RFI QA 2021 12 14.pdf
PDF 29 KB Posted
- Solicitation number
- 47PA0322R0003
About this file
This document contains responses to a request for information (RFI) regarding a federal contract opportunity for radiation portal monitor installation services. The General Services Administration (GSA) is seeking goods and services on behalf of the Department of Homeland Security (DHS) Countering Weapons of Mass Destruction (CWMD) Office to support testing of replacement radiation portal monitors (RPMs) at the Eagle Pass, Texas land port of entry. The replacement portal installation scope includes exterior and interior work such as contractor mobilization, assembly and installation of replacement Leidos RPM-8/SRPM-210 monitors currently in storage at the site, installation of associated power, data and fiber optic cables and conduits, and connection to network infrastructure. Following commissioning of the new RPMs by Pacific Northwest National Laboratory, the contractor will demobilize and close out the project. The RFI responses clarify that the project manager and scheduler can be the same person, there is no minimum number of required special inspections, and Leidos SRPM-210 monitors are the preferred equipment for the replacement project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WS11064_SET_ADD2_0_pw.pdf | ||
| Network Diagram - WS11064(2) 2021 01 04.pdf | ||
| 47PA0322R0003 Generated PDF with TOC (3).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Services Administration
Special Programs Division
Building 41, Denver Federal Center
Denver, CO 80225
RFI Log Solicitation No. 47PA0322R0003 // Radiation Portal Monitor (RPM) Installation - Eagle Pass, TX
Project: Radiation Portal Monitor (RPM) Installation
Location: Eagle Pass, TX
RFI # RFI Question Response By RFI Response
1 Can the scheduler and project manager be the same person? Matthew Scheie (PM) Yes.
2 For the periodic special inspections, is there a required minimum number of inspections? Matthew Scheie (PM) No.
3 Leidos SRPM-210 RPMs are the preferred vendor for the RPMs correct? Page 15 and 16 of the drawings also mentions Smith, is this the temporary RPMs to be installed? Matthew Scheie (PM) The RPMs to be installed are currently at Eagle Pass LPOE in storage.
4 Please confirm who is the vendor for the Vehicle Identification System (VIS) cameras and is the Govt. responsible for removing and reinstalling the system? Matthew Scheie (PM) Answer to be provided in the next round of RFIs.
5 Are there any preferred contractors for electrical scopes of work? Matthew Scheie (PM) No.
File details come from the government source that posted it. Updated .