Amended Attachments 1 - 4.pdf
PDF 82 KB Posted
- Attached to
- GSA: Unbundled Energy Attribute Certificates in Midcontinent Independent System Operator (MISO)
- Solicitation number
- 47PA0723Q0001
- Issued by
- Not on record
About this file
This document contains four attachments related to a federal contract for the procurement of unbundled energy attribute certificates (EACs) in the Midcontinent Independent System Operator electricity market. Attachment 1 requires carbon pollution-free electricity suppliers to verify that any EACs sold under the contract were generated by eligible carbon-free generators, that all environmental attributes were transferred to the government, and that the EACs were not double sold or claimed. Attachment 2 requires carbon pollution-free electricity generators to register facility information, including resource type, capacity, vintage, and balancing authority. Attachment 3 requires generators to verify that any EACs listed in Attachment 6 were sold exclusively to the EAC provider and that environmental attributes were transferred to the provider and not double claimed. Attachment 4 requires EAC providers to notify the government that specified quantities of EACs from listed carbon-free electricity sources have been conveyed in accordance with the contract terms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1: VERIFICATION FROM CARBON POLLUTION-FREE ELECTRICITY SUPPLIER
I, (print name and title) ______________________________________________, verify, on behalf of
(name of Energy Attribute Certificate (EAC) provider)___________________, that 1) all the EACs sold under this GSA Contract No.___________________ (the Contract) were generated by eligible Carbon
Pollution-Free Electricity (CFE) generators as defined by this Contract 2) all the environmental attributes, including any emissions reduction credits or emissions allowances which are specifically owned by or to which the EAC generator is otherwise entitled to convey, represented by the EAC purchased under this Contract were transferred to the Government; 3) the environment attributes represented by the EACs were not sold, marketed, or otherwise claimed by a third party; and 4) the
EACs comply with the CFE generation requirements contained in Section A.11 of the Contract
Name of EAC product:
I further verify that the EACs claimed for the product were sold once and only once, and that the electrical energy that was generated with the EACs claimed was not sold, marketed, or otherwise represented as CFE and was not used to meet any voluntary or mandated federal, state or local CFE requirement, other CFE procurement, renewable portfolio standard, or other renewable or CFE mandate. I have authority to submit this report on the company’s behalf.
Signature: ___________________________ Date: __________________________
Name: ______________________________
Title: _______________________________
Company: ___________________________
ATTACHMENT 2. CARBON POLLUTION-FREE ELECTRICITY GENERATOR REGISTRATION FORM
Facility Information Name of Facility: ____________________________
Address of Facility: __________________________ Facility ID Number 1 :____________ EIA or QF (circle one)
Contact Person: ______________________________
Title: ______________________________________
Email: ____________________________________
New Resource Capacity Additions Detail* Existing Resource Capacity Detail**
Other Information***
Resource New Resource Capacity Additions
(MW)
Placed-in- Service Date of New Resource Capacity Additions
(MM/DD/
/YYYY)
Is the power output of any New Resource Capacity Additions independe ntly metered?
(Y/N)
MWh/EACs sold from independently metered New Resource Capacity Additions
Existing Resource Capacity prior to New Capacity Additions
(MW)
Placed-in-Service Date of Existing Resource Capacity prior to New Resource Capacity Additions
(MM/DD/YYYY)
Total MWh/EACs sold from New and Existing Resource Capacity
Is the total power output of the New and Existing Resource Capacity sold through this contract? (Y/N)
Vintage of Generation/ Delivery
(MM/YYYY)
Balancing Authority of Generating Resource
Geothermal
Wind
Solar electric
Hydroelectric (must qualify as
CFE)
1 Please enter Energy Information Administration (EIA) identification number for the generating facility. If the facility does not have an EIA number, please enter the utility-assigned Qualifying Facility (QF) identification number.
Hydrokinetic (including tidal, wave, current, and thermal)
Note: Modifications must result in new resource capacity additions. Modifications that result in increased power output from existing capacity or that reestablish an existing generating resource’s placed-in-service date do not qualify as new resource capacity additions.
* For resources that have been modified to result in new resource capacity additions, please indicate either the new capacity or new capacity added to existing resource capacity in megawatts (MW), the placed-in-service date of the new resource capacity (MM/DD/YYYY), whether the new resource capacity additions are independently metered (Y/N) apart from existing resource capacity, the megawatt-hour and EAC output resulting from the new resource capacity only and provide a brief description of the modification (e.g., new wind turbines, additional solar panels) .
** For resources that are existing, please indicate the existing resource capacity (MW) or the existing resource capacity (MW) prior to new resource capacity additions, as well as the placed-in-service date of any existing resource capacity.
*** Please provide other information including the total megawatt-hours (MWh) and EACs sold from both new and existing resource capacity, whether the generator’s total output (MWh) is sold under this contract, the vintage of generation delivered (list separate MWh line items by month/quarter), and indicate the balancing authority of the generating resource.
If multiple facilities are being used for this contract, Contractors are required to provide a completed copy of this form for each facility.
ATTACHMENT 3: CARBON POLLUTION-FREE ELECTRICITY VERIFICATION
The (indicate the number)___________________Energy Attribute Certificates (EAC) listed in
Attachment 6 2 were sold exclusively to (name of EAC provider) ________________________________________.
Further, 1) all the environmental attributes, including any emissions reduction credits or emissions allowances which are specifically owned by or to which the EAC generator is otherwise entitled to convey, represented by the carbon pollution-free electricity (CFE) generation listed below, were transferred to the EAC provider above; 2) to the best of my knowledge, the EACs were not sold, marketed or otherwise claimed by a third party; 3) the EACs were sold once and only once; 4) the electrical energy that was generated with the attributes was not used on-site for generation 2 ; and 5) the electrical energy that was generated with the attributes was not separately sold, marketed or otherwise represented as CFE and was not used to meet any federal, state or local requirement, separate procurement, portfolio standard, or other energy mandate.
The facilities that generated all of the EACs sold to (Name of EAC supplier)
________________________________________ are listed in Attachment 6 2 by fuel type.
I have authority to submit this report on the company’s behalf.
Signature: ___________________________ Date: __________________________
Name: ______________________________
Title: _______________________________
2 Electrical energy in this case is sometimes referred to as parasitic load or station service.
This form is used by the Government to verify the accuracy of claims made by retail marketers.
ATTACHMENT 4: CARBON POLLUTION-FREE ELECTRICITY ENERGY ATTRIBUTE
CERTIFICATE NOTIFICATION
(Contractor Name) __________________________ verifies that Energy Attribute Certificate(s) (EACs) in the amounts described in Attachment 9, associated with power generation from the carbon pollution-free electricity (CFE) source(s) listed in Attachment 9, have been provided to the Government in accordance with the terms of Contract No. __________________________ for the period (Insert
Dates) __________________________ . The EACs provided to the Government include emissions, and other environmental characteristics and non-power attributes associated with carbon pollution-free resources. (Contractor Name) __________________________ represents that the environmental attributes, including any attendant emission credits which are specifically owned by or to which the EAC generator is otherwise entitled to convey, that are the subject of this Notification have not been sold, reserved, or conveyed to any party other than Government and that the electric power generated in association with this/these EACs has not been represented to retain or possess such attributes. The
EACs that are the subject of this Notification are based upon the generation of electricity from (Insert type of CFE Resource(s)) __________________________ __________________________ at (Insert
Source Facility Location(s)) __________________________ . The total amount of EACs covered by this Notification is:(Insert Quantity conveyed in MWhs) __________________________ .
Signature: ___________________________ Date: __________________________
Name: ______________________________
Title: _______________________________
File details come from the government source that posted it. Updated .