Attachment 13 CFE Generator Registration Form.pdf

PDF 81 KB Posted

Attached to
Solicitation 47PA0723R0002 - FY23 R7 TX Competitive Electricity Supply
Solicitation number
47PA0723R0002
Issued by
Not on record

View the file

Other files

File Type Posted
Solicitation No.47PA0723R0002 Amendment 3.pdf PDF
Amendment 2_Solicitation 47PA0723R0002_Exhibit 1.xlsx XLSX spreadsheet
Amendment 2_Solicitation 47PA0723R0002_Economic Price Adjustment Clause.pdf PDF
Amendment 0002_Solicitation 47PA0723R0002.pdf PDF
Amendment 2_Solicitation 47PA0723R0002_Additional Questions and Answers.pdf PDF
Amendment 0001_Exhibit 1 _Solicitation 47PA0723R0002 .xlsx XLSX spreadsheet
Amendment 0001_Solicitation 47PA0723R0002.pdf PDF
ATTACHMENT 4 SAMPLE FEDERAL CONTRACTOR VETERANS EMPLOYMENT REPORT.pdf PDF
ATTACHMENT 5 SUBCONTRACTING PLANS.pdf PDF
ATTACHMENT 2 CONTRACTOR INFORMATION.pdf PDF
ATTACHMENT 1 TECHNICAL PROPOSAL CHECKLIST.pdf PDF
Attachment 16 CFE Calculations.pdf PDF
ATTACHMENT 3 PRICE COMPONENT CONFIRMATION TABLE.pdf PDF
Solicitation 47PA0723R0002 Exhibit 1.xlsx XLSX spreadsheet
Attachment 15 CFE Attribute Certificate Notification.pdf PDF
Attachment 14 CFE Verification.pdf PDF
ATTACHMENT 6 52-212-3-Offeror-Representations-and-Certifications---Commercial-Products-and-Commercial-Services-.pdf PDF
RFP Solicitation No.47PA0723R0002.pdf PDF
Attachment 12 Verification from CFE Supplier.pdf PDF
Solicitation 47PA0723R0002 Exhibit 1.pdf PDF
Solicitation 47PA0723R0002 Price Component Confirmation Table .pdf PDF
Solicitation 47PA0723R0002 Attachments 1-6.pdf PDF
Solicitation No.47PA0723R0002 - FY23 R7 TX Competitive Electricity Supply.pdf PDF
Solicitation 47PA0723R0002 Attachments 12-16.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 13. CARBON POLLUTION-FREE ELECTRICITY GENERATOR REGISTRATION FORM

Facility Information

Name of Facility: ____________________________

Address of Facility: __________________________ Facility ID Number 1 :____________ EIA or QF (circle one)

Contact Person: ______________________________

Title: ______________________________________

Email: ____________________________________

New Resource Capacity Additions Detail* Existing Resource Capacity Detail** Other Information***

Resource New Resource Capacity Additions

(MW)

Placed-in- Service Date of New Resource Capacity Additions

(MM/DD/

/YYYY)

Is the power output of any New Resource Capacity Additions independently metered? (Y/N)

MWh/EACs sold from independently metered New Resource Capacity Additions

Existing Resource Capacity prior to New Capacity Additions

(MW)

Placed-in-Service Date of Existing Resource Capacity prior to New Resource Capacity Additions

(MM/DD/YYYY)

Total MWh/EACs sold from New and Existing Resource Capacity

Is the total power output of the New and Existing Resource Capacity sold through this contract? (Y/N)

Vintage of Generation/D elivery

(MM/YYYY)

Balancing Authority of Generating Resource

Geothermal

Wind

Solar electric

Hydroelectric (must qualify as

CFE)

1 Please enter Energy Information Administration (EIA) identification number for the generating facility. If the facility does not have an EIA number, please enter the utility-assigned Qualifying Facility (QF) identification number.

Hydrokinetic (including tidal, wave, current, and thermal)

Note: Modifications must result in new resource capacity additions. Modifications that result in increased power output from existing capacity do not qualify as new resource capacity additions or reestablish an existing generating resource’s placed-in-service date.

* For resources that have been modified to result in new resource capacity additions, please indicate either the new capacity or new capacity added to existing resource capacity in megawatts (MW), the placed-in-service date of the new resource capacity (MM/DD/YYYY), whether the new resource capacity additions are independently metered (Y/N) apart from existing resource capacity, the megawatt-hour and EAC output resulting from the new resource capacity only and provide a brief description of the modification (e.g., new wind turbines, additional solar panels) in the space provided below.

** For resources that are existing, please indicate the existing resource capacity (MW) or the existing resource capacity (MW) prior to new resource capacity additions, as well as the placed-in-service date of any existing resource capacity.

*** Please provide other information including the total megawatt-hours (MWh) and EACs sold from both new and existing resource capacity, whether the generator’s total output (MWh) is sold under this contract, the vintage of generation delivered (list separate MWh line items by month/quarter), and indicate the balancing authority of the generating resource.

If multiple facilities are being used for this contract, Contractors are required to provide a completed copy of this form for each facility.

File details come from the government source that posted it. Updated .