Network Diagram - WS11064(2) 2021 01 04.pdf

PDF 96 KB Posted

Attached to
Radiation Portal Monitor (RPM) Installation - Eagle Pass, TX
Solicitation number
47PA0322R0003
Issued by

About this file

This document provides details for a federal contract opportunity to install replacement Radiation Portal Monitors (RPMs) at the Land Port of Entry located in Eagle Pass, Texas. The Department of Homeland Security Countering Weapons of Mass Destruction Office, through the General Services Administration Reimbursable Services Program, requests goods and services to support testing replacements for aging Leidos RPM-8/SRPM-210 radiation detection portals. The replacement portal installation scope includes exterior and interior work such as assembling and installing the new RPMs, connecting associated power, data and fiber optic cables/conduits, and integrating the new systems with network infrastructure. Following validation of the new RPMs by Pacific Northwest National Laboratory, the contractor will demobilize and close out the project.

View the file

Other files

File Type Posted
RFI QA 2021 12 14.pdf PDF
WS11064_SET_ADD2_0_pw.pdf PDF
47PA0322R0003 Generated PDF with TOC (3).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Revision 2 RPM REPLACEMENT PROGRAM

Eagle Pass Bridge 2 - TX IOC Upgrade – SRPM 210 and RPM8 Tandem Network Diagram (WS11064) January 4, 2021

Prepared for the U.S. Department of Homeland Security Countering Weapons of Mass Destruction Office under U.S. Department of Energy Contract DE-AC05-76RL01830

WARNING: This document is FOR OFFICIAL USE ONLY (FOUO). It contains information that may be exempt from public release under the Freedom of Information Act (5 USC 552). It is to be controlled, stored, handled, transmitted, distributed, and disposed of in accordance with DHS policy relating to FOUO information and is not to be released to the public or other personnel who do not have a valid “need to know” without prior approval of an authorized DHS official.

Name/Org: Brian Collins/PNNL - VcBmUI

Date: January 12, 2021

Guide: DHS SCG DNDO-001.3

FOUO Sheets: 1 i

FOR OFFICIAL USE ONLY

DISCLAIMER

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

PACIFIC NORTHWEST NATIONAL LABORATORY

operated by

BATTELLE

for the

UNITED STATES DEPARTMENT OF ENERGY

under Contract DE-AC05-76RL01830

File details come from the government source that posted it. Updated .