior spaces, all of which are critical in preparing overall preservation strategies for major rehabilitations of historic buildings as well as short-term requirements for immediate maintenance to halt and reverse damage to significant building materials and features.
II. PROJECT OBJECTIVES
A. This project covers all services necessary for the preparation of a BPP, utilizing the new web-based electronic format.
B. The principal goal of the plan is to develop interior and exterior zones to guide preservation treatment levels. Additional goals include the documentation of building history, original construction, and current material conditions.
C. The BPP shall include all areas shown in the attached plans for each subject building, including, but not limited to:
1. Site: Entire site for each structure, including exterior paving, pedestrian and vehicle entries, areaways, retaining walls, and any plantings
2. Elevations: All building elevations, including the exterior facades of each individual structure, as well as canopies, vestibules, exterior stairs, enclosed garages and enclosed or open porches
3. Basement: All spaces and circulation routes and stairs, including basement level entries and areaways; storage and mechanical spaces
4. First Floor: Pedestrian entries, circulation routes and stairs; work/open office and office areas; computer rooms, kitchens, break/locker and toilet rooms; janitorial spaces, closets, support, storage, garage and mechanical spaces
5. Second Floor: Circulation routes and stairs; work/open office and office areas; break/locker and toilet rooms; support, storage and mechanical spaces as applicable.
D. All BPP submissions shall be provided in accordance to the Project Schedule. Once the final submission is approved by GSA it shall be uploaded to the BPP website for record.
1. The Historic Preservation Professional (HPP) will be provided with a user name and password to access the internet-based BPP site. Access will include editing privileges for the various fields for which data entry is required. Access will also include links to other sites, such as the GSA Technical Specifications, for referencing to recommended treatments for repair and long-term maintenance.
Access to linked sites will not include editing privileges of information on those linked sites.
III. FORMAT DESCRIPTION
A. The BPP shall be comprised of three parts with each providing a sound basis for the next.
1. History and Documentation: Devoted to the identification of each historic building, including general building information, real estate profile, history, including design and construction, and a description of the building as originally built.
This portion of the work may reference two Vermont Border Stations Historic
Building Preservation Plans (HBPPs) prepared by Ann Beha Associates:
a. February 1993 Vermont Border Stations HBPP which includes:
VT - Beecher Falls LPOE and the VT - Richford LPOE
b. February 1995 Vermont Border Stations HBPP which includes
VT – Canaan LPOE and VT - East Richford LPOE
2. Building Analysis: Focuses on establishing architectural significance and level of integrity retained. The information collected includes survey of building exterior, including courtyards, and interior spaces and elements. Types of materials present, and their condition, are noted. In addition, building systems, including mechanical, electrical, and life safety are noted, as is the level of compliance with applicable codes.
3. Recommended Treatment: Based upon the information collected in the previous two parts, which establishes the significance and current condition of the building, this part formulates the preservation zoning of the building, and provides recommended treatments for the repair, restoration and maintenance of the building’s exterior and interior spaces and elements.
B. In addition to the three areas of information described above, the BPP shall feature an image library consisting of historical photographs, current condition photographs, and digital images of existing plans for original construction as well as subsequent alteration projects.
C. Graphic floor plans, and elevations shall be overlaid with standard Microsoft colors denoting the Preservation Zones according to the following “stoplight” color scheme:
Zone 1 Restoration:
Zone 2 Rehabilitation:
Zone 3 Renovation:
D. Attachment 1 outlines the areas of information required by the BPP.
E. The Historic Preservation Professional (HPP) will be provided with a copy of the BPP User’s Guide, which describes the requirements for each area of information required. Specific security clearances will be required for access to the GSA BPP.
Detailed instructions on completing the necessary forms and steps to obtain security clearances will be forwarded from GSA upon execution of the contract.
IV. SCOPE OF WORK
A. Overview
The Historic Preservation Professional (HPP) shall perform all services described herein and all services incident thereto as required under the HPP Contract, in accordance with the Project Objectives, Description of Work, Governing Studies and Requirements, and other considerations set out herein, including the following attachments:
1. Attachment 1: BPP Requirements Chart
2. Attachment 2: Digital Photographic Documentation
3. Attachment 3: Guidelines for Zoning Historic Buildings
B. Requirement Details: This project includes providing information for all fields required by the web-based BPP format, as indicated in Attachment 1.
In summary, these include:
1. History and Documentation:
a. Gather information about the four LPOEs as indicated in Attachment 1, including a list of available documents. Archival research shall include but not be limited to documents located in the GSA New England Region 1, including the two Vermont Border Stations Historic Building Preservation Plans
(HBPPs) prepared by Ann Beha Associates in February 1993 and February 1995.
b. Prepare a general description of each building and an assessment of architectural and cultural significance.
c. Provide bibliography of all sources consulted in the preparation of History and Documentation.
2. Building Analysis:
a. Conduct site visits to each building in order to produce photographic documentation, establish preservation zoning, and prepare descriptions of significant original materials and conditions including missing or altered elements for each of the four LPOEs.
b. Photograph each building’s interior and exterior spaces to show materials and features, as listed in, but not limited to, the spaces listed, and as directed in Attachment 2.
c. Review historic construction documents to confirm the existence and configuration of original significant public spaces, for purposes of prescribing restoration approaches.
d. Perform evaluations of all material conditions within the four LPOEs, including identifying probable causes of deterioration.
3. Recommended Treatments:
a. Establish a prioritization of “Preservation Zones”, in accordance with the guidelines in Attachment 3, identifying the levels of significance for the building’s interior and exterior spaces, in order to assign appropriate levels of treatment for the building’s rehabilitation, modernization and long-term maintenance. These preservation zones shall be presented in the graphic format described in Section 4 a.v., above, and shall also address the building site, including but not limited to, paving, site retaining walls and, plantings.
b. Based upon findings of building analysis and evaluation of building material conditions, and established “preservation zoning”, provide recommendations for the most appropriate treatments, including restoration and repair methods and long-term maintenance.
c. Reference GSA technical specification sections as applicable.
d. Review all applicable GSA technical specification sections, and establish links to appropriate sections.
e. For procedures relevant to the materials of this particular building, provide recommendations for revising technical specifications where information contained therein may no longer be recommendable, or where current practices may supersede those prescribed.
f. Identify sources for all recommended treatments not currently contained in GSA technical specifications.
4. Photographs:
a. The photographs shall include both historic and non-historic locations.
b. Photographs shall be provided in digital format only, meeting current standards for professional architectural photography, at a minimum size and resolution of 5 x 7 inches, 300 DPI. Submitted photographs shall document spaces and conditions in views that legibly convey the overall appearance of the space as well as significant features and conditions, minimizing proportional distortion. All images shall be uploaded to the database and checked to verify image quality.
c. As part of the 100% FINAL Submission, the contractor shall submit
(2) bound copies and (2) CDs of the Final BPP Report, including all photographs.
C. Criteria Governing Survey
1. Services performed under this Contract shall conform to all applicable requirements and criteria indicated in the following handbooks and publications, and the latest issues and changes thereto:
a. Government Studies, Surveys and Reports
i. Any previously completed Historic Structure Reports and/or Building Preservation Plans, if available, and including the two Vermont Border
Stations Historic Building Preservation Plans (HBPPs) prepared by Ann Beha Associates in February 1993 and February 1995.
ii. Applicable studies undertaken on the building (consult GSA Region 1 Regional Historic Preservation Officer, Building Manager and GSA Region 1 Asset Managers)
iii. GSA Technical Guides and Notes, available at www.gsa.gov/historicpreservation>technical resources, National Park Service Preservation Briefs and Tech Notes.
iv. Building Engineering Report (BER), if any have been done
b. Government Requirements
i. ADM 1020.1 and PBS 1022.2: GSA Procedures for Historic Properties.
ii. The National Historic Preservation Act of 1966, as amended and Executive Order 11593.
iii. The Secretary of the Interior’s Standards and Illustrated Guidelines for Rehabilitating Historic Buildings, Revised 1992 (36 CFR 67).
iv. GSA 2018 P-100: Facilities Standards for the Public Buildings Service.
V. PROJECT SCHEDULE:
Project Milestones:
A. Planning
Kick-off Meeting
Provide proposed Work Plan 14 Calendar Days after with target dates for deliverables Kick – off Meeting GSA Review: 14 Calendar Days
B. 50% Submission: 30 Calendar Days after receipt of GSA review comments on Work Plan, above GSA Review: 21 Calendar Days
C. 75% Submission: 30 Calendar Days after receipt
50% Draft Submission, above
D. 100% Draft Submission: 30 Calendar Days after receipt
75% Draft Submission, above
E. 100% FINAL Submission
Provide two (2) bound copies 30 Calendar Days after receipt of BPP report, and (2) CDs, of GSA review comments on including all photographs 100% submission, above
GSA FINAL Review: 21 Calendar Days
F. Final Submission Upload:
Upload data and provide two 14 Calendar Days after receipt
(2) bound copies and (2) CDs of GSA review comments on, of the Final BPP Report, 100% FINAL Submission, including all photographs. Above
In the event that a submission from the contractor is found to have major errors/not worthy of review, the corrections will be revised and resubmitted to the GSA within 5 days of the initial notification.
VI. SECURITY CLEARANCES:
Security clearances will be required for any team members performing on-site research or photography. An allowance of approximately four weeks for security clearances should be included at the beginning of the proposed Work Plan.
Detailed instructions on completing the necessary forms and steps to obtain security clearances will be forward
C. Administration
C.1 Contracting Officer (CO) The contracting officer is the final authority in all contractual matters relating to this award. The CO has overall responsibility for administration of the contract and is authorized to take action on behalf of the Government relating to the contract. Should there be discussion of potential changes to the SOW or the Scope of work the Contractor shall inform the CO and CS. Changes to the SOW or scope of work cannot occur without a contract modification signed by the Contracting Officer.
C.2 Contract Specialist (CS) The contract specialist is not authorized to modify the terms and conditions of a contract however the CS will complete all administrative tasks related to the contract, including preparing correspondence between the vendor and CO and coordinating the project with the PC. Should there be discussion of potential changes to the SOW or the Scope of work the Contractor shall inform the CS and CO. Changes to the SOW or scope of work cannot occur without a contract modification signed by the Contracting Officer.
C.3 Project Coordinator (PC)
The PC is not a Contracting Officer and is not authorized to modify the terms and conditions of the contract. The PC will work with the contractor on all day to day requirements to assist with the progress of the contract. The contractor shall update the PC on the project progress and should include the PC on all correspondence with GSA personnel. All submissions will be reviewed and approved by the PC.
C.4 Period of Performance
This award will be effective from the date of establishment for a 40 week period. The Government may cancel the award at any time by notifying the Contractor Team Lead at least thirty (30) days in advance.
C.5 Security Requirements and Personal Identity Verification Procedures (Non-
Classified Contract)
The Contractor shall comply with directions provided by the Contracting Officer (CO) regarding all security requirements. All Contractor employees shall receive a favorable suitability determination, security clearance, and/or meet all security requirements, prior to reporting to work or performing work under this contract in accordance with Contractors Federal Supply Schedule 00CORP and HSPD(12)Security Procedures (attached).
C.6 Kickoff Meeting
At the Government’s request, the contractor shall participate in the kickoff meeting for when the contract is established. This may require physical presence by the contractor at each kickoff meeting at no additional cost to the Government. All members of the contractor’s project team shall attend the kick-off meeting and the site-visit.
C.7 Proprietary Information
In the event that performance of any work under the contract causes the Contractor to gain access to proprietary and/or confidential information of other contractors, the Contractor is required to immediately execute Non-Disclosure Agreements (NDA) with those contractors, in order to protect the information from unauthorized use. The Contractor is required to refrain from using any such information for any purposes other than for which it was furnished. The Contractor must immediately provide the Contracting Officer with a copy of any such agreements with original signatures affixed.
The GSA points of contact responsible for overall administration of this contract are:
Contract Specialist (CS):
Erin Clark
General Services Administration Public Buildings Service Thomas P. O’Neill Jr. Federal Building 10 Causeway Street Boston, MA 02222 Email: Erin.Clark@GSA.gov
Contracting Officer (CO):
Michele Valenza General Services Administration Public Buildings Service Thomas P. O’Neill Jr. Federal Building 10 Causeway Street Boston, MA 02222 Email: Michele.Valenza@GSA.gov
D. Request for Quote
This acquisition will follow the regulations outlined in FAR 13.104.
D.1 Instructions for Quotes
The due date for Receipt of Quote (RFQ) is 4:30pm ET May 17, 2019. Quotes shall be submitted in accordance with this solicitation to Erin.Clark@GSA.gov and Michele.Valenza@GSA.gov. Emailed quotes in the form Word or PDF document are required no other format will be accepted. The prospective offeror assumes full responsibility for ensuring that its’ quote is received on or before the specified date and time.
The final offer shall include all line items and associated quantities as stated in the statement of work. The quote shall be identified with a description of what required documents will be completed at the 50% submission, 75% submission and the final submission. Please note travel fees must be included in the fixed price quote for the contract as the government will not pay for travel as a separate line item.
D.2 Prospective Contractors’ Questions
Any questions regarding this procurement shall be sent electronically to Erin.Clark@GSA.gov with the subject line “HPP for VT LPOE Quote” no later than 4:30pm ET on Friday May 10, 2019. In posing questions, Contractors must cite the relevant RFQ section and page number.
Questions should be written in a manner that enables clear understanding of the Contractor’s questions or concerns. Statements expressing opinions, sentiments, or conjectures are not considered valid inquiries and will not receive a response. Further, Contractors are reminded that GSA will not address hypothetical questions aimed at receiving a potential “evaluation decision.”
E. Evaluation Criteria
E.1 Evaluation Procedures
52.212-2 Evaluation—Commercial Items.
EVALUATION—COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a firm fixed price contract resulting from this solicitation to the offeror whose quote conforms to the solicitation and will be the most advantageous to the Government. During the evaluation, price and other factors shall be considered. Please note that technical and past performance are equally important and when combined are significantly more important than price. Since price is not necessarily the determining factor, award may be made to the offeror with other than the lowest price.
(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written not52.212ice of withdrawal is received before award.
(End of provision)
E.2 Past Performance
The contractor shall have proven specialization in architectural historic preservation and demonstrate a familiarity with characteristics of mid-20th century architecture, including certain wall design, construction and maintenance issues. The vendor shall provide a brief description of three completed projects similar in scope that were completed within the past ten (10) years by the proposed team, including the main contractor and any sub-contractors for this project. The Historic Preservation Professional (HPP) shall submit relevant samples of work in its submission, showing a study of the hierarchy of historical areas, elements and details for preservation rehabilitation, and renovation. In addition a reference shall be provided for each project including the reference’s name, title, email address and phone number.
E.3 Technical
A. The contractor shall provide a team of experts assigned to this contract, including individuals trained in architecture and architectural conservation, who have demonstrable training and experience in assessing the cultural and material significance of historic buildings, the survey and analysis of historic building spaces and materials and the causes of their deterioration, and the identification of appropriate treatments for their repair, conservation and long-term maintenance. The contractor shall describe the team composition including the job titles and their descriptions. In addition the contractor shall provide a description of how the proposed team was selected and a written outline for how the work shall be performed and completed from start to finish for this requirement.
An Adequate and appropriate number of professionals shall be included on the team to conduct research, perform inspections, analyze material conditions, describe the building using correct architectural terminology, and assess the significance of the building and its spaces and features using established federal preservation standards promulgated by the Department of the Interior within the project schedule. The Team shall be capable of completing each deliverable within the time frame established in the Project Schedule.
The contractor shall provide resumes for each of the proposed project team members in the following disciplines:
1. Qualified historic preservation staff
2. Historic Preservationists with training and experience in the production of CAD documents and specification editing.
3. Individuals with training and experience in the editing of professional reports, particularly related to architectural and engineering fields, whose responsibility shall be the preparation of accurate and high quality descriptions of building architecture and history.
4. Individuals with training and experience in architectural photography, whose sole responsibility shall be the execution of high quality photographic documentation of all required building elements.
F. Summary of Deadlines
Questions regarding this RFQ are due no later than 4:30 ET Friday, May 10, 2019 to Erin Clark at Erin.Clark@gsa.gov
Quotes are due no later than 4:30PM ET Friday, May 17, 2019, in accordance with the instructions contained herein.
G. Contract Clauses
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/.
52.212-4 Contract Terms and Conditions-Commercial Items (OCT 2018)
52.203-99 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
(Jan 2017)
52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011)
52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016)
52.227-14 Rights in Data-General (May 2014)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)
[End of Addendum 52.212-4]
GSAR 552.204-9 Personal Identity Verification Requirements (OCT 2012)
a. The contractor shall comply with GSA personal identity verification requirements, identified at http://wwgsa.gov/hspd12, if contractor employees require access to GSA controlled facilities or information systems to perform contract requirements.
b. The contractor shall insert this clause in all subcontracts when the subcontractor is required to have access to a GSA-controlled facility or access to a GSA controlled information system.
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders- Commercial Items (JAN 2019)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(3) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(4) 52.233-3, Protest After Award (Aug 1996) (31U.S.C.3553).
(5) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting
Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
52.204-10 Reporting Executive Compensation & First-Tier Subcontract Awards (OCT 2018) (Pub. L.
109-282) (31 U.S.C. 6101 note).
52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) (31 U.S.C. 6101 note).
52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
52.219-28, Post Award Small Business Program Representation (JUL 2013) (15 U.S.C. 632(a)(2)).
52.222–19 Child Labor—Cooperation with Authorities and Remedies (JAN 2018) (E.O. 13126).
52.222-21 Prohibition of Segregated Facilities (APR 2015).
52.222-3, Convict Labor (JUNE 2003) (E.O. 11755).
52.222-26 Equal Opportunity (APR 2015)(E.O. 11246)
52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).
52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).
52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) (E.O.
13513)
52.225–5, Trade Agreements (AUG 2018) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
52.232-34, Payment by Electronic Funds Transfer--Other than System for Award Management (JUL
2013) (31 U.S.C. 3332).
52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015)
52.222-62 Paid Sick Leave Under Executive Order 13706. (Jan 2017)
52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications (AUG 2018)
H. Solicitation Provisions
52.203-98 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements – Representation (DEVIATION 2015-02) (FEB 2015)
52.204-16 Commercial and Government Entity Code Reporting (JUL 2016)
52.212-2 Evaluation—Commercial Items (As noted on page 12.)
52.212-3 Offerors Representations and Certifications-Commercial Items (NOV 2017) Offerors must complete annual representations and certifications on-line at http://orca.bpn.gov in accordance with FAR 52.212-3, “Offerors Representations and Certifications- Commercial Items.” If paragraph (j) of the provision is applicable, a written submission is required.
52.223-4 Recovered Material Certification (MAY 2008)
52.232-38 Submission of Electronic Funds Transfer Information with Offer (JUL 2013)