472_25278.RWG_Ionia IT Room Expansion_DTMB-0415 (Advertisment).pdf
PDF 169 KB Posted
- Attached to
- 472/25278. RWG; Ionia C.F. - IT Room Expansion
- Solicitation number
- RFQ 171 270000000032 2
- Issued by
- Michigan
About this file
This is a project advertisement issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division for the IT Room Expansion project at Ionia Correctional Facility located at 1576 Bluewater Highway, Ionia, MI 48846. The scope of work encompasses architectural modifications including removal of existing VCT flooring and lay-in ceiling, CMU wall reconfiguration, concrete floor preparation and sealing, new fire-rated construction, and painting and firestopping; mechanical and fire suppression work including installation of two ceiling-mounted evaporators, two roof-mounted condensing units, hydronic system modifications, removal of wet sprinkler systems, and installation of new dry chemical fire suppression systems; electrical work including UPS unit replacement, lighting upgrades, and new electrical panels; and technology and security buildout including new communication room construction, installation of new racks and cable infrastructure, fiber optic and CAT-6 cabling, and relocation of existing equipment. A mandatory pre-bid walk-through conference is scheduled for Thursday, November 5, 2026, at 10:00 AM local time at the facility. Bids are due on November 18, 2026, at 2:00 PM Eastern time. All contractor/vendor representatives attending the pre-bid conference must submit a Vendor/Contractor LEIN Request five business days prior to the meeting.
Bid responses must be uploaded to SIGMA VSS and include proof of State Project Registration from the Department of Labor and Economic Opportunity. A maximum of two attachments (each less than 25 MB) may be submitted, with one containing bid documents and the other containing Qualified Disabled Veteran information if applicable. Five percent bid security is required. Questions must be submitted via email to Bret Emerson at bids@commtechdesign.com no later than 2:00 PM Eastern on November 11, 2026. Bid documents are available through https://sigma.michigan.gov/webapp/PRDVSS1X1/Advantage4. The PSC/Agency is Commtech Design, Inc., located at 6585 Belding Road NE, Suite B, Rockford, MI 49341, with contact phone 616-863-8136. The NIGP codes associated with this project are 90903, 90977, 91200, and 90783.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0415 (R 4/26)
PROJECT ADVERTISEMENT
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN & CONSTRUCTION DIVISION
This form is required for the advertising of all construction projects. (1984 PA 431)
DTMB FILE NO.
472/25278.RWG
DATE
10/20/2026
ADVERTISEMENT DATE
10/20/2026
BID DUE DATE
November 18, 2026 @ 2:00 p.m. EASTERN time
PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)
IT Room Expansion Ionia Correctional Facility – 1576 Bluewater Hwy, Ionia, MI 48846
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION
A MANDATORY pre-bid Conference will be held at:
Ionia Correctional Facility – 1576 Bluewater Hwy, Ionia, MI 48846 on Thursday November 5, 2026, at 10:00 AM Local Time
Mandatory Yes No
LEIN CHECK (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith & Sharon Frost at email addresses: SmithD76@michigan.gov & FrostS1@michigan.gov .The email “Subject” must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting).
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
DESCRIPTION OF WORK:
• Architectural:
o Work includes removal of existing VCT flooring and lay-in ceiling in Server Room 1-211.
o Paint the newly exposed metal deck in the Server Room to match the Electrical Room.
o Remove the existing CMU wall separating the Server and Electrical room and patch the floor as needed.
o Clean and prep the concrete floor for sealant in Corridor Room 1-208, the Telephone/Data Room 1-210, and the new Server Room 1-211.
o Close off the Electrical Room with new fire rated CMU walls, painted to match existing walls with new fire sealed door.
o Remove and replace the door and hardware for Server Room door 1-211 and add a new fire seal.
o Add new fire seal to existing Corridor Door 1-209.
o Paint all doors and frames enclosing the new Server Room.
o Add firestopping to CMU wall joints to existing walls enclosing the new Server Room 1-211 and the existing walls of the Telephone/Data Room 1-210.
• Mechanical/Fire Suppression:
mailto:SmithD76@michigan.gov mailto:FrostS1@michigan.gov o Work includes providing and installing two new ceiling mounted evaporators, two new roof mounted condensing units, refrigerant piping, and condensate piping.
o Modifications to the existing hydronic system.
o Modifications to fresh air ductwork.
o Removal of existing wet sprinkler system in the IT room.
o Installation of the new dry chemical fire suppression system for new IT room.
o Removing and re-installing existing dry chemical fire suppression system for the telephone room.
• Electrical:
o Disconnecting and removing existing UPS units and replacing with new 40KVA UPS unit for new and future infrastructure.
o Disconnecting and removing existing lighting and provide and install new high lumen light fixtures.
o Providing and installing new UPS and Emergency electrical panels for new equipment and devices.
o Providing and installing new power devices for communications racks.
• Technology & Security:
o Build out new Comm Room
▪ Install New Racks and Cable Ladder as shown
▪ Install Grounding In new Comm Room
▪ Install turtle shell above the new racks. See architect drawings.
o Move existing cables and equipment from existing racks to new racks.
o Provide new fiber cable and splice to existing fiber cable.
o Provide new CAT-6 cables and splice to existing cables.
o Transition all cabling and equipment to the new racks o There are 4 existing racks in comm Room A2 that shall be replaced with new 7’ 4-post racks and installed in the new Comm room A1 as part of this bid.
o There is Wall mount equipment that shall be relocated to the New Racks as part of this Bid o There is one existing rack that houses the camera equipment - Rack A2-2.
▪ A2-2 Camera Rack Work
• Install the new 7’ 4-post rack for the camera equipment in the new Comm Room A1.
• Install the PDU’s for this rack.
• Relocate Singlemode Fiber Optic Cabling and Rack Mount Panels to the new Rack.
• Relocation of all other equipment from existing Camera rack into this rack will be done by others.
o Contractor shall coordinate all work with:
▪ DTMB
▪ Keefe
▪ JPAY
▪ MDOC Radio group
▪ GTL/Viapath
Please NOTE:
• All bid responses require proof of State Project Registration from the Department of Labor and Economic Opportunity.
• Bid responses and bid attachments MUST be uploaded to SIGMA VSS.
• Contractors should only submit a maximum of two (2) attachments (both being less than 25 MB) for bid responses. One attachment is to be bid documents (Bid Summary, Bid Schedule, Bid Bond, Certification forms, Signature Authority, etc.) and if applicable, the other attachment should be Qualified Disabled Veteran (QDV) information (DD214, Proof of 51% Ownership and Proof of Service-Connected Disability)
• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your bid response.
SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the bid response has been uploaded.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov
• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
• You may be asked by our contract specialists to email your bid response. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.
• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
• Bid Responses should not be emailed to the Project Director.
5% BID SECURITY REQUIRED
NIGP CODES: 90903, 90977, 91200, 90783
ACCEPTING QUESTIONS UNTIL:
Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Bret Emerson at bids@commtechdesign.com no later than 2:00 P.M. Eastern on November 11, 2026.
Documents may be obtained from:
https://sigma.michigan.gov/webapp/PRDVSS1X1/Advantage4
PSC/Agency: Commtech Design, Inc.
Address: 6585 Belding Road. NE - Suite B Rockford, MI 49341
Phone: 616-863-8136
Attention: Bret Emerson RCCD. NTS
Email: bids@commtechdesign.com
Approved by:
mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService mailto:bids@commtechdesign.com