472-25259-ABG Kinross Buffer Fence - Project Statement.pdf
PDF 251 KB Posted
- Solicitation number
- RFP-171-250000002559-2
- Issued by
- Chippewa County, Michigan
About this file
This is a Project Statement from the State of Michigan's Department of Technology, Management and Budget (DTMB) for the Kinross Correctional Facility located in Kincheloe, Michigan. The project involves replacing the existing entrance gate system with a new 32'-0" wide gate and installing additional bollards, along with constructing a new buffer fence extending from the southwest corner of the campus around the east side to the existing parking lot. The Professional Services Contractor (PSC) is required to provide Phase 500 Final Design and Phase 600/700 Construction Administration services, including field investigation, documentation of existing conditions, development of plans and specifications, plan review submission, pre-bid walkthrough, and construction administration. The mandatory walk-through inspection is scheduled for Monday, June 30, 2025, at 12:00 pm, and proposal responses are due on Thursday, July 17, 2025.
The project aims to have investigation services and design completed by Summer 2025, with bidding in late summer and construction in Fall 2025. The PSC proposal must comply with State of Michigan DTMB requirements, include LARA plan review and permit applications, utilize current state contract document formats, provide construction cost estimates, and submit detailed design and construction scheduling. The proposal must be uploaded to SIGMA VSS and include a breakdown of anticipated hours and billing rates for each design phase. The project will adhere to all relevant federal and state agency codes, standards, regulations, and workers' safety rules, with reference to agencies such as EPA, OSHA, DOT, DCH, EGLE, DNR, and MIOSHA.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0427 (R 10/22)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration
Design and Construction Division 3111 West St. Joseph
Street Lansing, Michigan 48909
FILE NUMBER
472/25259.ABG
PROPOSAL DUE DATE
Thursday, July 17, 2025
CLIENT AGENCY
Michigan Department of Corrections
PROJECT NAME AND LOCATION
Kinross Correctional Facility – Buffer Fence Extension and Entrance Gate Upgrade PROJECT ADDRESS (if applicable) 4533 W Industrial Park Dr, Kincheloe, MI 49788
CLIENT AGENCY CONTACT
Richard White, whiter12@michigan.gov
TELEPHONE NUMBER
517-242-3599
DTMB - DCD PROJECT DIRECTOR
Alan Goschka, goschkaa@michigan.gov
TELEPHONE NUMBER
517-388-3489
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
Monday, June 30, 2025 at 12:00pm at the Kinross Correctional Facility, 4533 W Industrial Park Dr, Kincheloe, MI 49788. Meeting at the main entrance at the Administration Building.
MANDATORY (Check box if Mandatory)
LEIN CHECK (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith & Sharon Frost at email addresses: SmithD76@michigan.gov & FrostS1@michigan.gov .The email “Subject” must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting).
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
PROJECT DESCRIPTION/SERVICES REQUESTED:
The Kinross Correctional Facility is replacing the existing entrance gate system with a new wider gate and additional bollards along with installing a new buffer fence from the southwest corner of the campus around the east side and up to the existing parking lot. The new entrance gate shall have a clear post to post width of 32’-0” and bollards shall be designed on either side of the entrance gate as required to deter any vehicle access.
The Professional Services Contractor (PSC) is to provide a proposal for Phase 500 Final Design and Phase 600/700 Construction Administration services to field investigate and document the existing conditions at the entrance gate and along the proposed buffer fence route so that all conditions are depicted in the design documents. Develop plans/specifications to replace the entrance gate and add the required buffer fence, submission for plan review, pre-bid walkthrough and evaluation recommendation along with construction administration services.
mailto:whiter12@michigan.gov mailto:goschkaa@michigan.gov mailto:SmithD76@michigan.gov mailto:FrostS1@michigan.gov
The PSC Proposal (Technical and Cost) for all required Professional Architectural and Engineering Services shall be in compliance with the State of Michigan, Department of Technology Management and Budget DTMB Project Statement Form (DMB427), DTMB ISID Billable Rate Professional Services Contract and the DTMB 430 RFP Billable Rate Form (DMB 430) and DTMB Facilities Administration, Design and Construction Division policies and procedures for the development of Contract Bid Documents and Construction Administration. A proposed schedule for design, bidding and construction must be included.
The cost portion shall be submitted in DTMB410 format.
THE PSC PROPOSAL SHALL INCLUDE:
1. All required LARA plan review, permit application preparation, permitting fees, reimbursements, and approvals.
2. Contract Documents utilizing the current State of Michigan, DTMB, Facilities and Business Services Administration, Design and Construction Division and the Master Spec format.
3. Clear documentation of the number of meetings proposed during the design and construction administration phases and indicate whether the meetings are proposed to be on-site, face to face, by telephone, or in specific electronic format.
4. Providing 50% and Final (100%) estimates of construction costs for development plans.
5. Design and construction scheduling. Provide a proposed PSC design schedule. The Agency desires to have the design completed as soon as possible.
6. Submittal of 50% and 90% contract documents for owner review, posting on SIGMA-VSS, Best
Value Bid Evaluation, PSC recommendation of Contract Award, and Contract Administration.
7. Under the Cost Proposal, Section III-2-B Fee with Anticipated Hours and Billing Rate – PSC to breakdown and provide a table for each design phase – Phase 500, Phase 600 and Phase 700.
The PSC shall provide a biweekly progress summary email to the project team, briefly documenting the prior 2-week’s progress by the PSC and display the initial project schedule and current schedule status.
The PSC shall be required to maintain a complete project file of all project documentation including, but not limited to, contract documents, all correspondence, all e-mails, all RFI’s and answers, Field Orders, and telephone communication logs. The project files shall be maintained in an electronic file format and delivered to the DTMB Design and Construction Division with the PSC’s final Payment Request.
Reference Documents
Attachment A – Site Maps
Please NOTE:
• Proposal responses MUST be uploaded to SIGMA VSS. Please enter the total cost for all phases as the bid amount.
• Firms are encouraged to combine their technical and cost proposals into one (1) attachment for proposal submission.
• Please remember that attachments can be no larger than 30mb.
• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your proposal response.
SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the proposal response has been uploaded.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov
• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
• You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.
mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov
• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
• Responses should not be emailed to the Project Director.
NIGP CODES
90607, 90638, 90656, 90678, 92517, 92533
DESIRED SCHEDULE OF WORK
Investigation services and design completed Summer 2025, bidding late summer 2025, with construction Fall of 2025
ACCEPTING RFP QUESTIONS UNTIL:
Please do not submit online questions via VSS. ALL questions should be emailed to Alan Goschka at goschkaa@michigan.gov address no later than 2:00 p.m., Eastern on Wednesday, July 9, 2025.
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431) Attachment(s) mailto:goschkaa@michigan.gov goschkaa Text Box Attachment A goschkaa Text Box File 472/25259.ABG Kinross Correctional Facility Buffer Fence Extension and Entrance Gate Upgrade goschkaa Callout Kinross Correctional Facility Campus
GoschkaA Line
GoschkaA Line
GoschkaA Line
GoschkaA Line
GoschkaA Callout Approximate location of Buffer Fence extension
GoschkaA Callout New Entrance Gate location