472.24069.JGH - Ionia CF - Gen Rplcmnt & AST Install - Bid Set (Plumbing, Mech, Elect).pdf
PDF 16 MB Posted
- Solicitation number
- RFQ 171 260000000274 1
- Issued by
- Huron County, Michigan
About this file
This is a construction bid set document for the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, for a general replacement and air-source heat pump installation project at the Ionia Correctional Facility Building 200. The project encompasses comprehensive plumbing, mechanical, and electrical work, including installation of new sanitary and vent piping systems, trench drains, catch basins, roof drains, rain conductor piping, fire suppression systems, natural gas piping, heating systems with unit heaters, a new 800 kW diesel generator with day tank, fuel oil storage systems, electrical distribution upgrades including a new 1000 kVA transformer and 1600A automatic transfer switch, and associated controls and infrastructure. The scope requires coordination among multiple trades, field verification of existing conditions, ground penetrating radar surveys for underground utilities, hydrovac excavation where necessary, and compliance with Michigan Building Code and applicable local codes. Contractors must attend post-construction meetings at 6 and 11 months, track and report recycled material amounts, coordinate with facility staff, provide advance notice for hot work, and use tamperproof fasteners in areas exposed to inmates.
The document establishes detailed specifications and standards for all work, including requirements for equipment installation per manufacturers' written instructions, mechanical seals for below-grade penetrations, fire stopping at rated enclosure penetrations, specific pipe slopes for sanitary systems, and isolation separators for copper piping in metal studs. All work must be performed by licensed contractors and subcontractors as required by Michigan law, with all equipment and materials maintained in new condition during construction. The contractor receives one facility escort throughout the project and must coordinate extensively with the architectural, mechanical, electrical, and structural design teams to avoid conflicts. Materials and workmanship are guaranteed for a minimum of one year from system acceptance, and the fire protection contractor must submit certification, hydraulic calculations, AutoCAD drawings, spare parts lists, and operation and maintenance manuals to the owner upon completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING ABBREVIATIONS
PLUMBING SYMBOLS LEGEND
PLUMBING PIPING PLUMBING EQUIPMENT
1. ALL PLUMBING WORK SHALL CONFORM TO MICHIGAN
PLUMBING CODE, LATEST APPLICABLE EDITION, AND ALL
APPLICABLE LOCAL CODES.
2. INSTALL ALL EQUIPMENT, MATERIALS, AND
ACCESSORIES PER MANUFACTURERS WRITTEN
INSTRUCTIONS.
3. SITE CONTRACTOR TO RUN UTILITIES TO 5'-0" FROM
BUILDING LINE.
4. ALL INVERT ELEVATIONS ARE BASED ON A FINISH FLOOR
LEVEL OF 100'-0". ALL INVERTS, STATED OR NOT, NEW
OR EXISTING, SHALL BE COORDINATED IN THE FIELD.
VERIFY EXISTING INVERTS PRIOR TO STARING WORK.
5. ALL PIPE SIZES SHOWN ARE SERVICE SIZE. SIZE
SLEEVES FOR 1" CLEAR SPACE BETWEEN PIPE AND
SLEEVE FOR INSTALLATION OF MECHANICAL SEAL.
6. CONTRACTOR TO VERIFY LOCATIONS OF EXISTING
UNDERGROUND UTILITIES BEFORE BEGINNING WORK.
7. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY
CONFLICT WITH NEW CONSTRUCTION AND RELOCATE
AS NEEDED.
8. MECHANICAL SEALS REQUIRED FOR BELOW GRADE
WALL PENETRATIONS. ALL WALL AND SLAB
PENETRATIONS OF MASONRY OR CONCRETE
CONSTRUCTION SHALL BE SLEEVED.
9. 2% SLOPE FOR ALL SANITARY PIPING 2-1/2" OR LESS IN
DIAMETER. 1% SLOPE FOR ALL SANITARY PIPING 3" OR
MORE IN DIAMETER.
10. 1% SLOPE FOR ALL RAIN CONDUCTOR PIPING.
11. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES,
LOCATION, ELEVATIONS, AND DETAILS OF ALL EXISTING
CONDITIONS THAT MAY AFFECT THE WORK.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING THE INTEGRITY OF ALL EQUIPMENT AND
MATERIALS IN A "NEW" CONDITION DURING
CONSTRUCTION.
13. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED
BY LAW.
14. DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE
WITH THE CODES AND REGULATIONS ENFORCED BY
LOCAL BUILDING OFFICIALS.
15. IF THERE IS CONFLICTING INFORMATION IN THE PLANS
OR SPECIFICATIONS THE MORE STRINGENT AND
GREATER COST ITEM SHALL BE USED.
16. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND SUGGESTED ROUTES. IT IS
NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS,
PRESERVE HEADROOM AND KEEP OPENINGS AND
PASSAGEWAYS CLEAR. DO NOT SCALE FROM
DRAWINGS.
17. PIPING LAYOUT IS SCHEMATIC. EXACT LOCATION OF
PIPING AND EQUIPMENT SHALL BE COORDINATED WITH
BUILDING STRUCTURE, EQUIPMENT FURNISHED,
ARCHITECTURAL DRAWINGS AND ALL OTHER TRADES
PRIOR TO INSTALLATION. ANY CONTRACTOR INSTALLING
WORK WITHOUT PRIOR COORDINATION SHALL
RELOCATE HIS WORK AT HIS EXPENSE TO ALLOW
PROPER INSTALLATION OF ANY AND ALL TRADES WORK.
18. PLUMBING UTILITY PIPING SHALL NOT BE RUN ABOVE
ELECTRICAL GEAR OR IN THE SERVICE SPACE
REQUIRED BY THE NATIONAL ELECTRICAL CODE.
19. PROVIDE ISOLATION SEPARATORS FOR COPPER PIPING
RUNNING THROUGH METAL STUDS.
20. PROVIDE FIRE STOPPING AT ALL PENETRATIONS OF FIRE
RATED ENCLOSURES.
21. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH
POST CONSTRUCTION MEETING WITH THE ENGINEER
AND OWNER TO REVIEW AND FIX ISSUES DURING THE
WARRANTY PERIOD.
22. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO
OWNER OF THE AMOUNT OF MATERIAL BEING RECYCLED
THROUGHOUT THE PROJECT.
23. CONTRACTOR WILL HAVE 1 ESCORT TO WORK WITH
THROUGH AT THE PROJECT.
24. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY
IN ADVANCE FOR ANY HOT WORK TO ALLOW THE
OWNER TO DISABLE THE FIRE ALARM.
25. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES
SHALL USE TAMPERPROOF SCREWS.
GENERAL PLUMBING NOTES
MISCELLANEOUS NOTES
PLUMBING VALVES
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
AD AREA DRAIN
ASR AUTOMATIC SPRINKLER RISER
BFS BELOW FLOOR SLAB
BWV BACK WATER VALVE
CB CATCH BASIN
CI CAST IRON
CO CLEAN OUT
CV CONTROL VALVE
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DWH DOMESTIC WATER HEATER
E.T.C. ELECTRICAL TRADES CONTRACTOR
EWC ELECTRIC WATER COOLER
EXIST EXISTING
FD FLOOR DRAIN
FC FINAL CONNECTIONS
FDC FIRE DEPT. CONNECTION
FF FINISH FLOOR
FHV FIRE HOSE VALVE
FT FEET
GAL GALLON
GD GARBAGE DISPOSAL
GI GREASE INTERCEPTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIB
HD HEAD (FT)
HP HORSE POWER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
LAV LAVATORY
LT LAUNDRY TRAY
MA MEDICAL AIR
MAX MAXIMUM
MGC MEDICAL GAS CONSOLE
MH MAN HOLE
MIN MINIMUM
MS MOP SINK
M.T.C. MECHANICAL TRADES CONTRACTOR
NTS NOT TO SCALE
ORD OVERFLOW ROOF DRAIN
OXY OXYGEN
P PUMP
PD PRESSURE DROP
PVC POLY-VINYL-CHLORIDE
RC RAIN CONDUCTOR
RD ROOF DRAIN
RI ROUGH-IN
REQ'D REQUIRED
SAN SANITARY
SHWR SHOWER
SK SINK
SP STAND PIPE
SQ. FT. SQUARE FEET
SS SERVICE SINK
ST STORM
S&W STOP & WASTE
STR STRAINER
SV STACKED VENT
TYP. TYPICAL
UR URINAL
VB VACUUM BREAKER
VS VENT STACK
V.F.D VARIABLE FREQUENCY DRIVE
VTR VENT THRU ROOF
W WASTE
WB WET BULB
WC WATER CLOSET
WH WALL HYDRANT
WS WASTE STACK
W&V WASTE AND VENT
X-CW EXIST. CW PIPING
ITEM
EXISTING
COLD WATER
COLD WATER BELOW FINISH SLAB
HOT WATER
HOT WATER BELOW FINISH SLAB
HOT WATER RETURN
HOT WATER RETURN BELOW FINISH SLAB
SOFTENED WATER
SOFTENED WATER BELOW FINISH SLAB
SOFTENED WATER RETURN
SOFTENED WATER RETURN BELOW FINISH
SLAB
TEMPERED WATER
TEMPERED WATER BELOW FINISH SLAB
TEMPERED WATER RETURN
TEMPERED WATER RETURN BELOW FINISH
SLAB
DEIONIZED WATER
DEIONIZED WATER BELOW FINISH SLAB
REVERSE OSMOSIS WATER
REVERSE OSMOSIS WATER RETURN BELOW
FINISH SLAB
FIRE PROTECTION
GAS (NATURAL)
GAS (LIQUID PETROLEUM)
ACID RESISTANT
VENT ACID RESISTANT WASTE
ACID RESISTANT WASTE BELOW FINISH SLAB
RAIN CONDUCTOR
STORM BELOW FINISH SLAB
OVERFLOW RAIN CONDUCTOR
OVERFLOW RAIN CONDUCTOR BELOW FINISH
SLAB
SANITARY WASTE
SANITARY WASTE BELOW FINISH SLAB
VENT PIPING
VENT PIPING BELOW FINISH SLAB
COMPRESSED AIR
OXYGEN
NITROUS OXIDE
NITROGEN
MEDICAL AIR
VACUUM
DEMOLITION
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
OS&Y VALVE
SOLENOID VALVE
EXPANSION VALVE WITH THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
FLOOR CLEANOUT
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
INLINE CLEANOUT
PLUMBING TRAP
THERMOMETER
CONNECTION
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
FLOOR DRAIN & FLOOR SINK
BACK FLOW PREVENTER
FLANGE END CONNECTION
WALL HYDRANT & HOSE BIBB
REGULAR & OVERFLOW ROOF DRAIN
PIPE CAP
PIPE BREAK
WATER METER
GAS METER
PRESSURE GAUGE
FIRE HYDRANT
SPRINKLER HEAD (PENDANT)
SPRINKLER HEAD (UPRIGHT)
SPRINKLER HEAD (SIDEWALL)
FIRE DEPARTMENT CONNECTION
PIPING FLEXIBLE CONNECTOR
SIGHT GLASS
PIPE EXPANSION
COMPENSATOR FLOW SENSOR DEVICE
FLOW METER
FLOW SWITCH
PRESSURE SWITCH
SUPERVISORY SWITCH INVERTED
BUCKET TRAP
FLOAT & THERMOSTATIC TRAP
X
X
XX
XXXX
XX
XXXX
CW
CW
HW
HW
HWR
HWR
SW
SW
SWR
SWR
TW
TW
TWR
TWR
DI
DI
RO
RO
FP
G
LP
ARV
ARW
ARW
RC
ST
ORC
ORC
SAN
SAN
V
V
CA
NO
N2
MA
VAC
M
M
P
FS
FT
BT
PS
SS
18'-5/8" 24 5/8" 8'-0
1'-0"
ZURN MODEL #Z887-12-HD, 12"x24" CATCH BASIN w/P12-PS PERFORATED STAINLESS
STEEL GRATE
ZURN MODEL
P12-PS
PERFORATED
STAINLESS STEEL
GRATE.
24 5/8" 8'-0"
6" SAN
OUTLET
ZURN MODEL #FT
FOUL AIR TRAP
ZURN MODEL #Z887-12-HD,
12"x24" CATCH BASIN w/P12-PS PERFORATED
STAINLESS STEEL GRATE
NOTE: THIS CONNECTION MUST BE MADE
AT THE FACTORY
ZURN MODEL #Z-Z882 HIGH DENSITY
POLYETHYLENE WITH STEEL FRAME
TRENCH DRAIN SYSTEM
END CAP
PLAN VIEW
ELEVATION
1 TRENCH DRAIN WITH CATCH BASIN DETAIL
SCALE: NTS
FINISH FLOOR = 100'-0"
TRENCH DRAIN I.E. = COORDINATE WITH
CONCRETE SLOPE ON ARCHITECTURAL DRAWINGS.
FINISH
FLOOR
24 5/8"
ZURN MODEL #Z887-12-HD, 12"x24" CATCH BASIN w/P12-PS PERFORATED STAINLESS
STEEL GRATE
24 5/8"
4" SAN
OUTLET
ZURN MODEL #FT
FOUL AIR TRAP
ZURN MODEL #Z887-12-HD,
12"x24" CATCH BASIN w/P12-PS PERFORATED
STAINLESS STEEL GRATE
PLAN VIEW
ELEVATION
2 CATCH BASIN DETAIL
SCALE: NTS
FINISH FLOOR = 100'-0"
CATCH BASIN I.E. = COORDINATE WITH CONCRETE
SLOPE ON ARCHITECTURAL DRAWINGS.
12"
FIRE PROTECTION SYMBOLS LEGEND
PLUMBING PIPING PLUMBING EQUIPMENT
MISCELLANEOUS NOTES
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
FIRE PROTECTION FLOW DIRECTION
PIPING DROP
PIPING RISE
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
INLINE CLEANOUT
CONNECTION
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
FLOOR DRAIN & FLOOR SINK
BACK FLOW PREVENTER
FLANGE END CONNECTION
PIPE CAP
PIPE BREAK
WATER METER
PRESSURE GAUGE
FIRE HYDRANT
SPRINKLER HEAD (PENDANT)
SPRINKLER HEAD (UPRIGHT)
SPRINKLER HEAD (SIDEWALL)
FIRE DEPARTMENT CONNECTION
FLOW SWITCH
PRESSURE SWITCH
SUPERVISORY SWITCH INVERTED
X
X
XX
XXXX
XX
XXXX
FP
M
P
FS
PS
SS
1. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN AND PAY FOR REQUIRED PERMITS AND APPROVAL FEES ASSOCIATED WITH THIS PROJECT FOR HIS PORTION OF THE WORK.
2. FIRE PROTECTION DESIGN, PIPING, CALCULATIONS, AND DRAWINGS SHALL BE COMPLETED BY
CERTIFIED FIRE PROTECTION CONTRACTOR.
3. PROVIDE LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO FURNISH AND INSTALL FIRE
PROTECTION WORK. WORK SHALL CONFORM WITH THE BUILDING AND FIRE CODES AND NFPA
CRITERIA.
4. WORK SHALL BE COORDINATED WITH OWNER AND WITH OTHER TRADES TO AVOID INTERFERENCES.
GENERAL NOTES FOR FIRE PROTECTION
1. FIRE PROTECTION SYSTEM SHALL BE DESIGNED IN COMPLIANCE WITH THE
LATEST EDITION OF NFPA 13 AND LOCAL FIRE CODE REQUIREMENTS.
2. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS,
REVISIONS, AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUES,
ORDINANCES, CODES OF REGULATIONS OF FEDERAL, STATE, AND LOCAL
AUTHORITIES HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE
RECEIVED.
3. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,
UNDERWRITERS LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI,
NEC, STATE FIRE INSURANCE REGULATION BODY, NFPA, OR OTHERS.
THESE STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED
ON THE DRAWING AND SPECIFICATIONS.
4. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES PER
MANUFACTURERS WRITTEN INSTRUCTIONS.
5. ALL PIPE SIZES SHOWN ARE SERVICE SIZE. SIZE SLEEVES FOR 1" CLEAR
SPACE BETWEEN PIPE AND SLEEVE FOR INSTALLATION OF MECHANICAL
SEAL.
6. FIRE SUPPRESSION DESIGN & PIPING SHALL BE COMPLETED BY CERTIFIED
FIRE SUPPRESSION CONTRACTOR.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE
INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A "NEW" CONDITION
DURING CONSTRUCTION.
8. ALL WORK SHALL BE PERFORMED BY LICENSED CONTRACTORS AND
SUBCONTRACTORS AS REQUIRED BY LAW.
9. DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CODES
AND REGULATIONS ENFORCED BY LOCAL BUILDING OFFICIALS.
10. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF TERMINATION OF
PIPES AND SUGGESTED ROUTES. IT IS NOT INTENTION OF DRAWINGS TO
INDICATE ALL NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM
AND KEEP OPENINGS AND PASSAGEWAYS CLEAR. DO NOT SCALE FROM
DRAWINGS.
11. FIRE SUPPRESSION PLANS ARE BASED ON A PERFORMANCE
SPECIFICATION AND IDENTIFY AREAS FOR FIRE SUPPRESSION. DETAILED
PLANS FOR THE FIRE SUPPRESSION LAYOUT AND FLOW CALCULATIONS
TO BE SUBMITTED SEPARATELY BY THE CONTRACTOR TO PLAN REVIEW
FOR APPROVAL WITH THEIR HYDRAULIC CALCULATIONS.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING FLOW TEST DATA AND
PREPARING ALL REQUIRED HYDRAULIC CALCULATIONS.
13. FLOW TEST RESULTS TO BE CALCULATED FROM TEST LOCATION NEAREST TO
THE FIRE RISER.
14. FIRE SUPPRESSION DESIGN & PIPING SHALL BE BY CERTIFIED FIRE
SUPPRESSION CONTRACTOR.
15. WET PIPE AUTOMATIC SPRINKLER RISER SHALL BE COMPLETE WITH THE
FOLLOWING: ALARM CHECK VALVE, 2" MAIN DRAIN, PRESSURE GAUGE
WITH SHUTOFF VALVE, PADDLE TYPE WATER FLOW SWITCH AND 1"
INSPECTOR'S TEST CONNECTION, AS WELL AS ANY ADDITIONAL
REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION.
16. PROVIDE AND INSTALL ADDITIONAL AUTOMATIC SPRINKLERS UNDER ALL
OBSTRUCTIONS IN EXPOSED AREAS PER NFPA 13. THIS SHOULD INCLUDE
ADDITIONAL SPRINKLERS BELOW DUCTS AND MEZZANINES WHICH ARE 48
INCHES WIDE OR WIDER. ALL SPRINKLERS UNDER OBSTRUCTIONS SHALL
BE EQUIPPED WITH CAGE GUARDS.
17. AUTOMATIC SPRINKLERS SHALL BE DESIGNED PER THE APPROPRIATE
SEISMIC PER NFPA 13, CURRENT EDITION.
18. WHERE REQUIRED BY CODE OR DIRECTED BY LOCAL AUTHORITIES ,
CONTRACTOR SHALL PROVIDE SEISMIC HANGING & CONSTRAINTS ON ALL
PIPING IN COMPLETE ACCORDANCE WITH THE LATEST ISSUE OF THE
STATE MECHANICAL BUILDING CODE, LOCAL CODES, AND NFPA.
19. AUTOMATIC SPRINKLERS SHALL BE HYDRAULICALLY CALCULATED BASED
UPON A FLOW TEST USING CITY HYDRANTS CLOSEST TO THE PROPOSED
TIE IN POINT. STATIC AND RESIDUAL PRESSURE SHALL BE RECORDED
ALONG WITH ACTUAL FLOW (GPM) DATA.
20. FIRE PROTECTION CONTRACTOR OR ANY OF HIS SUB-CONTRACTORS
SHALL BE RESPONSIBLE FOR DAMAGE TO OWNER'S PROPERTY AND
SHALL REPAIR EQUIPMENT OR UTILITIES DAMAGED BY HIS EMPLOYEES
WHILE PERFORMING WORK. REPAIRS SHALL BE PERFORMED ONLY BY
CERTIFIED TRADE PERSONNEL. COSTS INVOLVED WITH THIS REPAIR
SHALL BE THE RESPONSIBILITY OF THE FIRE PROTECTION CONTRACTOR
AS ASSESSED BY THE PROJECT MANAGER.
21. ALL EQUIPMENT AND MATERIAL BEING UTILIZED SHALL BE UNDERWRITERS
LABORATORIES LISTED-(UL) APPROVED AND LISTED IN THE CURRENT
EDITION OF APPROVAL GUIDES.
22. ALL FIRE PROTECTION PIPING SHALL BE INSTALLED TO ALLOW DRAINAGE
BACK TO SYSTEM RISERS WHENEVER POSSIBLE. WHERE THIS IS
IMPRACTICAL AUXILIARY DRAINS SHALL BE INSTALLED AND DRAINED
WHERE DIRECTED BY THE OWNER'S REPRESENTATIVE.
23. ANY PENETRATION THROUGH THE EXTERIOR WALLS OR FLOORS SHALL BE
SEALED TO MAKE WATER TIGHT AND MAINTAIN CURRENT FIRE RATINGS.
24. ALL PIPE, FITTINGS, AND HANGERS SHALL BE AS PERMITTED BY NFPA 13,
CURRENT EDITION AND ATTACHED TO STRUCTURAL MEMBERS.
25. MATERIALS AND WORKMANSHIP FOR FIRE PROTECTION CONTRACTORS
WORK SHALL HAVE A MINIMUM OF A ONE-(1) YEAR GUARANTEE FROM THE
TIME THE SYSTEM IS ACCEPTED AND APPROVED BY THE OWNER.
26. FIRE PROTECTION CONTRACTOR SHALL BE CERTIFIED BY THE STATE OF
MICHIGAN, TO PERFORM THIS WORK.
27. AUTOMATIC WET PIPE SPRINKLER SYSTEMS SHALL BE PRESSURE TESTED
AT 200-PSI OR 150% THE WORKING PRESSURE, WHICHEVER IS GREATER,
FOR TWO (2) HOURS WITH NO VISIBLE LEAKAGE. LEAKS SHALL BE
REPAIRED BY TIGHTENING OR REPLACEMENT OF FITTINGS. WRAPPING,
CAULKING, OR OTHER MEANS SHALL NOT BE ALLOWED.
28. AT THE COMPLETION OF THE PROJECT THE FIRE PROTECTION
CONTRACTOR SHALL FURNISH TO THE OWNER AN OPERATION AND
MAINTENANCE MANUAL COMPLETE WITH: CATALOG CUTS ON ALL MAJOR
PIECES FOR EQUIPMENT, COPY OF HYDRAULIC CALCULATIONS, COPY OF
DRAWINGS IN AUTO-CAD FORMAT, COPY OF NFPA 25, CURRENT EDITION,
RECOMMENDED SPARE PARTS LIST, WIRING DIAGRAMS, AND OWNER'S
MANUAL.
29. FIRE PROTECTION CONTRACTOR SHALL FURNISH THE OWNER WITH
THREE (3) COPIES OF THE MATERIAL AND TEST CERTIFICATES AT THE
COMPLETION OF THE PROJECT.
30. AUTOMATIC SPRINKLERS SHALL UTILIZE HIGHER TEMPERATURE
SPRINKLERS WHERE REQUIRED BY NFPA 13.
31. PROVIDE A SPARE SPRINKLER HEAD CABINET WITH A MINIMUM OF
THREE-(3) SPRINKLERS OF EACH TYPE UTILIZED.
32. ALL WATER FLOW SWITCHES, VALVE SUPERVISORY SWITCHES, SMOKE
DETECTORS, SHALL BE TIED INTO THE MAIN FIRE ALARM PANEL.
33. ALL SPRINKLERS IN MECHANICAL ROOMS SHALL BE 160°F COMPLETE WITH
CAGE GUARDS.
34. ALL SPRINKLERS SHALL BE INSTALLED IN THE CENTER OF TILE WITH A 1"
VARIANCE IN EITHER DIRECTION. QUARTER POINTS ARE NOT ALLOWED.
35. FIRE PROTECTION CONTRACTOR SHALL PAY CLOSE ATTENTION THAT THIS
IS A WORKING SITE. INSTALLATION MUST BE COORDINATED WITH THE
PROJECT MANAGER AND BUILDING COORDINATOR.
36. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE
AND REPLACE ALL CEILING TILES AND CEILING GRID REQUIRED TO
INSTALL FIRE PROTECTION PIPING.
37. FIRE PROTECTION CONTRACTOR SHALL REVIEW ARCHITECTURAL AND
HVAC PLANS. ANY AREAS WITH THE POTENTIAL FOR FREEZING WET PIPES
SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER.
38. FIRE PROTECTION CONTRACTOR SHALL REVIEW AND COORDINATE ALL
WORK ACTIVITIES WITH OTHER TRADES TO ALLEVIATE POTENTIAL
CONFLICTS.
39. ALL SPRINKLER PIPING SHALL BE SUPPORTED FROM TOP CHORD OF
JOISTS. DO NOT SUSPEND ITEMS FROM BOTTOM CHORD WITHOUT
SPECIFIC APPROVAL.
GENERAL FIRE SUPPRESSION NOTES
FIRE PROTECTION DESIGN DATA
DESIGN:
BASE HYDRAULIC CALCULATIONS ON NFPA 13 AND COMPLY WITH LOCAL FIRE
MARSHALL, CODES AND AUTHORITY HAVING JURISDICTION.
AUTOMATIC SPRINKLERS:
SYSTEM: WET PIPE SYSTEM
A WET PIPE SYSTEM FOR A LIGHT HAZARD OCCUPANCY
REFERENCE:
SEE ARCHITECTURAL DRAWINGS FOR OCCUPANT TYPE AND BUILDING CODE
INFORMATION.
INSPECTION:
PLANS OF THE SPRINKLER SYSTEMS SHALL BE SUBMITTED TO THE LOCAL FIRE
MARSHALL AND AUTHORITY HAVING JURISDICTION FOR PLAN REVIEW.
NOTES:
1. UNLESS OTHERWISE NOTED. COORDINATE HEAD LOCATIONS WITH MECHANICAL,
ELECTRICAL AND PLUMBING CONTRACTORS PRIOR TO INSTALLATION TO AVOID
ANY CONFLICTS.
2. WERE THERE IS NO CEILING AND THE FIRE SUPPRESSION PIPING IS EXPOSED, THE
FIRE SUPPRESSION PIPING IS TO BE PRIMED AND PAINTED. CONTRACTOR TO
COORDINATE FIRE SUPPRESSION PIPING PAINT COLOR WITH ARCHITECT.
file no.
index no.
contract order no.
Y23461 consultant job no.
24306.00
472/24069.JGH
checked by drawn by consultant issue date
M a t r ix sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
4/27/2026 CD SET
P-100
PLUMBING SYMBOLS,
NOTES, ABBREVIATIONS,
AND SCHEDULES
DBP
CAT
P-400
P-400
GENERAL PLUMBING NOTES
1. INSTALL NEW BELOW GRADE SANITARY PIPING, VENT PIPING, AND ALL ASSOCIATED ACCESSORIES
IN THE LOCATION SHOWN.
2. AFTER ALL NEW EXTERIOR WORK IS COMPLETED, CONTRACTOR TO REPAIR GREEN SPACE AS
REQUIRED TO MATCH EXISTING.
3. CONTRACTOR TO INSTALL NEW TRENCH DRAIN IN THE LOCATION SHOWN TO ACCOMMODATE
FUTURE CONCRETE PAD. FUTURE CONCRETE PAD SHOWN ON DRAWING FOR REFERENCE.
4. CONTRACTOR TO ROUTE NEW PLUMBING VENT THROUGH NEW ROOF CURB AND NEW ROOF BOOT.
CONTRACTOR TO PATCH VENT PENETRATIONS TO SEAL WATER TIGHT.
MECHANICAL/PLUMBING KEY NOTES
INSTALL NEW TRENCH DRAIN, CATCH BASIN, SANITARY PIPING, AND ALL ASSOCIATED
ACCESSORIES PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS IN THE LOCATION
SHOWN. COORDINATE EXACT LOCATION FOR INSTALLATION OF NEW TRENCH DRAIN AND
CATCH BASIN WITH THE ARCHITECTURAL DRAWINGS.
INSTALL NEW CATCH BASIN, SANITARY PIPING, AND ALL ASSOCIATED ACCESSORIES PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS IN THE LOCATION SHOWN. COORDINATE
EXACT LOCATION FOR INSTALLATION OF NEW CATCH BASIN WITH THE ARCHITECTURAL
DRAWINGS.
CONTRACTOR TO INSTALL NEW BURIED DOMESTIC COLD WATER PIPING AND ALL
ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN 48" BELOW GRADE. CONTRACTOR TO
CAP NEW DOMESTIC COLD WATER PIPING BELOW GRADE IN THE LOCATION SHOWN FOR
FUTURE USE.
CONTRACTOR TO REFER TO CIVIL DRAWINGS FOR PIPING CONTINUATION.
INSTALL NEW VENT PIPING, FITTINGS, HANGERS, SUPPORTS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN. CONTRACTOR TO ROUTE NEW VENT THROUGH
NEW ROOF CURB AND NEW ROOF BOOT. CONTRACTOR TO PATCH VENT PENETRATIONS TO
SEAL WATER TIGHT.
INSTALL NEW DOMESTIC COLD WATER PIPING, FITTINGS, SUPPORTS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOW. CONTRACTOR TO ROUTE DOMESTIC COLD WATER
PIPING 24'" AFF AND CAP FOR FUTURE USE.
INSTALL NEW ROOF DRAINS, RAIN CONDUCTOR PIPING, BURIED RAIN CONDUCTOR PIPING,
HANGERS, SUPPORTS, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN.
INSTALL NEW ROOF DRAINS AND ALL ASSOCIATED ACCESSORIES PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS. CONTRACTOR TO INSTALL NEW RAIN
CONDUCTOR PIPING AS HIGH AS POSSIBLE IN THE SPACE.
GENERAL FIRE SUPPRESSION NOTES
1. INSTALL NEW SPRINKLER HEADS AND FIRE SUPPRESSION PIPING AS REQUIRED TO SPRINKLE THE
ENTIRE ADDITION PER NFPA 13. FIRE SUPPRESSION DESIGN & PIPING SHALL BE BY CERTIFIED FIRE
SUPPRESSION CONTRACTOR. FIRE SUPPRESSION DESIGN SHALL BE SUBMITTED TO THE
AUTHORITY HAVING JUSTIFICATION FOR REVIEW/APPROVAL PRIOR TO BEGINNING FIRE
SUPPRESSION WORK
2. MODIFY EXISTING BUILDING 200 FIRE SUPPRESSION SYSTEM AS REQUIRED TO SPRINKLE THE
ENTIRE ADDITION PER NFPA 13.
V
TD-1
6"
CB-1
6"
TD-1
SAN UP
TO FCO
SAN SAN
6"
2" V UP
2"
SAN
6"
SAN
6"
SAN 6"
CO (ISNTALL WITHIN 5'
OF THE BUILDING)
9'-2"
8" CW UP
8"
CW
8" CW CAPPED
BELOW GRADE FOR
FUTURE USE
SAN UP
TO FCO
CB-2
4"
6" SAN (REFER TO CIVIL
FOR CONTINUATION)
1 1 1
FUTURE CONCRETE PAD
(SHOWN FOR REFERENCE)
I.E. = 98'-0"
FINISHED FLOOR
I.E. = 100'-0"
RC
4" RC (REFER TO CIVIL
FOR CONTINUATION)
4" RC UP7
4"7
CO (ISNTALL WITHIN 5'
OF THE BUILDING)
2" V UP,
3" VTR
8" CW DN
8" CW CAPPED
FOR FUTURE USE
6 6
FUTURE CONCRETE PAD
(SHOWN FOR REFERENCE)
ERT VAN
ROOM
FILTRATION
ROOM
GENERATOR
ROOM
CORRIDOR
RD-1 RD-1 RD-1
CO
RC RC RC
4" RC DN
4" 4" 4"
7 7 7
CO
4"7
4"7
RC
RC
file no.
index no.
contract order no.
Y23461 consultant job no.
24306.00
472/24069.JGH
checked by drawn by consultant issue date
M a t r ix sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
4/27/2026 CD SET
P-400
ENLARGED PARTIAL
BUILDING 200 BELOW
FLOOR PLAN - PLUMBING
NEW
DBP
CAT
1 ENLARGED PARTIAL BUILDING 200 ADDITION - BELOW FLOOR PLAN - PLUMBING NEW
SCALE: 1/4" = 1'-0" SITE PLAN - PLUMBING NEWN
N
2 ENLARGED PARTIAL BUILDING 200 ADDITION - FIRST FLOOR PLAN - PLUMBING NEW
SCALE: 1/4" = 1'-0"
N
GENERAL HVAC NOTES
1. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE,
LATEST APPLICABLE EDITION.
2. LOCATE EXHAUST OUTLETS OF VENTILATION SYSTEMS,
COMBUSTION EQUIPMENT STACKS, & PLUMBING VENTS AT
LEAST 10 FEET FROM OUTDOOR AIR INTAKES.
3. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES PER
MANUFACTURERS WRITTEN INSTRUCTIONS.
4. ALL EXISTING SYSTEMS THAT SERVES AREAS BEING
RENOVATED SHALL BE REBALANCED AS REQUIRED.
5. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION
THAT MAY AFFECT NORMAL OPERATION OF OTHER AREAS.
6. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY
CONFLICT WITH NEW CONSTRUCTION AND RELOCATE AS
NEEDED.
7. LOCATIONS OF THE THERMOSTATS TO BE VERIFIED IN FIELD.
8. ALL REHEAT COIL HS&R RUNOUT PIPES SHALL BE 3/4" UNLESS
OTHERWISE NOTED.
9. COORDINATE LOUVER SIZES WITH ARCHITECTURAL TRADES
PRIOR TO CONSTRUCTION.
10. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER
DISCIPLINES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.
11. PROVIDE MANUAL AIR VENTS WITH 3/4" HOSE CONNECTION AT
ALL HIGH POINTS.
12. OFFSET PIPING TO ACCOMMODATE LARGE DUCTWORK.
13. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION,
ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS THAT
MAY AFFECT THE WORK.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
THE INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A "NEW"
CONDITION DURING CONSTRUCTION.
15. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED BY LAW.
16. CONTRACTOR SHALL USE LOW PRESSURE LOSS DUCT
FITTINGS IN ACCORDANCE WITH SMACNA. (WYES, RADIUSED
OR VANED TEES, ETC.) DUCTWORK SHALL BE GALVANIZED
SHEET METAL, MIN. 26 GA.
17. ALL DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSION.
INCREASE DUCT SIZE FOR LINING.
18. ALL EXTERNALLY ISOLATED HVAC EQUIPMENT SHALL HAVE
FLEXIBLE DUCT CONNECTORS.
19. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR
SPECIFICATIONS THE MORE STRINGENT AND GREATER COST
ITEM SHALL BE USED.
20. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND DUCTS AND SUGGESTED ROUTES.
IT IS NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE
HEADROOM AND KEEP OPENINGS AND PASSAGEWAYS CLEAR.
DO NOT SCALE FROM DRAWINGS.
21. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS,
REVISIONS, AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE
STATUTES, ORDINANCES, CODES OR REGULATIONS OF
FEDERAL, STATE, AND LOCAL AUTHORITIES HAVING
JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.
22. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY
OSHA, UNDERWRITERS, LABORATORIES, AMERICAN CODES,
ASA, ASHRAE, ARI, NEC, STATE FIRE INSURANCE REGULATION
BODY, NFPA OR OTHERS, THESE STANDARDS SHALL BE
FOLLOWED WHETHER OR NOT INDICATED ON THE DRAWING
AND SPECIFICATIONS.
23. COORDINATE WITH ARCHITECTURAL FOR EXACT LOCATION OF
EQUIPMENT.
24. DUCT/PIPING LAYOUT IS SCHEMATIC. EXACT LOCATION OF
DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH
BUILDING STRUCTURE, EQUIPMENT FURNISHED,
ARCHITECTURAL DRAWINGS, AND ALL OTHER TRADES PRIOR
TO INSTALLATION. ANY CONTRACTOR INSTALLING WORK
WITHOUT PRIOR COORDINATION SHALL RELOCATE HIS WORK
AT HIS EXPENSE TO ALLOW PROPER INSTALLATION OF ANY
AND ALL TRADES WORK.
25. UNLESS OTHERWISE NOTED, ALL DUCT/PIPING SHALL BE
CONCEALED WHEREVER POSSIBLE. PROVIDE CHROME
ESCUTCHEON OR ALUMINUM DUCT COLLAR AT EACH
PENETRATION OF A FINISHED SURFACE.
26. DUCT/PIPING SHALL NOT BE RUN ABOVE ELECTRICAL GEAR IN
THE SERVICE SPACE REQUIRED BY THE NATIONAL ELECTRICAL
CODE.
27. ANY ADDITIONAL LOW VOLTAGE CONTROL WIRING THAT IS
REQUIRED SHALL BE PROVIDED BY THE HVAC CONTRACTOR.
CONTROL WIRING SHALL BE RUN IN CONDUIT IF REQUIRED BY
LOCAL CODES OR THE SPECIFICATIONS. POWER SHALL BE
PROVIDED BY THE ELECTRICAL CONTRACTOR.
28. PROVIDE VIBRATION ISOLATION AT EACH CONNECTION TO A
MOTORIZED PIECE OF EQUIPMENT BY THE HVAC
CONTRACTOR.
29. MOUNT THERMOSTAT/SENSORS AT 48" AFF UNLESS NOTED
OTHERWISE.
30. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH POST
CONSTRUCTION MEETING WITH THE ENGINEER AND OWNER
TO REVIEW AND FIX ISSUES DURING THE WARRANTY PERIOD.
31. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO
OWNER OF THE AMOUNT OF MATERIAL BEING RECYCLED
THROUGHOUT THE PROJECT.
32. CONTRACTOR WILL HAVE 1 ESCORT TO WORK WITH THROUGH
AT THE PROJECT.
33. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY IN
ADVANCE FOR ANY HOT WORK TO ALLOW THE OWNER TO
DISABLE THE FIRE ALARM.
34. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES SHALL
USE TAMPERPROOF SCREWS.
35. CONTRACTOR TO REFER TO ALL ELECTRICAL CONSTRUCTION
DOCUMENTS AND DIVISION 26 SPECIFICATIONS FOR CONTROL
WIRING RACEWAYS. ALL CONTROL WIRING RACEWAYS ARE TO
MEET MDOC REQUIREMENTS.
MECHANICAL SYMBOLS LEGEND
HVAC PIPING SYMBOLSHVAC PIPING
HVAC DUCTWORK
F/S F/S s s
TEMPERATURE CONTROL SYMBOLS
MISCELLANEOUS NOTES
HVAC DUCTWORK SYMBOLS HVAC DUCTWORK & DIFFUSER TAGS HVAC PIPING VALVES
MECHANICAL ABBREVIATIONS
AFF ABOVE FINISH FLOOR
AC AIR COMPRESSOR
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
A.T.C. ARCHITECTURAL TRADES CONTRACTOR
B BOILER
B.A.S. BUILDING AUTOMATION SYSTEM
CAF COMBUSTION AIR FAN
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CHLR CHILLER
CHP CONSOLE HEAT PUMP
CONV CONVECTOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONTROL VALVE
CWP CHILLED WATER PUMP
DB DRY BULB
DFU DUCT FURNACE
DIA DIAMETER
DN DOWN
DPR DAMPER
DS DUCT SILENCER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
E.T.C. ELECTRICAL TRADES CONTRACTOR
EVR EVAPORATOR
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST EXISTING
FF FINISH FLOOR
FPM FEET PER MINUTE
FT FEET
FTR FINNED TUBE RADIATION
FU FURNACE
GAL GALLON
GFRH GAS FIRED RADIANT HEATER
GR GRILLE
H HUMIDIFIER
HC HEATING COIL
HD HEAD (FT)
HP HORSE POWER
HHP HORIZONTAL HEAT PUMP
HTG HEATING
HVAC HEATING, VENTILATION, & AIR CONDITIONING
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IAH INTAKE HOOD
LAT LEAVING AIR TEMPERATURE
LH LATENT HEAT (MBH)
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH BTU PER HOUR (THOUSAND)
MIN MINIMUM
M.T.C. MECHANICAL TRADES CONTRACTOR
N.C. NOISE CRITERIA
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
P PUMP
PCR PUMPED CONDENSATE RETURN
PD PRESSURE DROP
RCP RADIANT CEILING PANEL
REQ'D REQUIRED
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RLH RELIEF HOOD
RTU ROOF TOP UNIT
SD SUPPLY DIFFUSER
SF SUPPLY FAN
SG SUPPLY GRILLE
SH SENSIBLE HEAT (MBH)
SM SHEET METAL
SQ. FT. SQUARE FEET
SST SATURATED SUCTION TEMPERATURE
STR STRAINER
TC TOTAL COOLING (MBH)
TCL TEMPERATURE CONTROL
T&P TEMPERATURE & PRESSURE RELIEF VALVE
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
VRH VARIABLE AIR VOLUME REHEAT BOX
FPVAV FAN POWERED VARIABLE AIR VOLUME BOX
V.F.D VARIABLE FREQUENCY DRIVE
ZD ZONE DAMPER
X-SA EXISTING ITEM (EXISTING SUPPLY AIR DUCT)
ITEM
EXISTING
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSATE DRAIN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
COOLING TOWER WATER SUPPLY
COOLING TOWER WATER RETURN
DIRECT EXPANSION
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
SUCTION (REFRIGERANT)
LIQUID (REFRIGERANT)
SUCTION (DIRECT EXPANSION)
LIQUID (DIRECT EXPANSION)
LOW PRESSURE STEAM (0-20 LBS.)
MEDIUM PRESSURE STEAM (21-75 LBS.)
HIGH PRESSURE STEAM (76 LBS. & ABV.)
STEAM CONDENSATE (GRAVITY)
PUMPED STEAM CONDENSATE
STEAM CONDENSATE BOILER FEED
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
SOLENOID VALVE
EXPANSION VALVE WITH
THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
THERMOMETER
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
BACK FLOW PREVENTER
PIPE CAP
PIPE BREAK
THERMOMETER WELL
EXPANSION LOOP
EXPANSION COMPENSATOR
FLOAT & THERMOSTATIC STEAM TRAP
INVERTED BUCKET STEAM TRAP
THERMOSTAT
PROGRAMMABLE THERMOSTAT
THERMOSTAT (W/ NIGHT SETBACK)
ROOM SENSOR
HUMIDISTAT
PRESSURE GAUGE
DAMPER (ELECTRIC OPERATION)
DAMPER (PNEUMATIC OPERATION)
DAMPER BLADES
SUPPLY AIR DUCT
EXIST SUPPLY AIR DUCT
RETURN AIR DUCT
EXIST RETURN AIR DUCT
OUTSIDE AIR DUCT
EXIST OUTSIDE AIR DUCT
EXHAUST AIR DUCT
EXIST EXHAUST AIR DUCT
SUPPLY AIR DUCT RISER
RETURN AIR DUCT RISER
OUTSIDE AIR DUCT RISER (AS NOTED)
EXHAUST AIR DUCT
INSULATED DUCTWORK (AS NOTED)
SUPPLY AIR DIFFUSER (SQUARE)
SUPPLY AIR DIFFUSER (INLINE)
TURNING VANES
SURFACE MTD. GRILLE
SUPPLY AIR DIFFUSER (ROUND)
90° TEE W/45° APPROACH
CONICAL TAKE-OFF
CONICAL TAKE-OFF W/ DAMPER
BALANCE DAMPER
RETURN AIR DUCT BOOT
ECCENTRIC REDUCER
CONCENTRIC REDUCER
VERTICAL FIRE DAMPER
EXISTING VERTICAL FIRE DAMPER
HORIZONTAL FIRE DAMPER
EXISTING HORIZONTAL FIRE DAMPER
VERTICAL SMOKE DAMPER
HORIZONTAL SMOKE DAMPER
VERTICAL FIRE / SMOKE DAMPER
HORIZONTAL FIRE / SMOKE DAMPER
DUCT SMOKE DETECTOR, INSTALLED BY M.T.C.,
PROVIDED & WIRED BY E.T.C.
UNIT HEATER
CEILING EXHAUST FAN
ROOF MOUNTED EXHAUST FAN
DEMOLITION
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
X
X
XX
XXXX
XX
XXXX
SA
OA
X-OA
X-EA
EA
X-SA
X-RA
RA
SCP
SC
DXS
DXL
HR
CR
CD
CS
DX
CTR
HPR
HS
HPS
CTS
CWR
CWS
S
L
LPS
MPS
HPS
SC (BF)
TAG CFM
NECK REMARKS
SIZE
BT
FT
SD-1 250
8"ø ---
P
H
S
T
T P
T N
M
M
SD
1. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
2. EXISTING EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATION OF EXISTING
DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH BUILDING
STRUCTURE, EQUIPMENT FURNISHED, ARCHITECTURAL DRAWINGS AND ALL
OTHER TRADES PRIOR TO DEMOLITION.
3. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,
AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,
CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL AUTHORITIES
HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.
4. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,
UNDERWRITERS LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, NEC,
STATE FIRE INSURANCE REGULATION BODY, NFPA OR OTHERS. THESE
STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE
DRAWING AND SPECIFICATIONS.
5. COORDINATE CUTTING AND PATCHING WITH GENERAL CONTRACTOR.
6. ALL BOLD DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS NOTED BY
KEYNOTE. ALL OTHER EXISTING SYSTEMS SHOWN FOR REFERENCE ONLY.
7. PATCH AND REPAIR ALL FLOOR AND WALL SURFACES LEFT DAMAGED OR
INCOMPLETE FROM REMOVAL OF EXISTING EQUIPMENT OR OTHER FIXED
ACCESSORIES WITH MATERIALS TO MATCH EXISTING, AS ACCEPTABLE TO THE
ARCHITECT AND OWNER.
8. NOTATIONS ARE MADE IN VARIOUS PLACES ON THE DRAWINGS TO CALL
ATTENTION TO DEMOLITION WHICH IS REQUIRED. HOWEVER, THESE
DRAWINGS ARE NOT INTENDED TO SHOW EACH AND EVERY ITEM TO BE
REMOVED. CONTRACTOR SHALL REMOVE ALL MATERIALS RELATED TO THEIR
RESPECTIVE TRADES AS REQUIRED TO PERMIT THE CONSTRUCTION OF THE
NEW WORK AS SHOWN.
9. THE GENERAL CONTRACTOR SHALL COORDINATE THE EXTENT OF THE
REQUIRED DEMOLITION OF THE EXISTING BUILDING AS REQUIRED TO
FACILITATE THE CONSTRUCTION OF THE PROJECT AS SHOWN AS PART OF
THIS WORK.
10. ALL DEMOLITION SHALL BE APPROVED BY THE OWNER/TENANT PRIOR TO
COMMENCEMENT AND SHALL BE PERFORMED UNDER REQUIREMENTS AND
APPROVAL OF THE LOCAL CODE JURISDICTIONS.
11. ASBESTOS ABATEMENT: CONTRACTOR SHALL NOTIFY BUILDING
REPRESENTATIVE IMMEDIATELY WHEN AND IF ANY ITEMS ARE ENCOUNTERED
THAT IN ANY WAY, SHAPE, OR FORM APPEAR TO BE HAZARDOUS OF NATURE.
ASBESTOS ABATEMENT IS NOT PART OF THE SCOPE OF THE DESIGN
PROFESSIONALS DOCUMENTATION OR RESPONSIBILITY TO SURVEY, IDENTIFY,
OR FOR CONSULTATION OF PROPER DISPOSAL.
12. PROTECT ALL EXISTING WORK WHICH IS TO REMAIN AND RESTORE IN AN
APPROVED MANNER ANY SUCH WORK WHICH BECOMES DAMAGED.
13. RUBBISH AND DEBRIS RESULTING FROM THE WORK SHALL BE REMOVED
IMMEDIATELY FROM THE SITE IN A SAFE AND LEGAL MANNER BY THE
CONTRACTOR.
14. DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT BUILDING
REPRESENTATIVE TO CLARIFY ANY ITEMS NOT SHOWN ON THESE
DOCUMENTS OR SHOWN NOT MATCHING FIELD CONDITIONS.
GENERAL DEMOLITION NOTES
GENERATOR
DT-1
FLEXIBLE
CONNECTOR,
TYP.
SHUTOFF
VALVE, TYP.
RACOR HOUSING DOUBLE UNIT
MODEL #751000FV10 WITH RACOR
MODEL #2020V30 FILTER
SOLENOID
VALVE
DT-1 SUPPLY
PUMP
DT-1 RETURN
PUMP
UNION, TYP.
2" VENT THRU OUTSIDE WALL, VENT TO
BE HIGHER THEN TOP OF OUTDOOR
TANK AND HIGH AS POSSIBLE IN THE
GENERATOR ROOM.
3" EMERGENCY VENT THRU OUTSIDE
WALL, VENT TO BE HIGHER THEN TOP OF
OUTDOOR TANK AND HIGH AS POSSIBLE
IN THE GENERATOR ROOM.
1" FUEL OIL PIPING TO AST-1
1 NEW GENERATOR AND DAY TANK PIPING DIAGRAM
SCALE: NTS
CHECK VALVE,
TYP.
TYPICAL UNIT HEATER 3-WAY CONTROL VALVE
HYDRONIC PIPING DIAGRAM
SCALE: NTS
COIL
HS
HR
3/4" HOSE END
DRAIN VALVE
SHUTOFF VALVE (TYP.)
CIRCUIT SETTER
UNION (TYP)
P/T TAP (TYP.)
STRAINER
AUTOMATIC AIR
VENT (TYP.)
TYPICAL UNIT HEATER 2-WAY CONTROL VALVE
HYDRONIC PIPING DIAGRAM
SCALE: NTS
COIL
HS
HR
3/4" HOSE END
DRAIN VALVE
2-WAY, 2-POSITION
CONTROL VALVE
SHUTOFF VALVE (TYP.)
CIRCUIT SETTER
UNION (TYP)
P/T TAP (TYP.)
STRAINER
AUTOMATIC AIR VENT
3-WAY, 2-POSITION
CONTROL VALVE
file no.
index no.
contract order no.
Y23461 consultant job no.
24306.00
472/24069.JGH
checked by drawn by consultant issue date
M a t r ix sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
4/27/2026 CD SET
M-100
MECHANICAL SYMBOLS,
NOTES, ABBREVIATIONS,
AND SCHEDULES
M-200
X-G
X-3" (BURIED)
X-6" (BURIED)
X- G
X-6" (5 PSI, BURIED)
FROM METER AT MTU
MAINTENANCE GARAGE
X-3" (BURIED)
X-3" (BURIED)
X-3" (BURIED)
X-3" (BURIED)
X- G
X- G
X- G
X-3" (5 PSI, BURIED)
TO BUILDING 300
X-G
X-3" (5 PSI, BURIED)
TO BUILDING 200
X-G
X-G
X-G
X-G
X-3" (BURIED)
X-3" (BURIED)
X-3" (BURIED)
X-3" (BURIED)
X-6" (BURIED)
X-
G
X-6" (10 PSI, BURIED)
FROM METER AT MTU
MAINTENANCE GARAGE
X-6" (BURIED)
X-6" (BURIED)
X-6" (BURIED)
X- G
X- G
X- G
X-6" (10 PSI, BURIED)
TO HOUSING UNITS
SIDEWALK
DEMOLITION2
MECHANICAL DEMOLITION NOTES
DISCONNECT, REMOVE, AND DEMO EXISTING DIRECT NATURAL GAS PIPING, VALVES,
FITTINGS, AND ALL ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN.
CONTRACTOR IS TO DEMOLISH THE EXISTING BURIED NATURAL GAS PIPING BACK TO
THE MAIN AND CAP IN THE LOCATION SHOWN.
CONTRACTOR TO SAWCUT, DISCONNECT, REMOVE, AND DEMO EXISTING SIDEWALK
IN THE LOCATION SHOWN AS REQUIRED TO DEMOLISH THE EXISTING DIRECT BURIED
NATURAL GAS PIPING. CONTRACTOR TO VERIFY LOCATION OF DIRECT BURIED
NATURAL GAS PIPING WITH GPR PRIOR TO SAWCUTTING/REMOVING THE EXISTING
SIDEWALK. CONTRACTOR TO PATCH EXISTING SIDEWALK TO BE FLUSH AND MATCH
EXISTING AFTER ALL DEMOLITION AND NEW WORK IS COMPLETED AS SHOWN ON
NEW DRAWINGS.
GENERAL DEMOLITION NOTES
1. CONTRACTOR TO PROVIDE/COMPLETE A GROUND PENETRATING RADAR
SURVEY PRIOR TO CONSTRUCTION TO VERIFY LOCATIONS OF ALL EXISTING
UNDERGROUND UTILITIES IN THE AREA OF EXISTING DIRECT BURIED PIPING.
ALL EXCAVATION IS TO BE HYDROVAC-EXCAVATION. CONTRACTOR TO
COORDINATE WITH MDOC ATLEAST 10-DAYS IN ADVANCE PRIOR TO BEGINNING
ONSITE HYDROVAC-EXCAVATION.
2. CONTRACTOR TO PROVIDE BARRICADES, SIGNS, AND OTHER SAFETY
MEASURES AROUND ALL AREAS OF EXCAVATION. ALL BARRICADES, SIGNS, AND
OTHER SAFETY MEASURES MUST BE COORDINATED AND APPROVED BY MDOC
PRIOR TO INSTALLING.
3. CONTRACTOR TO BACKFILL, RE-GRADE, AND FULLY RESTORE ALL GREEN
AREAS AFFECTED BY CONSTRUCTION TO MATCH EXISTING AFTER ALL
DEMOLITION/NEW WORK IS COMPLETE.
4. LOCATIONS OF EXISTING BURIED NATURAL GAS PIPING, AND ALL ASSOCIATED
ACCESSORIES ARE BASED ON THE FACILITY'S RECORD DRAWINGS.
CONTRACTOR TO FIELD VERIFY EXACT LOCATIONS WITH GROUND
PENETRATING RADAR PRIOR TO BEGINNING CONSTRUCTION.
5. EXISTING NATURAL PIPING IS TO REMAIN ACTIVE UNTIL ALL THE NEW NATURAL
GAS PIPING SHOWN ON THE NEW DRAWING IS INSTALLED AND PREPARED FOR
A SMALL CHANGEOVER SHUTDOWN. AFTER THE NEW NATURAL GAS PIPING IS
FULLY COMPLETED AND OPERATIONAL, THE EXISTING NATURAL GAS PIPING
CAN BE DEMOLISHED TO THE EXTENTS SHOWN.
6. CONTRACTOR TO ENSURE THAT THE FACILITY'S NATURAL GAS SERVICE
REMAINS ONLINE BESIDES SMALL CHANGE OVER SHUTDOWNS DURING
CONSTRUCTION. ALL SHORT CHANGE OVER SHUTDOWNS ARE TO BE
COMPLETED AT NIGHT DURING OFF HOURS. ALL SHUTDOWNS ARE TO BE
COORDINATED WITH A FORMAL SHUTDOWN REQUEST SUBMITTED TO THE
ENTIRE PROJECT TEAM AND APPROVED BY MDOC 10 DAYS IN ADVANCE PRIOR
TO BEING COMPLETED. CONTRACTOR TO REFER TO MDOC UTILITY SHUTDOWN
STANDARD IN PROJECT SPECIFICATIONS.
5. CONTRACTOR IS TO SAWCUT, DISCONNECT, REMOVE, AND DEMO EXISTING
SIDEWALK IN THE LOCATION SHOWN AS REQUIRED TO DEMOLISH THE EXISTING
DIRECT BURIED PIPING AND INSTALL THE NEW DIRECT BURIED PIPING AS
SHOWN ON THE NEW DRAWING. CONTRACTOR TO PATCH EXISTING SIDEWALK
TO BE FLUSH AND MATCH EXISTING AFTER ALL DEMOLITION AND NEW WORK IS
COMPLETED.
file no.
index no.
contract order no.
Y23461 consultant job no.
24306.00
472/24069.JGH
checked by drawn by consultant issue date
M a t r ix sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
4/27/2026 CD SET
M-200
ENLARGED PARTIAL SITE
PLAN - MECHANICAL
DEMOLITION
DBP
CAT
N SITE PLAN - MECHANICAL DEMOLITION1 ENLARGED PARTIAL SITE PLAN - MECHANICAL DEMOLITION
SCALE: 1/8" = 1'-0"
M-201
X-G
X-3" (BURIED)
X-6" (BURIED)
X- G
X-6" (5 PSI, BURIED)
FROM METER AT MTU
MAINTENANCE GARAGE
X-3" (BURIED)
X-3" (BURIED)
X-3" (BURIED)
X-3" (BURIED)
X- G
X- G
X- G
X-3" (5 PSI, BURIED)
TO BUILDING 300
X-3" (5 PSI, BURIED)
TO BUILDING 200
X-6" (BURIED)
X-
G
X-6" (10 PSI, BURIED)
FROM METER AT MTU
MAINTENANCE GARAGE
X-6" (BURIED)
X-6" (BURIED)
X-6" (BURIED)
X- G
X- G
X- G
X-6" (10 PSI, BURIED)
TO HOUSING UNITS
G
G G G
3" (BURIED) 3" (BURIED)
3" (BURIED) 3" (BURIED)FUTURE WATER
TREATMENT
STRUCTURE
1 1 1
SIDEWALK
REPLACEMENT
MECHANICAL KEY NOTES
INSTALL NEW BURIED NATURAL GAS PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN. CONTRACTOR TO FIELD
VERIFY THERE ARE NO OBSTRUCTIONS FOR THE BURIED NATURAL GAS PIPE
ROUTING WITH GROUND PENETRATING RADAR SURVEY PRIOR TO CONSTRUCTION.
ALL NEW DIRECT BURIED NATURAL GAS PIPING IS TO BE INSTALLED WITH TRACER
WIRE. CONTRACTOR TO MODIFY EXISTING DIRECT BURIED NATURAL GAS PIPING AS
REQUIRED FOR NEW CONNECTION IN THE LOCATION SHOWN. NEW DIRECT BURIED
NATURAL GAS PIPING TO BE INSTALLED A MINIMUM OF 42" BELOW GRADE.
FUTURE WATER TREATMENT STRUCTURE IS NOT IN THE SCOPE OF THE PROJECT.
FUTURE WATER TREATMENT STRUCTURE IS SHOWN FOR REFERENCE ONLY TO
ENSURE THE NEW DIRECT BURIED NATURAL GAS PIPING DOES NOT CONFLICT WITH
THIS LOCATION.
CONTRACTOR IS TO REPAIR EXISTING SIDEWALK AS REQUIRED TO MATCH EXISTING.
THE NEW SIDEWALK REPAIR IS TO BE FLUSH WITH THE EXISTING SIDEWALK AND
MATCH THE THICKNESS OF THE EXISTING SIDEWALK. ALL NEW SIDEWALKS ARE TO
HAVE A MINIMUM 6” MDOT 21AA SUBBASE COMPACTED TO 98% MAXIMUM DENSITY.
ALL NEW SIDEWALKS ARE TO HAVE 6X6X1.4X1.4 WWF REINFORCEMENT. DOWELS
ARE TO BE INSTALLED 12” O.C. ON LOCATIONS WHERE NEW CONCRETE SIDEWALKS
ARE TYING INTO EXISTING SIDEWALKS.
MECHANICAL GENERAL NOTES
1. CONTRACTOR TO SAW CUT AND PATCH CONCRETE SIDEWALK AS REQUIRED TO
REMOVE EXISTING DIRECT BURIED NATURAL GAS PIPING. CONTRACTOR TO
INSTALL NEW CONCRETE SIDEWALK AS REQUIRED TO MATCH THE EXISTING
SLOPE/CONFIGURATION PRIOR TO CONSTRUCTION. CONTRACTOR TO INSTALL
MINIMUM 6" MDOT 21AA SUBBASE COMPACTED TO 98% MAXIMUM DENSITY
BELOW NEW CONCRETE SIDEWALK. NEW SIDEWALK IS TO MATCH THE
THICKNESS OF THE EXISTING SIDEWALK AND HAVE 6x6x1.4x1.4 WWF
REINFORCEMENT. DOWELS ARE TO BE INSTALLED 12" O.C. AT LOCATIONS
WHERE THE NEW CONCRETE SIDEWALK/DRIVEWAY ARE TYING INTO THE
EXISTING CONCRETE SIDEWALK.
2. CONTRACTOR TO PROVIDE/COMPLETE A GROUND PENETRATING RADAR
SURVEY PRIOR TO CONSTRUCTION TO VERIFY LOCATIONS OF ALL EXISTING
UNDERGROUND UTILITIES IN THE AREA OF EXISTING DIRECT BURIED PIPING
AND LOCATION SHOWN FOR NEW DIRECT BURIED PIPING. ALL EXCAVATION IS
TO BE HYDROVAC-EXCAVATION. CONTRACTOR TO COORDINATE WITH MDOC
ATLEAST 10-DAYS IN ADVANCE PRIOR TO BEGINNING ONSITE
HYDROVAC-EXCAVATION.
3. CONTRACTOR TO PROVIDE BARRICADES, SIGNS, AND OTHER SAFETY
MEASURES AROUND ALL AREAS OF EXCAVATION. ALL BARRICADES, SIGNS, AND
OTHER SAFETY MEASURES MUST BE COORDINATED AND APPROVED BY MDOC
PRIOR TO INSTALLING.
4. CONTRACTOR TO BACKFILL, RE-GRADE, AND FULLY RESTORE ALL GREEN
AREAS AFFECTED BY CONSTRUCTION TO MATCH EXISTING AFTER ALL
DEMOLITION/NEW WORK IS COMPLETE.
5. LOCATIONS OF EXISTING BURIED NATURAL GAS PIPING, AND ALL ASSOCIATED
ACCESSORIES ARE BASED ON THE FACILITY'S RECORD DRAWINGS.
CONTRACTOR TO FIELD VERIFY EXACT LOCATIONS WITH GROUND
PENETRATING RADAR PRIOR TO BEGINNING CONSTRUCTION.
6. EXISTING NATURAL PIPING IS TO REMAIN ACTIVE UNTIL ALL THE NEW NATURAL
GAS PIPING SHOWN ON THE NEW DRAWING IS INSTALLED AND PREPARED FOR
A SMALL CHANGEOVER SHUTDOWN. AFTER THE NEW NATURAL GAS PIPING IS
FULLY COMPLETED AND OPERATIONAL, THE EXISTING NATURAL GAS PIPING
CAN BE DEMOLISHED TO THE EXTENTS SHOWN ON THE DEMOLITION DRAWING.
7. CONTRACTOR TO ENSURE THAT THE FACILITY'S NATURAL GAS SERVICE
REMAINS ONLINE BESIDES SMALL CHANGE OVER SHUTDOWNS DURING
CONSTRUCTION. ALL SHORT CHANGE OVER SHUTDOWNS ARE TO BE
COMPLETED AT NIGHT DURING OFF HOURS. ALL SHUTDOWNS ARE TO BE
COORDINATED WITH A FORMAL SHUTDOWN REQUEST SUBMITTED TO THE
ENTIRE PROJECT TEAM AND APPROVED BY MDOC 10 DAYS IN ADVANCE PRIOR
TO BEING COMPLETED. CONTRACTOR TO REFER TO MDOC UTILITY SHUTDOWN
STANDARD IN PROJECT SPECIFICATIONS.
SEEDING SCHEDULE
CONTRACTOR TO SUPPLY 6" OF TOPSOIL OVER ALL
DISTURBED AREAS. SEED ALL DISTURBED AREAS WITH
THE FOLLOWING SEED MIX:
40% KENTUCKY BLUEGRASS
25% CREEPING FESCUE
20% PERENNIAL RYEGRASS
15% CHEWING FESCUE
APPLY AT A RATE OF 8 LBS PER 1,000 SQUARE FEET OR
350 LBS PER ACRE.
file no.
index no.
contract order no.
Y23461 consultant job no.
24306.00
472/24069.JGH
checked by drawn by consultant issue date
M a t r ix sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
4/27/2026 CD SET
M-201
ENLARGED PARTIAL SITE
PLAN - MECHANICAL
NEW
DBP
CAT
N SITE PLAN - MECHANICAL NEW 1 ENLARGED PARTIAL SITE PLAN - MECHANICAL NEW
SCALE: 1/8" = 1'-0"
M-300
X-L (72" x 72")
X-L (72" x 72")
X-GENERATOR
X-CONCRETE PAD
M
M
X-UH
X-1" HS & HR
S
X-UH
X-DAY TANK
X-MUFFLER
X-12"
VTR
X-2" VTR
S
X-1" HS & HR
X-3/4" HS & HR
X-3/4" FOS
& 1" FOR
X-3/4" FOS &
1" FOR (BURIED)
X-
FO
S (B
UR
IE
D) X-
FO
R
(B
UR
IE
D)
X-3/4" FOS &
1" FOR (BURIED)
X-
FO
S (B
UR
IE
D) X-
FO
R
(B
UR
IE
D)
X-FOS (B
URIED)
X-FOR (B
URIED)
X-FOS (B
URIED)
X-FOR (B
URIED)
X-FOS (B
URIED)
X-FOR (B
URIED)
X-FOS (BURIED)
X-FOR (BURIED)
X-DIESEL TANK
(BURIED)
X-FOR
4" FILL AND 4" V TO
ABOVE GRADE
4" DIPSTICK TO
ABOVE GRADE
X-EA1
1 1
8SIDEWALK DEMOLITION
X-EA1
X-FOS
X-1/2"
X-1/2"
X-3/4" HS & HR
X-3/4" FOS &
1" FOR (BURIED) 6
X-3/4" FOS &
1" FOR (BURIED) 6
X-3/4" FOS &
1" FOR (BURIED)
X-3/4" FOS &
1" FOR (BURIED)
X-4" (BURIED) 7
2" VENT TO
ABOVE GRADE7
MECHANICAL DEMOLITION NOTES
DISCONNECT, REMOVE, AND DEMO EXISTING GENERATOR, GENERATOR ISOLATION
FRAME, CONCRETE PAD, EXHAUST AIR DUCTWORK, FUEL OIL PIPING, PIPING
SUPPORTS, EXHAUST VENT, MUFFLER, VENT THROUGH ROOF, CONTROLS, AND ALL
ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO PATCH EXISTING
VENT THROUGH ROOF PENETRATION AS REQUIRED TO MATCH EXISTING, SEAL
WATERTIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES.
DISCONNECT, REMOVE, AND DEMO EXISTING GENERATOR DAY TANK, PUMP, FUEL
OIL PIPING, PIPING SUPPORTS, VENT PIPING, VENT THROUGH ROOF, CONTROLS, AND
ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO PATCH
EXISTING VENT THROUGH ROOF PENETRATION AS REQUIRED TO MATCH EXISTING,
SEAL WATERTIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES. REFER TO
ARCHITECTURAL DRAWINGS TO ROOF PATCHING DETAILS.
DISCONNECT, REMOVE, AND DEMO EXISTING LOUVER, DAMPER, DAMPER
ACTUATOR(S), CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN
THEIR ENTIRETY. CONTRACTOR TO PATCH EXISTING LOUVER OPENING WITH
TOOTH-IN BLOCK/BRICK TO MATCH EXISTING AND SEAL WATERTIGHT. REFER TO
ARCHITECTURAL DRAWINGS TO WALL PATCHING DETAILS.
DISCONNECT, REMOVE, AND DEMO EXISTING ABOVE FLOOR FUEL OIL SUPPLY
PIPING, FUEL OIL RETURN PIPING, PIPING SUPPORTS, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO PATCH EXISTING
CONCRETE FLOOR AND EXISTING BLOCK WALLS AS REQUIRED WHERE PIPE
SUPPORTS AND ALL ASSOCIATED ACCESSORIES ARE REMOVED TO MATCH EXISTING.
DISCONNECT, REMOVE, AND DEMO EXISTING FUEL OIL SUPPLY PIPING AND FUEL OIL
RETURN PIPING ROUTED THROUGH THE EXISTING CONCRETE FLOOR. CONTRACTOR
TO PATCH EXISTING CONCRETE FLOOR PENETRATIONS AS REQUIRED TO BE FLUSH
AND MATCH EXISTING.
DISCONNECT, REMOVE, AND DEMO EXISTING DIRECT BURIED FUEL OIL SUPPLY
PIPING, BURIED FUEL OIL RETURN PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING BURIED FUEL TANK, FUEL, BURIED FUEL
OIL SUPPLY/RETURN PIPING, BURIED FILL PIPING, BURIED VENT PIPING, CONTROLS,
CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
CONTRACTOR TO INFILL THE LOCATION OF THE DEMOLISHED BURIED FUEL TANK AS
REQUIRED TO MATCH EXISTING GRADE. CONTRACTOR TO INSTALL A MINIMUM OF 6"
OF TOP SOIL AND RE-SEED AS REQUIRED TO MATCH EXISTING GREEN SPACE.
CONTRACTOR TO SAWCUT, DISCONNECT, REMOVE, AND DEMO EXISTING SIDEWALK
IN THE LOCATIONS SHOWN AS REQUIRED TO DEMOLISH THE EXISTING DIRECT
BURIED PIPING AND INSTALL THE NEW DIRECT BURIED PIPING AS SHOWN ON THE
NEW DRAWING. CONTRACTOR TO VERIFY LOCATION OF DIRECT BURIED PIPING WITH
GPR PRIOR TO SAWCUTTING/REMOVING THE EXISTING SIDEWALK. CONTRACTOR TO
PATCH EXISTING SIDEWALK TO BE FLUSH AND MATCH EXISTING AFTER ALL
DEMOLITION AND NEW WORK IS COMPLETED AS SHOWN ON NEW DRAWINGS.
GENERAL DEMOLITION NOTES
1. ALL EQUIPMENT, CONTROLS, CONTROL WIRING, PIPING, VALVES, FITTINGS, AND
ALL ASSOCIATED ACCESSORIES TO REMAIN AND BE RE-USED UNLESS
OTHERWISE NOTED.
2. CONTRACTOR TO PROVIDE/COMPLETE A GROUND PENETRATING RADAR
SURVEY PRIOR TO CONSTRUCTION TO VERIFY LOCATIONS OF ALL EXISTING
UNDERGROUND UTILITIES IN THE AREA OF EXISTING DIRECT BURIED PIPING
AND EXISTING BURIED DIESEL TANK. ALL EXCAVATION IS TO BE
HYDROVAC-EXCAVATION. CONTRACTOR TO COORDINATE WITH MDOC ATLEAST
10-DAYS IN ADVANCE PRIOR TO BEGINNING ONSITE HYDROVAC-EXCAVATION.
3. CONTRACTOR TO PROVIDE BARRICADES, SIGNS, AND OTHER SAFETY
MEASURES AROUND ALL AREAS OF EXCAVATION. ALL BARRICADES, SIGNS, AND
OTHER SAFETY MEASURES MUST BE COORDINATED AND APPROVED BY MDOC
PRIOR TO INSTALLING.
4. CONTRACTOR TO BACKFILL, RE-GRADE, AND FULLY RESTORE ALL GREEN
AREAS AFFECTED BY CONSTRUCTION TO MATCH EXISTING AFTER ALL
DEMOLITION/NEW WORK IS COMPLETE.
5. CONTRACTOR IS TO SAWCUT, DISCONNECT, REMOVE, AND DEMO EXISTING
SIDEWALK IN THE LOCATIONS SHOWN AS REQUIRED TO DEMOLISH THE
EXISTING DIRECT BURIED PIPING AND INSTALL THE NEW DIRECT BURIED PIPING
AS SHOWN ON THE NEW DRAWING. CONTRACTOR TO PATCH EXISTING
SIDEWALK TO BE FLUSH AND MATCH EXISTING AFTER ALL DEMOLITION AND
NEW WORK IS COMPLETED.
6. LOCATIONS OF EXISTING DIRECT BURIED FUEL TANK, DIRECT BURIED FUEL OIL
PIPING, VENT PIPING, FILL PIPING, AND ALL ASSOCIATED ACCESSORIES ARE
BASED ON THE FACILITY'S RECORD DRAWINGS. CONTRACTOR TO FIELD VERIFY
EXACT LOCATIONS WITH GROUND PENETRATING RADAR PRIOR TO BEGINNING
CONSTRUCTION.
7. CONTRACTOR TO PATCH, PRIME, AND PAINT ALL INTERIOR WALLS AS REQUIRED
TO MATCH EXISTING WHERE EXISTING EQUIPMENT IS DEMOLISHED.
file no.
index no.
contract order no.
Y23461 consultant job no.
24306.00
472/24069.JGH
checked by drawn by consultant issue date
M a t r ix sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
4/27/2026 CD SET
M-300
ENLARGED PARTIAL SITE
PLAN - MECHANICAL
DEMOLITION
DBP
CAT
N SITE PLAN - MECHANICAL DEMOLITION1 ENLARGED PARTIAL SITE PLAN - MECHANICAL DEMOLITION
M-400
X-UH
X-1" HS & HR
S
X-UH
S
X-1" HS & HR
X-3/4" HS & HR
X-3/4" HS & HR
L-1 (120" x 96")
M D-1
CONCRETE PAD
MUFFLER
12" V
EXHAUST THIMBLE
DT-1
FOS
FOR
FO
R
(B
UR
IE
D)
FO
S
(B
UR
IE
D)
FO
R
(B
UR
IE
D)
FO
S
(B
UR
IE
D)
FO
R
(B
UR
IE
D)
FO
S
(B
UR
IE
D)
FO
R
(B
UR
IE
D)
FO
S
(B
UR
IE
D)
FOR (BURIED)
FOS (BURIED)
1"
1"
1"
1"
1"1"
FOR
FOS
AST-1 (4,000 GALLON)
CONCRETE PAD
1"
SLOPE
1" FOS &
FOR DN
1" FUEL OIL
GENERATOR V DN
PIPE SUPPORT
EA DUCT
12" PLENUM
SL
OP
E
SL
OP
E
SL
OP
E
SLOPESLOPE
7 7
2" V
S
UH-1
MIN 15'-0 FROM X-DRIVEWAY
3" EMERGENCY V
FOS
FOR
1" 1"
M
D-2 L-2 (96" x 96") L-3 (96" x 96")
M
D-3
CONTROL PANEL
UH-1
HS
HR
1"
1 1
24"x48"
ACCESS
DOOR
3/4" 3/4"
HS
HR
3/4"
3/4"
GENERATOR
ROOM
STORAGE
CORRIDOR
MECHANICAL KEY NOTES
MECHANICAL GENERAL NOTES
1. CONNECT NEW EXHAUST DAMPER ACTUATOR (D-1) AND INTAKE DAMPER ACTUATORS (D-2 & D-3) TO THE NEW GENERATOR. ALL DAMPERS
ARE TO BE PROVEN OPEN BEFORE STARTING THE GENERATOR. ALL DAMPERS ARE TO CLOSE WHEN THE GENERATOR IS OFF. ALL
DAMPERS ARE TO BE NORMALLY OPEN/POWERED CLOSE.
2. CONTRACTOR TO SAW CUT AND PATCH CONCRETE SIDEWALK AS REQUIRED TO ROUTE NEW BURIED FUEL PIPING. CONTRACTOR TO INSTALL NEW CONCRETE SIDEWALK AS REQUIRED TO MATCH THE EXISTING SLOPE/CONFIGURATION PRIOR TO CONSTRUCTION.
CONTRACTOR TO INSTALL MINIMUM 6" MDOT 21AA SUBBASE COMPACTED TO 98% MAXIMUM DENSITY BELOW NEW CONCRETE SIDEWALK.
NEW SIDEWALK IS TO MATCH THE THICKNESS OF THE EXISTING SIDEWALK AND HAVE 6x6x1.4x1.4 WWF REINFORCEMENT. DOWELS ARE TO BE INSTALLED 12" O.C. AT LOCATIONS WHERE THE NEW CONCRETE SIDEWALK/DRIVEWAY ARE TYING INTO THE EXISTING CONCRETE
SIDEWALK.
3. CONTRACTOR TO PROVIDE/COMPLETE A GROUND PENETRATING RADAR SURVEY PRIOR TO CONSTRUCTION TO VERIFY LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES IN THE AREA OF EXISTING DIRECT BURIED PIPING AND EXISTING BURIED DIESEL TANK. ALL EXCAVATION IS TO BE HYDROVAC-EXCAVATION. CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL NOT USED EXCAVATED MATERIALS OFFSITE. CONTRACTOR TO COORDINATE WITH MDOC ATLEAST 10-DAYS IN ADVANCE PRIOR TO BEGINNING ONSITE
HYDROVAC-EXCAVATION.
4. CONTRACTOR TO PROVIDE BARRICADES, SIGNS, AND OTHER SAFETY MEASURES AROUND ALL AREAS OF EXCAVATION. ALL BARRICADES, SIGNS, AND OTHER SAFETY MEASURES MUST BE COORDINATED AND APPROVED BY MDOC PRIOR TO…