472.19306.JBB_AlgerCFDoors&WindowsUpgrades_BLDG HU-2 Plans.pdf

PDF 13 MB Posted

Attached to
472/19306. JBB; Alger C. F. - Doors and Windows Upgrades
Solicitation number
RFQ-171-250000000266-2
Issued by
Alger County, Michigan

About this file

These architectural and engineering construction documents detail a doors and windows upgrade project for the Alger Correctional Facility, located at N6141 Industrial Park Drive in Munising, Michigan, managed by the State of Michigan's Department of Technology, Management and Budget (DTMB) and Department of Corrections. The project specifically focuses on Housing Units 1-5, with detailed plans for Housing Unit 2 (Birch), and involves comprehensive upgrades to doors, windows, frames, and associated electrical systems. The project includes demolition of existing doors, windows, and related infrastructure, followed by installation of new aluminum and hollow metal doors, security glazing, frames, and electrical components across multiple housing units.

The project documents indicate a precise, security-focused renovation approach, with specific attention to maintaining facility security during construction. The upgrade plans include specialized security glazing (GL-2 and GL-3), heavy-duty aluminum and hollow metal door installations, and careful electrical system modifications. The project appears to be funded through state facilities administration, with a comprehensive set of technical specifications that address structural, architectural, and electrical considerations. The construction documents are dated 25 February 2025, suggesting this is a current/near-future infrastructure improvement initiative aimed at modernizing and enhancing the correctional facility's physical infrastructure and security systems.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

O

R

R

ARCHITECTS. ENGINEERS. PLANNERS

OHM-ADVISORS.COM

PR

EL

IM

IN

AR

Y

CO

NS

TR

UC

TI

ON

FI

NA

L R

EC

OR

D

DA

TE

IS

SU

ED

F

OR

DT

MB

F

ILE

N

UM

BE

R:

ID

EN

TI

FI

CA

TI

ON

N o.

SH

EE

T

DE

SI

GN

ED

DR

AW

N

CH

EC

KE

D

AP

PR

OV

ED

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

OHM PROJECT No.

2/1

.JB

B

VV TD VV LM

F

EB

G-

AL

GE

R

CF

D

OO

RS

A

ND

W

IN

DO

W S

UP

GR

AD

ES

DT

MB

AL

GE

R

CO

RR

EC

TI

ON

AL

F

AC

ILI

TY

7136240040

HO

US

IN

G

UN

IT

CO

VE

R

SH

EE

T

424 HANCOCK STREET

HANCOCK, MICHIGAN 49930

PH 906.482.0535 | F 906.482.6453

GENERAL NOTES:

1. GENERAL NOTES APPLY TO ALL DRAWINGS

2. DO NOT SCALE DRAWINGS. ANY DIMENSIONAL INFORMATION REQUIRED WHICH IS

NOT INDICATED ON DRAWING DIMENSION STRINGS SHALL BE OBTAINED FROM THE

ARCHITECT.

3. DIMENSIONS SHOWN ARE FINISH SURFACE OF EXISTING CONSTRUCTION, UNLESS

NOTED OTHERWISE.

4. CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS (I.E.

EXISTING MATERIALS, FRAMING MEMBER SIZES AND LOCATIONS, METHODS OF

CONSTRUCTION). IF DISCREPANCIES ARE FOUND, NOTIFY ARCHITECT BEFORE

PROCEEDING WITH WORK.

5. CONTRACTOR SHALL PAY ALL PERMIT FEES.

6. CONTRACTOR SHALL MAINTAIN THE IMMEDIATE CONSTRUCTION SITE IN A SECURE,

CLEAN AND SAFE MANNER.

7. PROTECTION: CONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR TAKING ALL

STEPS NECESSARY TO PROTECT THE PUBLIC FROM INJURY AND ADJACENT PROPERTY

DAMAGES DURING CONSTRUCTION.

8. REPAIR ALL EXISTING CONSTRUCTION AFFECTED BY NEW WORK TO ITS ORIGINAL

CONDITION.

HOUSING UNIT 2 (BIRCH) DRAWING INDEX:

I Certify That The Electrical Plans Were Prepared Under My Direct Supervision

G-000 COVER SHEET

G-001 CODE REVIEWS

I Certify That The Architectural Plans Were Prepared Under My Direct Supervision

ARCHITECTURAL

A-001 GENERAL INFORMATION

A-002 SITE KEY PLAN

2 HU-D1 HOUSING UNIT 2 (BIRCH) SECOND FLOOR DEMOLITION PLAN

2 HU-A1 HOUSING UNIT 2 (BIRCH) SECOND FLOOR DEMOLITION PLAN

2 HU-A2 HOUSING UNIT 2 (BIRCH) SECOND ENLARGED PLAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE OF MICHIGAN

STATE FACILITIES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

STATE OF MICHIGAN

HEIDI WASHINGTON , Director

DEPARTMENT OF CORRECTIONS

OHM PROJECT No.

DATE:

DTMB File No.

7136240040

25 FEB 2025

PLAN REVIEW

472/19306.JBB

ADAM LACH, RA, DIRECTOR

ALGER CORRECTIONAL FACILITY

DOORS & WINDOWS UPGRADES

N6141 INDUSTRIAL PARK DRIVE

MUNISING, MI 49862

ELECTRICAL

E-001 ELECTRICAL NOTES AND SYMBOLS

1HU-ED1 HOUSING UNIT 1-5 SECOND FLOOR ELECTRICAL DEMOLITION PLAN

1HU-E1 HOUSING UNIT 1-5 SECOND FLOOR ELECTRICAL POWER PLAN

P:\7101_7200\7136240040_AlgerCFDoors&Windows\Drawings\Arch-IntDes\2-Arch Desktop\New Facilties Project\Sheets\7136240040-G-000 HOUSING UNIT 2.dwg, 2/26/2025 2:58:02 PM, _DWG To PDF.pc3

I Certify That The Structural Plans Were Prepared Under My Direct Supervision

SEE CODE SHEET AND

ARCHITECTURAL SHEETS

FOR ARCHITECT'S SEAL

R

ARCHITECTS. ENGINEERS. PLANNERS

OHM-ADVISORS.COM

PR

EL

IM

IN

AR

Y

CO

NS

TR

UC

TI

ON

FI

NA

L R

EC

OR

D

DA

TE

IS

SU

ED

F

OR

AC

CO

UN

TI

NG

T

EM

P:

DT

MB

F

ILE

N

UM

BE

R:

ID

EN

TI

FI

CA

TI

ON

N o.

SH

EE

T

DE

SI

GN

ED

DR

AW

N

CH

EC

KE

D

AP

PR

OV

ED

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

OHM PROJECT No.

2/1

.JB

B

VV TD VV LM

F

EB

G-

AL

GE

R

CF

D

OO

RS

A

ND

W

IN

DO

W S

UP

GR

AD

ES

DT

MB

AL

GE

R

CO

RR

EC

TI

ON

AL

F

AC

ILI

TY

7136240040

CO

DE

R

EV

IE

W

424 HANCOCK STREET

HANCOCK, MICHIGAN 49930

PH 906.482.0535 | F 906.482.6453

P:\7101_7200\7136240040_AlgerCFDoors&Windows\Drawings\Arch-IntDes\2-Arch Desktop\New Facilties Project\Sheets\7136240040-G-001.dwg, 2/26/2025 2:55:06 PM, _DWG To PDF.pc3

HOUSING UNITS 1-5

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

ABBREVIATIONS

MATERIAL SYMBOLS

N

A

DETAIL TITLE2

PLAN SYMBOLS GENERAL NOTES

R

ARCHITECTS. ENGINEERS. PLANNERS

OHM-ADVISORS.COM

PR

EL

IM

IN

AR

Y

CO

NS

TR

UC

TI

ON

FI

NA

L R

EC

OR

D

DA

TE

IS

SU

ED

F

OR

AC

CO

UN

TI

NG

T

EM

P:

DT

MB

F

ILE

N

UM

BE

R:

ID

EN

TI

FI

CA

TI

ON

N o.

SH

EE

T

DE

SI

GN

ED

DR

AW

N

CH

EC

KE

D

AP

PR

OV

ED

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

OHM PROJECT No.

2/1

.JB

B

VV TD VV LM

F

EB

A-

AL

GE

R

CF

D

OO

RS

A

ND

W

IN

DO

W S

UP

GR

AD

ES

DT

MB

AL

GE

R

CO

RR

EC

TI

ON

AL

F

AC

ILI

TY

7136240040

GE

NE

RA

L I

NF

OR

MA

TI

ON

424 HANCOCK STREET

HANCOCK, MICHIGAN 49930

PH 906.482.0535 | F 906.482.6453

P:\7101_7200\7136240040_AlgerCFDoors&Windows\Drawings\Arch-IntDes\2-Arch Desktop\New Facilties Project\Sheets\7136240040-A-001.dwg, 2/26/2025 2:55:10 PM, _DWG To PDF.pc3

R

ARCHITECTS. ENGINEERS. PLANNERS

OHM-ADVISORS.COM

PR

EL

IM

IN

AR

Y

CO

NS

TR

UC

TI

ON

FI

NA

L R

EC

OR

D

DA

TE

IS

SU

ED

F

OR

AC

CO

UN

TI

NG

T

EM

P:

DT

MB

F

ILE

N

UM

BE

R:

ID

EN

TI

FI

CA

TI

ON

N o.

SH

EE

T

DE

SI

GN

ED

DR

AW

N

CH

EC

KE

D

AP

PR

OV

ED

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

OHM PROJECT No.

2/1

.JB

B

VV TD VV LM

F

EB

A-

AL

GE

R

CF

D

OO

RS

A

ND

W

IN

DO

W S

UP

GR

AD

ES

DT

MB

AL

GE

R

CO

RR

EC

TI

ON

AL

F

AC

ILI

TY

7136240040

SI

TE

K

EY

P

LA

N

424 HANCOCK STREET

HANCOCK, MICHIGAN 49930

PH 906.482.0535 | F 906.482.6453

PROJECT BUILDING LOCATION PLAN1

P:\7101_7200\7136240040_AlgerCFDoors&Windows\Drawings\Arch-IntDes\2-Arch Desktop\New Facilties Project\Sheets\7136240040-A-002.dwg, 2/26/2025 2:55:06 PM, _DWG To PDF.pc3

WORK AREA:

ALTERATION 1

DEMOLITION PLAN GENERAL NOTES

1. REMOVE ALL MATERIALS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION

PROCESS AND DISPOSE OFF SITE IN A SAFE AND LEGAL MANNER.

2. PROVIDE TEMPORARY DUSTPROOF PARTITIONS WITH DOORS AS REQUIRED TO ADEQUATELY

SEPARATE OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST.

3. CONTINUOUSLY MAINTAIN ALL MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR

ALL PORTIONS OF THE BUILDING THAT REMAIN OCCUPIED DURING CONSTRUCTION.

4. ALL DEMOLITION WORK REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS

AND/ OR AS REQUIRED TO ACCOMMODATE THE RENOVATION WORK.

5. CAP, PATCH AND REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE

ARCHITECTURAL, STRUCTURAL, MECHANICAL AND/OR ELECTRICAL ITEMS ARE REMOVED AS A

RESULT OF THE DEMOLITION OPERATIONS.

6. PREPARE ALL DEMOLITION AREAS FOR NEW FINISHES.

7. REMOVE AND RELOCATE MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, DUCTWORK, WIRING DEVICES, PANELS AND ACCESSORIES AS REQUIRED. REFER TO

MECHANICAL AND ELECTRICAL DRAWINGS FOR MECHANICAL AND ELECTRICAL DEMOLITION.

8. NOTIFY ARCHITECT OF ANY REQUIREMENTS FOR ACCESS PANELS NOT SHOWN ON DOCUMENTS

BEFORE PROCEEDING WITH WORK.

9. ITEMS NOTED EXISTING FOR CLARITY; ASSUME NO NEW WORK UNLESS NOTED OTHERWISE.

DEMOLITION PLAN KEY NOTES

1. REMOVE EXISTING ALUMINUM DOOR, FRAME AND HARDWARE.

2. REMOVE EXISTING GLAZING & PREP FOR NEW GLAZING. EXISTING FRAME TO REMAIN.

3. REMOVE EXISTING HM DOOR, FRAME AND HARDWARE.

4. REMOVE EXISTING 8" CMU & BRICK CAVITY WALL BELOW EXISTING SIDELITE. REMOVE PORTION OF

EXISTING WALL BELOW FINISHED FLOOR LEVEL AND PREP FOR NEW CONCRETE FLOOR SLAB AND FINISHED FLOOR INFILL TO MATCH EXISTING ADJACENT SURFACES. BRICK TO BE DISMANTLED AND

SALVAGED FOR RE-USE.

5. REMOVE DAMAGED TILE WALL , AND/OR BASE DOWN TO CONCRETE FLOOR SLAB. PREP FOR NEW TILE TO MATCH EXISTING. ASSUME LESS THAN 1 SQUARE FOOT OF MATERIAL PER LOCATION INDICATED.

6. PROVIDE TEMPORARY DUST PARTITION TO CEILING WITH EGRESS DOOR.

7. REMOVE DAMAGED BRICK; IF EXTENTS NOT NOTED ASSUME LESS THAN ONE SQUARE FOOT OF

MATERIAL PER LOCATION INDICATED.

8. REMOVE DAMAGED THIN SET QUARRY TILE AND QUARRY COVE BASE; IF EXTENTS NOT NOTED ASSUME

LESS THAN ONE SQUARE FOOT OF MATERIAL PER LOCATION INDICATED.

9. REMOVE EXISTING LINTEL. REVISE EXISTING CMU AND BRICK OPENING: REFER TO NEW WORK PLANS.

INSTALL BRICK VENEER AT OPENING. SALVAGE EXISTING BRICK FOR RE-USE.

10. CRITICAL TIMELINE OPENING.

11. STRIP AND CLEAN ENTIRE FRAME AND PREP FOR NEW PAINT. PAINT SECURITY FRAME TO MATCH

EXISTING COLORS.

12. REMOVE EXISTING COILING OVERHEAD DOOR, TRACK & EXTERIOR WEATHER SEAL. STRUCTURAL FRAME

AND BUMPERS TO REMAIN IN PLACE.

13. EXISTING OVERHEAD HEATER. REFER TO MECHANICAL & ELECTRICAL SHEETS FOR RELATED WORK.

14. EXISTING SECURITY FENCING SHALL REMAIN. ENGAGE SECURITY FENCE CONTRACTOR TO

TEMPORARILY REMOVE AND REINSTALL FENCING AS REQUIRED TO FACILITATE WORK ACTIVITIES. THE FENCE MAY ONLY BE REMOVED DURING ACTIVE WORK AND MUST BE SECURELY REINSTALLED BY THE END OF EACH WORK SHIFT UNLESS PRIOR APPROVAL FOR EXTENDED REMOAVAL IS GRANTED BY THE

WARDEN.

15. CLEAN GROUT JOINTS AS REQUIRED FOR NEW TUCK-POINTING AT 12" HIGH SOLDIER COURSE SILL.

16. REFER TO ELECTRICAL SHEETS.

17. REMOVE & STORE EXISTING WOOD WALL MOUNTED SHELF AND PREP FOR REINSTALL.

18. REMOVE EXISTING SECURITY GRILLE FROM EXISTING DOOR. CLEAN FRAMES AND PREP FOR NEW PAINT.

PAINT SECURITY FRAME TO MATCH EXISTING COLORS.

19. REMOVE EXISTING VCT OR THIN SET QUARRY TILE FLOORING FROM ENTRY. CLEAN AND PREP FOR

CONCRETE SEALER. REPAIR CONCRETE IF NECESSARY.

20. REMOVE EXISTING QUARRY TILE AND WALK-OFF MAT FRAME.

# DENOTES PLAN KEY NOTE ITEM USING NUMBERS BELOW. ALL PLAN KEY NOTES MAY NOT

APPLY TO THIS BUILDING.

R

ARCHITECTS. ENGINEERS. PLANNERS

OHM-ADVISORS.COM

PR

EL

IM

IN

AR

Y

CO

NS

TR

UC

TI

ON

FI

NA

L R

EC

OR

D

DA

TE

IS

SU

ED

F

OR

AC

CO

UN

TI

NG

T

EM

P:

DT

MB

F

ILE

N

UM

BE

R:

ID

EN

TI

FI

CA

TI

ON

N o.

SH

EE

T

DE

SI

GN

ED

DR

AW

N

CH

EC

KE

D

AP

PR

OV

ED

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

OHM PROJECT No.

2/1

.JB

B

VV TD VV LM

F

EB

2 H

U- D1

AL

GE

R

CF

D

OO

RS

A

ND

W

IN

DO

W S

UP

GR

AD

ES

DT

MB

AL

GE

R

CO

RR

EC

TI

ON

AL

F

AC

ILI

TY

7136240040

HO

US

IN

G

UN

IT

(B

IR

CH

) S

EC

ON

D

FL

OO

R

DE

MO

LIT

IO

N

PL

AN

424 HANCOCK STREET

HANCOCK, MICHIGAN 49930

PH 906.482.0535 | F 906.482.6453

HOUSING UNIT 3 (CEDAR) ENLARGED PLAN1

ENLARGED DEMO PLAN AT DOOR HU2312

P:\7101_7200\7136240040_AlgerCFDoors&Windows\Drawings\Arch-IntDes\2-Arch Desktop\New Facilties Project\Sheets\7136240040-2 HU-D1.dwg, 2/26/2025 2:59:07 PM, _DWG To PDF.pc3

WORK AREA:

ALTERATION 1

R

ARCHITECTS. ENGINEERS. PLANNERS

OHM-ADVISORS.COM

PR

EL

IM

IN

AR

Y

CO

NS

TR

UC

TI

ON

FI

NA

L R

EC

OR

D

DA

TE

IS

SU

ED

F

OR

AC

CO

UN

TI

NG

T

EM

P:

DT

MB

F

ILE

N

UM

BE

R:

ID

EN

TI

FI

CA

TI

ON

N o.

SH

EE

T

DE

SI

GN

ED

DR

AW

N

CH

EC

KE

D

AP

PR

OV

ED

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

OHM PROJECT No.

2/1

.JB

B

VV TD VV LM

F

EB

2 H

U- A1

AL

GE

R

CF

D

OO

RS

A

ND

W

IN

DO

W S

UP

GR

AD

ES

DT

MB

AL

GE

R

CO

RR

EC

TI

ON

AL

F

AC

ILI

TY

7136240040

HO

US

IN

G

UN

IT

(B

IR

CH

) S

EC

ON

D

FL

OO

R

PL

AN

424 HANCOCK STREET

HANCOCK, MICHIGAN 49930

PH 906.482.0535 | F 906.482.6453

HOUSING UNIT 2 (BIRCH) SECOND FLOOR PLAN1

P:\7101_7200\7136240040_AlgerCFDoors&Windows\Drawings\Arch-IntDes\2-Arch Desktop\New Facilties Project\Sheets\7136240040-HU 2-A1.dwg, 2/26/2025 2:58:33 PM, _DWG To PDF.pc3

ARCHITECTURAL PLAN NOTES

ARCHITECTURAL PLAN KEY NOTES

1. INSTALL NEW HOLLOW METAL FRAME AND DOOR.

2. INSTALL NEW ALUMINUM FRAME AND DOOR.

3. INSTALL NEW GLAZING AND GASKETS IN EXISTING ALUMINUM FRAMED WINDOWS.

4. INFILL REMOVED BRICK WITH SALVAGED MATERIAL; IF EXTENTS NOT NOTED,

ASSUME LESS THAN ONE SQUARE FOOT OF MATERIAL PER LOCATION INDICATED.

5. EXISTING OVERHEAD HEATER. REFER TO ELECTRICAL SHEETS FOR RELATED

WORK.

6. REINSTALL SECURITY FENCING AFTER GLAZING INSTALLATION IS COMPLETE.

COORDINATE REMOVAL, ADDITIONAL TEMPORARY SECURITY MEASURES AND

REPLACEMENT OF SECURITY FENCING AS REQUIRED TO REPLACE GLAZING WITH

OWNER. SEE KEYNOTE ON DEMOLITION PLAN.

7. INSTALL OVERHEAD COILING DOOR IN EXISTING OPENING.

8. INSTALL WEATHERPROOF COVER PLATE OVER EXISTING ABANDONED KEYPAD.

9. REPAIR DAMAGED CONCRETE BLOCK AND BASE USING A TWO-COMPONENT,

POLYMER-MODIFIED, NON-SAG MORTAR WITH CORROSION INHIBITOR, FOLLOWING

THE MANUFACTURER’S APPLICATION INSTRUCTIONS.

10. TUCKPOINTING; IF EXTENTS NOT NOTED ASSUME LESS THAN ONE SQUARE FOOT OF

MATERIAL PER LOCATION INDICATED.

11. CONCRETE SLAB INFILL AND ADJACENT WALL REPAIR AT LOCATIONS OF WALL

REMOVAL. INSTALL FLOOR AND WALL FINISHES AND WALL BASE TO MATCH

ADJACENT SURFACES.

12. REPAIR EXISTING THIN SET QUARRY TILE FLOORING AND/ OR TILE WALL BASE AT

DOOR EDGES AND AT AREAS OF NEW CMU WALL RELATED WORK. DO NOT OVERLAP

DOOR FRAME WITH WALL BASE.

13. REPAIR EXISTING THIN SET QUARRY FLOOR TILE IN DAMAGED AREAS. PATCH IN NEW

QUARRY TILE AND QUARRY COVE BASE WHERE DAMAGED AREAS PREVIOUSLY

REMOVED; IF EXTENTS NOT NOTED ASSUME LESS THAN ONE SQUARE FOOT OF

MATERIAL PER LOCATION INDICATED.

14. REINSTALL EXISTING WOOD WALL MOUNTED SHELF WITH APPROPRIATE FASTENERS

IN EXISTING CMU WALL.

15. INSTALL EXISTING SECURITY GRILLE FROM REMOVED DOOR ON NEW DOOR WITH

ONE-WAY SEX BOLTS TO MATCH EXISTING. COORDINATE WITH NEW DOOR FOR

COMPATIBILITY WITH GLAZING & HARDWARE AND MOUNT TO DOOR IN SIMILAR

FASHION.

16. INSTALL NEW NGP 413 SADDLE AS TRANSITION BETWEEN EXISTING CONCRETE AND

VCT, FASTENERS TO BE TAMPER RESISTANT TORX.

17. INSTALL NEW STEEL DOOR FRAME WITH JAMBS & HEADER. REFER TO DOOR FRAME

DETAILS. PATCH EXISTING WALLS AS REQUIRED.

18. PATCH EXISTING CONCRETE FLOOR AS NECESSARY TO CREATE A SMOOTH,

CONTINUOUS SURFACE. PREPARE SURFACE AND APPLY W.R. MEADOWS LIQUI-HARD

PER MANUFACTURER'S INSTRUCTIONS.

1. DO NOT SCALE DRAWINGS. IF DIMENSIONS CANNOT BE DETERMINED OR DOCUMENTS ARE IN CONFLICT, THE CONTRACTOR SHALL OBTAIN CLARIFICATION FROM THE ARCHITECT PRIOR TO CONTINUATION OF WORK.

2. FIELD VERIFY ALL PROJECT CONDITIONS PRIOR TO THE START OF WORK AND AS NEEDED THROUGHOUT THE DURATION OF CONSTRUCTION. BRING ANY DISCREPANCIES WHICH MAY SIGNIFICANTLY AFFECT NEW

CONSTRUCTION WORK TO THE ATTENTION OF THE ARCHITECT FOR REVIEW.

3. VERIFY SIZE AND LOCATION OF MECHANICAL AND ELECTRICAL EQUIPMENT, PADS, PENETRATIONS AND

SUPPORTS WITH MECHANICAL AND ELECTRICAL DRAWINGS.

4. PROVIDE WALL INFILL AND PATCHING AT LOCATIONS WHERE ITEMS ARE DEMOLISHED BUT NO REPLACEMENT IS INDICATED. ALL FINISHED WALLS WITHIN SCOPE OF PROJECT WILL BE FREE OF ANY DAMAGED AREAS.

5. SEE SPECIFICATION APPENDIX 1 - SPECIAL WORKING CONDITIONS FOR REQUIREMENTS FOR SEQUENCING/

EQUIPMENT OUTAGES.

6. ITEMS NOTED AS EXISTING FOR CLARITY; ASSUME NO NEW WORK UNLESS OTHERWISE NOTED.

DENOTES PLAN KEY NOTE ITEM USING NUMBERS BELOW. ALL PLAN KEY NOTES MAY NOT

APPLY TO THIS BUILDING.

OMIT

DOOR TYPES

DOOR FRAME TYPES

G

F2

8"

" M

AX

8"

8"

SEE SCHEDULE FOR GLAZING TYPES

DOOR MATERIAL DESIGNATIONS:

AL STANDARD ALUMINUM

HDAL HEAVY DUTY ALUMINUM

HM HOLLOW METAL

ST STEEL

FRAME MATERIAL DESIGNATIONS:

AL STANDARD ALUMINUM

HDAL HEAVY DUTY ALUMINUM

HM HOLLOW METAL

DOOR/ FRAME FINISHDESIGNATIONS:

PF PREFINISHED

PT PAINTED

GLAZING:

GL-1 1" IGU W/ LOW-E (NON SECURE AREAS ONLY)

GL-1T SAME AS GL-1, W/ TEMPERED GLASS

GL-2 1 1/8" AIR-GAP SECURITY GLAZING

GL-3 3/8" LAMINATED POLYCARBONATE SECURITY GLAZING

DOOR SCHEDULE

DESCRIPTION MARK SIZE NO. OF LEAFS DOOR FRAME HDW

WIDTH HEIGHT THICK. TYPE MAT'L FINISH GLAZING TYPE MAT'L FINISH JAMB DETAIL HEAD DETAIL GLAZING DEPTH SET # Main entry DoorHOUSING UNIT 2 HU231 4'-0" 7'-2" 1 3/4" 1 G HDAL PF GL-2 F2 HDAL PF 2/ HU 2-A2 3/ HU 2-A2 GL-2 6 1/2"" 2

R

ARCHITECTS. ENGINEERS. PLANNERS

OHM-ADVISORS.COM

PR

EL

IM

IN

AR

Y

CO

NS

TR

UC

TI

ON

FI

NA

L R

EC

OR

D

DA

TE

IS

SU

ED

F

OR

AC

CO

UN

TI

NG

T

EM

P:

DT

MB

F

ILE

N

UM

BE

R:

ID

EN

TI

FI

CA

TI

ON

N o.

SH

EE

T

DE

SI

GN

ED

DR

AW

N

CH

EC

KE

D

AP

PR

OV

ED

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

OHM PROJECT No.

2/1

.JB

B

VV TD VV LM

F

EB

2 H

U- A2

AL

GE

R

CF

D

OO

RS

A

ND

W

IN

DO

W S

UP

GR

AD

ES

DT

MB

AL

GE

R

CO

RR

EC

TI

ON

AL

F

AC

ILI

TY

7136240040

HO

US

IN

G

UN

IT

(B

IR

CH

) E

NL

AR

GE

D

PL

AN

424 HANCOCK STREET

HANCOCK, MICHIGAN 49930

PH 906.482.0535 | F 906.482.6453

ENLARGED PLAN AT DOOR HU2311DOOR JAMB DETAIL2

DOOR HEAD DETAIL3

HOUSING UNIT MASONRY OPENING REINFORCEMENT DETAIL IN ELEVATION4

FLOOR SLAB INFILL DETAIL5

STEEL FRAME BASEPLATE DETAIL6

P:\7101_7200\7136240040_AlgerCFDoors&Windows\Drawings\Arch-IntDes\2-Arch Desktop\New Facilties Project\Sheets\7136240040-2 HU-A2.dwg, 2/26/2025 2:55:51 PM, _DWG To PDF.pc3

M

I/C

B

M

PS

P

DC

DO

ES

R

ARCHITECTS. ENGINEERS. PLANNERS

OHM-ADVISORS.COM

PR

EL

IM

IN

AR

Y

CO

NS

TR

UC

TI

ON

FI

NA

L R

EC

OR

D

DA

TE

IS

SU

ED

F

OR

AC

CO

UN

TI

NG

T

EM

P:

DT

MB

F

ILE

N

UM

BE

R:

ID

EN

TI

FI

CA

TI

ON

N o.

SH

EE

T

DE

SI

GN

ED

DR

AW

N

CH

EC

KE

D

AP

PR

OV

ED

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

OHM PROJECT No.

2/1

.JB

B

VV TD VV LM

F

EB

E-

AL

GE

R

CF

D

OO

RS

A

ND

W

IN

DO

W S

UP

GR

AD

ES

DT

MB

AL

GE

R

CO

RR

EC

TI

ON

AL

F

AC

ILI

TY

7136240040

EL

EC

TR

IC

AL

N

OT

ES

A

ND

S

YM

BO

LS

424 HANCOCK STREET

HANCOCK, MICHIGAN 49930

P:\7101_7200\7136240040_AlgerCFDoors&Windows\Drawings\Arch-IntDes\2-Arch Desktop\New Facilties Project\Sheets\7136240040-E-001 ELECTRICAL NOTES AND SYMBOLS.dwg, 2/26/2025 2:56:26 PM, _DWG To PDF.pc3

DC

ES

EXISTING DOOR

CONTROL PANEL.

1. REMOVE CONNECTION TO MAG LOCK. PROTECT AND SAVE CONDUCTORS FOR REUSE.

2. REMOVE CONNECTION TO ELECTRIC STRIKE. PROTECT AND SAVE CONDUCTORS FOR REUSE.

3. REMOVE CONNECTION TO DOOR CONTACT. PROTECT AND SAVE CONDUCTORS FOR REUSE.

4. REMOVE CONNECTION TO DOOR CONTACT. REMOVE CONDUIT AND CONDUCTORS BACK TO SOURCE.

5. REMOVE CONNECTION TO ELECTRIC CURTAIN HEATER. REMOVE AND SALVAGE CURTAIN HEATER FOR

GARAGE DOOR INSTALLATION. PROTECT AND SALVAGE CONDUIT AND CONDUCTORS.

ELECTRICAL DEMOLITION KEY NOTES

# DENOTES PLAN KEY NOTE ITEM USING NUMBERS BELOW.

1. DRAWINGS SHOW MAJOR DEMOLITION ONLY; THE CONTRACTOR SHALL PROVIDE ALL DEMOLITION FOR THE

COMPLETION OF THE WORK WHETHER EXPLICITLY SHOWN OR NOT.

2. THE OWNER RESERVES THE RIGHT TO KEEP ANY REMOVED EQUIPMENT OR MATERIALS. ALL DEMOLITION

DEBRIS TO BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED LANDFILL.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY TEMPORARY EXTERIOR OPENINGS MADE FROM

DEMOLITION WORK TO ENSURE THEY ARE WEATHER TIGHT AT THE END OF EACH DAY.

4. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING WHERE CONDUITS AND JUNCTION BOXES

ARE REMOVED UNLESS OTHERWISE NOTED.

5. ANY JUNCTION BOXES REMAINING IN PLACE THAT HAVE HAD DEVICES REMOVED ARE TO RECEIVE BLANK COVER

PLATES MATCHING PROJECT REQUIREMENTS.

6. CONDUITS AND CONDUCTORS ABANDONED AS PART OF THE WORK SHALL BE DEMOLISHED WHERE NOT BURIED

IN WALLS OR UNDERGROUND. CAP OR PLUG ANY ABANDONED CONDUITS THAT REMAIN.

7. WHERE DEVICES ARE REMOVED FROM THE MIDDLE OF A CIRCUIT, THE CONTRACTOR SHALL BE RESPONSIBLE

TO RE-ROUTE THE CIRCUIT TO MAINTAIN CIRCUIT INTEGRITY TO REMAINING DEVICES.

8. CONTRACTOR TO NOTIFY ENGINEER OF ANY DISCREPANCIES FOUND IN EXISTING CONDITIONS.

9. CONTRACTOR TO COORDINATE WITH THE OWNER OR ENGINEER A MINIMUM OF 24 HOURS IN ADVANCE OF

SHUTTING OFF OR DISCONNECTING ANY UTILITIES. CONTRACTOR TO ENSURE ALL EXISTING SYSTEMS TO REMAIN ARE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT UNLESS OTHERWISE DIRECTED BY

THE ENGINEER/OWNER.

10. CONTRACTOR TO TAKE ALL PRECAUTIONS NECESSARY TO PROTECT ITEMS NOT INTENDED TO BE DEMOLISHED AND TO RESTORE TO EXISTING CONDITIONS ANY ITEMS DAMAGED THAT WERE NOT INTENDED TO BE

DEMOLISHED.

GENERAL DEMOLITION NOTES

HOUSING 1-5 SECOND FLOOR ELECTRICAL DEMOLITION PLAN1

R

ARCHITECTS. ENGINEERS. PLANNERS

OHM-ADVISORS.COM

PR

EL

IM

IN

AR

Y

CO

NS

TR

UC

TI

ON

FI

NA

L R

EC

OR

D

DA

TE

IS

SU

ED

F

OR

AC

CO

UN

TI

NG

T

EM

P:

DT

MB

F

ILE

N

UM

BE

R:

ID

EN

TI

FI

CA

TI

ON

N o.

SH

EE

T

DE

SI

GN

ED

DR

AW

N

CH

EC

KE

D

AP

PR

OV

ED

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

OHM PROJECT No.

2/1

.JB

B

VV TD VV LM

F

EB

1H

U-

ED

AL

GE

R

CF

D

OO

RS

A

ND

W

IN

DO

W

S

UP

GR

AD

ES

DT

MB

AL

GE

R

CO

RR

EC

TI

ON

AL

F

AC

ILI

TY

7136240040

HO

US

IN

G

UN

IT

1- 5 S

EC

ON

D

FL

OO

R

EL

EC

TR

IC

AL

D

EM

OL

IT

IO

N

PL

AN

424 HANCOCK STREET

HANCOCK, MICHIGAN 49930

P:\7101_7200\7136240040_AlgerCFDoors&Windows\Drawings\Arch-IntDes\2-Arch Desktop\New Facilties Project\Sheets\7136240040-1HU-D1 HOUSING UNIT 1-5 SECOND FLOOR ELECTRICAL DEMOLITION PLAN.dwg, 2/26/2025 2:58:19 PM, _DWG To PDF.pc3

DC

ES

EXISTING DOOR

CONTROL PANEL.

HOUSING UNIT 1-5 SECOND FLOOR ELECTRICAL PLAN1

R

ARCHITECTS. ENGINEERS. PLANNERS

OHM-ADVISORS.COM

PR

EL

IM

IN

AR

Y

CO

NS

TR

UC

TI

ON

FI

NA

L R

EC

OR

D

DA

TE

IS

SU

ED

F

OR

AC

CO

UN

TI

NG

T

EM

P:

DT

MB

F

ILE

N

UM

BE

R:

ID

EN

TI

FI

CA

TI

ON

N o.

SH

EE

T

DE

SI

GN

ED

DR

AW

N

CH

EC

KE

D

AP

PR

OV

ED

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

OHM PROJECT No.

2/1

.JB

B

VV TD VV LM

F

EB

1H

U- E1

AL

GE

R

CF

D

OO

RS

A

ND

W

IN

DO

W S

UP

GR

AD

ES

DT

MB

AL

GE

R

CO

RR

EC

TI

ON

AL

F

AC

ILI

TY

7136240040

HO

US

IN

G

UN

IT

1- 5 S

EC

ON

D

FL

OO

R

EL

EC

TR

IC

AL

P

LA

N

424 HANCOCK STREET

HANCOCK, MICHIGAN 49930

P:\7101_7200\7136240040_AlgerCFDoors&Windows\Drawings\Arch-IntDes\2-Arch Desktop\New Facilties Project\Sheets\7136240040-1HU-E1 HOUSING UNIT-1 (ASPEN) SECOND FLOOR DEMOLITION PLAN.dwg, 2/26/2025 2:55:13 PM, _DWG To PDF.pc3

Sheets and Views
G-000 BUILDING 100 (ADMINISTRATION) COVER SHEET
G-000 BUILDING 200 (SUPPORT SERVICES) COVER SHEET
G-000 BUILDING 300 (EDUCATION) COVER SHEET
G-000 BUILDING 500 (MAINTENANCE) COVER SHEET
G-000 BUILDING 600 (HAZARDOUS STORAGE) COVER SHEET
G-000 BUILDING 700 (GUARD POSTS) COVER SHEET
G-000 HOUSING UNIT 1 COVER SHEET
G-000 HOUSING UNIT 2 COVER SHEET
G-000 HOUSING UNIT 3 COVER SHEET
G-000 HOUSING UNIT 4 COVER SHEET
G-000 HOUSING UNIT 5 COVER SHEET
G-000 HOUSING UNIT 6 COVER SHEET
G-001 CODE REVIEW
A-001 GENERAL INFORMATION
OLE1
7136240040-V_NOTES
A-002 SITE KEY PLAN
7136240040-LARGE SITE PLAN
100-D1 BUILDING 100 ADMIN FIRST FLOOR DEMOLITION PLAN
7136240040-DV_BLDG 100 ADMIN FLR 1
7136240040-V_NOTES
100-D2 BUILDING 100 ADMIN SECOND FLOOR DEMOLITION PLAN
7136240040-DV_BLDG 100 ADMIN FLR 2
7136240040-V_NOTES
100-D3 BUILDING 100 ADMIN ENLARGED DEMOLITION PLANS
7136240040-DV_BLDG 100 ADMIN FLR 1
7136240040-DV_BLDG 100 ADMIN FLR 2
7136240040-V_NOTES
100-A1 BUILDING 100 ADMIN FIRST FLOOR PLAN
7136240040-V_BLDG 100_ADMIN FLR 1
100-A2 BUILDING 100 ADMIN SECOND FLOOR PLAN
7136240040-V_BLDG 100_ADMIN FLR 2
100-A3 BUILDING 100 ADMIN ENLARGED PLANS & SCHEDULES
7136240040-V_NOTES
7136240040-V_BLDG 100_ADMIN FLR 1
7136240040-V_BLDG 100_ADMIN FLR 2
100-A4 DOOR FRAME DETAILS
100-A5 DOOR FRAME DETAILS
200-D1 BUILDING 200 SUPPORT SERVICES FIRST FLOOR DEMOLITION PLAN
7136240040-DV_BLDG 200 SUPPORT FLR 1
7136240040-V_NOTES
200-D2 BUILDING 200 SUPPORT SERVICES ENLARD DEMOLITION PLANS
7136240040-DV_BLDG 200 SUPPORT FLR 1
7136240040-V_NOTES
200-A1 BUILDING 200 SUPPORT SERVICES FIRST FLOOR PLAN
7136240040-V_BLDG 200 SUPPORT FLR 1
200-A2 BUILDING 200 SUPPORT SERVICES ENLARGED PLANS
7136240040-V_NOTES
7136240040-V_BLDG 200 SUPPORT FLR 1
200-A3 BUILDING 200 SUPPORT SERVICES DOOR SCHEDULE & DETAILS
7136240040-V_NOTES
300-D1 BUILDING 300 EDUCATION FIRST FLOOR DEMOLITION PLAN
7136240040-DV_BLDG 300 EDUCATION FLR 1
300-D2 BUILDING 300 EDUCATION ENLARGED DEMOLITION PLANS
7136240040-DV_BLDG 300 EDUCATION FLR 1
7136240040-V_NOTES
300-A1 BUILDING 300 EDUCATION FIRST FLOOR PLAN
7136240040-V_BLDG 300 EDUCATION FLR 1
300-A2 BUILDING 300 EDUCATION ENLARGED PLANS & DETAILS
7136240040-V_NOTES
7136240040-V_BLDG 300 EDUCATION FLR 1
500-D1 BUILDING 500 MAINTENANCE FIRST FLOOR DEMOLITION PLAN
7136240040-DV_BLDG 500 MAINT FLR 1
500-D2 BUILDING 500 MAINTENANCE ENLARGED DEMOLITION PLANS
7136240040-DV_BLDG 500 MAINT FLR 1
7136240040-V_NOTES
500-A1 BUILDING 500 MAINTENANCE FIRST FLOOR PLAN
7136240040-V_BLDG 500 MAINT FLR 1
500-A2 BUILDING 500 MAINTENANCE ENLARGED PLANS
7136240040-V_NOTES
7136240040-V_BLDG 500 MAINTENANCE ENLARGED LOCATION PLANS
600-A1 BUILDING 600 HAZARDOUS STORAGE PLANS & DETAILS
7136240040-DV_BLDG 600 HAZARD STOR
7136240040-V_BLDG 600 HAZARD STOR
7136240040-V_NOTES
700-A1 BUILDING 700 GUARD POSTS PLANS & DETAILS
7136240040-DV_BLDG GUARD TOWER 1-4
7136240040-V_BLDG GUARD TOWER 1-4
7136240040-V_NOTES
1 HU-D1 HOUSING UNIT 1 (ASPEN) SECOND FLOOR DEMOLITION PLAN
7136240040-DV_BLDG HU 1 FLR 2
7136240040-V_NOTES
1 HU-A1 HOUSING UNIT 1 (ASPEN) SECOND FLOOR PLAN
7136240040-V_BLDG HU 1 FLR 2
1 HU-A2 HOUSING UNIT 1 (ASPEN) ENLARGED PLAN
7136240040-V_BLDG HU 1 FLR 2
7136240040-V_NOTES
2 HU-D1 HOUSING UNIT 2 (BIRCH) SECOND FLOOR DEMOLITION PLAN
7136240040-DV_BLDG HU 2 FLR 2
7136240040-V_NOTES
2 HU-A1 HOUSING UNIT 2 (BIRCH) SECOND FLOOR PLAN
7136240040-DV_BLDG HU 2 FLR 2
2 HU-A2 HOUSING UNIT 2 (BIRCH) ENLARGED PLAN
7136240040-V_BLDG HU 2 FLR 2
7136240040-V_NOTES
3 HU-D1 HOUSING UNIT 3 (CEDAR) SECOND FLOOR DEMOLITION PLAN
7136240040-DV_BLDG HU 3 FLR 2
7136240040-V_NOTES
3 HU-A1 HOUSING UNIT 3 (CEDAR) SECOND FLOOR PLAN
7136240040-V_BLDG HU 3 FLR 2
3 HU-A2 HOUSING UNIT 3 (CEDAR) ENLARGED PLAN
7136240040-V_BLDG HU 3 FLR 2
7136240040-V_NOTES
4 HU-D1 HOUSING UNIT 4 (MAPLE) SECOND FLOOR DEMOLITION PLAN
7136240040-DV_BLDG HU 4 FLR 2
7136240040-V_NOTES
4 HU-A1 HOUSING UNIT 4 (MAPLE) SECOND FLOOR PLAN
7136240040-V_BLDG HU 4 FLR 2
4 HU-A2 HOUSING UNIT 4 (MAPLE) ENLARGED PLAN
7136240040-V_BLDG HU 4 FLR 2
7136240040-V_NOTES
5 HU-D1 HOUSING UNIT 5 (PINE) SECOND FLOOR DEMOLITION PLAN
7136240040-DV_BLDG HU 5 FLR 2
7136240040-V_NOTES
5 HU-A1 HOUSING UNIT 5 (PINE) SECOND FLOORPLAN
7136240040-V_BLDG HU 5 FLR 2
5 HU-A2 HOUSING UNIT 5 (PINE) ENLARGED PLAN
7136240040-V_BLDG HU 5 FLR 2
7136240040-V_NOTES
6 HU-D1 HOUSING UBIT 6 (SPRUCE) SECOND FLOOR DEMOLITION PLAN
7136240040-DV_BLDG HU 6 FLR 2
7136240040-V_NOTES & DETAILS
6 HU-A1 HOUSING UNIT 6 (SPRUCE) SECOND FLOOR PLAN
7136240040-V_BLDG HU 6 FLR 2
6 HU-A2 HOUSING UNIT 6 (SPRUCE) ENLARGED PLANS
7136240040-V_NOTES
7136240040-V_BLDG HU 6 FLR 2
E-001 ELECTRICAL NOTES AND SYMBOLS
100-ED1 BUILDING 100 ADMIN FIRST FLOOR ELECTRICAL DEMOLITION PLAN
7136240040-ELECTRICAL NOTES AND SYMBOLS
100-E1 BUILDING 100 ADMIN FIRST FLOOR ELECTRICAL PLAN
200-ED1 BUILDING 200 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
7136240040-ELECTRICAL NOTES AND SYMBOLS
200-E1 BUILDING 200 ADMIN FIRST FLOOR ELECTRICAL PLAN
600-E1 BUILDING 600 HAZARDOUS STORAGE ELECTRICAL PLANS
7136240040-VE_HAZARDOUS WASTE
7136240040-VE_HAZARDOUS WASTE(2)
7136240040-ELECTRICAL NOTES AND SYMBOLS
700-E1 BUILDING 700 GUARD POSTS ELECTRICAL PLANS
7136240040-ELEC GAURD TOWER 1-4
7136240040-ELEC GAURD TOWER 1-4(2)
7136240040-ELECTRICAL NOTES AND SYMBOLS
1HU-ED1 HOUSING UNIT 1-5 SECOND FLOOR ELECTRICAL DEMOLITION PLAN
7136240040-ELECTRICAL NOTES AND SYMBOLS
1HU-E1 HOUSING UNIT 1-5 SECOND FLOOR ELECTRICAL PLAN
6HU-ED1 HOUSING UNIT 6 (SPRUCE) SECOND FLOOR ELECTRICAL DEMOLITION PLAN
7136240040-ELECTRICAL NOTES AND SYMBOLS

6HU-E1 HOUSING UNIT 6 (SPRUCE) SECOND FLOOR ELECTRICAL PLAN

File details come from the government source that posted it. Updated .