Attachment 13 CFE Generator Registration Form.pdf
PDF 81 KB Posted
- Solicitation number
- 47PA0723R0002
- Issued by
- Not on record
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 13. CARBON POLLUTION-FREE ELECTRICITY GENERATOR REGISTRATION FORM
Facility Information
Name of Facility: ____________________________
Address of Facility: __________________________ Facility ID Number 1 :____________ EIA or QF (circle one)
Contact Person: ______________________________
Title: ______________________________________
Email: ____________________________________
New Resource Capacity Additions Detail* Existing Resource Capacity Detail** Other Information***
Resource New Resource Capacity Additions
(MW)
Placed-in- Service Date of New Resource Capacity Additions
(MM/DD/
/YYYY)
Is the power output of any New Resource Capacity Additions independently metered? (Y/N)
MWh/EACs sold from independently metered New Resource Capacity Additions
Existing Resource Capacity prior to New Capacity Additions
(MW)
Placed-in-Service Date of Existing Resource Capacity prior to New Resource Capacity Additions
(MM/DD/YYYY)
Total MWh/EACs sold from New and Existing Resource Capacity
Is the total power output of the New and Existing Resource Capacity sold through this contract? (Y/N)
Vintage of Generation/D elivery
(MM/YYYY)
Balancing Authority of Generating Resource
Geothermal
Wind
Solar electric
Hydroelectric (must qualify as
CFE)
1 Please enter Energy Information Administration (EIA) identification number for the generating facility. If the facility does not have an EIA number, please enter the utility-assigned Qualifying Facility (QF) identification number.
Hydrokinetic (including tidal, wave, current, and thermal)
Note: Modifications must result in new resource capacity additions. Modifications that result in increased power output from existing capacity do not qualify as new resource capacity additions or reestablish an existing generating resource’s placed-in-service date.
* For resources that have been modified to result in new resource capacity additions, please indicate either the new capacity or new capacity added to existing resource capacity in megawatts (MW), the placed-in-service date of the new resource capacity (MM/DD/YYYY), whether the new resource capacity additions are independently metered (Y/N) apart from existing resource capacity, the megawatt-hour and EAC output resulting from the new resource capacity only and provide a brief description of the modification (e.g., new wind turbines, additional solar panels) in the space provided below.
** For resources that are existing, please indicate the existing resource capacity (MW) or the existing resource capacity (MW) prior to new resource capacity additions, as well as the placed-in-service date of any existing resource capacity.
*** Please provide other information including the total megawatt-hours (MWh) and EACs sold from both new and existing resource capacity, whether the generator’s total output (MWh) is sold under this contract, the vintage of generation delivered (list separate MWh line items by month/quarter), and indicate the balancing authority of the generating resource.
If multiple facilities are being used for this contract, Contractors are required to provide a completed copy of this form for each facility.
File details come from the government source that posted it. Updated .